CN102926752A - First transporter device for heading machine - Google Patents
First transporter device for heading machine Download PDFInfo
- Publication number
- CN102926752A CN102926752A CN2012104693908A CN201210469390A CN102926752A CN 102926752 A CN102926752 A CN 102926752A CN 2012104693908 A CN2012104693908 A CN 2012104693908A CN 201210469390 A CN201210469390 A CN 201210469390A CN 102926752 A CN102926752 A CN 102926752A
- Authority
- CN
- China
- Prior art keywords
- chute
- conveyor
- support
- fortune
- intermediate chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
A first transporter device for a heading machine applied to the technical field of heading machines comprises a front chute, a first chain guide plate, an intermediate chute, a rear support frame body, a second chain guide plate, a rear chute, a mine car, two transportation connecting frames, two transport belt conveyors and the like, wherein the front chute, the intermediate chute and the rear chute are fixedly connected by bolts; the front chain guide plate is fixedly connected with the front chute and the intermediate chute by bolts; the second chain guide plate is fixedly connected with the intermediate chute through bolts; the intermediate chute is fixedly connected with a bracket through holts; the bracket is fixedly connected with the rear support frame body through bolts and is used for lapping the mine car for loading materials conveyed from a first conveyor with the lower side of the first transporter device; and the front chute is fixedly connected with the rear chute by bolts. According to the first transporter device, by simple disassembly, assembly and combination, the problem about material transportation in a traditional tunneling lane is solved; and the material transfer in various modes is realized by adopting the first transporter device.
Description
Technical field
The present invention relates to a kind of development machine first conveyor device in the Boring Machine Technique field.
Background technology
At present, development machine is one of capital equipment of mining machinery, and generally adopts star-wheel shovel board, first conveyor, two runnings to carry the devices such as conveyor for the material transportation behind the driving.The first conveyor structural formula that existing development machine adopts: transporter is comprised of forward and backward chute, is applicable to carry conveyor overlap joint transported material with two runnings.And such transporter tail height is lower, and cantilever segment is shorter, the overlap joint transported materials such as inapplicable and mine car, explosion-proof tractor, railless free-wheeled vehicle.Therefore, develop a kind of development machine is new problem anxious to be resolved with the first conveyor device always.
Summary of the invention
The object of the present invention is to provide a kind of development machine first conveyor device, by simple dismounting, combination, the problem with solving material transportation in the existing digging laneway adopts this first conveyor device, can realize multiple means of transportation transhipment material.
The object of the present invention is achieved like this: a kind of development machine first conveyor device, by front chute, bolt, the first pressuring chain plate, intermediate chute, the rear support support body, support, the second pressuring chain plate, rear chute, mine car, two fortune links, two runnings are carried conveyor and are formed, front chute, three sections chutes of intermediate chute and rear chute are bolted fixing, the first pressuring chain plate and front chute, intermediate chute is bolted fixing, the second pressuring chain plate and intermediate chute are bolted fixing, intermediate chute and support are bolted fixing, and be provided with holder device in the bottom, support and rear support support body are bolted fixing, be used for to load below first conveyor is carried the mine car of the material that gets off and first conveyor device to overlap; Front chute and rear chute are bolted fixing, and two fortune links and rear support support body are bolted fixing, are used for loading from first conveyor carrying two running year conveyors of the material that gets off to link to each other with two fortune links by bearing pin; The operating principle of this device is that intermediate chute and front chute, rear chute are bolted, detachable first conveyor chute structure, realization and two running year conveyors, mine car overlap joint transported material; Detachable intermediate chute structure realizes the adjustment to first conveyor tail height, cantilever segment change in length.Make first conveyor and two fortune leather belt reshipment machines, mine car overlap joint transported material, adapt to the use of various working, increase intermediate chute, two sections original chutes are split into three sections, but the size of the non-disconnectable inloading part of decrease is convenient to underground transportation and installation; In the situation of front chute, rear chute no change, can be by changing length and the angle of intermediate chute, change the height of a fortune discharging point and with respect to the distance of body afterbody, satisfy client's various different requirements; Increase the design of intermediate chute, can make the front chute of original common fortune, rear chute assembling is used in a fortune that lengthens, greatly improved the versatility of section's dress part, reduced cost of production, alleviated workman's labour intensity, the joint face of front chute is connected with bolt with the front joint face of intermediate chute, the rear joint face of intermediate chute is connected with bolt with the joint face of rear chute, complete lengthening one fortune chute is finished in assembling, the intermediate chute bottom has support to hold up, the support other end is fixed by bolts on the rear support support body, has guaranteed intensity and the stability of chute bracketed part.
Main points of the present invention are its structure and operating principle.Its operating principle is that intermediate chute and front chute, rear chute are bolted, detachable first conveyor chute structure, realization and two running year conveyors, mine car overlap joint transported material; Detachable intermediate chute structure realizes the adjustment to first conveyor tail height, cantilever segment change in length.Make first conveyor and two fortune leather belt reshipment machines, mine car overlap joint transported material, adapt to the use of various working, increase intermediate chute, two sections original chutes are split into three sections, but the size of the non-disconnectable inloading part of decrease is convenient to underground transportation and installation; In the situation of front chute, rear chute no change, can be by changing length and the angle of intermediate chute, change the height of a fortune discharging point and with respect to the distance of body afterbody, satisfy client's various different requirements; Increase the design of intermediate chute, can make the front chute of original common fortune, rear chute assembling is used in a fortune that lengthens, greatly improved the versatility of section's dress part, reduced cost of production, alleviated workman's labour intensity, the joint face of front chute is connected with bolt with the front joint face of intermediate chute, the rear joint face of intermediate chute is connected with bolt with the joint face of rear chute, complete lengthening one fortune chute is finished in assembling, the intermediate chute bottom has support to hold up, the support other end is fixed by bolts on the rear support support body, has guaranteed intensity and the stability of chute bracketed part.
A kind of development machine with the first conveyor device compared with prior art, have by simple dismounting, combination, with the problem that solves material transportation in the existing digging laneway, adopt this first conveyor device, can realize the advantages such as multiple means of transportation transhipment material, will be widely used in the Boring Machine Technique field.
Description of drawings
The present invention is described in detail below in conjunction with drawings and Examples.
Fig. 1 is structural representation of the present invention.
Fig. 2 is employing of the present invention overlap joint two runnings schematic diagrames when carrying the conveyors overlap joint.
With reference to accompanying drawing, a kind of development machine first conveyor device, by front chute 1, bolt 2, the first pressuring chain plate 3, intermediate chute 4, rear support support body 5, support 6, the second pressuring chain plate 7, rear chute 8, mine car (or explosion-proof tractor, railless free-wheeled vehicle) 9, two fortune links 10, two runnings are carried conveyor 11 and are formed, front chute 1,8 three sections chutes of intermediate chute 4 and rear chute are connected and fixed by bolt 2, the first pressuring chain plate 3 and front chute 1, intermediate chute 4 is connected and fixed by bolt 2, the second pressuring chain plate 7 is connected and fixed by bolt 2 with intermediate chute 4, intermediate chute 4 is connected and fixed by bolt 2 with support 6, and be provided with holder device in the bottom, support 6 is connected and fixed by bolt 2 with rear support support body 5, is used for loading mine car (or the explosion-proof tractor of carrying the material that gets off from first conveyor, railless free-wheeled vehicle) 9 below the first conveyor device, overlaps; Front chute 1 and rear chute 8 are connected and fixed by bolt 2, and two transport links 10 is connected and fixed by bolt 2 with rear support support body 5, are used for loading from first conveyor carrying two running year conveyors 11 of the material that gets off to link to each other by bearing pin and two fortune links 10; The operating principle of this device is, intermediate chute 4 is connected by bolt 2 with front chute 1, rear chute 8, and detachable first conveyor chute structure realizes carrying conveyors 11, mine car (or explosion-proof tractor, railless free-wheeled vehicle) 9 overlap joint transported materials with two runnings; Detachable intermediate chute 4 structures realize the adjustment to first conveyor tail height, cantilever segment change in length.Make first conveyor and two fortune leather belt reshipment machines 11, mine cars (or explosion-proof tractor, railless free-wheeled vehicle) 9 overlap joint transported materials, adapt to the use of various working, increase intermediate chute 4, two sections original chutes are split into three sections, but the size of the non-disconnectable inloading part of decrease is convenient to underground transportation and installation; In the situation of front chute 1, rear chute 8 no changes, can be by changing length and the angle of intermediate chute 4, change the height of a fortune discharging point and with respect to the distance of body afterbody, satisfy client's various different requirements; Increase the design of intermediate chute, can make the front chute 1 of original common fortune, rear chute 8 assemblings are used in a fortune that lengthens, greatly improved the versatility of section's dress part, reduced cost of production, alleviated workman's labour intensity, the joint face of front chute 1 is connected with bolt 2 with the front joint face of intermediate chute 4, the rear joint face of intermediate chute 4 is connected with bolt 2 with the joint face of rear chute 8, complete lengthening one fortune chute is finished in assembling, intermediate chute 4 bottoms have support 6 to hold up, support 6 other ends are fixed on the rear support support body with bolt 2, have guaranteed intensity and the stability of chute bracketed part.
Claims (2)
1. development machine first conveyor device, by front chute, bolt, the first pressuring chain plate, intermediate chute, the rear support support body, support, the second pressuring chain plate, rear chute, mine car, two fortune links, two runnings are carried conveyor and are formed, it is characterized in that: front chute, three sections chutes of intermediate chute and rear chute are bolted fixing, the first pressuring chain plate and front chute, intermediate chute is bolted fixing, the second pressuring chain plate and intermediate chute are bolted fixing, intermediate chute and support are bolted fixing, and be provided with holder device in the bottom, support and rear support support body are bolted fixing, be used for to load below first conveyor is carried the mine car of the material that gets off and first conveyor device to overlap; Front chute and rear chute are bolted fixing, and two fortune links and rear support support body are bolted fixing, are used for loading from first conveyor carrying two running year conveyors of the material that gets off to link to each other with two fortune links by bearing pin.
2. a kind of development machine first conveyor device according to claim 1, it is characterized in that: the operating principle of this device is, intermediate chute and front chute, rear chute are bolted, detachable first conveyor chute structure realizes carrying conveyor, mine car overlap joint transported material with two runnings; Detachable intermediate chute structure realizes the adjustment to first conveyor tail height, cantilever segment change in length.Make first conveyor and two fortune leather belt reshipment machines, mine car overlap joint transported material, adapt to the use of various working, increase intermediate chute, two sections original chutes are split into three sections, but the size of the non-disconnectable inloading part of decrease is convenient to underground transportation and installation; In the situation of front chute, rear chute no change, can be by changing length and the angle of intermediate chute, change the height of a fortune discharging point and with respect to the distance of body afterbody, satisfy client's various different requirements; Increase the design of intermediate chute, can make the front chute of original common fortune, rear chute assembling is used in a fortune that lengthens, greatly improved the versatility of section's dress part, reduced cost of production, alleviated workman's labour intensity, the joint face of front chute is connected with bolt with the front joint face of intermediate chute, the rear joint face of intermediate chute is connected with bolt with the joint face of rear chute, complete lengthening one fortune chute is finished in assembling, the intermediate chute bottom has support to hold up, the support other end is fixed by bolts on the rear support support body, has guaranteed intensity and the stability of chute bracketed part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104693908A CN102926752A (en) | 2012-11-19 | 2012-11-19 | First transporter device for heading machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104693908A CN102926752A (en) | 2012-11-19 | 2012-11-19 | First transporter device for heading machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102926752A true CN102926752A (en) | 2013-02-13 |
Family
ID=47641664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104693908A Pending CN102926752A (en) | 2012-11-19 | 2012-11-19 | First transporter device for heading machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102926752A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112253107A (en) * | 2020-12-21 | 2021-01-22 | 三一重型装备有限公司 | First conveyor device and heading machine |
CN113790062A (en) * | 2021-10-19 | 2021-12-14 | 三一重型装备有限公司 | First conveyer connection structure and entry driving machine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201043467Y (en) * | 2007-02-16 | 2008-04-02 | 上海创力矿山设备有限公司 | Gantry type intermediate haulage conveyor of heading machine |
CN201277035Y (en) * | 2008-09-12 | 2009-07-22 | 三一重型装备有限公司 | Blade type cantilever conveyer |
CN101737046A (en) * | 2008-11-26 | 2010-06-16 | 三一重型装备有限公司 | Scraper type cantilever conveyer |
CN101906968A (en) * | 2010-06-30 | 2010-12-08 | 三一重型装备有限公司 | Tunneling machine |
CN201696042U (en) * | 2010-06-30 | 2011-01-05 | 三一重型装备有限公司 | Tunneling machine |
-
2012
- 2012-11-19 CN CN2012104693908A patent/CN102926752A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201043467Y (en) * | 2007-02-16 | 2008-04-02 | 上海创力矿山设备有限公司 | Gantry type intermediate haulage conveyor of heading machine |
CN201277035Y (en) * | 2008-09-12 | 2009-07-22 | 三一重型装备有限公司 | Blade type cantilever conveyer |
CN101737046A (en) * | 2008-11-26 | 2010-06-16 | 三一重型装备有限公司 | Scraper type cantilever conveyer |
CN101906968A (en) * | 2010-06-30 | 2010-12-08 | 三一重型装备有限公司 | Tunneling machine |
CN201696042U (en) * | 2010-06-30 | 2011-01-05 | 三一重型装备有限公司 | Tunneling machine |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112253107A (en) * | 2020-12-21 | 2021-01-22 | 三一重型装备有限公司 | First conveyor device and heading machine |
CN113790062A (en) * | 2021-10-19 | 2021-12-14 | 三一重型装备有限公司 | First conveyer connection structure and entry driving machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103420123B (en) | Main belt machine end self-cleaning belt feeder and main belt machine end self-cleaning system | |
CN201496069U (en) | Bridge type transfer machine with large span | |
CN105129331A (en) | Retractable type belt conveying device | |
CN115402730A (en) | Intelligent fast digging follow-up continuous transportation system for coal mine | |
CN102926752A (en) | First transporter device for heading machine | |
CN110725695A (en) | Belt conveying system and tunneling equipment with same | |
CN204436459U (en) | A kind of warehouse style leather belt reshipment machine | |
CN203239353U (en) | Mining gantry type reversed loader | |
CN201201797Y (en) | Bidirectional transportation belt conveyor | |
CN103274171B (en) | Intermediate frame mechanism for telescopic belt conveyor | |
CN206035517U (en) | Concurrent operation formula speedy drivage support system | |
CN202743922U (en) | Self-moving device of loader | |
CN107060756A (en) | A kind of airborne rotary and lifting transporter | |
CN103935688A (en) | Conveyor belt capable of bending horizontally | |
CN101264830A (en) | Rock loading machine for mine | |
CN205204021U (en) | Colliery is scraper chain for shuttle car in pit | |
CN105537929A (en) | Tool for underground assembling of shield tunneling machine | |
CN105217267B (en) | Mining mobile flexible tape transporter | |
CN211768162U (en) | Overlength overlap joint bridge type reprint belt feeder | |
CN207813645U (en) | Transportation system for drill loader and driving system | |
CN103640842A (en) | Slope change guiding device for belt conveyor in coal mine tunnel | |
CN204606894U (en) | Machine transported by a kind of scraper plate two | |
CN207917939U (en) | Two operatings carry jigger | |
CN204642925U (en) | A kind of delivery chute on heavy-duty plate feeder | |
CN202520309U (en) | Parallel rapid bolt supporting operation system for heading machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130213 |