CN102913717A - CO2 (carbon dioxide) buried pipeline structure - Google Patents

CO2 (carbon dioxide) buried pipeline structure Download PDF

Info

Publication number
CN102913717A
CN102913717A CN2012104247292A CN201210424729A CN102913717A CN 102913717 A CN102913717 A CN 102913717A CN 2012104247292 A CN2012104247292 A CN 2012104247292A CN 201210424729 A CN201210424729 A CN 201210424729A CN 102913717 A CN102913717 A CN 102913717A
Authority
CN
China
Prior art keywords
work
outer pillar
insulating material
air layer
relief opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104247292A
Other languages
Chinese (zh)
Inventor
吴益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yixing Huasheng Environmental Protection Pipeline Co Ltd
Original Assignee
Yixing Huasheng Environmental Protection Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yixing Huasheng Environmental Protection Pipeline Co Ltd filed Critical Yixing Huasheng Environmental Protection Pipeline Co Ltd
Priority to CN2012104247292A priority Critical patent/CN102913717A/en
Publication of CN102913717A publication Critical patent/CN102913717A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a CO2 (carbon dioxide) buried pipeline structure which comprises an operation outer protection pipe, a heat insulating material, an air layer, an operation steel pipe, air outlets and an air inlet. The operation steel pipe is positioned inside the operation outer protection pipe, the heat insulating material is sleeved outside the operation steel pipe, the air layer is reserved between the heat insulating material and the operation outer protection pipe, the air outlets are respectively fixed at two ends and in the middle of the operation outer protection pipe, and the air inlet is further fixed at one end of the operation outer protection pipe. The CO2 buried pipeline structure has the advantages of low heat loss, energy conservation, improved heat insulation effect, long pipeline service life and lowered cost.

Description

A kind of CO 2The buried pipe structure
Technical field
The present invention relates to a kind of pipeline configuration, relate in particular to a kind of buried pipe structure.
Background technique
Along with improving constantly of production technology, the structure that people can use in life also can improve thereupon, the existing buried pipe that does not pass through gas treatment, the inside all are air contents, because the thermal conductivity of air itself is higher, so that heat loss is high, relatively waste energy, be incubated low, simultaneously also easily oxide etch of pipeline, reduce the working life of pipeline, operating cost is high.
Summary of the invention
The objective of the invention is to provide a kind of CO 2The buried pipe structure.
According to an aspect of the present invention, provide a kind of CO 2The buried pipe structure, comprise the outer pillar of work, thermal insulating material, air layer, working steel tube, relief opening and gas injection port, working steel tube is built in the outer pillar of work, working steel tube is arranged with thermal insulating material outward, be air layer between thermal insulating material and the outer pillar of work, two ends and the middle part of the outer pillar of work are fixed with respectively relief opening, and an end of the outer pillar of work also is fixed with a gas injection port.
In some embodiments, working steel tube is U-shaped with the outer pillar of work.
In some embodiments, relief opening, gas injection port are communicated with air layer respectively.
In some embodiments, relief opening is three.
A kind of CO of the present invention 2The buried pipe structure has that heat loss is low, an energy saving, heat insulation effect improves, pipeline life prolongs and reduce cost effect.
Description of drawings
Fig. 1 is the CO of an embodiment of the present invention 2The structural representation of buried pipe structure.
Embodiment
As shown in Figure 1, the present invention discloses a kind of CO 2The buried pipe structure, comprise the outer pillar 1 of work, thermal insulating material 2, air layer 3, working steel tube 4, relief opening 5 and gas injection port 6, working steel tube 4 is built in the outer pillar 1 of work, the working steel tube 4 outer thermal insulating materials 2 that are arranged with, be air layer 3 between thermal insulating material 2 and the outer pillar 1 of work, work two ends and the middle part of outer pillar 1 is fixed with respectively relief opening 5, and an end of the outer pillar 1 of working also is fixed with a gas injection port 6.In some embodiments, working steel tube 4 is U-shaped with the outer pillar 1 of work.Relief opening 5, gas injection port 6 are communicated with air layer 3 respectively.Relief opening 5 is three.A kind of CO of the present invention 2The buried pipe structure is injected CO the air layer 3 in the pillar 1 from gas injection port 6 outside work 2, because CO 2The density of density ratio air large, inject so CO 2Will toward the bottom deposition of the outer pillar 1 of work, will CO will be positioned at 2The air of top is extruded, and the relief opening 5 of outer pillar 1 one ends of namely working will be with except CO 2Bas Discharged, also above relief opening 5, increase gas measurement instrument simultaneously, gas detecting instrument is controlled start and close by key switch, startup self-detection by after enter normal working, gas detecting instrument detects the gas in the air layer 3 with fixed frequency, and its concentration value changed into electrical signal, electrical signal is through the amplification of amplification circuit, eliminator carries out filtering, after the conversion of analog to digital conversion circuit, become the digital signal that directly to be processed by microprocessor by original analog amount, after this signal is sent into microprocessor, microprocessor reads the correction parameter among the EEPROM, signal is proofreaied and correct processing with the software aspect such as temperature correction, the digital quantity of input is converted into gas concentration value shows intuitively at liquid crystal display.When gas injection port 6 has CO endlessly 2When being injected in the air layer 3, CO 2 Outer pillar 1 middle part of the work that will arrive, the relief opening 5 at outer pillar 1 middle part of working will be except CO 2Other gases discharge, gas measurement instrument detects the CO at middle part simultaneously 2Concentration value, show which gas componant air layer 3 also contains, last CO 2The other end of the outer pillar 1 of arrival work, the gas measurement instrument of relief opening 5 tops will be to the CO in the air layer 3 2Do last detection, the CO that shows in the liquid crystal display of detector 2The concentration of concentration value in continuous increase, other gas concentrations are in continuous minimizing, wait in the liquid crystal display of detector only to show CO 2Concentration value the time, with regard to throttle down, allow be full of pure CO in the pipeline 2Gas.
A kind of CO of the present invention 2The buried pipe structure increases relief opening 5 and gas injection port 6 at existing buried pipe two ends, also increases gas detecting instrument above relief opening 5 simultaneously, has guaranteed to only have CO in the air layer 3 2Existence.Because gas is in zero degrees celsius, CO 2Thermal conductivity be 0.0137, and the thermal conductivity 0.0233 of air compares and nearly differs half, so its heat loss is low, and then energy saving, plays better heat insulation effect, air layer 3 does not have O simultaneously 2, pipeline can oxidation, has prolonged the life-span of pipeline, has reduced cost, has improved working efficiency, and the reasonable like this existing resource of having used is so that whole operation reaches the effect of better energy-saving and emission-reduction.

Claims (4)

1. CO 2The buried pipe structure, comprise the outer pillar of work, thermal insulating material, air layer, working steel tube, relief opening and gas injection port, it is characterized in that, described working steel tube is built in the outer pillar of work, described working steel tube is arranged with thermal insulating material outward, be air layer between the outer pillar of described thermal insulating material and described work, two ends and the middle part of the outer pillar of described work are fixed with respectively relief opening, and an end of the outer pillar of described work also is fixed with a gas injection port.
2. a kind of CO according to claim 1 2The buried pipe structure is characterized in that, described working steel tube is U-shaped with the outer pillar of work.
3. a kind of CO according to claim 1 2The buried pipe structure is characterized in that, described relief opening, gas injection port are communicated with air layer respectively.
4. a kind of CO according to claim 1 2The buried pipe structure is characterized in that, described relief opening is three.
CN2012104247292A 2012-10-30 2012-10-30 CO2 (carbon dioxide) buried pipeline structure Pending CN102913717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104247292A CN102913717A (en) 2012-10-30 2012-10-30 CO2 (carbon dioxide) buried pipeline structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104247292A CN102913717A (en) 2012-10-30 2012-10-30 CO2 (carbon dioxide) buried pipeline structure

Publications (1)

Publication Number Publication Date
CN102913717A true CN102913717A (en) 2013-02-06

Family

ID=47612212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104247292A Pending CN102913717A (en) 2012-10-30 2012-10-30 CO2 (carbon dioxide) buried pipeline structure

Country Status (1)

Country Link
CN (1) CN102913717A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022099A (en) * 2019-12-26 2020-04-17 中铁隧道局集团有限公司 CO for ventilation in high-heat tunnel construction2Double-layer heat-insulation soft air pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093151A (en) * 1993-04-02 1994-10-05 郑金安 Double-layer insulating plastic pipe pipe (road)
CN1111207A (en) * 1994-02-03 1995-11-08 日本酸素株式会社 Hot isolated container and production of same
CN1239203A (en) * 1998-06-15 1999-12-22 尚久駜 Hollow insulating sleeve pipe and its installation technology
CN2356209Y (en) * 1999-03-03 1999-12-29 吴英华 Composite insulation direct buried pipe
CN201184481Y (en) * 2008-03-06 2009-01-21 山东鼎超供热设备有限公司 Composite heat preservation structure of prefabricated direct-buried steam pipeline
CN201731179U (en) * 2010-05-21 2011-02-02 钟小冬 Double-layer heat preservation pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093151A (en) * 1993-04-02 1994-10-05 郑金安 Double-layer insulating plastic pipe pipe (road)
CN1111207A (en) * 1994-02-03 1995-11-08 日本酸素株式会社 Hot isolated container and production of same
CN1239203A (en) * 1998-06-15 1999-12-22 尚久駜 Hollow insulating sleeve pipe and its installation technology
CN2356209Y (en) * 1999-03-03 1999-12-29 吴英华 Composite insulation direct buried pipe
CN201184481Y (en) * 2008-03-06 2009-01-21 山东鼎超供热设备有限公司 Composite heat preservation structure of prefabricated direct-buried steam pipeline
CN201731179U (en) * 2010-05-21 2011-02-02 钟小冬 Double-layer heat preservation pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022099A (en) * 2019-12-26 2020-04-17 中铁隧道局集团有限公司 CO for ventilation in high-heat tunnel construction2Double-layer heat-insulation soft air pipe

Similar Documents

Publication Publication Date Title
CN102913717A (en) CO2 (carbon dioxide) buried pipeline structure
CN102620144A (en) Improved intelligent type leakage preventing coal gas drainer
CN206467268U (en) A kind of new VD vacuum degassing furnaces
CN2848324Y (en) Three phase separator device
CN202532186U (en) Improved intelligent anti-leakage gas drainage device
CN105060296A (en) Heat source parallel silicon carbide synthetic furnace
CN205786428U (en) A kind of titanium oxide type oxygen sensor
CN202221094U (en) Corrosion-free dust-collecting energy-saving chimney lining structure
CN205164626U (en) Complex acid ware
CN201981292U (en) Silicon single crystal growth furnace
CN106914077A (en) A kind of industrial dedusting method
CN202460341U (en) Multi-curved-surface plate and frame air filter
CN203498933U (en) Water choking preventing floor drain
CN207760054U (en) Carbon dioxide recovery sorption drying device
CN104977346A (en) Ammonia gas sensor
CN200940159Y (en) Leading-out electrode sealing device for resistance chemical vapor deposition furnace
CN201713556U (en) Miscellaneous copper melting shaft furnace chute heat preservation device
CN201791401U (en) Gas-water separator
CN201916923U (en) fume dew point corrosion prevention online warning device of heat pipe air preheater
CN210156493U (en) Battery formation exhaust pipeline and battery formation exhaust device
CN203540312U (en) Efficient insulation device of denitration reactor
CN214458112U (en) Automatic liquid drainage device of dehumidifier
CN205505732U (en) Sour lithium of lithium cell cathode material 4. 50V cobalt is burning furnace in advance
CN210343409U (en) Water-gas separation device for coal bed gas conveying positive pressure pipeline
CN202209848U (en) Gas separator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130206