CN102966169B - Automatic baffle of foundation ditch - Google Patents
Automatic baffle of foundation ditch Download PDFInfo
- Publication number
- CN102966169B CN102966169B CN201210534262.7A CN201210534262A CN102966169B CN 102966169 B CN102966169 B CN 102966169B CN 201210534262 A CN201210534262 A CN 201210534262A CN 102966169 B CN102966169 B CN 102966169B
- Authority
- CN
- China
- Prior art keywords
- panel
- fixed
- vertical
- compoboard
- foundation trench
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000005755 formation reactions Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 15
- 239000000203 mixtures Substances 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000000034 methods Methods 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 11
- 239000002689 soil Substances 0.000 description 8
- 230000000414 obstructive Effects 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 238000007599 discharging Methods 0.000 description 4
- 230000036536 Cave Effects 0.000 description 2
- 210000001331 Nose Anatomy 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000010410 layers Substances 0.000 description 2
- 239000000463 materials Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 235000014121 butter Nutrition 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000006243 chemical reactions Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000011248 coating agents Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000010586 diagrams Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 239000011514 iron Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000011499 joint compounds Substances 0.000 description 1
- 230000000051 modifying Effects 0.000 description 1
- 230000001681 protective Effects 0.000 description 1
Abstract
Description
Technical field
The present invention relates to the working a kind of foundation trench automatic damper of urban discharging pipeline.
Background technology
Urban discharging pipeline construction has following characteristics conventionally: a narrow field, and excavation foundation trench does not generally possess the slope of putting condition, and big machinery is difficult to enter place; B pipe diameter is little, and excavation foundation trench is narrow; C excavation foundation trench is shallow; D obstruction is many, and irregular; E construction is simple, and fltting speed is very fast.Therefore,, when foundation trench excavation is below groundwater table and while there is the weak soil place that drift sand stream soil easily occurs and cave in, often need foundation trench Tu Bi to carry out supporting.
Conventionally the support pattern adopting has: put slope, baffle plate, Gravity Retaining Wall, outrigger base piling wall, sheet pile joist anchor and draw several supporting and protection structure such as (supports).Due to municipal construction condition, only have baffle plate and steel sheet pile feasible, but that steel sheet pile have construction machinery volume is large, be difficult to march into the arena, and the high feature of cost; Therefore not the engineering of particular importance, generally adopt baffle arrangement more.Combination baffle structure closure is poor, and time-consuming taking a lot of work, and speed of application is slower.
Summary of the invention
For above-mentioned situation, for overcoming prior art defect, the present invention's object is just to provide a kind of foundation trench automatic damper, and in the time of can effectively solving urban discharging pipeline construction supporting, supporting and protection structure cost is high, time-consuming taking a lot of work, the problem that speed of application is slow.
The technical scheme that the present invention solves is, comprise panel, crossbeam and double lead-screw, the plug-in formation baffle plate of compoboard on panel He Qi top, on baffle plate, there is crossbeam, on panel, there is the vertical beam being connected with crossbeam, the two ends of double lead-screw are connected between two crossbeams and vertical beam on baffle plate, on vertical beam, be fixed with and be placed in two gripper shoes between panel right-hand member, the right side of gripper shoe is close to be fixed with and is placed in two dividing plates between panel, on the left side wall of gripper shoe, be fixed with propulsion plant, the left end of propulsion plant leans in pipeline opening.
Automatic damper of the present invention is simple in structure, manufactures handling ease, and cost is low, volume is little, can Assembling, meet the condition in avenue construction, meet the feature of the fast transfer of pipeline construction, and combine easy for installation, flexibly, while meet meeting obstruction, adjust position.
Accompanying drawing explanation
Fig. 1 is structural front view of the present invention.
Fig. 2 is that the A-A of Fig. 1 of the present invention is to sectional view.
Fig. 3 be Fig. 1 of the present invention B-B to sectional view.
Fig. 4 is the annexation schematic diagram of hydraulic cylinder of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is elaborated.
By Fig. 1-Fig. 4, provided, the present invention includes panel, crossbeam and double lead-screw, the plug-in formation baffle plate of compoboard 2 on panel 1 He Qi top, on baffle plate, there is crossbeam 3, on panel, there is the vertical beam 4 being connected with crossbeam, the two ends of double lead-screw 5 are connected between two crossbeams and vertical beam on baffle plate, on vertical beam, be fixed with and be placed in two gripper shoes 6 between panel right-hand member, the right side of gripper shoe is close to be fixed with and is placed in two dividing plates 7 between panel, on the left side wall of gripper shoe, be fixed with propulsion plant, the left end of propulsion plant leans in pipeline opening.
Described propulsion plant is comprised of backing plate, protection sleeve, hydraulic cylinder and hydraulic pump, hydraulic cylinder 8 is connected with hydraulic pump, hydraulic cylinder one end is fixed in gripper shoe, on another movable end, be fixed with backing plate 9, on the left surface of backing plate, there is stiffening girder 10, there is the protection sleeve 11 being connected as a single entity in the left side of stiffening girder, and protection sleeve puts in pipeline opening, and stiffening girder withstands on pipeline opening periphery, the described thick 3mm of panel 1, inside is evenly equipped with a plurality of first vertical stiffening rib of spacing 250mm, there is thickening plate 12 lower end of described compoboard 2, and thickening plate is inserted in the inserting groove of panel, described thickening plate 12 is the steel plate that 20mm is thick, described crossbeam 3 and gripper shoe 6 are all to be made by ' work ' shaped steel, described compoboard 2 is to be arranged on same straight line and to be formed by least 3 above rectangle plate bodys, is evenly equipped with a plurality of second vertical stiffening rib 14 of spacing 250mm in compoboard, the thickness of described compoboard 2 is 3mm, is highly 2.0-2.5m, described crossbeam 3 has 3, be placed in respectively the lower end of panel, the upper end of compoboard, junction between panel and compoboard, vertical beam has 2, be placed in respectively left end and the right-hand member of panel, the vertical beam of right-hand member is fixed on the panel on compoboard right side, between the vertical beam top of left end and the crossbeam right-hand member of panel lower end, be connected with acclivitous cant beam 17, the left end of cant beam is connected with whippletree 15 through double lead-screw, whippletree is fixed on the left end of panel, the left end of whippletree is connected with slash 16 upper end, the lower end of slash is tilted to the right and is fixed on the crossbeam left end of panel bottom, the crossbeam left end of panel bottom and the vertical beam lower end of panel left end link together, the right-hand member of described panel 1 is the ramped shaped being tilted to the right, and hole 13 is arranged at right-hand member top, and the length of panel 1 is greater than the length of compoboard.
The present invention is mainly comprised of integral part (claim not only panel), assembled plate (claim not only compoboard), crossbeam, inner support (but also claiming double lead-screw), propulsion plant five parts, integral part is in baffle plate bottom, two side shields and inner support connect into integral body, and height is determined by place major obstacle thing buried depth situation.Top is assembled by assembled plate, convenient dismounting, conversion while being convenient to meet obstruction.Integral part is connected employing slot with assembled plate, be convenient to fast dismantling and remove and installation.Inner support adopts double helix screw mandrel (or hydraulic cylinder).Propulsion plant is comprised of backing plate, hydraulic cylinder, hydraulic pump.
According to construction plant condition, automatic damper can be designed to monolithic or two kinds of patterns of Assembling.While thering is certain self-stable ability according to engineering geological conditions ,Dang stratum, automatic damper integral part is installed after being excavated to projected depth; When stratum does not have self-stable ability completely, after excavation 1-2m, put into integral part, then Bian Wa limit is sunk to, until projected depth.After integral part installs, according to obstruction situation ,Jiang top, top assembled plate, arrange and be arranged in the slot of bottom integral part; After assembled plate installs, crossbeam, inner support are installed in draw-in groove, according to foundation trench width adjustment mariages inner support length.Telescopic hydraulic cylinder is finally installed, and hydraulic cylinder one end is connected in the gripper shoe of integral part, and movable end withstands mounting pipe road junction backing plate.
Using method: after foundation trench excavation certain length, automatic damper is installed, cleaning foundation trench is to pipe laying after designing requirement, and after the 1st pipeline installed, tamped backfill, to requiring absolute altitude, is propped up baffle plate with excavation mechinery tethered sliding; After 2-3 root pipeline is installed, pipeline external surface with banket while thering is larger friction resistant resistance, movable end is bearing in mounted nose end, the mouth of pipe is installed backing plate.After this with foundation trench excavation direction, rely on hydraulic cylinder jacking baffle plate, follow-up excavation supporting foundation trench both sides Tu Bi, keeps soil wall stability in short-term, guarantees pipeline installation quality and construction safety; Driving space meets after the length of single pipe, and indentation hydraulic cylinder is installed pipe; And then repetition previous action, go round and begin again, until a line segment is transferred to next working face after finishing.As larger in propelling resistance, when thrust power is not enough, can partial demolition top combination baffle, or at baffle plate and native wall contact surface coating butter, reduce frictional resistance.When running into less obstruction and cross foundation trench, the place ahead, dismountable top combination baffle, along with propelling is converted and is continued to obstruction rear to use.Integral part overall length, should not be greater than 7.0ml, and protection segment length, gets 0.8ml conventionally; Construction section length, conventionally gets single pipe range and adds suitable installation, is generally not more than 4.0ml; Hydraulic feed device length, gets 0.5-0.8ml conventionally; Driving end-stopping plate length, gets 1.5ml conventionally.Combination baffle height, adopts 2.0-2.5m conventionally; Standing part height is got 2.00m conventionally; Height overall is not more than 4.50m.
When the present invention specifically implements, be to using the degree of depth as 4.5M is as basis, concrete engineering can be according to given calculating and check formula, voluntarily adjustment above.
1), structural meterials is ordinary steel except leading screw.
2), the thick 3mm of integral part panel, vertical stiffening rib 10*50mm, spacing 250mm.
3), assemble thickness of slab 3mm, vertical stiffening rib 6*50mm, spacing 250mm; Assembled plate bottom insertion end adds steel plate with 20mm.
4), ' work ' shaped steel, 6*12mm twice for crossbeam.
5), inner support adopts Φ 68mm double lead-screw (or hydraulic cylinder), is conducive to flexible modulation width, makes full use of, and saves material and cost, increase work efficiency; Meanwhile, when occurring, soil pressure is large especially, causes propelling at need, can suitably turn width down, reduces soil pressure.
6), hydraulic cylinder and hydraulic pump thrust are not less than 300T; Gripper shoe is welded by i iron; Nose end backing plate protective sleeve is made by 8mm steel plate.
Automatic damper of the present invention has following difference compared to shield machine: section configuration is square and for circular; Opened top, does not have closure; Driving is also what to separate with casting system, by ground excavation machine, completes driving.Major function is the effect of stablizing Excavation.Be mainly used in urban discharging pipeline installation; Be applicable to the soft soil layer that loose soil layer and mud, mucky soil etc. easily drift sand occur, cave in, groundwater table is especially applicable below, has particularly considered a difficult problem for the old pipeline complexity in city.The present invention has saved a large amount of artificial, has improved efficiency of construction; Reduced spillage of material; Reduced from many aspects cost.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210534262.7A CN102966169B (en) | 2012-12-12 | 2012-12-12 | Automatic baffle of foundation ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210534262.7A CN102966169B (en) | 2012-12-12 | 2012-12-12 | Automatic baffle of foundation ditch |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102966169A CN102966169A (en) | 2013-03-13 |
CN102966169B true CN102966169B (en) | 2014-01-15 |
Family
ID=47796579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210534262.7A CN102966169B (en) | 2012-12-12 | 2012-12-12 | Automatic baffle of foundation ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102966169B (en) |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3938765A1 (en) * | 1989-11-23 | 1991-05-29 | Bilfinger Berger Bau | Drainage pipe renewal process - uses driving tube surrounding old pipe and fitted with guide body |
CN2512841Y (en) * | 2001-11-09 | 2002-09-25 | 李学林 | Mounting and seam filling self control support inner mold for concrete flat joint mouth pipe |
JP3940689B2 (en) * | 2003-03-24 | 2007-07-04 | 前田製管株式会社 | Box culvert construction apparatus and box culvert construction method |
CN201785758U (en) * | 2010-07-30 | 2011-04-06 | 上海市第五建筑有限公司 | Foundation pit supporting system |
CN202390844U (en) * | 2011-12-28 | 2012-08-22 | 中国十七冶集团有限公司 | Detachable reinforcing device for supporting pile of deep foundation pit |
CN102562094B (en) * | 2012-01-10 | 2014-02-12 | 中铁隧道集团有限公司 | Cast-in-place construction method for support structure of tunnel groove formwork |
CN202543948U (en) * | 2012-05-08 | 2012-11-21 | 中冶建工集团有限公司 | Support device for excavation of deep foundation pit of piping trench of urban main road |
CN202945681U (en) * | 2012-12-12 | 2013-05-22 | 邹进昭 | Automatic baffle for foundation trench |
-
2012
- 2012-12-12 CN CN201210534262.7A patent/CN102966169B/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
CN102966169A (en) | 2013-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196034B (en) | A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam | |
CN103981898B (en) | A kind of inverse underground engineering construction method done of overall open cut node | |
CN103321230B (en) | The deep big foundation pit excavation method in place is passed through in the long distance of operation shallow embedding subway | |
CN106402490B (en) | Silt stratum push pipe jacking construction method based on steel bushing head tool pipe | |
CN104805854B (en) | A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment | |
CN103741714A (en) | Construction method for full cover-excavation reverse method of underground engineering | |
CN103306289B (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN102094425B (en) | Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam | |
CN101509263A (en) | Digging method foundation pit structure of steel cover and plate cover, and construction method | |
CN101672041B (en) | Top-down construction method of large underground structure outer wall | |
JP6010070B2 (en) | Temporary closing method for existing underwater structures | |
CN103556579A (en) | Box culvert pushing construction method integrating comprehensive grouting, pressure maintaining and pipe roof support | |
CN103195158B (en) | Municipal drainage pipeline slurry balance pipe-jacking construction method | |
CN103046638A (en) | Pipe jacking construction method | |
CN108442382B (en) | In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method | |
CN104652418B (en) | Diaphragm wall underground utilities position construction method | |
CN206800412U (en) | The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft | |
CN104631475A (en) | Safe and fast construction method of down-traversing river shallow depth bored tunnel | |
CN202194148U (en) | Waterproof curtain | |
CN104131575A (en) | Plugging and drainage method for dam foundation on karst highly developed stratum | |
CN104775439B (en) | A kind of pattern foundation pit supporting structure sealing integral structure and its construction method | |
CN105133627A (en) | Construction method for single-wall steel sheet pile cofferdam in running water state | |
CN103590836B (en) | Method for processing tunnel collapse caused by shallow-buried excavation | |
CN103510520A (en) | Sectionalized construction method of deep and large foundation pit | |
CN104060617B (en) | The prefabricated assembled inner support system of foundation pit support system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 Termination date: 20151212 |
|
EXPY | Termination of patent right or utility model |