CN102966799A - Antirust aluminum alloy supporting frame in cable trench - Google Patents
Antirust aluminum alloy supporting frame in cable trench Download PDFInfo
- Publication number
- CN102966799A CN102966799A CN201210462137XA CN201210462137A CN102966799A CN 102966799 A CN102966799 A CN 102966799A CN 201210462137X A CN201210462137X A CN 201210462137XA CN 201210462137 A CN201210462137 A CN 201210462137A CN 102966799 A CN102966799 A CN 102966799A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- supporting frame
- cable trench
- alloy supporting
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention provides an antirust aluminum alloy supporting frame in a cable trench, wherein the antirust aluminum alloy supporting frame in the cable trench consists of an aluminum alloy supporting frame main body and aluminum alloy supporting frame branches; the aluminum alloy supporting frame main body and the aluminum alloy supporting frame branches are connected by stainless steel bolts; the supporting frame main body is fixed with the wall of the cable trench or a tunnel through the utilization of expansion bolts; and bundling tapes for hoping aluminum alloy cables are arranged on the aluminum alloy supporting frame branches. In such a way, during the erection of the cables in the cable trench, the erection time is short, the workload is low, no rusting occurs and the construction progress is sped up.
Description
Technical field
The present invention relates to power transmission cable erection auxiliary device technical field, be specifically related to a kind of cable trench rust-preventing aluminum alloy carriage.
Background technique
At present, setting up generally of power transmission cable is built into step with angle steel welding cross bar or with cement in the cable trench, because the cross bar of angle steel welding gets rusty in the water erosion of cable trench back warp, the cable step that cement is built into, in the cable trench, although can not get rusty, workload is large, time is long, affects the duration.
Summary of the invention
Technical problem to be solved by this invention provides a kind of cable trench rust-preventing aluminum alloy carriage.
For achieving the above object, following technological scheme is adopted in the invention:
A kind of cable trench rust-preventing aluminum alloy carriage, formed by aluminum alloy bracket main body and aluminum alloy carriage support body, connect by stainless steel bolt, bracket main body is fixed with EXPANSION ANCHOR BOLTS and cable trench or tunnel wall, is provided with the band of anchor ear aluminium alloy electric cable on the aluminum alloy carriage support body.
Because adopt aforesaid technological scheme, the invention has following superiority:
A kind of cable trench rust-preventing aluminum alloy carriage sets up cable in the cable trench, the time of setting up is short, and workload is little, can not get rusty, and accelerate the construction period.
Description of drawings
Fig. 1 is structural representation of the present invention;
Among the figure: 1, aluminum alloy bracket main body; 2, aluminum alloy carriage support body; 3, stainless steel bolt; 4, band.
Embodiment
In conjunction with Fig. 1, a kind of cable trench rust-preventing aluminum alloy carriage, formed by aluminum alloy bracket main body 1 and aluminum alloy carriage support body 2, connect by stainless steel bolt 3, aluminum alloy bracket main body 1 by EXPANSION ANCHOR BOLTS 3 fixing with cable trench or tunnel wall on, be provided with the band 4 of anchor ear elastic cable paper on the aluminum alloy carriage support body 2.
During use, with aluminum alloy bracket main body 1 by EXPANSION ANCHOR BOLTS 3 fixing with cable trench or tunnel wall on, again aluminum alloy carriage support body 2 is connected on the aluminum alloy bracket main body 1 by stainless steel bolt 3, then with elastic cable paper with band 4 anchor ears.
Claims (1)
1. it is characterized in that: a kind of cable trench rust-preventing aluminum alloy carriage, formed by aluminum alloy bracket main body and aluminum alloy carriage support body, connect by stainless steel bolt, bracket main body is fixed with EXPANSION ANCHOR BOLTS and cable trench or tunnel wall, is provided with the band of anchor ear aluminium alloy electric cable on the aluminum alloy carriage support body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210462137XA CN102966799A (en) | 2012-11-16 | 2012-11-16 | Antirust aluminum alloy supporting frame in cable trench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210462137XA CN102966799A (en) | 2012-11-16 | 2012-11-16 | Antirust aluminum alloy supporting frame in cable trench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102966799A true CN102966799A (en) | 2013-03-13 |
Family
ID=47797135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210462137XA Pending CN102966799A (en) | 2012-11-16 | 2012-11-16 | Antirust aluminum alloy supporting frame in cable trench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102966799A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789549Y (en) * | 2005-04-25 | 2006-06-21 | 孙坚伟 | Assembling support |
CN2806930Y (en) * | 2005-08-03 | 2006-08-16 | 上海电力线路器材有限公司 | Arc support for tunnel electric cable |
CN200973001Y (en) * | 2006-09-04 | 2007-11-07 | 广州市广延机电工程有限公司 | Mounting cable support |
CN201487388U (en) * | 2009-08-06 | 2010-05-26 | 齐丹 | Bracket of cable channel |
US20110062292A1 (en) * | 2009-09-14 | 2011-03-17 | Mccoy Donald P | Non-metallic support stanchion |
CN102684130A (en) * | 2012-05-17 | 2012-09-19 | 浙江泰昌实业有限公司 | Self-supporting type square tunnel combining support for adjustable cable tunnel |
CN203202420U (en) * | 2012-11-16 | 2013-09-18 | 新安县电业公司 | Rust-proof aluminum alloy bracket for cable trenches |
-
2012
- 2012-11-16 CN CN201210462137XA patent/CN102966799A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789549Y (en) * | 2005-04-25 | 2006-06-21 | 孙坚伟 | Assembling support |
CN2806930Y (en) * | 2005-08-03 | 2006-08-16 | 上海电力线路器材有限公司 | Arc support for tunnel electric cable |
CN200973001Y (en) * | 2006-09-04 | 2007-11-07 | 广州市广延机电工程有限公司 | Mounting cable support |
CN201487388U (en) * | 2009-08-06 | 2010-05-26 | 齐丹 | Bracket of cable channel |
US20110062292A1 (en) * | 2009-09-14 | 2011-03-17 | Mccoy Donald P | Non-metallic support stanchion |
CN102684130A (en) * | 2012-05-17 | 2012-09-19 | 浙江泰昌实业有限公司 | Self-supporting type square tunnel combining support for adjustable cable tunnel |
CN203202420U (en) * | 2012-11-16 | 2013-09-18 | 新安县电业公司 | Rust-proof aluminum alloy bracket for cable trenches |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967796B (en) | Method for arranging parallel steel wire stay cable | |
CN204651649U (en) | Portable grounding wire device | |
CN203202420U (en) | Rust-proof aluminum alloy bracket for cable trenches | |
CN102966799A (en) | Antirust aluminum alloy supporting frame in cable trench | |
CN106193279B (en) | Time building method of main structure wall prestressed structure and main structure wall | |
CN202467623U (en) | Novel detachable climbing ladder | |
CN204179563U (en) | The high tower pulley block of aluminium twisted wire with carbon fiber composite core | |
CN204809813U (en) | Angle steel tower high tension cable fixed bolster | |
CN203161459U (en) | Fixing device used for fixing wind power generator tower barrel with platform | |
CN202353149U (en) | Stay rod crossarm | |
CN204418778U (en) | The fixing arm-tie of steel tower | |
CN202746487U (en) | Protective fastening clamp for steel wire rope of power transmission line | |
CN201626778U (en) | Sky anchor in grotto | |
CN203947842U (en) | Push rod fastening devices | |
CN205841983U (en) | Combined pipeline support | |
CN203394406U (en) | Horizontal directional drilling emergency rescue device | |
CN205080856U (en) | Iron tower number plate fixing device | |
CN204304366U (en) | Novel angle iron tap cable fixes cuff | |
CN203547101U (en) | Screw bolt tool type overhanging scaffold | |
CN204156462U (en) | A kind of multiline combination reinforced strain clamp | |
CN203839894U (en) | Power transmission line dedicated vibration-proof hammer | |
CN208310841U (en) | Monoblock type for the installation of contact network in tunnel davit is grounded conduit | |
CN202068125U (en) | Insulating mobile type spanning rack | |
CN202559822U (en) | Buffer | |
CN218371047U (en) | Auxiliary device for retracting anchor cable steel strand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130313 |