CN102941301B - A kind of combination loose tool of a contour forming and manufacturing process thereof - Google Patents
A kind of combination loose tool of a contour forming and manufacturing process thereof Download PDFInfo
- Publication number
- CN102941301B CN102941301B CN201210455445.XA CN201210455445A CN102941301B CN 102941301 B CN102941301 B CN 102941301B CN 201210455445 A CN201210455445 A CN 201210455445A CN 102941301 B CN102941301 B CN 102941301B
- Authority
- CN
- China
- Prior art keywords
- ring
- upper pad
- time
- overcoat
- interior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The combination loose tool of one contour forming and a manufacturing process thereof, belong to flat-die forging technical field.Combination loose tool of the present invention comprises the overcoat with endoporus, interior lower gasket ring, interior upper pad one ring and interior upper pad two ring; The loose tool that described overcoat, interior lower gasket ring and interior upper pad one ring composition first time is shaped, described interior lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad one ring is arranged on the top of overcoat endoporus, and described interior upper pad one ring is corresponding with the profile of first time shaping material base with the die cavity that interior lower gasket ring forms jointly; The loose tool that described overcoat, interior lower gasket ring and interior upper pad two ring composition second time is shaped, described interior lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad two ring is arranged on the top of overcoat endoporus, and described interior upper pad two ring is corresponding with the profile of the die cavity that interior lower gasket ring forms jointly and blocking blank.Manufacturing process of the present invention, comprises the steps: pulling, and first time is shaped, and melts down heating, and second time is shaped.
Description
Technical field
The invention belongs to flat-die forging technical field, particularly relate to a kind of combination loose tool and manufacturing process thereof of a contour forming, for the making of the finish forge blocking base of nozzle body class part various in Aeroengine Products.
Background technology
Modern Engine nozzle body class part is the strength member of engine, and such part of designing requirement in early stage is cast form; But the intensity due to foundry goods can not meet the overall performance requirement of high thrust-weight ratio engine, therefore change in design produces such part for adopting precision plastic forming technology, to reach the object promoting its performance indications; The nozzle body class part using the manufacture of precision plastic forming technology instead remains the requirement of former casting project organization substantially.Because nozzle body class design of part is complicated, adopt conventional Forging Technology base forming process many, number of molds is many, and stock utilization is low.
Abroad, its manufacturing technology belongs to high sophisticated technology field, and forming technique privacy degrees is high.At home, though the net-size forging of current structure of the same type is succeeded in developing, because its complex structure, dimensional accuracy are high, manufacture difficulty is very large, causes the qualification rate of net-size forging very low, only has about 25%; Adopt common forging and molding mode base, because many key technical problems are not resolved, cause final qualification rate also only to have about 36%.Complicated design of part, accurate dimensional requirement, II grade of net-size forging standard, determines the difficulty of such machine parts'precise plastic forming technology.
Summary of the invention
For prior art Problems existing, the invention provides a kind of combination loose tool and manufacturing process thereof of a contour forming; This manufacturing process can realize completing the base shaping simultaneously of three kinds of structures in a combination loose tool, improves operating efficiency and product percent of pass.
To achieve these goals, the present invention adopts following technical scheme, a kind of combination loose tool of a contour forming, comprises the overcoat with endoporus, interior lower gasket ring, interior upper pad one ring and interior upper pad two ring; The loose tool that described overcoat, interior lower gasket ring and interior upper pad one ring composition first time is shaped, in described in the loose tool that first time is shaped, lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad one ring is arranged on the top of overcoat endoporus, and described interior upper pad one ring is corresponding with the profile of first time shaping material base with the die cavity that interior lower gasket ring forms jointly; The loose tool that described overcoat, interior lower gasket ring and interior upper pad two ring composition second time is shaped, in described in the loose tool that second time is shaped, lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad two ring is arranged on the top of overcoat endoporus, and described interior upper pad two ring is corresponding with the profile of the die cavity that interior lower gasket ring forms jointly and blocking blank.
The outside dimension of described interior upper pad one ring, interior upper pad two ring is identical, and corresponding with the hole size of overcoat.
For the ease of being taken out by the blocking blank after shaping, described interior upper pad two ring is made up of two semi-rings.
The manufacturing process of the combination loose tool of the contour forming described in employing, comprises the steps:
Step one: pulling
By the pulling of the two ends of raw material bar to required size and structure;
Step 2: first time is shaped
Interior lower gasket ring is put into the bottom of overcoat endoporus, then the bar that two ends pull out is put into the die cavity of upper pad one ring, more together put into the top of overcoat endoporus together with interior upper pad one ring, carry out first time forging and molding, form the material base that is shaped for the first time;
Step 3: melt down heating
First time shaping material base is taken out from first time shaping loose tool, then carries out melting down heating;
Step 4: second time is shaped
First time shaping material base after heating is put into the die cavity of gasket ring under jacket internal, the upper rear interior upper pad two ring set being entered first time shaping material base puts the top of overcoat endoporus into, carries out second time forging and molding, forms blocking blank.
Beneficial effect of the present invention:
The present invention revolutionizes a traditional fiery mold forming technique, changes the shaping mode of multi-mould multiple working procedure; Achieve and complete three kinds of structures base forming technology simultaneously in one set of die, easily ensure structure and the dimensional requirement of the part of final precision forging.
The manufacturing process of combination loose tool of the present invention is adopted to substantially increase raw-material utilization rate, save the consumption of from one piece, improve the qualification rate of final fine forge piece product, reduce cost, add income, drastically increase aero-engine structural member fine forging technology level; And save a large amount of subsequent mechanical labor contents, reach the final forming requirements of fine forge piece, improve the service life of finish forge mould.
Accompanying drawing explanation
Fig. 1 is the structural representation of the loose tool that the present invention is shaped first time;
Fig. 2 is the structural representation of the loose tool that the present invention's second time is shaped;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structural representation of blocking blank;
Fig. 5 is the right view of Fig. 4;
Fig. 6 is the structural representation of bar after pulling;
In figure, 1--overcoat, lower gasket ring in 2--, upper pad one ring in 3--, upper pad two ring in 4--, the thin oval flange of 5--, 6--trunk structure, 7--is with tapering cylinder thin rod part, and 8--first time is shaped material base, 9--blocking blank, bar after 10-pulling, 11-overcoat endoporus, 12-interior upper pad one ring external diameter, 13-interior upper pad two ring external diameter, 14-interior lower gasket ring external diameter.
Detailed description of the invention
Now be configured as example with the blocking blank of nozzle body part, the present invention is described in further detail:
As shown in Figure 4, Figure 5, it comprises band tapering cylinder thin rod part 7 structure to the structure of the blocking blank of nozzle body part, and middle part is thin oval flange 5 structure with 73 ° of oblique angle, and upper end is trunk structure 6.
As shown in FIG. 1 to 3, a kind of combination loose tool of a contour forming, comprises the overcoat 1 with endoporus, interior lower gasket ring 2, interior upper pad one ring 3 and interior upper pad two ring 4; The loose tool that described overcoat 1, interior lower gasket ring 2 and interior upper pad one ring 3 composition first time is shaped, in described in the loose tool that first time is shaped, lower gasket ring 2 is arranged on the bottom of overcoat 1 endoporus, interior upper pad one ring 3 is arranged on the top of overcoat 1 endoporus, and described interior upper pad one ring 3 is corresponding with the profile of first time shaping material base 8 with the die cavity that interior lower gasket ring 2 forms jointly; The loose tool that described overcoat 1, interior lower gasket ring 2 and interior upper pad two ring 4 composition second time is shaped, in described in the loose tool that second time is shaped, lower gasket ring 2 is arranged on the bottom of overcoat 1 endoporus, interior upper pad two ring 4 is arranged on the top of overcoat 1 endoporus, and described interior upper pad two ring 4 is corresponding with the profile of the die cavity that interior lower gasket ring 2 forms jointly and blocking blank 9.
The outside dimension of described interior upper pad one ring 3, interior upper pad two ring 4 is identical, and corresponding with the hole size of overcoat 1, and the outside dimension of interior lower gasket ring 2 is corresponding with overcoat 1 hole size.
For the ease of being taken out by the blocking blank 9 after shaping, described interior upper pad two ring 4 is made up of two semi-rings.
The manufacturing process of the combination loose tool of the contour forming described in employing, comprises the steps:
Step one: pulling
Select the diameter of raw material bar, meet middle gathering stock and non-unstability, by the pulling of the two ends of bar to required size and structure, as shown in Figure 6;
Step 2: first time is shaped
Interior lower gasket ring 2 is put into the bottom of overcoat 1 endoporus, then the bar that two ends pull out is put into the die cavity of upper pad one ring 3, the top of overcoat 1 endoporus is together put into again together with interior upper pad one ring 3, carry out first time forging and molding, band tapering cylinder thin rod part 7 structure of formation of parts and with thin oval flange 5 structure of 73 ° of oblique angle, forms first time shaping material base 8;
Step 3: melt down heating
Taken out from first time shaping loose tool by first time shaping material base 8, then carry out melting down heating, heating-up temperature is 1160 DEG C;
Step 4: second time is shaped
First time shaping material base 8 after heating is put into the die cavity of gasket ring 2 under overcoat 1 inside, the upper rear of interior upper pad two ring 4 being inserted in first time shaping material base 8 puts the top of overcoat 1 endoporus into, carry out second time forging and molding, the trunk structure 6 of formation of parts, form blocking blank 9.
Claims (2)
1. a combination loose tool for a contour forming, is characterized in that comprising the overcoat with endoporus, interior lower gasket ring, interior upper pad one ring and interior upper pad two ring; The loose tool that described overcoat, interior lower gasket ring and interior upper pad one ring composition first time is shaped, in described in the loose tool that first time is shaped, lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad one ring is arranged on the top of overcoat endoporus, and described interior upper pad one ring is corresponding with the profile of first time shaping material base with the die cavity that interior lower gasket ring forms jointly; The loose tool that described overcoat, interior lower gasket ring and interior upper pad two ring composition second time is shaped, in described in the loose tool that second time is shaped, lower gasket ring is arranged on the bottom of overcoat endoporus, interior upper pad two ring is arranged on the top of overcoat endoporus, and described interior upper pad two ring is corresponding with the profile of the die cavity that interior lower gasket ring forms jointly and blocking blank; The outside dimension of described interior upper pad one ring, interior upper pad two ring is identical, and corresponding with the hole size of overcoat; Described interior upper pad two ring is made up of two semi-rings.
2. adopt the manufacturing process of the combination loose tool of a contour forming according to claim 1, it is characterized in that, comprise the steps:
Step one: pulling
By the pulling of the two ends of raw material bar to required size and structure;
Step 2: first time is shaped
Interior lower gasket ring is put into the bottom of overcoat endoporus, then the bar that two ends pull out is put into the die cavity of upper pad one ring, more together put into the top of overcoat endoporus together with interior upper pad one ring, carry out first time forging and molding, form the material base that is shaped for the first time;
Step 3: melt down heating
First time shaping material base is taken out from first time shaping loose tool, then carries out melting down heating;
Step 4: second time is shaped
First time shaping material base after heating is put into the die cavity of gasket ring under jacket internal, the upper rear interior upper pad two ring set being entered first time shaping material base puts the top of overcoat endoporus into, carries out second time forging and molding, forms blocking blank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210455445.XA CN102941301B (en) | 2012-11-13 | 2012-11-13 | A kind of combination loose tool of a contour forming and manufacturing process thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210455445.XA CN102941301B (en) | 2012-11-13 | 2012-11-13 | A kind of combination loose tool of a contour forming and manufacturing process thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102941301A CN102941301A (en) | 2013-02-27 |
CN102941301B true CN102941301B (en) | 2015-09-16 |
Family
ID=47724342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210455445.XA Expired - Fee Related CN102941301B (en) | 2012-11-13 | 2012-11-13 | A kind of combination loose tool of a contour forming and manufacturing process thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102941301B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103192021A (en) * | 2013-04-12 | 2013-07-10 | 吴桥县华锋五金工具有限责任公司 | Flange shaft forging method |
CN109590429A (en) * | 2018-11-27 | 2019-04-09 | 中国航发沈阳黎明航空发动机有限责任公司 | A kind of manufacturing process and mold of bias adjustable vane |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101116891A (en) * | 2007-09-12 | 2008-02-06 | 天津市天重江天重工有限公司 | Fabrication technology of big flange stub axle type components |
CN201644691U (en) * | 2009-12-31 | 2010-11-24 | 江苏金源锻造股份有限公司 | Composite forming die mold of complicated axial forging with shaft shoulder and flange plate |
CN101985152A (en) * | 2010-08-02 | 2011-03-16 | 天津市天锻压力机有限公司 | Large screw forging mold |
CN201799555U (en) * | 2010-08-02 | 2011-04-20 | 天津市天锻压力机有限公司 | Large screw forging die |
CN202316884U (en) * | 2011-11-16 | 2012-07-11 | 天津重型装备工程研究有限公司 | Forging mould for manufacturing flange shaft forge piece of semi built-up crank shaft |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6245443A (en) * | 1985-08-23 | 1987-02-27 | Rizumu Jidosha Buhin Seizo Kk | Cold forging method for winding shaft of seat belt |
JP2001025844A (en) * | 1999-07-12 | 2001-01-30 | Kobe Steel Ltd | Die forging method of shaft-like forged product having plural flanges |
-
2012
- 2012-11-13 CN CN201210455445.XA patent/CN102941301B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101116891A (en) * | 2007-09-12 | 2008-02-06 | 天津市天重江天重工有限公司 | Fabrication technology of big flange stub axle type components |
CN201644691U (en) * | 2009-12-31 | 2010-11-24 | 江苏金源锻造股份有限公司 | Composite forming die mold of complicated axial forging with shaft shoulder and flange plate |
CN101985152A (en) * | 2010-08-02 | 2011-03-16 | 天津市天锻压力机有限公司 | Large screw forging mold |
CN201799555U (en) * | 2010-08-02 | 2011-04-20 | 天津市天锻压力机有限公司 | Large screw forging die |
CN202316884U (en) * | 2011-11-16 | 2012-07-11 | 天津重型装备工程研究有限公司 | Forging mould for manufacturing flange shaft forge piece of semi built-up crank shaft |
Non-Patent Citations (1)
Title |
---|
镶块结构在胎模锻工艺中的应用;张建中;《锻压机械》;19950228(第01期);第19页第2栏第3段,图3 * |
Also Published As
Publication number | Publication date |
---|---|
CN102941301A (en) | 2013-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103100669B (en) | A kind of with flange casting bolt hole gate valve body composite pouring technique | |
CN105397010A (en) | Isothermal die forging forming die and method for rare earth magnesium alloy thin webbed supporting fork | |
CN102941301B (en) | A kind of combination loose tool of a contour forming and manufacturing process thereof | |
CN209614103U (en) | The blank mold structure of automobile engine using new energy resources gear shaft enclosed forging and forming | |
CN108160934B (en) | Multi-piece casting process and casting mold for engine cam shaft | |
CN204135261U (en) | A kind of forging mold of one-throw crankshaft | |
CN100411770C (en) | Generator magnetic pole precision forging method | |
CN204209069U (en) | A kind of engine cylinder cover casting mould | |
CN203875291U (en) | Exhaust manifold casting mold | |
CN103572149B (en) | High strength brake disk and castmethod thereof | |
CN104550762A (en) | Casting mold for female and male rotors and pouring system of casting mold | |
CN105834359A (en) | Casting mold of gravity casting machine | |
CN102211146B (en) | Combined mold for extra-large casting and forging | |
CN203992317U (en) | A kind of mould of registration | |
CN206779463U (en) | A kind of breakdown pressure sintering graphite jig | |
CN201848503U (en) | Blade guide frame casting forming die | |
CN201735742U (en) | Steel ingot for forging or rolling | |
CN105128252A (en) | Technology for reinforcing strength of mold part by adding fiber into injection mold part | |
CN201308965Y (en) | Core assembly | |
CN101698227A (en) | Technological method for die-casting aluminum alloy of inner flange box body | |
CN102806331A (en) | Centrifugal casting mold for cylinder sleeve | |
CN204365979U (en) | The running gate system of thin-section casting | |
CN217169496U (en) | Shared mould blank assembly convenient for replacing water gap | |
CN201040309Y (en) | Orifice casting cold model for roller | |
CN204094036U (en) | Spacing bearing pin cold-heading device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 110043 Dong TA street, Dadong District, Shenyang, Liaoning Province, No. 6 Patentee after: Chinese Hangfa Shenyang Liming Aero engine limited liability company Address before: 110043 Dong TA street, Dadong District, Shenyang, Liaoning Province, No. 6 Patentee before: Liming Aeroplane Engine (Group) Co., Ltd., Shenyang City |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150916 Termination date: 20201113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |