CN102969711A - Line loss control system - Google Patents

Line loss control system Download PDF

Info

Publication number
CN102969711A
CN102969711A CN 201210478523 CN201210478523A CN102969711A CN 102969711 A CN102969711 A CN 102969711A CN 201210478523 CN201210478523 CN 201210478523 CN 201210478523 A CN201210478523 A CN 201210478523A CN 102969711 A CN102969711 A CN 102969711A
Authority
CN
China
Prior art keywords
data
line loss
loss
line
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210478523
Other languages
Chinese (zh)
Inventor
王文林
唐龙江
胡海琴
聂清海
程金松
朱向立
夏培峰
王阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201210478523 priority Critical patent/CN102969711A/en
Publication of CN102969711A publication Critical patent/CN102969711A/en
Priority to CN201310493325.3A priority patent/CN103501003A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention belongs to the field of power systems and automation, and particularly relates to a line loss control system. The system comprises a data acquisition unit, a processing control unit and an output display unit, wherein the acquisition unit is used for acquiring basic data for line loss computation, and the basic data comprise device parameter information, device state data, measured data, state estimation data and electric quantity data; the processing control unit is used for receiving the basic data acquired by the acquisition unit, and carrying out online computation and result analysis on load tests, line loss, network loss and the like; and the output display unit is used for receiving and displaying computation and result data of the processing control unit. The line loss control system can be used for implementing multi-dimensional network loss management, normalized load tests, and multi-dimensional online statistical line loss rate and theoretical line loss rate analyzing and monitoring reflecting the effects of changes of a grid framework, a load level, an operation mode and the like on electric transmission and transformation equipment and line los in time, and provide data support for economic operation and management of a power grid.

Description

The line loss control system
Technical field
The invention belongs to electric power system and automatic field, be specifically related to a kind of line loss control system.
Background technology
The electrical network electric energy loss is calculated and is comprised that the statistical line losses rate is calculated and the Molded Line loss rate is calculated.The statistical line losses rate is each net, the province and district city electric company line loss rate that each supplies to the electrical network in institute's compass of competency, electricity sales amount gauge table statistics draws; The Molded Line loss rate line loss rate that to be each net, province and district district electric company draw according to device parameter, load trend, property calculation affiliated defeated, change, controller switching equipment.Electrical network electric energy loss rate (claiming again line loss rate) is important economic and technical norms of concentrated expression Study on Power Grid Planning, production run and management level.
Domestic have the minority electric power enterprise to carry out the research of electrical network electric energy loss online evaluation, set up the powernet electric energy loss method of calculating and analysis based on automation system for the power network dispatching and Electric Energy Acquisition System, but can't carry out slitless connection with existing dispatching patcher, computational methods are single, do not carry out the various dimensions of multiple computational methods relatively, device parameter collection point manual maintenance amount is large, data pick-up is untimely, not carrying out data check can cause result of calculation inaccurate, and can not carry out in line computation, can not in time reflect the situation of change of electrical network electric energy loss.And can not normality carry out area power grid load measurement and the theoretical evaluation work of line loss, can not satisfy the requirement that the economy operation of power grid management becomes more meticulous.
Summary of the invention
The purpose of this invention is to provide a kind of line loss control system that is applied to network system, this system by and have the slitless connection of dispatching patcher now, realize the network loss management of various dimensions, the load measurement of normalization, Online statistics line loss rate and the computational analysis of Molded Line loss rate and the monitoring of various dimensions, reflected that timely Net Frame of Electric Network, load level, operational mode etc. change the impact on electrical network power transmission and transforming equipment and line loss, for the economy operation of power grid management provides Data support.
For achieving the above object, the technical solution used in the present invention is: a kind of line loss control system is characterized in that: system comprises data acquisition unit, processing and control element (PCE) and output display unit, wherein
Collecting unit: gather the basic data that is used for line loss calculating, basic data comprises device parameter information, device status data and measured data, Data of State Estimation and electric quantity data;
Processing and control element (PCE): receive the basic data that collecting unit gathers, and to load measurement, line loss, network loss etc. are carried out in line computation and interpretation of result;
Output display unit: accept calculating and result data and the demonstration of processing and control element (PCE).
As shown from the above technical solution, the line loss control system comprises line loss based on the various dimensions computation model in line computation and monitoring, and described line loss based on the various dimensions computation model is used for Real Time Monitoring to line loss rate, loss on transmission rate and the Network Loss Rate of the online computational analysis of various dimensions of line loss, loss on transmission and the network loss of electrical network and electrical network in line computation and monitoring.Multiple load measurement analysis of calculation models, described multiple load measurement analysis of calculation models comprises regional load, factory station and transformer minimax load, transformer capacity-load ratio, regional transformer capacity-load ratio, line load rate, voltage levvl and power supply situation.Basic management, described basic management is mainly used in the management to grid equipment parameter and collection point, by the parsing to EMS system grid topology data, realizes the slitless connection with the EMS system.After adopting technique scheme, carry out the online computational analysis of line loss by rms current method, power integral method, state estimation, electric quantity acquisition, the situation of change that can in time reflect the electrical network electric energy loss, utilize the computational methods of various dimensions to carry out the line loss computational analysis, avoided the inaccurate of single algorithm line loss data.And consider that the factors such as temperature, corona, device type and Electric Power Network Planning are on the impact of result of calculation.Can carry out to line loss, loss on transmission the analytic statistics of " various dimensions management ", automatically generate the line loss analyzing report.The multiple result of calculation analysis of load measurement can reflect the present situation of electrical network, for reasonably adjusting power system operating mode, provides Data support.Basic management can be carried out unified version management and calculation of parameter to the grid equipment parameter, by with the close coupling of EMS system, make the collection point automatic adaptation, improved operating efficiency.
Description of drawings
Fig. 1 is principle of the present invention, FB(flow block).
Embodiment
A kind of line loss control system is characterized in that: system comprises data acquisition unit, processing and control element (PCE) and output display unit, wherein
Collecting unit: gather the basic data that is used for line loss calculating, basic data comprises device parameter information, device status data and measured data, Data of State Estimation and electric quantity data;
Processing and control element (PCE): receive the basic data that collecting unit gathers, and to load measurement, line loss, network loss etc. are carried out in line computation and interpretation of result;
Output display unit: accept calculating and result data and the demonstration of processing and control element (PCE).
Described device parameter information is selected manual typing or peripheral system access;
Described device status data and measured data are carried out the search of the whole network automated topology and are obtained in the EMS system;
Data of State Estimation and electric quantity data are provided by EMS system and electric weight system respectively;
Above-mentioned basic data is carried out data correction by the scheduler task timing extraction of formulation and to the flaw data.
Described load measurement comprises transformer capacity-load ratio, line load rate and voltage levvl;
Described line loss is calculated and is comprised employing mean square root method, power integral method enforcement state estimation and electric quantity acquisition;
Described network loss is calculated and is comprised critical point definition, network loss form, network loss curve and network loss tabulate statistics;
Described data analysis comprises on-line monitoring, line loss comparison, line loss statement analysis, load measurement report analysis.
The line loss control system comprises line loss calculating, according to certain data collection cycle electric network composition is carried out topology and obtain measured data and grid equipment detail parameters from peripheral support system (as: EMS system etc.), carry out the theoretical calculating of line loss (computational methods comprise: the calculating of rms current method and power integral etc.) and multiple line loss result and compare analysis.Load measurement carries out load measurement according to the image data of collection point and calculates (content of calculating comprises: transformer capacity-load ratio, line load rate etc.).The network loss management according to the result that theory wire loss calculates and statistical line losses calculates, counts respectively the electric weight of each collection point, calculates line loss, loss on transmission and electricity volume, thereby calculates Network Loss Rate and multiple network loss result is compared analysis.Basic management, method is carried out version management to the grid equipment detail parameters, guarantees that the equipment detail parameters that participates in calculating all is up-to-date.Analysis management, the line loss rate of method Real Time Monitoring circuit, and report to the police to line loss rate is out-of-limit.
Among the present invention, the root mean square calculation method during described line loss is calculated is to carry out online computational analysis every day, can utilize the result of calculation of every day to carry out monthly or annual statistical analysis; Load measurement can carry out once to every day in normalization simultaneously, and utilizes the result of calculation of load measurement every day to carry out monthly or annual statistical analysis; Final generative theory line loss report and load measurement report.Wherein the calculating of root mean square theory wire loss and load measurement calculate and can and formulate timer-triggered scheduler task dual mode and realize with artificial manual calculations.
Its implementation side's flow process is: after method is used, enter the line loss computing module, check respectively that according to the difference of computational methods line loss result of calculation also can carry out the comprehensive comparative analysis of many algorithms and compare analysis according to network loss and Network Loss Rate that multiple line loss result calculates algorithms of different.Enter the load measurement module, can check the result of calculation of various computation models.When the grid equipment parameter in the basic management is changed, can manually recomputate theory wire loss and load measurement, form at last theory wire loss report and load measurement report.
Be described as follows below in conjunction with the gatherer process of the data acquisition flow among Fig. 1 to basic data:
1, whether differentiates first for manually from keyboard typing electrical network parameter, such as resistance, reactance value.
If 2 "No" are then from other existing electrical network parameter, as pouring in batches the parameter of electrical network in the system of resistance, reactance value into.
If 3 "Yes" are then from manually from keyboard typing electrical network parameter, such as resistance, reactance value.
4, system carries out searching of topological relation (that is: whether equipment and equipment room being linked together) automatically.
5, from EMS (EMS), the voltage of equipment, the equivalent size of electric current are namely finished the full mesh topology search.
6, system carries out data relatively (system is value, the numerical value in the coulomb collection system, the equipment actual measured value of estimation automatically), and rejects bad data, generates available data.
7, available data have been arranged after, the basis of data analysis just is provided for the system-computed platform, can carry out the data analysis of 18 projects of 5 classifications and control line loss work.

Claims (3)

1. line loss control system, it is characterized in that: system comprises data acquisition unit, processing and control element (PCE) and output display unit, wherein
Collecting unit: gather the basic data that is used for line loss calculating, basic data comprises device parameter information, device status data and measured data, Data of State Estimation and electric quantity data;
Processing and control element (PCE): receive the basic data that collecting unit gathers, and to load measurement, line loss, network loss etc. are carried out in line computation and interpretation of result;
Output display unit: accept calculating and result data and the demonstration of processing and control element (PCE).
2. line loss control system according to claim 1 is characterized in that:
Described device parameter information is selected manual typing or peripheral system access;
Described device status data and measured data are carried out the search of the whole network automated topology and are obtained in the EMS system;
Data of State Estimation and electric quantity data are provided by EMS system and electric weight system respectively;
Above-mentioned basic data is carried out data correction by the scheduler task timing extraction of formulation and to the flaw data.
3. line loss control system according to claim 1 is characterized in that:
Described load measurement comprises transformer capacity-load ratio, line load rate and voltage levvl;
Described line loss is calculated and is comprised employing mean square root method, power integral method enforcement state estimation and electric quantity acquisition;
Described network loss is calculated and is comprised critical point definition, network loss form, network loss curve and network loss tabulate statistics;
Described data analysis comprises on-line monitoring, line loss comparison, line loss statement analysis, load measurement report analysis.
CN 201210478523 2012-11-22 2012-11-22 Line loss control system Pending CN102969711A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN 201210478523 CN102969711A (en) 2012-11-22 2012-11-22 Line loss control system
CN201310493325.3A CN103501003A (en) 2012-11-22 2013-10-18 Line loss control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210478523 CN102969711A (en) 2012-11-22 2012-11-22 Line loss control system

Publications (1)

Publication Number Publication Date
CN102969711A true CN102969711A (en) 2013-03-13

Family

ID=47799672

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 201210478523 Pending CN102969711A (en) 2012-11-22 2012-11-22 Line loss control system
CN201310493325.3A Pending CN103501003A (en) 2012-11-22 2013-10-18 Line loss control system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201310493325.3A Pending CN103501003A (en) 2012-11-22 2013-10-18 Line loss control system

Country Status (1)

Country Link
CN (2) CN102969711A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532136A (en) * 2013-10-16 2014-01-22 国网安徽省电力公司 On-line computation and aid decision making system and on-line computation and aid decision making method for province-prefecture-country integrated network loss
US20160253768A1 (en) * 2013-12-18 2016-09-01 State Grid Corporation Of China Method for determining integrated network loss rate in uhv ac cross-regional electricity trading
CN108009940A (en) * 2017-11-10 2018-05-08 国网浙江省电力公司电力科学研究院 Same period line loss exception analysis method and system based on Tableau
CN110867861A (en) * 2019-12-04 2020-03-06 广西大学 Method for accurately delimiting theoretical line loss of power distribution network

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210001A (en) * 2019-05-14 2019-09-06 国电南瑞科技股份有限公司 A kind of layering and zoning Network Loss Rate statistical method based on EMS system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714234B (en) * 2009-10-23 2012-09-26 西北电网有限公司 Grid line loss monitoring and analyzing system
CN102455707A (en) * 2010-10-21 2012-05-16 贵州航天控制技术有限公司 Ship attitude sensor based on infinite impulse response digital filtering technology
CN102074954B (en) * 2010-12-20 2014-02-19 重庆电力科学试验研究院 Comprehensive energy-conservation evaluation and decision-making method for urban and rural distribution network
CN102254256A (en) * 2011-07-21 2011-11-23 福建省电力有限公司福州电业局 Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof
CN102567645B (en) * 2012-01-10 2014-10-22 河北省电力公司 Method for counting equipment of power grid and computing transmission losses on basis of on-line theoretical transmission loss computation
CN102722851B (en) * 2012-06-08 2015-11-18 上海市电力公司 A kind of majority based on intelligent power grid technology is according to interface synthesis line loss management system of local electric network

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532136A (en) * 2013-10-16 2014-01-22 国网安徽省电力公司 On-line computation and aid decision making system and on-line computation and aid decision making method for province-prefecture-country integrated network loss
US20160253768A1 (en) * 2013-12-18 2016-09-01 State Grid Corporation Of China Method for determining integrated network loss rate in uhv ac cross-regional electricity trading
US10580096B2 (en) * 2013-12-18 2020-03-03 State Grid Corporation Of China Economic & Technology Research Method for determining integrated network loss rate in UHV AC cross-regional electricity trading
CN108009940A (en) * 2017-11-10 2018-05-08 国网浙江省电力公司电力科学研究院 Same period line loss exception analysis method and system based on Tableau
CN110867861A (en) * 2019-12-04 2020-03-06 广西大学 Method for accurately delimiting theoretical line loss of power distribution network

Also Published As

Publication number Publication date
CN103501003A (en) 2014-01-08

Similar Documents

Publication Publication Date Title
CN103872782B (en) A kind of power quality data integrated service system
CN103955777B (en) Photovoltaic generation accesses power distribution network conceptual design and analysis and evaluation accessory system
CN102184209B (en) Simulation data accessing method based on power grid CIM (Common Information Model) interface
CN109657912B (en) Visual power grid risk management and control method and system
CN104239059B (en) Intelligence based on full model matches somebody with somebody the construction method of electricity consumption unified information support platform
CN201789341U (en) Monitoring system of intelligent micro-grid
CN104219315A (en) Operation monitoring system for electricity consumption information acquisition system and monitoring method thereof
CN104252649A (en) Regional wind power output prediction method based on correlation between multiple wind power plants
CN102969711A (en) Line loss control system
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN102129060A (en) Electric energy meter reliability detection method and device
CN102930398A (en) Intelligent checking method and system for relay protection setting values based on extensible markup language (XML) technology
CN102682197A (en) Monitoring method and monitoring device for predicating change trend of energy consumption of single equipment in real time
CN101923685A (en) System and method for deciding power shedding load based on line breaking fault rate prediction
CN110019098A (en) Electrical energy measurement big data analysis system based on Hadoop frame
CN103532136A (en) On-line computation and aid decision making system and on-line computation and aid decision making method for province-prefecture-country integrated network loss
CN103632311A (en) Fault examining system and method for power grid operation
CN103944265A (en) Interactive and smart electric energy distribution and consumption monitoring device and method
CN110879543A (en) Real-time hybrid simulation platform of electric power system
CN102856896A (en) On-line analytical method for direct-current transmission loss
CN108875103B (en) Power grid online simulation system and method
WO2023086017A2 (en) Method and apparatus for determining state of phovoltaic power station, device, and readable storage medium
CN117374978B (en) Grid-connected scheduling management method and system constructed by combining knowledge graph
CN113469488B (en) Online diagnosis and analysis system for topological structure of power distribution network equipment
CN102426623A (en) Automatic failure fitting modeling method for power load modeling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130313