CN102912773B - Volute casing protecting method in hydropower station expansion construction - Google Patents

Volute casing protecting method in hydropower station expansion construction Download PDF

Info

Publication number
CN102912773B
CN102912773B CN201210432533.8A CN201210432533A CN102912773B CN 102912773 B CN102912773 B CN 102912773B CN 201210432533 A CN201210432533 A CN 201210432533A CN 102912773 B CN102912773 B CN 102912773B
Authority
CN
China
Prior art keywords
spiral case
gypsum
hydropower station
volute casing
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210432533.8A
Other languages
Chinese (zh)
Other versions
CN102912773A (en
Inventor
刘伯鹍
蔡波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN201210432533.8A priority Critical patent/CN102912773B/en
Publication of CN102912773A publication Critical patent/CN102912773A/en
Application granted granted Critical
Publication of CN102912773B publication Critical patent/CN102912773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Revetment (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a volute casing protecting method in the hydropower station expansion construction. The invention is to provide the volute casing protecting method in the hydropower station expansion construction, so as to avoid deformation of a volute casing and guarantee that no influence on the material performance of the volute casing is caused. According to the invention, a technical scheme is as follows: the method comprises the following steps of: (a) closing a water inlet valve and a guide vane of the volute casing, so that a sealed and watertight cavity is formed in the volute casing; arranging a slurry inlet pipe and a gas outlet pipe, wherein one ends of the slurry inlet pipe and the gas outlet pipe extend into the volute casing; (b) injecting gypsum slurry into the volute casing through the slurry inlet pipe; (c) after the gypsum slurry is solidified, implementing the hydropower station expansion construction; and (d) after the hydropower station expansion construction is finished, spraying water into the volute casing; after the water absorbing strength of the gypsum inside the volute casing is reduced, excavating and recycling the gypsum; only leaving a gypsum layer on the inner wall of the volute casing as a protective layer; and finally, washing the residual gypsum by using water, so that the gypsum completely falls off. The volute casing protecting method in the hydropower station expansion construction, provided by the invention, is suitable for reinforcing and protecting the hydropower station volute casing in the hydropower station expansion construction and can be also used for protecting other empty cavities.

Description

Spiral case guard method in hydropower station expansion construction
Technical field
The present invention relates to the spiral case guard method in a kind of hydropower station expansion construction; mainly be applicable to reinforce power station spiral case in power station expansion machine and protect; make spiral case not because of adjacent regions (machine pier, fan housing) steel concrete remove/newly-built and be affected, also can be used for the protection of other cavity body (cavity body that especially various Irregular Boundary Surface is formed).
Background technology
In some hydropower station expansion process, need to maintain original spiral case and (part) spiral case external wrapping concrete present situation, and only machine pier, fan housing structure and relevant device are replaced.In the steel concrete demolishing process to original machine pier, fan housing structure, if do not carry out consolidation process to spiral case, under the External Force Acting exceeding external wrapping concrete ability to bear and spiral case self-strength, spiral case body generally can be made to produce distortion and affect use.
Spiral case is reinforced; act on the external force on spiral case top; mainly contain the impact force of construction machinery; and newly water the weight of large-sized unit of machine pier, fan housing weight concrete and renewal; generally adopting the scheme that welded steel structure supports or jack supports in steel spiral case at present, by forming rod member supporting way in spiral case, spiral case being protected.The intensity of limited supporting rod, can retrain the external force on spiral case top, namely limits the condition of work of top construction machinery.Simultaneously due to the particularity of spiral case cavity shape, supporting rod is generally inconvenient to arrange, when supporting rod is arranged sparse, easily makes spiral case stress concentrate, spiral case distortion occurs time serious.In addition, welding supports and removes cutting off in support process, polishing all can produce certain adverse effect to the material property of spiral case.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of convenient and quick construction, to the spiral case guard method in the high hydropower station expansion construction of mechanical impact force compliance in construction for above-mentioned Problems existing; give spiral case to support preferably; avoid spiral case to deform to reach, ensure the impregnable object of spiral case material property.
The technical solution adopted in the present invention is: the spiral case guard method in hydropower station expansion construction, is characterized in that step is as follows:
A, the water intaking valve of closing spiral case and stator, make spiral case inside form the watertight cavity of a sealing, arrange that inlet pipe and the escape pipe of spiral case inside are stretched in one end simultaneously;
B, in spiral case, inject gypsum slurries by inlet pipe, until slurries are full of whole spiral case;
C, after gypsum slurries solidifies, carry out hydropower station expansion construction;
After d, hydropower station expansion construction complete, spray water in spiral case, after the gypsum injection index of its inside reduces, gypsum is excavated and reclaims, only stay one deck gypsum on spiral case inwall as topping, finally with water residual gypsum washed away and make it come off completely;
The not expanding gypsum powder that after described gypsum slurries adopts crystallization, intensity index is identical or close with spiral case external wrapping concrete intensity is made.
The water inlet end of described spiral case is provided with interim plug, and described inlet pipe and escape pipe are arranged on this plug.
After each parts have been arranged in step a, checked the sealing of spiral case by inlet pipe to water filling in spiral case, its test stone is, after being full of water in spiral case, and only escape pipe water outlet.
Inject gypsum slurries in spiral case before, the equipment that may flow through after flowing out slurries carries out covering protection.
In described steps d, drainage collection is carried out to the waste water obtained after flush clean.
The invention has the beneficial effects as follows: 1, to filler plaster slurries in airtight spiral case; after slurries crystallization and freezing; fully contact with spiral case inside; the support that spiral case is enough is given from inside; in conjunction with external wrapping concrete, spiral case is protected simultaneously; reduce the impact of expansion machine construction on spiral case as much as possible; improve spiral case to the mechanical impact force adaptive capacity in construction; effectively prevent the distortion of spiral case; ensure that its stability, solve normal welding tubing support cause spiral case stress concentrate, yielding problem.2, select high strength gypsum as inserts, gypsum slurries is adopted during filling, be easy to fill, after the construction of expansion machine, the gypsum of solidification is sprayed water, the mode of " machinery excavate+water under high pressure wash away " is adopted to remove gypsum, not only convenient and swift, and ensure that spiral case material property is unaffected.3, the gypsum sets time is short, generates crystal intensity high, not only ensure that the protected effect to spiral case, and save the duration.
Accompanying drawing explanation
Fig. 1 is floor map of the present invention.
Fig. 2 is the A-A sectional drawing of Fig. 1.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the present embodiment Specific construction step is as follows:
A, be form obturator in spiral case 5, spiral case 5 inside need be made to form confined air cavity; First water intaking valve and the stator 6 of spiral case 5 is closed, spiral case 5 inside is made to form the watertight cavity of a sealing, arrange that inlet pipe 3 and escape pipe 4(double as outlet pipe simultaneously and use simultaneously), it is inner that spiral case 5 is stretched in described inlet pipe 3 and escape pipe 4 one end, and it is outside that the other end is positioned at spiral case 5.If the straight length between water intaking valve and spiral case 5 is long, at the water inlet end of spiral case 5, interim plug 1 can be installed, with stator 6 acting in conjunction of closing, spiral case 5 be sealed, now, described inlet pipe 3 and escape pipe 4 are arranged on this plug.
After layout completes, by checking the sealing of spiral case 5 to water filling in spiral case 5, namely pass through inlet pipe 3 to water filling in spiral case 5, escape pipe 4 is given vent to anger simultaneously, until be full of water in spiral case 5, if now only escape pipe 4 water outlet, can judge that the sealing of spiral case 5 is good.After having inspected, by the water emptying in spiral case 5.
B, in spiral case 5, inject gypsum slurries by inlet pipe 3, until slurries are full of whole spiral case 5(when escape pipe has slurries to overflow, show to be full of slurries in spiral case); The high strength gypsum powder that do not expand that after described gypsum slurries adopts crystallization, intensity index is identical or close with spiral case 5 external wrapping concrete intensity is made, and when spiral case 5 external wrapping concrete intensity is C25, then can select α 25 model high strength gypsum powder.
C, after gypsum slurries solidifies, by specification to its maintenance, then carry out hydropower station expansion construction.
After d, hydropower station expansion construction complete, utilize the characteristic of water-proof gypsum difference, the filler plaster in spiral case 5 is sprayed water, allow it absorb water.Due in wet environment; cohesion in gypsum crystal weakens; intensity is caused to reduce; machinery is now adopted to be dug out by large-scale gypsum and reclaim; only stay and be cemented in the topping of a small amount of gypsum on spiral case 5 inwall as spiral case 5 inwall; finally adopt water under high pressure to wash away residual gypsum, under the impact force water effect of flowing, gypsum destroys faster, carries out drainage simultaneously collect process to waste water.
For preventing gypsum slurries outflow in filling process from having an impact to peripheral part, before implementation step b, the equipment that may flow through can be flowed out to slurries and carrying out covering protection.

Claims (4)

1. the spiral case guard method in hydropower station expansion construction, is characterized in that step is as follows:
A, the water intaking valve of closing spiral case (5) and stator (6), make spiral case (5) inside form the watertight cavity of a sealing, arrange that the inner inlet pipe (3) of spiral case (5) and escape pipe (4) are stretched in one end simultaneously;
B, inject gypsum slurries in spiral case (5), until slurries are full of whole spiral case (5) by inlet pipe (3);
C, after gypsum slurries solidifies, carry out hydropower station expansion construction;
After d, hydropower station expansion construction complete, water spray in spiral case (5), after the gypsum injection index of its inside reduces, excavates gypsum and reclaims, only stay one deck gypsum on spiral case (5) inwall as topping, finally with water residual gypsum washed away and make it come off completely;
The not expanding gypsum powder that after described gypsum slurries adopts crystallization, intensity index is identical or close with spiral case external wrapping concrete intensity is made;
The water inlet end of described spiral case (5) is provided with interim plug (1), and described inlet pipe (3) and escape pipe (4) are arranged on this plug.
2. the spiral case guard method in hydropower station expansion construction according to claim 1; it is characterized in that: after in step a, each parts have been arranged; checked the sealing of spiral case (5) to spiral case (5) interior water filling by inlet pipe (3); its test stone is; after being full of water in spiral case (5), only escape pipe (4) water outlet.
3. the spiral case guard method in hydropower station expansion construction according to claim 1 and 2, is characterized in that: inject gypsum slurries in spiral case (5) before, and the equipment that may flow through after flowing out slurries carries out covering protection.
4. the spiral case guard method in hydropower station expansion construction according to claim 1 and 2, is characterized in that: in described steps d, carries out drainage collection to the waste water obtained after flush clean.
CN201210432533.8A 2012-11-02 2012-11-02 Volute casing protecting method in hydropower station expansion construction Active CN102912773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210432533.8A CN102912773B (en) 2012-11-02 2012-11-02 Volute casing protecting method in hydropower station expansion construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210432533.8A CN102912773B (en) 2012-11-02 2012-11-02 Volute casing protecting method in hydropower station expansion construction

Publications (2)

Publication Number Publication Date
CN102912773A CN102912773A (en) 2013-02-06
CN102912773B true CN102912773B (en) 2015-01-28

Family

ID=47611323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210432533.8A Active CN102912773B (en) 2012-11-02 2012-11-02 Volute casing protecting method in hydropower station expansion construction

Country Status (1)

Country Link
CN (1) CN102912773B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389717B (en) * 2014-09-17 2016-06-22 中国电建集团西北勘测设计研究院有限公司 A kind of method determining Hydropower Unit worm frame compression clearance

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3037221B2 (en) * 1997-09-08 2000-04-24 忠義 植本 Hydroelectric generator
CN101603304B (en) * 2009-07-23 2010-10-27 河海大学 Construction method for repairing disjoint of water turbine volute by hydraulic structure disjoint filling silicone adhesive
CN102535411A (en) * 2012-02-18 2012-07-04 姚文龙 Method and device for draining secondary power generation of hydropower station
CN102758425B (en) * 2012-07-23 2014-06-11 天津大学 Preloading filling spiral case preloaded seam constructing device of hydropower station and implementing method thereof

Also Published As

Publication number Publication date
CN102912773A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102900848A (en) Shield tunneling machine under pressure warehouse entry air bag sealing device and method
CN201705359U (en) Tail shield sealed water-proof structure of shield machine
CN111734420B (en) Water-rich stratum shield underwater receiving method provided with tunnel portal mortar retaining wall
CN109083174A (en) It is a kind of can the quickly in place and monoblock type cofferdam removed and its construction method
CN105179875A (en) Non-excavation repairing method for deformation collapse of weak stratum drainage pipe
CN107217844A (en) The manufacture of the horizontal hole to be provided of wall and plugging device and method
CN107816117A (en) A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
CN102493818A (en) Rigid and flexible double protection structure for high and narrow dissolved cavern
CN205117355U (en) Branch storehouse formula sand gas that replaces tunnel just to serve as a contrast closes and fills lining cutting structure
CN102912773B (en) Volute casing protecting method in hydropower station expansion construction
CN214614083U (en) Grouting assembly for repairing quality defects of karst geological cast-in-place pile
CN203960916U (en) A kind of plugging device of deep foundation ditch base plate pressure-bearing drainage sump
CN104695327B (en) Suspension cable and the pre-buried tube seal structure of hoist cable beam-ends
CN116357391A (en) Air bag type hard rock stratum compressed air energy storage chamber structure
CN212251495U (en) Concrete pond underwater equipment installation device
CN207498973U (en) A kind of power station grout curtain cuts dirty drainage tube
CN202611712U (en) Rigid and flexible double protection structure for high and narrow dissolved cavern
CN206352508U (en) A kind of stopper structure being arranged between formwork jumbo and country rock
CN202830916U (en) Prefabricated waterproof pile
CN110468837B (en) Underwater hollowing defect repairing method and device for ship lock navigation wall pile foundation on gravel layer basis
CN214035783U (en) Device for controlling water gushing and sand gushing by additionally manufacturing drain pipe on high-permeability stratum in water-rich area
CN204283441U (en) A kind of Tunnel Collapse cavity backfill supplementary structure
CN204551261U (en) Suspension cable and hoist cable beam-ends built-in pipe hermetically-sealed construction
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation
CN102966049B (en) Method for treating vertical crack of reinforced concrete bridge abutment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant