CN102951560A - Lifting crane in electric power system - Google Patents

Lifting crane in electric power system Download PDF

Info

Publication number
CN102951560A
CN102951560A CN 201210416497 CN201210416497A CN102951560A CN 102951560 A CN102951560 A CN 102951560A CN 201210416497 CN201210416497 CN 201210416497 CN 201210416497 A CN201210416497 A CN 201210416497A CN 102951560 A CN102951560 A CN 102951560A
Authority
CN
China
Prior art keywords
pull bar
moving mechanism
voltage transformer
parallel moving
bearing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210416497
Other languages
Chinese (zh)
Inventor
李红军
王军利
牛卓博
陈晓杰
乔学军
王昭杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Power Supply Co Ltd filed Critical Baoding Power Supply Co Ltd
Priority to CN 201210416497 priority Critical patent/CN102951560A/en
Publication of CN102951560A publication Critical patent/CN102951560A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention discloses a lifting crane in an electric power system, comprising a plurality of pillars, a load-bearing frame, a guide rail, a parallel moving mechanism, and a manual sling. The load-bearing frame is detachably fixed on a transformer, a JP cabinet, or two supporting shelves on the upper end of a big measuring box. The plurality of pillars are detachably fixed together. The lower end of the lowest pillar is inserted in a positioning sleeve of a chassis. The guide rail is detachably fixed between the upper end of the highest pillar and the load-bearing frame. The parallel moving mechanism is slidably mounted on the guide rail. The lower end of the parallel moving mechanism is mounted with the manual sling. The lifting crane is easy in disassembly, light in weight, easy to transport and carry, easy to transport even in small space and a mountain area, fast in operating speed, and low in labor intensity.

Description

Lifting hoisting crane in the electric system
Technical field
The present invention relates to the lift heavy instrument of the electrical equipments such as a kind of installation, dismounting and change voltage transformer, JP cabinet, large batch meter.
Background technology
In the National Power System, industry, agricultural, civilian power taking all depend on the voltage transformer of all size, and the disassembling, assembling and replacing of voltage transformer is one of to work very frequently.Along with the fast development of China's economic construction, the renewal of consumer, the voltage transformer of a lot of original operations can not be suitable for and must change or increase-volume.Since historical reasons, some region house owed by a citizen amplification, and blocking channel causes the mechanical equipment of lifting can not enter the scene; In the mountain area, the lifting of voltage transformer is troubling old problem equally, and the mechanical equipment of lifting also is difficult for entering the scene; These occasions can only be taked manually slowly to dismantle voltage transformer by instruments such as ropes, and operating speed is slow, and labour intensity is high, and are dangerous large.No matter adopt traditional lifting machine equipment or artificial unloading's voltage transformer, all be easy to cause the generation of the colliding with of voltage transformer, displacement and the hidden danger such as out of control.
Summary of the invention
Purpose of the present invention solves the above-mentioned problems in the prior art exactly, and lifting hoisting crane, this hoisting crane easy accessibility in a kind of electric system is provided, lightweight, transportation, easy to carry is even if also be convenient to transportation at narrow space and mountain area, operating speed is fast, and labour intensity is low.
For achieving the above object, technical solution of the present invention is: lifting hoisting crane in a kind of electric system, and it comprises many pillars, bearing frame, guide rail, parallel moving mechanism and manual hoist cable; Bearing frame removably is fixed on two bracing frames of voltage transformer, JP cabinet or large batch meter upper end; Many pillars removably are fixed together, and nethermost pillar lower end is plugged in the locating bush on chassis; Guide rail removably is fixed between the upper end and bearing frame of the top pillar; Parallel moving mechanism is slidably mounted on the guide rail, and the parallel moving mechanism lower end is equipped with manual hoist cable.
The present invention also comprises the multilayer pull bar, and every layer of pull bar is comprised of pull bar A and pull bar B, and the end of pull bar A and pull bar B removably is fixed on respectively on two bracing frames of voltage transformer, JP cabinet or large batch meter, and the other end removably is fixed on the pillar.
Parallel moving mechanism described above is for to affect the mobile cucurbit that moves forward and backward by steel rope.
Manual hoist cable described above is the suspension hook that guide chain pulls.
Each parts of the present invention all are detachable fixable individual components, and during transportation, each parts is in bulk on transport trolley, and its volume is little, and is lightweight, and transportation, easy to carry is even if also be convenient to transportation at narrow space and mountain area.During use, each parts is fixed on together in order gets final product, two bracing frames of pillar and bearing frame and voltage transformer, JP cabinet or large batch meter form firm three-point support structure, parallel moving mechanism and manual hoist cable form again very easily translation and reciprocating mechanism, after as long as the voltage transformer that will need to change, JP cabinet or large batch meter are pulled down, be hung on the manual hoist cable, by parallel moving mechanism move to make things convenient for the position after, be transported to ground, again new voltage transformer, JP cabinet or large batch meter are lifted up to install and get final product, it is very easy to use.Its installing/dismounting is quick, and operating speed is fast, and labour intensity is low, and can not cause the generation of the colliding with of voltage transformer, displacement and the hidden danger such as out of control.
Description of drawings
Fig. 1 is mounting structure schematic diagram of the present invention.
As shown in Figure 1, the present embodiment comprises four pillars 21,22,23 and 24, bearing frame 6, guide rail 4, parallel moving mechanism, manual hoist cable and two-layer pull bar.Parallel moving mechanism is for to affect the mobile cucurbit 51 that moves forward and backward by steel rope 54, and manually hoist cable is the suspension hook 52 that guide chain 53 pulls.Bearing frame 6 two ends are bolted on the two cement bracing frames 91 and 92 of voltage transformer, JP cabinet or large batch meter upper end.Peg graft and are fixed together in four pillars 21,22,23 and 24 ends, following pillar 21 lower ends place in the locating bush on chassis 1.Guide rail 4 two ends are bolted on the upper end and bearing frame 6 of pillar 24 in the above.Affect the mobile cucurbit 51 that moves forward and backward to be slidably mounted on the guide rail 4 by steel rope 54, steel rope 54 1 ends are fixed on the mobile cucurbit 51, fall to the position of lower end staff stretchy behind the pulley 31 and 32 of the other end by guide rail 4 two ends.Mobile cucurbit 51 lower ends are equipped with the suspension hook 52 that is pulled by guide chain 53.Every layer of pull bar is comprised of pull bar A 81 and pull bar B 82, and the end of pull bar A 81 and pull bar B 82 is bolted on the two cement bracing frames 92 and 91 of voltage transformer, JP cabinet or large batch meter, and the other end is bolted on two pillars 21 and 24.Like this, four pillars and bearing frame and two cement bracing frames form firm three-point support structure, and four pillars are supported on the two cement bracing frames by two-layer pull bar tension again, the present invention are supported more solid and reliable.7 is voltage transformer, and 10 is the Comprehensive Control case.
Four pillars 21 of embodiment described above, 22,23 and 24 also can be bolted by the flange of strut ends welding or integrative-structure is in the same place.
The present embodiment installation, dismounting, convenient transportation, simple to operate.Can make 1.8 meters of the weight parallels of dismounting, lift heavy can reach 3 tons up and down, and effective travel can reach 3 meters, can operation in the environment of narrow and small less than 3 square meters in region.
Above-described embodiment only is preferred and exemplary, and those skilled in the art for example can according to the description of this patent, adopt the parallel moving mechanism of other structure and the manual hoist cable of other structure; Use the pull bar of the pillar of other radical and other level or do not use pull bar according to the needs of voltage transformer, JP cabinet or large batch meter height.It is all covered by the protection domain of this patent.

Claims (5)

1. hoisting crane use in lifting in the electric system, it is characterized in that: it comprises many pillars, bearing frame, guide rail, parallel moving mechanism and manual hoist cable; Bearing frame removably is fixed on two bracing frames of voltage transformer, JP cabinet or large batch meter upper end; Many pillars removably are fixed together, and nethermost pillar lower end is plugged in the locating bush on chassis; Guide rail removably is fixed between the upper end and bearing frame of the top pillar; Parallel moving mechanism is slidably mounted on the guide rail, and the parallel moving mechanism lower end is equipped with manual hoist cable.
2. lift in the electric system according to claim 1 and use hoisting crane, it is characterized in that: it also comprises the multilayer pull bar, every layer of pull bar is comprised of pull bar A and pull bar B, the end of pull bar A and pull bar B removably is fixed on respectively on two bracing frames of voltage transformer, JP cabinet or large batch meter, and the other end removably is fixed on the pillar.
3. according to claim 1 or 2 described voltage transformer hoisting cranes, it is characterized in that: described parallel moving mechanism is for to affect the mobile cucurbit that moves forward and backward by steel rope.
4. voltage transformer hoisting crane according to claim 3, it is characterized in that: described manual hoist cable is the suspension hook that guide chain pulls.
5. according to claim 1 or 2 described voltage transformer hoisting cranes, it is characterized in that: described manual hoist cable is the suspension hook that guide chain pulls.
CN 201210416497 2012-10-27 2012-10-27 Lifting crane in electric power system Pending CN102951560A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210416497 CN102951560A (en) 2012-10-27 2012-10-27 Lifting crane in electric power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210416497 CN102951560A (en) 2012-10-27 2012-10-27 Lifting crane in electric power system

Publications (1)

Publication Number Publication Date
CN102951560A true CN102951560A (en) 2013-03-06

Family

ID=47761037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210416497 Pending CN102951560A (en) 2012-10-27 2012-10-27 Lifting crane in electric power system

Country Status (1)

Country Link
CN (1) CN102951560A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103601087A (en) * 2013-12-06 2014-02-26 国家电网公司 Transformer lifting device
CN107866440A (en) * 2017-12-27 2018-04-03 国网山东省电力公司潍坊供电公司 Multi-function semi-automatic power equipment disassembles hanging apparatus
CN114031002A (en) * 2021-11-03 2022-02-11 上海建工七建集团有限公司 Tower crane wall-attached connecting piece dismounting device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103601087A (en) * 2013-12-06 2014-02-26 国家电网公司 Transformer lifting device
CN103601087B (en) * 2013-12-06 2015-11-25 国家电网公司 A kind of lifting device of transformer
CN107866440A (en) * 2017-12-27 2018-04-03 国网山东省电力公司潍坊供电公司 Multi-function semi-automatic power equipment disassembles hanging apparatus
CN114031002A (en) * 2021-11-03 2022-02-11 上海建工七建集团有限公司 Tower crane wall-attached connecting piece dismounting device and method

Similar Documents

Publication Publication Date Title
CN103613031B (en) Voltage transformer simple and easy hoisting device
CN202186848U (en) Universal movable maintenance gantry crane
CN203373014U (en) Static load loading apparatus of overhead and gantry crane
CN201660380U (en) Novel hoisting transportation vehicle
CN102363512B (en) Portable heavy electrical equipment carrier
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN204643706U (en) A kind of overhead hoist
CN102951560A (en) Lifting crane in electric power system
CN203269442U (en) Auxiliary suspension device for electric hoist
CN203247031U (en) Hoisting device for curtain board transporting
CN202785364U (en) Movable dual-door-type mast hoisting device
CN202936114U (en) Hoisting crane in electric power system
SE2250667A1 (en) A crane comprising a movable boom and a movable counterweight
CN103138189A (en) Hanging bracket special for electric power disconnecting switch overhauling
CN203289011U (en) Tension cross arm hoisting device
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN210973587U (en) Small-size removal hoisting machine
CN201817243U (en) Platform and device for replacing conductor rail
CN205367560U (en) Simple and easy hoisting accessory of movable
CN203187338U (en) Movable hoisting maintenance device
CN205419582U (en) Floor hoist
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
CN101537983B (en) Hoisting method of large-scale equipment in factory building for high-altitude positioning
CN203855326U (en) Lifting device of cable cover plate
CN204185153U (en) A kind of electric power lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: BAODING POWER SUPPLY COMPANY

Effective date: 20131230

Owner name: STATE GRID HEBEI ELECTRIC POWER COMPANY BAODING PO

Effective date: 20131230

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 071051 BAODING, HEBEI PROVINCE TO: 100761 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20131230

Address after: 100761 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: State Grid Hebei Electric Power Company

Applicant after: Baoding Power Supply Branch Company, State Grid Hebei Electric Power Company

Address before: 071051 No. 138 sunny north street, new urban district, Hebei, Baoding

Applicant before: Baoding Power Supply Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130306