CN102926393A - Vacuum water pumping device for treating liquefaction of building foundation and construction method - Google Patents

Vacuum water pumping device for treating liquefaction of building foundation and construction method Download PDF

Info

Publication number
CN102926393A
CN102926393A CN201210476152XA CN201210476152A CN102926393A CN 102926393 A CN102926393 A CN 102926393A CN 201210476152X A CN201210476152X A CN 201210476152XA CN 201210476152 A CN201210476152 A CN 201210476152A CN 102926393 A CN102926393 A CN 102926393A
Authority
CN
China
Prior art keywords
vertical pipe
earthquake
vacuum pump
building
liquefaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210476152XA
Other languages
Chinese (zh)
Inventor
吴海清
刘汉龙
陈育民
丁选明
陶惠
徐呈祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201210476152XA priority Critical patent/CN102926393A/en
Publication of CN102926393A publication Critical patent/CN102926393A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a vacuum water pumping device for treating liquefaction of a building foundation and a construction method. The vacuum water pumping device consists of vertical pipes with drain holes, horizontal pipes without drain holes, connectors, an earthquake triggering device, a vacuum pump, geotechnical cloth and a lead. A drilling construction way is used in the construction method, and the construction method comprises the following steps of: striking the vertical pipes with the drain holes into the surrounding of a building, wherein the pipes can penetrate through liquefiable earth layers; communicating the vertical pipes with the drain holes and the horizontal pipes without the drain holes through the connectors to form a drain system; connecting the vacuum pump and the horizontal pipes without the drain holes; embedding the earthquake triggering device in the building area; and connecting the earthquake triggering device and the vacuum pump through the lead. When an earthquake comes, the earthquake triggering device senses earthquake motion and triggers the vacuum pump to be started to pump excess pore water pressure produced by the liquefaction of the building foundation. The method is wide in application range, applicable to newly built and existing buildings and general liquefied foundations, simple in construction, easy to operate and low in cost.

Description

A kind of vacuum pumping device and job practices of processing building lot liquefaction
Technical field
The invention belongs to building hydraulic engineering technical field, particularly a kind of vacuum pumping device and job practices of processing building lot liquefaction.
 
Background technology
In recent years, China's earthquake was continuous, and especially 5.12 Wenchuan violent earthquakes have caused great casualties and property loss, and this reminds us the earthquake liquefaction problem can not be ignored.Because earthquake is frequent, China revises " seismic design provision in building code " GB 50011-2001, summed up Wenchuan earthquake earthquake experience in 2008, the disaster area fortification intensity is adjusted, the shockproof requirements of some key areas also all correspondingly increases.This has just produced a kind of problem, how to improve the antidetonation of built building grade, reduce the possibility of its foundation liquefaction.
The disaster that is caused by liquefaction in the at present earthquake has caused the common concern of engineering circles.In recent ten years, developed the processing method of multiple Liquefaction Foundation, before the present invention, existing pile foundation has crushed stone pile, anti-liquefaction rigid drainage pile, geo-grid sheet, slip casting etc.Wherein commonly used is to process easy liquefied foundation with pile foundation, but the pile foundation that is arranged in easy liquefaction soil layers very easily is seriously damaged, and construction is complicated, and cost is high.
The pile foundation of commonly using in the engineering now is the processing for the liquefied foundation before the architecture construction, and is not suitable for built building.
 
Summary of the invention
Purpose of the present invention is exactly the defective that is to overcome above-mentioned conventional method, invents a kind of vacuum pumping device and job practices of processing building lot liquefaction, the building that is specially adapted to build.
The technical solution used in the present invention is:
A kind of vacuum pumping device of processing building lot liquefaction, comprise vertical pipe, horizontal pipe, joint, earthquake flip flop equipment, vacuum pump, geotextiles, it is characterized in that: the form of construction work that adopts boring, around building, squeeze into vertical pipe, the vertical pipe depth of burying is according to position and the Depth determination of liquefiable soil layer, vertical pipe sets drain hole at the corresponding length of ground sandy soils place, and in the outside of vertical pipe parcel geotextiles, prevents that drain hole from stopping up; Lay horizontal pipe above vertical pipe, with vertical pipe and horizontal pipe UNICOM, vacuum pump is connected with horizontal pipe by joint; Bury the earthquake flip flop equipment underground in the building place, the earthquake flip flop equipment is connected by wire with vacuum pump; When earthquake was arrived, the earthquake flip flop equipment inductively shook, and triggered vacuum pump and started, and the excess pore water pressure that foundation liquefaction produces is extracted out.
Described pipeline is plastic drainage pipeline, and diameter range 750mm ~ 120mm, the radical of gutter are determined by vertical spacing that according to the size in building place vertical spacing is 1.5m ~ 3m.
A kind of job practices of processing the vacuum pumping device of building lot liquefaction, its major technique step is as follows:
1. according to the geological prospecting result, understand position and the degree of depth of ground liquefiable soil layer, determine the vertical pipe depth of burying;
2. the vertical pipe surface uniform is stamped drain hole;
3. accomplishing fluently the vertical pipe surface parcel geotextiles of drain hole;
4. adopt the job practices of boring to squeeze into ground with the vertical pipe of geotextiles parcel, the degree of depth is passed easy liquefied sand layer;
5. laying horizontal pipe;
6. use tee junction, two pass joints with vertical pipe and horizontal pipe UNICOM, form drainage system;
7. the pipeline with drainage system is communicated with vacuum pump, and makes vacuum pump keep "on" position;
8. embedding earthquake flip flop equipment on the building place;
9. by wire, vacuum pump is connected with the earthquake flip flop equipment.
 
Advantage of the present invention and effect are:
(1) with respect to pile foundation commonly used in the common engineering, the scope of application of the present invention is wider, and the liquefied foundation before not only being adapted to construct is processed, and built structure foundation is processed same applicable.
(2) with respect to pile foundation commonly used in the common engineering, this device adopts plastic conduit, and with low cost, construction technology is simple, is easy to operate in putting into practice engineering.
(3) in ground, bury the earthquake flip flop equipment underground, can start vacuum pump and draw water in time at the earthquake early period of origination, played the effect of good earthquake prevention.
 
Description of drawings
Fig. 1 the present invention processes the vacuum pumping device schematic diagram of building lot liquefaction
Fig. 2 the present invention processes the vacuum pumping device plan view of building lot liquefaction
Fig. 3 tee junction schematic diagram
Fig. 4 two pass joint schematic diagrames
Fig. 5 vertical pipe drain hole arrangement diagram
Among the figure:
1 building
2 horizontal pipes
3 vertical pipes
4 tee junctions
5 two pass joints
6 earthquake flip flop equipments
7 vacuum pumps
8 wires
9 drain holes
10 geotextiles
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described in detail.Protection scope of the present invention is not limited with the specific embodiment, but is limited by claim.
 
The specific embodiment:
The present invention is a kind of vacuum pumping device of processing building lot liquefaction, can in time the excessive moisture that produces owing to earthquake liquefaction in the ground be discharged outside the building lot, adopt the form of construction work of boring, vertically squeeze into the vertical pipe (3) with drain hole around building (1), vertical pipe (3) passes easy liquefaction soil layers; By tee junction (4), two pass joints (5) vertical pipe (3) is communicated with the horizontal pipe (2) with drain hole not, forms drainage system; Vacuum pump (7) is connected with the horizontal pipe (2) with drain hole not, bury earthquake flip flop equipment (6) underground in building (1) below, and link together by wire (8) with vacuum pump (7), when earthquake was arrived, earthquake flip flop equipment (6) touched vacuum pump (7) startup and draws water rapidly.
The Specific construction step:
1. according to the geological prospecting result, understand position and the degree of depth of ground liquefiable soil layer, determine vertical pipe (3) depth of burying;
2. vertical tube (3) road surface uniform is stamped drain hole (9);
3. in the vertical pipe of accomplishing fluently drain hole (9) (3) surface parcel geotextiles (10);
4. adopt the job practices of boring to squeeze into ground with the vertical pipe (3) of geotextiles (10) parcel, the degree of depth is passed easy liquefied sand layer;
5. lay not the horizontal pipe (2) with drain hole;
With tee junction (4), two pass joints (5) with vertical pipe (3) with not with horizontal pipe (2) UNICOM of drain hole, form drainage system;
7. the pipeline with drainage system is communicated with vacuum pump (7), and makes vacuum pump (7) keep "on" position;
8. embedding earthquake flip flop equipment (6) on the building place;
9. by wire (8), vacuum pump (7) is connected 6 with the earthquake flip flop equipment) connect.

Claims (4)

1. process the vacuum pumping device that building lot liquefies for one kind, comprise vertical pipe, horizontal pipe, joint, earthquake flip flop equipment, vacuum pump, geotextiles, it is characterized in that: the form of construction work that adopts boring, around building, squeeze into vertical pipe, the vertical pipe depth of burying is according to position and the Depth determination of liquefiable soil layer, vertical pipe sets drain hole at the corresponding length of ground sandy soils place, and in the outside of vertical pipe parcel geotextiles; Lay horizontal pipe above vertical pipe, with vertical pipe and horizontal pipe UNICOM, vacuum pump is connected with horizontal pipe by joint; Bury the earthquake flip flop equipment underground in the building place, the earthquake flip flop equipment is connected by wire with vacuum pump.
2. a kind of vacuum pumping device of processing building lot liquefaction according to claim 1, it is characterized in that: the radical of described vertical pipe is determined by vertical spacing that according to the size in building place vertically spacing is 1.5m ~ 3m.
3. a kind of vacuum pumping device of processing building lot liquefaction according to claim 1, it is characterized in that: described vertical pipe, horizontal pipe are plastic drainage pipeline, diameter is 750mm ~ 120mm.
4. a kind of job practices of processing the vacuum pumping device of building lot liquefaction according to claim 1 comprises following technical step:
1) according to the geological prospecting result, understand position and the degree of depth of ground liquefiable soil layer, determine the vertical pipe depth of burying;
2) the vertical pipe surface uniform is stamped drain hole;
3) accomplishing fluently the vertical pipe surface parcel geotextiles of drain hole;
4) adopt the job practices of boring to squeeze into ground with the vertical pipe of geotextiles parcel, the degree of depth is passed easy liquefied sand layer;
5) lay horizontal pipe;
6) use tee junction, two pass joints with vertical pipe and horizontal pipe UNICOM, form drainage system;
7) pipeline with drainage system is communicated with vacuum pump, and makes vacuum pump keep "on" position;
8) embedding earthquake flip flop equipment on the building place;
9) by wire, vacuum pump is connected with the earthquake flip flop equipment.
CN201210476152XA 2012-11-22 2012-11-22 Vacuum water pumping device for treating liquefaction of building foundation and construction method Pending CN102926393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210476152XA CN102926393A (en) 2012-11-22 2012-11-22 Vacuum water pumping device for treating liquefaction of building foundation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210476152XA CN102926393A (en) 2012-11-22 2012-11-22 Vacuum water pumping device for treating liquefaction of building foundation and construction method

Publications (1)

Publication Number Publication Date
CN102926393A true CN102926393A (en) 2013-02-13

Family

ID=47641310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210476152XA Pending CN102926393A (en) 2012-11-22 2012-11-22 Vacuum water pumping device for treating liquefaction of building foundation and construction method

Country Status (1)

Country Link
CN (1) CN102926393A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587499A (en) * 2017-10-09 2018-01-16 浙江科技学院 Liquified sand foundation bracing means and reinforcement means
CN108374406A (en) * 2018-02-07 2018-08-07 河海大学 The anti-foundation liquefaction system and application method of automatic sensing P wave and Active Drainage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033402A (en) * 1987-12-01 1989-06-14 张俊生 Vacuum discharging and board-like pressurizing unit combined treatment method
JPH0438319A (en) * 1990-06-04 1992-02-07 Fujita Corp Method for preventing ground from being liquefied
CN1793519A (en) * 2005-12-29 2006-06-28 徐士龙 Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method
CN101182709A (en) * 2007-11-30 2008-05-21 陈江涛 Method of composite electroosmosis, vacuum precipitation and vacuum preload reinforcement foundation and device thereof
CN201722698U (en) * 2010-07-09 2011-01-26 许累峰 Quick well sinking and water precipitating device
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN203034469U (en) * 2012-11-22 2013-07-03 河海大学 Vacuum water pumping device processing liquidation of building foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033402A (en) * 1987-12-01 1989-06-14 张俊生 Vacuum discharging and board-like pressurizing unit combined treatment method
JPH0438319A (en) * 1990-06-04 1992-02-07 Fujita Corp Method for preventing ground from being liquefied
CN1793519A (en) * 2005-12-29 2006-06-28 徐士龙 Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method
CN101182709A (en) * 2007-11-30 2008-05-21 陈江涛 Method of composite electroosmosis, vacuum precipitation and vacuum preload reinforcement foundation and device thereof
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN201722698U (en) * 2010-07-09 2011-01-26 许累峰 Quick well sinking and water precipitating device
CN203034469U (en) * 2012-11-22 2013-07-03 河海大学 Vacuum water pumping device processing liquidation of building foundation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587499A (en) * 2017-10-09 2018-01-16 浙江科技学院 Liquified sand foundation bracing means and reinforcement means
CN107587499B (en) * 2017-10-09 2019-12-24 浙江科技学院 Liquefiable sandy soil foundation reinforcing device and reinforcing method
CN108374406A (en) * 2018-02-07 2018-08-07 河海大学 The anti-foundation liquefaction system and application method of automatic sensing P wave and Active Drainage

Similar Documents

Publication Publication Date Title
CN106801417A (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN103437371B (en) Construction method of water drainage uplift pile
CN101886390A (en) All casing static pressure pile pulling technology in narrow space
CN106437798A (en) Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN102704488A (en) Novel soft soil foundation pit excavation method
CN109577380B (en) Construction method for basement bottom plate water seepage under karst landform condition
CN107908901A (en) The computational methods that artesian water precipitation influences surrounding enviroment in a kind of foundation pit construction
CN101225657A (en) Low-position belt type vacuum sealing-water lowering new method
CN102767174A (en) Dynamic and static water-discharging vibration method
CN102926393A (en) Vacuum water pumping device for treating liquefaction of building foundation and construction method
CN103542174B (en) A kind of Subsidence Land in Coal Mining Area Pipe-lining methods
CN203625883U (en) Steel sheet support pile with pipes for foundation pit construction
CN203034469U (en) Vacuum water pumping device processing liquidation of building foundation
CN104975611A (en) Sinking device and method for well point drawdown pipe of liquid soil layer
CN101130953B (en) Deep vacuum vibration processing method for soft ground base
CN202644589U (en) Soft soil geology pre-stress tube pile static pressing anti-soil-squeezing structure
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN204690767U (en) A kind of Novel water collection sleeve pipe for deep foundation ditch and water feeding and draining device
CN102828499A (en) Improved quick high vacuum densification soft foundation treatment method
CN206298896U (en) A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN204919528U (en) A go out membrane structure for detecting vacuum pre -compaction in -process reinforcement effect
CN210768905U (en) Coal mining bottom plate dredging water simulation device
CN104631465A (en) Deep foundation pit excavation construction method adopted under pebble bed red sandstone geological condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130213