CN102916851A - 一种网络流量预测方法及装置 - Google Patents
一种网络流量预测方法及装置 Download PDFInfo
- Publication number
- CN102916851A CN102916851A CN2012103593870A CN201210359387A CN102916851A CN 102916851 A CN102916851 A CN 102916851A CN 2012103593870 A CN2012103593870 A CN 2012103593870A CN 201210359387 A CN201210359387 A CN 201210359387A CN 102916851 A CN102916851 A CN 102916851A
- Authority
- CN
- China
- Prior art keywords
- flow
- predicted
- network traffic
- sample value
- operating system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210359387.0A CN102916851B (zh) | 2012-09-24 | 2012-09-24 | 一种网络流量预测方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210359387.0A CN102916851B (zh) | 2012-09-24 | 2012-09-24 | 一种网络流量预测方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102916851A true CN102916851A (zh) | 2013-02-06 |
CN102916851B CN102916851B (zh) | 2016-03-23 |
Family
ID=47615088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210359387.0A Active CN102916851B (zh) | 2012-09-24 | 2012-09-24 | 一种网络流量预测方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102916851B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103744749A (zh) * | 2014-01-11 | 2014-04-23 | 浪潮电子信息产业股份有限公司 | 一种基于预算算法的虚拟机智能备份方法 |
CN104410582A (zh) * | 2014-12-10 | 2015-03-11 | 国家电网公司 | 一种基于流量预测的电力通信网流量均衡方法 |
CN109586954A (zh) * | 2018-11-14 | 2019-04-05 | 网宿科技股份有限公司 | 一种网络流量预测方法、装置及电子设备 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020080726A1 (en) * | 2000-12-21 | 2002-06-27 | International Business Machines Corporation | System and method for determining network throughput speed and streaming utilization |
CN102104509A (zh) * | 2011-02-17 | 2011-06-22 | 浪潮(北京)电子信息产业有限公司 | 云操作系统中服务器负载预测的方法及装置 |
CN102647433A (zh) * | 2012-05-21 | 2012-08-22 | 北京航空航天大学 | 一种高效的云存储数据持有性验证方法 |
-
2012
- 2012-09-24 CN CN201210359387.0A patent/CN102916851B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020080726A1 (en) * | 2000-12-21 | 2002-06-27 | International Business Machines Corporation | System and method for determining network throughput speed and streaming utilization |
CN102104509A (zh) * | 2011-02-17 | 2011-06-22 | 浪潮(北京)电子信息产业有限公司 | 云操作系统中服务器负载预测的方法及装置 |
CN102647433A (zh) * | 2012-05-21 | 2012-08-22 | 北京航空航天大学 | 一种高效的云存储数据持有性验证方法 |
Non-Patent Citations (2)
Title |
---|
吴大鹏等: "面向链路稳定性的MANET路径建立机制", 《电子与信息学报》 * |
陈开岩等: "矿井风温预测的一种加速迭代计算新方法", 《采矿与安全工程学报》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103744749A (zh) * | 2014-01-11 | 2014-04-23 | 浪潮电子信息产业股份有限公司 | 一种基于预算算法的虚拟机智能备份方法 |
CN104410582A (zh) * | 2014-12-10 | 2015-03-11 | 国家电网公司 | 一种基于流量预测的电力通信网流量均衡方法 |
CN104410582B (zh) * | 2014-12-10 | 2017-10-10 | 国家电网公司 | 一种基于流量预测的电力通信网流量均衡方法 |
CN109586954A (zh) * | 2018-11-14 | 2019-04-05 | 网宿科技股份有限公司 | 一种网络流量预测方法、装置及电子设备 |
CN109586954B (zh) * | 2018-11-14 | 2020-09-18 | 网宿科技股份有限公司 | 一种网络流量预测方法、装置及电子设备 |
US11252044B2 (en) | 2018-11-14 | 2022-02-15 | Wangsu Science & Technology Co., Ltd. | Network traffic prediction method, apparatus, and electronic device |
Also Published As
Publication number | Publication date |
---|---|
CN102916851B (zh) | 2016-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yuan et al. | Network-wide traffic state estimation using loop detector and floating car data | |
Shu et al. | Wireless traffic modeling and prediction using seasonal ARIMA models | |
CN107239846B (zh) | 停车场泊位预测处理方法及装置 | |
CN104407688A (zh) | 基于树回归的虚拟化云平台能耗测量方法及系统 | |
Balijepalli et al. | The two-regime transmission model for network loading in dynamic traffic assignment problems | |
Lu et al. | A note on resource allocation scheduling with group technology and learning effects on a single machine | |
US20180047043A1 (en) | Determining Sensor Placement and a Reward Sharing Mechanism Based on Shared Energy Forecasting Information | |
US11379766B2 (en) | Sensor deployment | |
CN111835536B (zh) | 一种流量预测方法和装置 | |
Kim et al. | Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach | |
CN102916851B (zh) | 一种网络流量预测方法及装置 | |
Vicil et al. | Computationally efficient optimization of stock pooling and allocation levels for two-demand-classes under general lead time distributions | |
JP5628745B2 (ja) | トラヒック予測方法及び装置及びプログラム | |
JP6176390B2 (ja) | 情報処理装置、解析方法、及び、プログラム記録媒体 | |
CN115688547A (zh) | 模拟天气情景和极端天气预测 | |
CN104424294A (zh) | 一种信息处理方法及装置 | |
Diriba et al. | Statistical modeling of spatial extremes through max-stable process models: Application to extreme rainfall events in South Africa | |
Lu et al. | Estimation of lane-level travel time distributions under a connected environment | |
Zietz et al. | When was the US housing downturn predictable? A comparison of univariate forecasting methods | |
Zheng et al. | Evaluation of peak over threshold approach for road safety estimation | |
Han et al. | On the estimation of space-mean-speed from inductive loop detector data | |
CN103530190A (zh) | 一种负载预测方法及装置 | |
Sørup et al. | Evaluating catchment response to artificial rainfall from four weather generators for present and future climate | |
CN112764660A (zh) | 用于数据搬移的方法、设备和计算机可读存储介质 | |
CN102930346B (zh) | 一种soa服务平均故障间隔时间预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180827 Address after: 200436 Room 411, No. three, JIANGCHANG Road, Jingan District, Shanghai, 411 Patentee after: SHANGHAI INSPUR CLOUD CALCULATING SERVICE CO.,LTD. Address before: 100085 floor 1, C 2-1, No. 2, Shang Di Road, Haidian District, Beijing. Patentee before: INSPUR (BEIJING) ELECTRONIC INFORMATION INDUSTRY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221021 Address after: 071000 Room 502, Block B, East Lake Yunduan Science and Technology Industrial Park, No. 1111, Jinhe Street, Dongjinzhuang Township, Lianchi District, Baoding City, Hebei Province Patentee after: Baoding Inspur Cloud Computing Co.,Ltd. Address before: 200436 Room 411, No. three, JIANGCHANG Road, Jingan District, Shanghai, 411 Patentee before: SHANGHAI INSPUR CLOUD CALCULATING SERVICE CO.,LTD. |
|
TR01 | Transfer of patent right |