CN102924933A - Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof - Google Patents

Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof Download PDF

Info

Publication number
CN102924933A
CN102924933A CN2012103635337A CN201210363533A CN102924933A CN 102924933 A CN102924933 A CN 102924933A CN 2012103635337 A CN2012103635337 A CN 2012103635337A CN 201210363533 A CN201210363533 A CN 201210363533A CN 102924933 A CN102924933 A CN 102924933A
Authority
CN
China
Prior art keywords
rubber powder
desulfurization
storage stability
preparation
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103635337A
Other languages
Chinese (zh)
Inventor
李晓林
王秀平
郑广宇
张立群
张祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Chemical Technology
Original Assignee
Beijing University of Chemical Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Chemical Technology filed Critical Beijing University of Chemical Technology
Priority to CN2012103635337A priority Critical patent/CN102924933A/en
Publication of CN102924933A publication Critical patent/CN102924933A/en
Pending legal-status Critical Current

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The invention relates to desulfuration rubber powder modified asphalt with high storage stability and a preparation method thereof. The method comprises the following steps of: premixing asphalt, a stabilizer and desulfuration rubber powder at the temperature of between 160 and 190 DEG C; and mixing the asphalt, the stabilizer and the desulfuration rubber powder uniformly by high-speed shearing under the action of mechanical force to obtain the desulfuration rubber powder modified asphalt. According to the method, the compatibility of the asphalt and the desulfuration rubber powder is improved by the stabilizer under the chemical action, so that the storage stability of the desulfuration rubber powder modified asphalt is improved, and three index performances of the modified asphalt are also improved greatly. Simultaneously, the aims of recycling wastes and reducing environmental pollution are fulfilled.

Description

A kind of high storage stability asphalt modified with desulfurized rubber powder and preparation method thereof
Technical field:
The present invention relates to a kind of high storage stability asphalt modified with desulfurized rubber powder and preparation method thereof.
Background technology:
Pitch has been widely used in the construction of high-grade highway, but the plain asphalt road surface exists shortcomings such as high temperature easily softening, fragile under low temperaturely splits, poor flexibility.Polymer modified asphalt can improve these use propertieies of bituminous pavement, and simultaneously ageing-resistant and weather resistance and anti-water damage property are also largely strengthened.Studies show that polymer modified asphalt also is very significantly improved at aspects such as anti-rut, antifatigue cracking, resistance to permanent deformation.Because the existence of these premium propertiess, polymeric modification pitch more and more are applied to the construction of high-grade highway at present.The polymerization that is applied at present modifying asphalt mainly contains SBS thermoplastic elastomer, styrene-butadiene rubber(SBR), polyethylene etc., and still, the cost of these materials is higher, limits its application on highway.
Rubber powder is made through smashing to process by rubber wastes such as junked tires, and rubber powder modified asphalt not only can improve the various performances of pitch, can also recycle waste old, reduce solid waste to the pollution of environment, and cost is lower.The shortcomings such as but from domestic and international research situation, common waste rubber powder modified asphalt exists that viscosity is large, poor fluidity, compound stir difficulty and the bad dispersibility of rubber powder in pitch, causes easily compactness of pavement not enough, and porosity is large; Secondly, rubber powder is combined bad with the interface of pitch, poor stability, and in storing use procedure, the modifying asphalt poor stability produces laminated segregation easily between rubber powder and the pitch, have a strong impact on road quality.
The desulfurization rubber powder is the waste rubber powder that waste rubber powder is made through certain desulfurization means desulfurization, the desulfurization rubber powder is owing to be that the cross-link bond of three-dimensional net structure in the original shoddy is destroyed, the viscosity of asphalt modified with desulfurized rubber powder is descended rapidly, solved common rubber powder modified asphalt and had that viscosity is large, the problem of constructional difficulties.It is joined carry out the premium properties that modification not only can keep the waste rubber powder modifying asphalt in the pitch, simultaneously because it is in the process of carrying out desulfurization, under the effect of high temperature and high shear force, make the desulfurization vulcanized rubber powder produce the part active group, can well improve the consistency of itself and pitch, storage stability is had some improvement.But the desulfurization degree of the desulfurization rubber powder for preparing under present employed high temperature and the high shear force is smaller, segregation still can appear in the long-time high temperature storage process, simultaneously owing to the desulfurization rubber powder that exists of sweetening agent also can further be degraded, have influence on the use properties on modifying asphalt and road surface, need further to improve.The present invention comes modifying asphalt with the overcritical desulfurization rubber powder of high desulfurization degree, under the effect of stablizer, the storage stability of modifying asphalt is improved greatly, and high temperature and the low-temperature performance of pitch have also obtained further improvement simultaneously.
Summary of the invention:
The invention provides a kind of high storage stability asphalt modified with desulfurized rubber powder and preparation method thereof, the desulfurization rubber powder that makes with pitch, stablizer with supercritical process is premix at a certain temperature, then makes after high speed shear.Because used desulfurization rubber powder adopts supercritical process to make, its desulfurization degree is high, and the crosslinking structure of original rubber is broken, so that the viscosity of modifying asphalt reduces, ductility increases.In addition, the active group effect in the stablizer of interpolation and the desulfurization rubber powder so that the storage stability of modifying asphalt is improved, has suppressed the degraded of rubber powder in storage process simultaneously.
A kind of high storage stability asphalt modified with desulfurized rubber powder that the present invention relates to, its essentially consist and mass fraction are: 100 parts of pitches, 10~30 parts of desulfurization rubber powders, 0.1~10 part of stablizer.
Described stablizer is any in the following material or their mixture: Pyroglutaric acid, Succinic anhydried, resol, acrylate.
Described desulfurization rubber powder is the desulfurization rubber powder of waste rubber powder through making after the desulfurization, and particle diameter is 20 ~ 80 orders.
Described desulfurization rubber powder is the desulfurization rubber powder that supercritical process makes, can adopt commercial product also can adopt following method preparation: in high-temperature high-pressure reaction kettle, to add rubber powder, activator and dry ice and react, the quality of activator is 2% ~ 10% of rubber powder quality, and the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 150 ℃ ~ 190 ℃ conditions, react 120min ~ 300min; Then in the high speed Banbury mixer, shear 15min ~ 60min and obtain the desulfurization rubber powder.
Described activator is: N, N'-(dithio two-2,1-phenylene) dibenzamide, curing-2, any in 2'-dibenzoyl amido hexichol, tertiary butyl disulphide, the allyl disulfide or their mixture.
The present invention also provides a kind of preparation method of asphalt modified with desulfurized rubber powder, comprises two steps of material pre-mixing and high speed shear mixing, is specially:
(1) material pre-mixing: with pitch, desulfurization rubber powder and stablizer in proportion, under 160~190 ℃ of temperature, fully mix, obtain pre-composition;
(2) high speed shear is mixed: the pre-composition with step (1) obtains, and under 160~190 ℃ of temperature, use high-speed shearing emulsion machine to carry out continuous high shear mixing, make asphalt modified with desulfurized rubber powder.
The premixed time is 5~25min in the above-mentioned steps (1).
The rotating speed of above-mentioned steps (2) high speed emulsification pretreatment machine is 10000~16000r/min.
Above-mentioned steps (2) the high speed shear-mixed time is 30~60min.
The present invention makes pitch, stablizer and desulfurization rubber powder under 160~190 ℃ temperature through high speed shear.Used desulfurization rubber powder is the high desulfurization degree rubber powder that makes with supercritical process, in the two-phase system of this asphalt modified with desulfurized rubber powder, the rubber powder of partial desulfurization and pitch have good consistency and form homogeneous system with pitch, and the content of rubber powder phase is reduced, and assemble thereby reduce rubber powder granule.The reaction of active group in stablizer and the modifying asphalt further strengthens consistency, thereby has solved the problems such as the segregation layering that occurs in storage and the use procedure, degraded.And preparation process of the present invention is simple, and raw material is cheap, has very strong practicality.
Embodiment:
Below by Comparative Examples and embodiment the present invention is further elaborated.
Comparative Examples 1:
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, 20 mass parts, 40 purpose desulfurization rubber powders (the Jiangsu peace is strong), under 600r/min, stir 15min with common stirrer first at 180 ℃, then shear dispersion 45min at 180 ℃ of lower high-speed shearing machines that adopt, rotating speed is 10000r/min, obtain modifying asphalt, the performance index of modifying asphalt see Table 1.
Comparative Examples 2:
Add 100 mass parts, 40 order rubber powders, 3 mass parts N in high-temperature high-pressure reaction kettle, N'-(dithio two-2,1-phenylene) dibenzamide and dry ice react, and the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 170 ℃ of conditions, react 180min; Then be to shear 30min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 20 mass parts makes, under 600r/min, stir 15min with common stirrer first at 180 ℃, then shear dispersion 60min at 180 ℃ of lower high-speed shearing machines that adopt, rotating speed is 10000r/min, obtain modifying asphalt, the performance index of modifying asphalt see Table 1.
Embodiment 1:
Add 100 mass parts, 40 order rubber powders, 4.5 mass parts curing-2 in high-temperature high-pressure reaction kettle, 2'-dibenzoyl amido hexichol and dry ice react, and the add-on of dry ice makes CO in the still 2Degree is 0.466g/cm 3~ 0.6g/cm 3, under 170 ℃ of conditions, react 180min; Then be to shear 45min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 25 mass parts makes, 2 mass parts Pyroglutaric acids, under 600r/min, stir 15min with common stirrer first at 180 ℃, then shear and disperse 45min at 180 ℃ of lower high-speed shearing machines (German Fu Luke D type, lower with) that adopt, rotating speed is 12000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
Embodiment 2:
Add 100 mass parts, 40 order rubber powders, 6 mass parts tertiary butyl disulphide and dry ice and react in high-temperature high-pressure reaction kettle, the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 180 ℃ of conditions, react 150min; Then be to shear 45min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 25 mass parts makes, 1.5 mass parts acrylate, under 600r/min, stir 20min with common stirrer first at 160 ℃, then shear and disperse 45min at 160 ℃ of lower high-speed shearing machines (German Fu Luke D type, lower with) that adopt, rotating speed is 14000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
Embodiment 3:
In high-temperature high-pressure reaction kettle, add 100 mass parts, 40 order rubber powders, 2 mass parts N, N'-(dithio two-2, the 1-phenylene) dibenzamide, 1.5 mass parts curing-2,2'-dibenzoyl amido hexichol and dry ice react, and the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 180 ℃ of conditions, react 150min; Then be to shear 60min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 25 mass parts makes, 1 mass parts Pyroglutaric acid, 0.5 mass parts acrylate, under 600r/min, stir 20min with common stirrer first at 170 ℃, then shear and disperse 30min at 170 ℃ of lower high-speed shearing machines (German Fu Luke D type, lower with) that adopt, rotating speed is 16000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
Embodiment 4:
Add 100 mass parts, 40 order rubber powders, 2 mass parts curing-2 in high-temperature high-pressure reaction kettle, 2`-dibenzoyl amido hexichol, 4 mass parts tertiary butyl disulphide and dry ice react, and the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 170 ℃ of conditions, react 180min; Then be to shear 60min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 20 mass parts makes, 1 mass parts Pyroglutaric acid, 0.5 mass parts resol, 0.5 mass parts acrylate, under 600r/min, stir 25min with common stirrer first at 170 ℃, then shear and disperse 55min at 170 ℃ of lower high-speed shearing machines (German Fu Luke D type, lower with) that adopt, rotating speed is 10000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
Embodiment 5:
Add 100 mass parts, 40 order rubber powders, 3 mass parts allyl disulfides, 2 mass parts tertiary butyl disulphide and dry ice and react in high-temperature high-pressure reaction kettle, the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 190 ℃ of conditions, react 120min; Then be to shear 30min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 20 mass parts makes, 1 mass parts Succinic anhydried, 0.5 mass parts resol, 0.3 mass parts acrylate, under 600r/min, stir 15min with common stirrer first at 190 ℃, then shear and disperse 45min at 190 ℃ of lower high-speed shearing machines (German Fu Luke D type, lower with) that adopt, rotating speed is 12000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
Embodiment 6:
In high-temperature high-pressure reaction kettle, add 100 mass parts, 40 order rubber powders, 1 mass parts N, N'-(dithio two-2, the 1-phenylene) dibenzamide, 1.3 mass parts curing-2,2`-dibenzoyl amido hexichol, 3 mass parts allyl disulfides and dry ice react, and the add-on of dry ice makes CO in the still 2Density is 0.466g/cm 3~ 0.6g/cm 3, under 160 ℃ of conditions, react 220min; Then be to shear 45min in the high speed Banbury mixer (model F370, U.S. Farrel Corp. (US) 25 Main Street, Ansonia, CT 06401, U.S.A.) of 55r/min to obtain overcritical desulfurization rubber powder at rotating speed.
It is 100 parts matrix pitch (Qinhuangdao 70#) with mass fraction, the desulfurization rubber powder that the overcritical doctor treatment of 20 mass parts makes, 0.8 mass parts Pyroglutaric acid, 0.5 mass parts Succinic anhydried, 0.25 mass parts resol, 0.15 mass parts acrylate, under 600r/min, stir 10min with common stirrer first at 180 ℃, then at 180 ℃ of lower high-speed shearing machine (German Fu Luke D types that adopt, together lower) shear and disperse 45min, rotating speed is 13000r/min, obtain modifying asphalt, the performance index of test modifying asphalt.The results are shown in Table 2.
The data of contrast table 1, table 2 can be learnt, the desulfurization rubber powder modified asphalt of the present invention's preparation, on its penetration degree, softening temperature, low-temperature ductility, the especially stability in storage, the asphalt modified with desulfurized rubber powder performance of all not adding properties-correcting agent is significantly improved, and can reach the Ministry of Communications about the performance index requirement of rubber powder modified asphalt.
The performance data of table 1 asphalt modified with desulfurized rubber powder
Test index Matrix pitch Comparative Examples 1 Comparative Examples 2
Penetration degree (0.1mm) 67 35 34
5 ℃ of ductilities (cm) 0 8 11
Softening temperature (° C) 46 65 63
165 ℃ of viscositys (Pa.s) 0.15 1.8 1.2
Storage stability (℃, up and down softening point difference) - 8.3 7.4
The performance data of the modifying asphalt of table 2 the present invention preparation
Figure BDA00002192317600081
Annotate: the testing method of property indices is in table 1, the table 2:
The penetration degree test:
In the water bath with thermostatic control with 25 ℃ on sample, the draw point of load 100g weight freely falls, and the degree of depth of injection in 5 seconds sample is take 0.1mm as unit.
The ductility test:
In 5 ℃ water bath with thermostatic control, with the speed tension specimen of the 5cm/min length (cm) when rupturing.
Softening temperature test (ring and ball method):
5 ℃/min heats up in 5 ℃ of distilled water, and steel ball falls to when the lower floor backplate surface contacts on the sample loop, reads immediately temperature, be softening temperature (℃).
The stable storing property testing:
Pour the rubber powder modified asphalt sample for preparing into diameter 2.5Cm, long for vertically being positioned over 48h in 163 ℃ of baking ovens in the aluminum pipe of 14cm, put into up and down each 1/3 place of sample thief behind the refrigerator cooling 4h after the taking-up, test respectively softening temperature, and get its difference and be used for estimating storage stability.

Claims (7)

1. one kind high storage stability asphalt modified with desulfurized rubber powder, its essentially consist and mass fraction are: 100 parts of pitches, 10~30 parts of desulfurization rubber powders, 0.1~10 part of stablizer; Described stablizer is any in the following material or their mixture: Pyroglutaric acid, Succinic anhydried, resol, acrylate.
2. high storage stability asphalt modified with desulfurized rubber powder according to claim 1 is characterized in that: described desulfurization rubber powder is the desulfurization rubber powder of waste rubber powder through making after the desulfurization, and particle diameter is 20 ~ 80 orders.
3. high storage stability asphalt modified with desulfurized rubber powder according to claim 1 and 2, it is characterized in that: described desulfurization rubber powder makes under super critical condition.
4. the preparation method of a high storage stability asphalt modified with desulfurized rubber powder claimed in claim 1 comprises two steps of material pre-mixing and high speed shear mixing, is specially:
(1) material pre-mixing: with pitch, desulfurization rubber powder and stablizer in proportion, under 160~190 ℃ of temperature, fully mix, obtain pre-composition;
(2) high speed shear is mixed: the pre-composition with step (1) obtains, and under 160~190 ℃ of temperature, use high-speed shearing emulsion machine to carry out continuous high shear mixing, make asphalt modified with desulfurized rubber powder.
5. according to claim 4 preparation method, it is characterized in that: the premixed time is 5~25min in the step (1).
6. according to claim 4 preparation method, it is characterized in that: the rotating speed of step (2) high speed emulsification pretreatment machine is 10000~16000r/min.
7. according to claim 4 preparation method, it is characterized in that: step (2) the high speed shear-mixed time is 30~60min.
CN2012103635337A 2012-09-26 2012-09-26 Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof Pending CN102924933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103635337A CN102924933A (en) 2012-09-26 2012-09-26 Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103635337A CN102924933A (en) 2012-09-26 2012-09-26 Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof

Publications (1)

Publication Number Publication Date
CN102924933A true CN102924933A (en) 2013-02-13

Family

ID=47639871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103635337A Pending CN102924933A (en) 2012-09-26 2012-09-26 Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof

Country Status (1)

Country Link
CN (1) CN102924933A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104448457A (en) * 2014-12-12 2015-03-25 上海仁聚新材料科技有限公司 Rubber-plastic composite asphalt modifier, rubber-plastic composite modified asphalt and preparation method of rubber-plastic composite modified asphalt
CN104693817A (en) * 2015-02-12 2015-06-10 北京路德永泰环保科技有限公司 Composite-waste-rubber-powder-particle modified asphalt capable of being stored stably and preparation method thereof
CN107177208A (en) * 2017-05-05 2017-09-19 安徽世界村新材料有限公司 A kind of special scrap rubber composite modifier of waterproof roll and preparation method thereof
CN107325569A (en) * 2017-08-22 2017-11-07 四川知行路桥股份有限公司 A kind of modifying agent for high viscosity compound rubber asphalt
CN108727843A (en) * 2018-06-04 2018-11-02 长安大学 A kind of composite modified devulcanized rubber pitch and preparation method thereof
CN110746788A (en) * 2019-11-08 2020-02-04 同济大学 High-solubility rubber powder modified asphalt and preparation method thereof
CN113061288A (en) * 2021-03-29 2021-07-02 广西交科集团有限公司 Desulfurized rubber powder and preparation method thereof, and rubber asphalt composite material and preparation method thereof
CN113214535A (en) * 2021-03-31 2021-08-06 长安大学 Activated rubber powder and preparation method thereof, and modified asphalt based on activated rubber powder and preparation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1441005A (en) * 2003-03-31 2003-09-10 武汉理工大学 Asphalt modified with desulfurized rubber powder
JP2006206811A (en) * 2005-01-31 2006-08-10 Yokohama Rubber Co Ltd:The Rubber-containing composition and its production method and water-proof sheet comprising the rubber-containing composition
CN101503525A (en) * 2009-03-11 2009-08-12 北京化工大学 Method for desulphurization, disaggregation and regeneration of vulcanized rubber
CN101555354A (en) * 2008-04-11 2009-10-14 深圳市海川实业股份有限公司 Method for preparing waste rubber modified asphalt
CN101831184A (en) * 2010-03-23 2010-09-15 江汉大学 Pitch modified from waste tire rubber powder and preparation method thereof
CN102040847A (en) * 2010-12-03 2011-05-04 北京化工大学 Asphalt modified by desulfurated rubber powder and preparation method thereof
CN102604153A (en) * 2012-02-28 2012-07-25 青岛科技大学 Method and device for supercritical CO2 assisted preparation of regenerated rubber

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1441005A (en) * 2003-03-31 2003-09-10 武汉理工大学 Asphalt modified with desulfurized rubber powder
JP2006206811A (en) * 2005-01-31 2006-08-10 Yokohama Rubber Co Ltd:The Rubber-containing composition and its production method and water-proof sheet comprising the rubber-containing composition
CN101555354A (en) * 2008-04-11 2009-10-14 深圳市海川实业股份有限公司 Method for preparing waste rubber modified asphalt
CN101503525A (en) * 2009-03-11 2009-08-12 北京化工大学 Method for desulphurization, disaggregation and regeneration of vulcanized rubber
CN101831184A (en) * 2010-03-23 2010-09-15 江汉大学 Pitch modified from waste tire rubber powder and preparation method thereof
CN102040847A (en) * 2010-12-03 2011-05-04 北京化工大学 Asphalt modified by desulfurated rubber powder and preparation method thereof
CN102604153A (en) * 2012-02-28 2012-07-25 青岛科技大学 Method and device for supercritical CO2 assisted preparation of regenerated rubber

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
辛晓: "橡胶在超临界CO2流体中扩散与降解研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104448457A (en) * 2014-12-12 2015-03-25 上海仁聚新材料科技有限公司 Rubber-plastic composite asphalt modifier, rubber-plastic composite modified asphalt and preparation method of rubber-plastic composite modified asphalt
CN104448457B (en) * 2014-12-12 2016-06-22 上海仁聚新材料科技有限公司 Rubber and plastic composite asphalt modifier, rubber and plastic compound modified asphalt and preparation method thereof
CN104693817A (en) * 2015-02-12 2015-06-10 北京路德永泰环保科技有限公司 Composite-waste-rubber-powder-particle modified asphalt capable of being stored stably and preparation method thereof
CN107177208A (en) * 2017-05-05 2017-09-19 安徽世界村新材料有限公司 A kind of special scrap rubber composite modifier of waterproof roll and preparation method thereof
CN107325569A (en) * 2017-08-22 2017-11-07 四川知行路桥股份有限公司 A kind of modifying agent for high viscosity compound rubber asphalt
CN108727843A (en) * 2018-06-04 2018-11-02 长安大学 A kind of composite modified devulcanized rubber pitch and preparation method thereof
CN110746788A (en) * 2019-11-08 2020-02-04 同济大学 High-solubility rubber powder modified asphalt and preparation method thereof
CN113061288A (en) * 2021-03-29 2021-07-02 广西交科集团有限公司 Desulfurized rubber powder and preparation method thereof, and rubber asphalt composite material and preparation method thereof
CN113214535A (en) * 2021-03-31 2021-08-06 长安大学 Activated rubber powder and preparation method thereof, and modified asphalt based on activated rubber powder and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102924933A (en) Desulfuration rubber powder modified asphalt with high storage stability and preparation method thereof
CA2797305C (en) Rubber asphalt and preparation method thereof
CN101143968B (en) Waste rubber powder modified asphalt composition for increasing storage stability and preparation method thereof
CN101831184B (en) Pitch modified from waste tire rubber powder and preparation method thereof
CN100567399C (en) A kind of rubber powder modified asphalt and working method thereof
CN101812234B (en) Waste rubber powder/waste plastics/SBS composite modified asphalt and preparation method thereof
CN101767957B (en) Asphalt mixture modifier and application method thereof
Ahmedzade et al. Laboratory investigation of the properties of asphalt concrete mixtures modified with TOP–SBS
CN104559242A (en) Waste rubber powder modified asphalt composition and preparation method thereof
CN109385106A (en) Low viscous high performance modified bitumen of one kind and preparation method thereof
CN104830076A (en) Method for preparing rubber waste cracking converted modified asphalt
CN102040847A (en) Asphalt modified by desulfurated rubber powder and preparation method thereof
CN108165031A (en) A kind of production technology of rubber powder modified asphalt
CN103773009A (en) Preparation method for high-viscosity modified asphalt
CN109810520A (en) One kind having both the high glue pitch of high performance low-temperature environment-friendlyization and its production technology
CN103819918A (en) Composite high-viscosity modified asphalt and preparation method thereof
CN104693818A (en) Composite-SBS (Styrene Butadiene Styrene block polymer)-particle modified asphalt with storage stability and aging resistance and preparation method thereof
CN103897594A (en) Rubber powder modified emulsified asphalt waterproof coating
CN104830075A (en) Preparation method and use of low noise asphalt pavement cementing material
CN101831188B (en) Modified asphalt composition with high content of rubber powder and preparation and application thereof
CN102453333B (en) Preparation method of polymer modified asphalt
Ansari et al. Effect of cup lump rubber as a sustainable bio-modifier on the properties of bitumen incorporating polyphosphoric acid
Meng et al. Review of emulsified asphalt modification mechanisms and performance influencing factors
CN112409802B (en) High-performance waste tire rubber powder modified asphalt and preparation method thereof
CN106633964A (en) Modified asphalt composition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130213