1. an assembly technique for SMD power inductor magnetic core and egative film, is characterized in that including following steps:
Step 101: clean many auxiliary rods, multiple groove for placing power inductor skeleton is provided with above auxiliary rod described in every root, the magnetic core of described skeleton is positioned at the bottom of described groove, the egative film of described skeleton is positioned at the top of described groove, by clean many described auxiliary rods according to the upwardly-directed bottom at a container be made up of nonferromugnetic material placed side by side of groove described in it;
Step 102: magnetic core is poured on the described auxiliary rod in described container;
Step 103: shake described container and make described magnetic core enter in the groove of described auxiliary rod;
Step 104: the remaining described magnetic core not entering described groove in described container is taken out and places in addition;
Step 105: for the described groove of sky also not entering described magnetic core above described auxiliary rod, operator fills described magnetic core with hand in the groove of these skies, make on described auxiliary rod flutedly interiorly all have the described magnetic core kept flat;
Step 106: for the described magnetic core do not entered completely in described groove, described magnetic core to pick up with suction rod and carefully keeps flat in described groove afterwards by operator;
Step 107: the gum box of spreading machine is opened, both hands pick up the two ends of the described auxiliary rod having discharged described magnetic core, described auxiliary rod is put into described spreading machine and is fixed by this auxiliary rod by pin;
Step 108: confirm whether the described magnetic core on described auxiliary rod has inclination, if there is inclination by whole for this auxiliary rod taking-up, must return step 106, until all described magnetic core putting into described groove does not all tilt;
Step 109: with scrape blob of viscose first glue in gum box is pushed described in scrape blob of viscose front end, more described blob of viscose of scraping to be fixed;
Step 110: gently described blob of viscose of scraping is shifted onto other one end from one end of the upper plane of described auxiliary rod and carried out scraping glue, this scrape in glue process must ensure described in scrape blob of viscose front end glue be heaped-up;
Step 111: opened by described spreading machine, with the hands catches the two ends of described auxiliary rod vertically to be picked up by described auxiliary rod as early as possible and takes out and auxiliary rod described in horizontal;
Step 112: with the hands will paste lower described egative film after the justified margin of the described groove on egative film and described auxiliary rod and press described egative film one by one;
Step 113: both hands pick up the described auxiliary rod posting described egative film, put into the groove of pressure bar fixture;
Step 114: the two ends of with the hands picking up clean clean upper pressure bar, on described upper pressure bar, the position relative with the described groove of described auxiliary rod is provided with multiple magnetites, has one of magnetite to face down described upper pressure bar and is placed on described pressure bar fixture;
Step 115: the left and right sides left and right sides of the described upper pressure bar placed being aimed at described auxiliary rod, level is pushed to above described auxiliary rod, until two rods coincide together;
Step 116: described two rods are picked up by both hands together, makes described two rods revolve turnback, puts back in the groove of described pressure bar fixture after upper and lower switch again, will guarantee that described two rods closely merge, can not misplace in whole process;
Step 117: with the hands carefully the described auxiliary rod of top vertically picked up and place it on one side;
Step 118: with the hands described upper pressure bar is picked up, and visual examination is carried out to the described magnetic core pasting described egative film on described upper pressure bar, described egative film should overflow without glue and described magnetic core without skew, otherwise should do defective products process;
Step 119: described upper pressure bar qualified for described visual examination is put into continuous tunnel furnace drying.