CN102914674A - Method for selecting insulation clearance distance required by impulse voltage generator - Google Patents

Method for selecting insulation clearance distance required by impulse voltage generator Download PDF

Info

Publication number
CN102914674A
CN102914674A CN2012103792484A CN201210379248A CN102914674A CN 102914674 A CN102914674 A CN 102914674A CN 2012103792484 A CN2012103792484 A CN 2012103792484A CN 201210379248 A CN201210379248 A CN 201210379248A CN 102914674 A CN102914674 A CN 102914674A
Authority
CN
China
Prior art keywords
test
voltage
impulse
discharge
voltage generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103792484A
Other languages
Chinese (zh)
Other versions
CN102914674B (en
Inventor
曹晶
万启发
张勤
谷莉莉
许中
全姗姗
彭磊
李玮东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201210379248.4A priority Critical patent/CN102914674B/en
Publication of CN102914674A publication Critical patent/CN102914674A/en
Application granted granted Critical
Publication of CN102914674B publication Critical patent/CN102914674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The invention provides a method for selecting insulation clearance distance required by an impulse voltage generator. The method includes the following steps of firstly, determining nominal voltage UN of testing equipment according to test data; secondly, performing discharge tests to obtain a discharge voltage and distance relation curve; and thirdly, determining required insulation clearance distance according to the test curve. The method for selecting insulation clearance distance applicable to impact voltage generators different in specification parameters is provided by completely considering conditions such as test voltage of tested equipment, different margin coefficients and curves of different types of electrode discharging characteristics, and can provide reference for on-site mounting and positioning of impact testing equipment in labs.

Description

The system of selection of the required insulation clearance of a kind of impulse voltage generator
Technical field
The present invention relates to the system of selection of the required insulation clearance of a kind of impulse voltage generator, be a kind of minimum insulation that considers the conditions such as tested device trial voltage, different nargin coefficient, different type electrodes discharge characteristic curve apart from system of selection, can be the on-the-spot location of installing of different size parameter impulse voltage generator reference frame be provided.
Background technology
Along with development super, the extra-high voltage electric transmission and transformation engineering, impulse voltage generator has become each High-Voltage Experimentation chamber and has carried out one of thunder and lightning, switching impulse test visual plant.Its voltage and capacity promote with voltage class of electric power system and improve constantly, and thousands of kilovolts of impulse voltage generators are very general at home and abroad.Because impulse voltage generator voltage is higher, its insulation clearance of choose reasonable how, normally use simultaneously at assurance equipment, do not cause because the insulation distance shortcoming causes surroundings wall, grounding body paradoxical discharge phenomenon are occured, become the major issue that newly-built laboratory must be considered.
At present, situation about because clearance is inadequate peripheral object discharge being occured when existing the laboratory impulse voltage generator to use, cause a lot of high-voltage tests normally to carry out, reduced to a certain extent the service efficiency of impulse voltage generator, cause the device resource waste, situation is serious, the serious consequence that will cause the engineering project progress to lag behind.Simultaneously, the newly-built laboratory that has blindly increases insulation distance in order to stop insulation distance, causes laboratory construction cost significantly to promote, and design proposal is difficult to by examination.Therefore, the present invention proposes a kind of different size parameter impulse voltage generator insulation clear space that is applicable to apart from the method for selecting considering under the conditions such as tested device trial voltage, different nargin coefficient, different type electrodes discharge characteristic curve.
The at present domestic pertinent literature report that also is not applicable to the system of selection of the required insulation clearance of impulse voltage generator.In view of this, be necessary to provide the system of selection of the required insulation clearance of a kind of impulse voltage generator, to address the above problem.
Summary of the invention
The objective of the invention is to propose a kind of impulse voltage generator that considers under the conditions such as tested device trial voltage, different nargin coefficient, different type electrodes discharge characteristic curve and insulate clear space apart from system of selection, for laboratory testing rig the location is installed reference frame is provided.
Technical scheme of the present invention is: the system of selection of the required insulation clearance of a kind of impulse voltage generator, it is characterized in that, and may further comprise the steps:
1) according to the rated voltage of test figure confirmed test equipment U N:
Require to determine impulse test voltage according to the test type of carrying out, test standard U W, the impact test equipment rated voltage U NFor:
U N= K 1· K 2· K 3· U W
Wherein, K 1Be insulation research nargin coefficient; K 2Be the insulation margin coefficient of testing equipment own; K 3For big capacity load causes the correction factor that plant efficiency reduces;
2) carry out discharge test and obtain sparking voltage and distance relation curve:
Select grading ring, two kinds of typical electrode of wire that the simulation steel tower is carried out respectively standard thunder and lightning, switching impulse discharge, in the research interstice coverage, utilizing impulse voltage generator to produce the wavefront time is 1.2 μ s, half peak value time was that standard lightning wave and the wavefront time of 50 μ s is 250 μ s, half peak value time was the standard operation ripple of 2500 μ s, lifting and lowering method pressurization program is adopted in test, after being the gap tolerance, constantly raise trial voltage step by step until the discharge generation, reduce afterwards trial voltage, if still discharge continues to reduce trial voltage; The trial voltage if the gap tolerance then raises, repeat above process, lightning impulse test and switching impulse discharge test are all carried out repeatedly impulsive discharge, can obtain 50% probability sparking voltage of lightning impulse and switching impulse according to the test figure statistics, each Test Point Data match can be plotted discharge characteristic curve;
3) determine necessary insulation clearance according to trial curve:
According to the corresponding different voltages of impulse voltage generator each point height, can find respectively corresponding clearance distance, take each point as the center of circle, corresponding clearance distance is that radius is made circular arc, can obtain corresponding arc envelope line, thereby draws the edge line of apparatus insulated distance.
The invention has the beneficial effects as follows: this method is to consider a kind of different size parameter impulse voltage generator that is applicable to that proposes under the conditions such as tested device trial voltage, different nargin coefficient, different type electrodes discharge characteristic curve to insulate clear space apart from system of selection, can the location be installed for the laboratory impact test equipment is on-the-spot reference is provided.
Description of drawings
Fig. 1-Figure 4 shows that by carry out the impulsive discharge test in extra-high voltage open field test field selects grading ring, 2 kinds of different type electrodes of wire to carry out standard thunder and lightning, switching impulse test, each test product impulsive discharge test findings, wherein:
Fig. 1 is that analog conducting wire is to steel tower framework lightning impulse test result.
Fig. 2 is that grading ring is to steel tower framework lightning impulse test result.
Fig. 3 is that analog conducting wire is to steel tower framework switching impulse test result.
Fig. 4 is that grading ring is to steel tower framework switching impulse test result.
Fig. 5-Figure 6 shows that and determine impulse voltage generator insulation clearance method synoptic diagram, wherein Fig. 5 is front elevation, Fig. 6 is vertical view.
Embodiment
In order to understand better the present invention, further illustrate content of the present invention below in conjunction with embodiment, but content of the present invention not only is confined to the following examples.Those skilled in the art can make various changes or modifications the present invention, and these equivalent form of values are equally within the listed claims limited range of the application.
Symbol description in the accompanying drawing (Fig. 5, Fig. 6): 1-impulse voltage generator; The 2-wall; The 3-grading ring; 4-ground; d mThe longest clearance distance of-equipment peak place rated voltage correspondence; H-impulse voltage generator height; h-melt pit height; φ-impulse voltage generator external diameter.
The system of selection of the required insulation clearance of a kind of impulse voltage generator of the present invention may further comprise the steps:
1) according to the rated voltage of test figure confirmed test equipment U N:
Require to determine impulse test voltage according to the test type of carrying out, test standard U W, the impact test equipment rated voltage U NFor:
U N= K 1· K 2· K 3· U W
Wherein, K 1Be insulation research nargin coefficient; K 2Be the insulation margin coefficient of testing equipment own; K 3For big capacity load causes the correction factor that plant efficiency reduces;
2) carry out discharge test and obtain sparking voltage and distance relation curve:
Select grading ring, two kinds of typical electrode of wire that the simulation steel tower is carried out respectively standard thunder and lightning, switching impulse discharge, in the research interstice coverage, utilizing impulse voltage generator to produce the wavefront time is 1.2 μ s, half peak value time was that standard lightning wave and the wavefront time of 50 μ s is 250 μ s, half peak value time was the standard operation ripple of 2500 μ s, lifting and lowering method pressurization program is adopted in test, after being the gap tolerance, constantly raise trial voltage step by step until the discharge generation, reduce afterwards trial voltage, if still discharge continues to reduce trial voltage; The trial voltage if the gap tolerance then raises, repeat above process, lightning impulse test and switching impulse discharge test are all carried out repeatedly impulsive discharge, can obtain 50% probability sparking voltage of lightning impulse and switching impulse according to the test figure statistics, each Test Point Data match can be plotted discharge characteristic curve;
3) determine necessary insulation clearance according to trial curve:
According to the corresponding different voltages of impulse voltage generator each point height, can find respectively corresponding clearance distance, take each point as the center of circle, corresponding clearance distance is that radius is made circular arc, can obtain corresponding arc envelope line, thereby draws the edge line of apparatus insulated distance.
The below describes principle of the present invention according to instantiation.
At first, determine impulse test voltage U W, can and carry out experimental study requirement voltage swing according to correlation standard and carry out, then to trial voltage U WCause that according to insulation research nargin coefficient, the insulation margin coefficient of testing equipment own, large capacity complexity plant efficiency reduces by 3 parameters of correction factor and revises.3 coefficients are selected and can be changed within the specific limits according to concrete test situation with reference to following table, and the designer can be from the test product type, and the actual conditions such as the size of trial voltage are set out and suitably selected.
Figure 2012103792484100002DEST_PATH_IMAGE001
By carrying out different typical electrode type discharge tests, obtain to impact 50% discharge probability family curve such as Fig. 1-shown in Figure 4, among the figure, d is the discharge test clearance distance, U 50For impacting 50% discharge probability sparking voltage.According to the equipment rated voltage U NLook into above-mentioned discharge curve, can draw corresponding clearance distance d i, will d iMultiply by again safety margin coefficient (1.1 ~ 1.3), can determine necessary insulation distance.
Because impulse voltage generator is different along height each point pole tension, can according to the each point pole tension respectively correspondence find the respective clearance distance, such as Fig. 5-shown in Figure 6.Each point is followed successively by from top to bottom , respective distances is respectively
Figure DEST_PATH_IMAGE003
, be that radius is made circular arc with above-mentioned insulation distance, each arc envelope line can determine that the change of impact device insulation distance is along the line.In order to reduce the laboratory height, generator can be installed in deeply and be hMelt pit in, the laboratory height can reduce h
The present invention is applicable to different size type impulse voltage generator insulation clear distance and selects.
The content that is not described in detail in this instructions belongs to the known prior art of this area professional and technical personnel.

Claims (1)

1. the required insulation clearance of impulse voltage generator system of selection is characterized in that, may further comprise the steps:
1) according to the rated voltage of test figure confirmed test equipment U N:
Require to determine impulse test voltage according to the test type of carrying out, test standard U W, the impact test equipment rated voltage U NFor:
U N= K 1· K 2· K 3· U W
Wherein, K 1Be insulation research nargin coefficient; K 2Be the insulation margin coefficient of testing equipment own; K 3For big capacity load causes the correction factor that plant efficiency reduces;
2) carry out discharge test and obtain sparking voltage and distance relation curve:
Select grading ring, two kinds of typical electrode of wire that the simulation steel tower is carried out respectively standard thunder and lightning, switching impulse discharge, in the research interstice coverage, utilizing impulse voltage generator to produce the wavefront time is 1.2 μ s, half peak value time was that standard lightning wave and the wavefront time of 50 μ s is 250 μ s, half peak value time was the standard operation ripple of 2500 μ s, lifting and lowering method pressurization program is adopted in test, after being the gap tolerance, constantly raise trial voltage step by step until the discharge generation, reduce afterwards trial voltage, if still discharge continues to reduce trial voltage; The trial voltage if the gap tolerance then raises, repeat above process, lightning impulse test and switching impulse discharge test are all carried out repeatedly impulsive discharge, can obtain 50% probability sparking voltage of lightning impulse and switching impulse according to the test figure statistics, each Test Point Data match can be plotted discharge characteristic curve;
3) determine necessary insulation clearance according to trial curve:
According to the corresponding different voltages of impulse voltage generator each point height, can find respectively corresponding clearance distance, take each point as the center of circle, corresponding clearance distance is that radius is made circular arc, can obtain corresponding arc envelope line, thereby draws the edge line of apparatus insulated distance.
CN201210379248.4A 2012-10-09 2012-10-09 Method for selecting insulation clearance distance required by impulse voltage generator Active CN102914674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210379248.4A CN102914674B (en) 2012-10-09 2012-10-09 Method for selecting insulation clearance distance required by impulse voltage generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210379248.4A CN102914674B (en) 2012-10-09 2012-10-09 Method for selecting insulation clearance distance required by impulse voltage generator

Publications (2)

Publication Number Publication Date
CN102914674A true CN102914674A (en) 2013-02-06
CN102914674B CN102914674B (en) 2015-01-07

Family

ID=47613130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210379248.4A Active CN102914674B (en) 2012-10-09 2012-10-09 Method for selecting insulation clearance distance required by impulse voltage generator

Country Status (1)

Country Link
CN (1) CN102914674B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103592579A (en) * 2013-07-30 2014-02-19 中国电力科学研究院 Impulse discharge voltage calculating model construction method
CN108008257A (en) * 2017-11-08 2018-05-08 中国电力科学研究院有限公司 Different wave front time impulse sparkover voltage modification method, correcting device and computational methods
CN111220883A (en) * 2020-01-15 2020-06-02 西安交通大学 Method and device for detecting insulation defect of basin-type insulator based on steep wave voltage
CN114184913A (en) * 2021-11-30 2022-03-15 国网重庆市电力公司电力科学研究院 C5F10O-mixed gas electrical insulation characteristic test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187686A (en) * 2007-12-19 2008-05-28 中国电力科学研究院 Tube bus corona inception voltage and extinction voltage test judging method
CN101267097A (en) * 2007-12-26 2008-09-17 国网武汉高压研究院 High elevation correction method for ultra-high voltage and ultra-high voltage line air insulation clearance
CN201207068Y (en) * 2008-04-30 2009-03-11 中国电力科学研究院 Extra-high voltage power transmission and transformation experiment hall
CN101552446A (en) * 2008-12-19 2009-10-07 西北电网有限公司 High-altitude correction method for air insulation gap operating impulse voltage in power transmission line
DE102010017303A1 (en) * 2010-02-05 2011-08-11 Hinow, Georg, Dr. Ing., 01279 Impulse voltage testing system, has high voltage measuring divider installed as intermediate circuit, measurement signal plotting device possessing correction algorithm, and surge voltage generator for producing pulse voltage
US20110202294A1 (en) * 2010-02-05 2011-08-18 Martin Hinow High voltage impulse test system with a correction algorithm

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187686A (en) * 2007-12-19 2008-05-28 中国电力科学研究院 Tube bus corona inception voltage and extinction voltage test judging method
CN101267097A (en) * 2007-12-26 2008-09-17 国网武汉高压研究院 High elevation correction method for ultra-high voltage and ultra-high voltage line air insulation clearance
CN201207068Y (en) * 2008-04-30 2009-03-11 中国电力科学研究院 Extra-high voltage power transmission and transformation experiment hall
CN101552446A (en) * 2008-12-19 2009-10-07 西北电网有限公司 High-altitude correction method for air insulation gap operating impulse voltage in power transmission line
DE102010017303A1 (en) * 2010-02-05 2011-08-11 Hinow, Georg, Dr. Ing., 01279 Impulse voltage testing system, has high voltage measuring divider installed as intermediate circuit, measurement signal plotting device possessing correction algorithm, and surge voltage generator for producing pulse voltage
US20110202294A1 (en) * 2010-02-05 2011-08-18 Martin Hinow High voltage impulse test system with a correction algorithm

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
万启发等: "特高压拉V塔空气间隙外绝缘特性研究", 《电力设备》 *
曹晶等: "高海拔换流站相间操作冲击放电特性分析", 《高电压技术》 *
焦保利等: "特高压同塔双回交流线路的外绝缘特性", 《高电压技术》 *
霍锋等: "750kV双回紧凑型线路杆塔放电特性及绝缘配合", 《高电压技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103592579A (en) * 2013-07-30 2014-02-19 中国电力科学研究院 Impulse discharge voltage calculating model construction method
CN103592579B (en) * 2013-07-30 2016-03-09 国家电网公司 A kind of impulse sparkover voltage computing model construction method
CN108008257A (en) * 2017-11-08 2018-05-08 中国电力科学研究院有限公司 Different wave front time impulse sparkover voltage modification method, correcting device and computational methods
CN111220883A (en) * 2020-01-15 2020-06-02 西安交通大学 Method and device for detecting insulation defect of basin-type insulator based on steep wave voltage
CN111220883B (en) * 2020-01-15 2021-04-13 西安交通大学 Method and device for detecting insulation defect of basin-type insulator based on steep wave voltage
CN114184913A (en) * 2021-11-30 2022-03-15 国网重庆市电力公司电力科学研究院 C5F10O-mixed gas electrical insulation characteristic test method

Also Published As

Publication number Publication date
CN102914674B (en) 2015-01-07

Similar Documents

Publication Publication Date Title
Shu et al. Research and application of UHV power transmission in China
CN102721907A (en) Method for testing power-frequency and impulse superimposed voltage in high-altitude region
CN102914674A (en) Method for selecting insulation clearance distance required by impulse voltage generator
CN105045974A (en) Method for lightning protection measure simulation of HUV transformer
CN103063985A (en) Very fast transient overvoltage horizontal identification method
CN103760448A (en) Comprehensive live test method of insulation defects of metal oxide arrester for electric power
CN106019005B (en) Test system and method for simulating transient ground potential rise
Xin et al. Sensitivity analysis of reignition overvoltage for vacuum circuit breaker in offshore wind farm using experiment-based modeling
Zhou et al. Impact factor identification for switching overvoltage in an offshore wind farm by analyzing multiple ignition transients
CN102495338A (en) Sulfur hexafluoride gas partial discharging detection method under X ray irradiation and apparatus thereof
CN104021269B (en) The acquisition methods of 2km 4km height above sea level 500kV electrical equipments relatively thunder and lightning and switching impulse height above sea level correction value
CN105743075B (en) The single-phase arc grounding analogue means of power distribution network
CN109490654B (en) Multilayer FSS screen lightning coupling effect test device and test method
CN203444096U (en) Verifying device of ultrahigh frequency partial discharge detector of high-voltage switch device
CN203535183U (en) Interturn short circuit test device for current transformer cone capacitor
CN203630293U (en) Discharge test model for transformer main insulating surface suspended potential
CN203396900U (en) Tool for rapid power frequency test of multiple insulators
CN204225151U (en) Grounding net of transformer substation transparent observing well
CN202172009U (en) Shielding device for contact box type current transformer
Yue et al. Electric Field Calculation and Optimization of Shielding Device for Filter Capacitor Tower in±1100kV Indoor DC Yard
CN112699576A (en) Extra-high voltage direct current lightning electromagnetic transient engineering analysis method
CN105044486B (en) Overvoltage computation model for new energy power station low-voltage ride-through testing system
CN212341285U (en) Capacitor tower for synthesis test
Habash et al. Lightning risk assessment of power systems
CN204925276U (en) Continuous discharge electric arc lightning rod experimental apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20141216

C14 Grant of patent or utility model
C41 Transfer of patent application or patent right or utility model
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20141216

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute