Secondary equipment of intelligent converting station dynamic reconfiguration system and method
Technical field
The invention belongs to the power automation field, be specifically related to a kind of secondary equipment of intelligent converting station dynamic reconfiguration system and method.
Background technology
2007, somewhere power supply administration has carried out statistic of classification to the substation secondary device that damages, by consulting the correct time of ruuning situation record, runtime environment temperature, weather condition and device damage, the concrete reason that packet lookup is damaged, and to causing the substation secondary device source of damage to be classified as follows shown in the table 1.
Sequence number |
Date |
Project |
Frequency |
The accumulative total frequency |
Accumulative total % |
1 |
2006.2~2006.11 |
Be struck by lightning |
21 |
21 |
42.86% |
2 |
2006.2~2006.11 |
Operating ambient temperature is high |
13 |
34 |
69.39% |
3 |
2006.2~2006.11 |
Long operational time |
5 |
39 |
79.59% |
4 |
2006.2~2006.11 |
Ageing equipment |
5 |
44 |
89.80% |
5 |
2006.2~2006.11 |
The operation improper use |
3 |
47 |
95.92% |
6 |
2006.2~2006.11 |
Other |
2 |
49 |
100% |
Statistics shows, causes the main cause of the non-artificial damage of substation secondary device to be: substation secondary device suffers thunderbolt, high, the long operational time of operating ambient temperature and ageing equipment.
There is research to point out; highly integrated CPU card, logica board etc. are arranged in secondary device; also have power insert, modulus or digital-to-analog conversion plug-in unit, LCDs etc.; be integrated with small-sized TV, the TA of a large amount of coil windings above such plug-in unit; because compact conformation, long time continuous working is added the dust accumulation in the running environment; its heat only by on the equipment with outer blow type radiator fan delivery ratio the difficulty, so need some peripheral apparatus such as air-conditioning, exhaust fan etc.When the weather conditions of fast season of temperature variation and high temperature, should fail in time to open air-conditioning for master-control room, central station of floating dock, when perhaps air-conditioning breaks down, can not keep suitable indoor temperature.Because conventional proof cycle is limited, can not in time find the running environment of secondary device operation, equipment can continuous working under the continuous high temperature condition, might cause the phenomenon of " electron transfer ".In case occur, situation can be more and more serious, to causing short circuit at last, various components and parts are damaged.In real time measures ambient temperature of temperature online monitoring system is installed in suggestion, so that the operations staff pinpoints the problems fast and in time processing.In addition, secondary device need to be changed it in operation a period of time, and every complete equipment has tenure of use, to the time limit in time change, prevent the plate fault that causes because of the plug-in unit oxidation.
Studies show that, flashover, thunderbolt shock wave are coupled by ground wire, produce superpotential and cause secondary device to damage, cause power grid accident or equipment breakdown, major measure is to eliminate the existence of interference source and cut off coupling channel, to the independent grounded screen of secondary device installing, suppresses earthy variation.
Statistics shows, certain 110kV intelligent substation is since operation time a year and a half, and secondary equipment of intelligent converting station power supply defective is more, mostly is random fault, is difficult for finding.
According to another the maintenance information of engineering staff feedback, the common fault of secondary device has that power supply, remote signalling plate, CPU network interface, remote measurement plate, exit plate relay are bad, program BUG.In fact; substation secondary device has possessed certain self-checking function; for example " Q/GDW 396-2009 IEC 61850 engineering relay protection application models " have defined the self-diagnostic function of each module of microcomputer protecting device; the running status of power supply, CPU, I/O interface, A/D conversion, storer and other plug-in unit of touring diagnostic device is by giving supervisory system on brcbAlarm, the brcbCommState switch fault report.
At present, some intelligent substation pilot has been used the secondary device repair based on condition of component of state-based variable on-line monitoring, but monitoring only is the running status of perception secondary device, can not satisfy autonomous and self-healing requirement, unattended station particularly, can't reach the spot the very first time to finish to overhaul when secondary device lost efficacy and resume operation, universal equipment has reduced the complexity of system simultaneously, has improved the reliability of system.
Summary of the invention
For overcoming defects, the invention provides a kind of secondary equipment of intelligent converting station dynamic reconfiguration system and method, the running status of perception secondary device not only, and satisfied the autonomous and self-healing requirement of secondary device, can finish maintenance when secondary device lost efficacy the very first time resumes operation, common apparatus has reduced the complexity of system simultaneously, has improved the reliability of system.
For achieving the above object, the invention provides a kind of secondary equipment of intelligent converting station dynamic reconfiguration system, its improvements are, described system comprises: management host and receive the universal equipment of its steering order.
In the optimal technical scheme provided by the invention, described management host is managed described universal equipment, subscribes to the state variable of described universal equipment, and the described universal equipment self check service of clocked flip monitors described universal equipment running status.
In the second optimal technical scheme provided by the invention, described state variable comprises: power quality, earth point voltage, cabinet inside temperature, cpu load, free memory amount, idle exterior storage amount, operation task number, self-detection result, restart number of times, running status, ardware model number, OS Type and software version.
In the 3rd optimal technical scheme provided by the invention, described universal equipment for secondary device for subsequent use, is deployed in wall.
In the 4th optimal technical scheme provided by the invention, described universal equipment comprises: the self diagnosis module that is set up in parallel, state variable refresh module, service response module and event notice module; Described event notice module and described management host carry out data interaction.
In the 5th optimal technical scheme provided by the invention, described self diagnosis module, the monitoring input power quality of power supply, earth point voltage, cabinet inside temperature, cpu load, free memory space, idle external memory space and operation task number; Described state variable refresh module is obtained the concrete data of each state variable under the current state; Described service response module provides following service: to query of subscription and modification, the self check of each state variable, restart, stop transport, put into operation and for subsequent use; Described event notice module, the Discovery Status variate-value changes when the executive system self check, then notifies described management host.
In the 6th optimal technical scheme provided by the invention, provide a kind of secondary equipment of intelligent converting station dynamic reconfiguration method, its improvements are, described method comprises the steps:
(1). management host obtains intelligent substation SCD model, resolves the CID model of universal equipment;
(2). the putting into operation and stopping transport, display unit connecting state of in-service monitoring universal equipment;
(3). subscribe to the equipment state variable, regularly call self check service, the running status of online evaluation equipment;
(4). when device fails, the restarting or stop transport of control faulty equipment, and the putting into operation of universal equipment for subsequent use.
In the 7th optimal technical scheme provided by the invention, described step 2 comprises the steps:
(2-1). management host adds the 239.255.255.250 multicast group;
(2-2). during the universal equipment access network, initiatively send the SSDP message to the 239.255.255.250 multicast address;
(2-3). management host receives the SSDP message, obtains the universal equipment description document;
(2-4). management host analyzing device description document, obtain the universal equipment service description file;
(2-5). management host is showed universal equipment at graphical interfaces;
(2-6). management host regularly calls the server directory service of calling together of universal equipment by IEC 61850 clients, the running status of surveillance equipment IEC 61850 services;
(2-7). if find that universal equipment connects unusual, management host judges by PING and ARP mode whether the universal equipment network connection disconnects, and the real-time update graphical interfaces is showed;
Wherein, be provided with IEC 61850 clients in the management host.
In the 8th optimal technical scheme provided by the invention, described step 3 comprises the steps: (3-1). management
Main frame is resolved universal equipment service description file, subscription status variable;
(3-2). management host regularly calls the self check service of universal equipment;
(3-3). the universal equipment self check, when detecting state variable and changing, initiatively produce event notice, by the event notice module, be transferred to management host;
(3-4). management host monitors the event notice of universal equipment, and the variation that refreshes the show state variable proposes alarm, notifies the operations staff to confirm;
(3-5). the operations staff confirms that the universal equipment running status changes, and the order of severity that the assessment universal equipment breaks down determines to take counter-measure according to the order of severity;
Wherein, different according to the order of severity of fault, fault is divided into: generic failure, abnormal failure and catastrophic failure.
In the 9th optimal technical scheme provided by the invention, in described step 4, device fails, management host is notified the operations staff by the alarm mode, operations staff's failure judgement order of severity, if generic failure then carries out steps A, if abnormal failure then carries out step B, if catastrophic failure is then carried out step C;
Described steps A is: after the operations staff confirmed, the operation note of management host record continued operation;
Described step B comprises:
(B-1). after the operations staff confirms, management host statistical study operation note, the prompting operations staff can be restarted universal equipment, surpasses limit value if find to restart number of times, then proposes alarm, and prompting the operations staff process by catastrophic failure;
(B-2). equipment is restarted, and putting the system running state value during startup is 0, and system restarts time numerical value and progressively increases 1 time, starts that to finish rearmounted system running state value be 1, and whole variations of state variable are occured to management host;
(B-3). the restart procedure of management host surveillance equipment, show situation of change;
Described step C comprises:
(C-1) if. catastrophic failure, operator control backup device enter the operation state for the treatment of, and by UPnP hardware, operating system, software version coupling failed equipment and backup device, determine to take next step measure by joining the type result;
(C-2) if. join type success, show that backup device and failed equipment are the same model device, can adopt the mirror image mode to substitute faulty equipment, the operations staff downloads failed equipment CID model, device software, data file, configuration file to backup device, by management host control, first fault of stop device, then backup device puts into operation, after the failed equipment maintenance recovers, the backup device of stopping transport again, the failed equipment after the reparation that puts into operation;
(C-3) if. join type failure, show that backup device is general device, the operations staff downloads failed equipment CID model to backup device, control by management host, elder generation's fault of stop device, the backup device that then puts into operation is after the failed equipment maintenance recovers, the backup device of stopping transport again, failed equipment after repairing puts into operation;
Wherein, described failed equipment is the universal equipment that breaks down; Described backup device is universal equipment for subsequent use.
Compared with the prior art, a kind of secondary equipment of intelligent converting station dynamic reconfiguration system provided by the invention and method can the inline diagnosis equipment running status, find, control and management equipment, the dynamic restructuring faulty equipment recovers normal operation, improves perception, autonomy and the self-healing ability of system; Adopt the UPnP agreement, secondary device erecting equipment end software module, management host is installed the reference mark software module, not only can monitor the secondary device state variable, can also find reliably, management and opertaing device, realize perception, autonomy and the self-healing of secondary device; And, on the basis of statistical study secondary device most common failure, self diagnosis module, state variable refresh module, service response module and event notice module have been designed, management host can real time monitoring and the running status of assessment secondary device on this basis, helps the operations staff in time to find and the remover apparatus fault; Designed universal secondary device hardware and software platform, as stand-by equipment, Adoption Network to the time, network sampling, network tripping operation mode, function that can the dynamic restructuring faulty equipment is taken over the operation of faulty equipment; Set up the dynamic restructuring mechanism of a cover flexibility and reliability, can be applicable to the processing of general, unusual and catastrophic failure, joined type by the equipment software and hardware, can be with mirror image and common apparatus mode reconstruct faulty equipment; Moreover, designed based on the secondary device online evaluation of UPnP agreement and the management system of dynamic restructuring, can be applied to intelligent substation, reply Anomalous Disaster situation, under the prerequisite that does not increase the system complex degree, improve the reliability and maintainability energy of system.
Description of drawings
Fig. 1 is the structural representation of secondary equipment of intelligent converting station dynamic reconfiguration system.
Embodiment
As shown in Figure 1, a kind of secondary equipment of intelligent converting station dynamic reconfiguration system, described system comprises: the universal equipment of management host and its steering order of reception.
Described management host is managed described universal equipment, subscribes to the state variable of described universal equipment, and the described universal equipment self check service of clocked flip monitors described universal equipment running status.
Described state variable comprises: power quality, earth point voltage, cabinet inside temperature, cpu load, free memory amount, idle exterior storage amount, operation task number, self-detection result, restart number of times, running status, ardware model number, OS Type and software version.
Described universal equipment for secondary device for subsequent use, is deployed in wall.
Described universal equipment comprises: the self diagnosis module that is set up in parallel, state variable refresh module, service response module and event notice module; Described event notice module and described management host carry out data interaction.
Described self diagnosis module, the monitoring input power quality of power supply, earth point voltage, cabinet inside temperature, cpu load, free memory space, idle external memory space and operation task number; Described state variable refresh module is obtained the concrete data of each state variable under the current state; Described service response module provides following service: to query of subscription and modification, the self check of each state variable, restart, stop transport, put into operation and for subsequent use; Described event notice module, the Discovery Status variate-value changes when the executive system self check, then notifies described management host.
A kind of secondary equipment of intelligent converting station dynamic reconfiguration method comprises the steps:
(1). management host obtains intelligent substation SCD model, resolves the CID model of universal equipment;
(2). the putting into operation and stopping transport, display unit connecting state of in-service monitoring universal equipment;
(3). subscribe to the equipment state variable, regularly call self check service, the running status of online evaluation equipment;
(4). when device fails, the restarting or stop transport of control faulty equipment, and the putting into operation of universal equipment for subsequent use.
Described step 2 comprises the steps:
(2-1). management host adds the 239.255.255.250 multicast group;
(2-2). during the universal equipment access network, initiatively send SSDP (SSDP) message to the 239.255.255.250 multicast address;
(2-3). management host receives the SSDP message, obtains the universal equipment description document;
(2-4). management host analyzing device description document, obtain the universal equipment service description file;
(2-5). management host is showed universal equipment at graphical interfaces;
(2-6). management host regularly calls server directory (GetServerDirectory) service of calling together of universal equipment, the running status of surveillance equipment IEC 61850 services by IEC 61850 clients;
(2-7). if find that universal equipment connects unusual, management host judges by PING and ARP mode whether the universal equipment network connection disconnects, and the real-time update graphical interfaces is showed;
Wherein, be provided with IEC 61850 clients in the management host.
Described step 3 comprises the steps: (3-1). management host is resolved universal equipment service description file, subscription status variable;
(3-2). management host regularly calls the self check service of universal equipment;
(3-3). the universal equipment self check, when detecting state variable and changing, initiatively produce event notice, by the event notice module, be transferred to management host;
(3-4). management host monitors the event notice of universal equipment, and the variation that refreshes the show state variable proposes alarm, notifies the operations staff to confirm;
(3-5). the operations staff confirms that the universal equipment running status changes, and the order of severity that the assessment universal equipment breaks down determines to take counter-measure according to the order of severity;
Wherein, different according to the order of severity of fault, fault is divided into: generic failure, abnormal failure and catastrophic failure.
In described step 4, device fails, management host is notified the operations staff by the alarm mode, and operations staff's failure judgement order of severity is if generic failure then carries out steps A, if abnormal failure then carries out step B, if catastrophic failure is then carried out step C;
Described steps A is: after the operations staff confirmed, the operation note of management host record continued operation;
Described step B comprises:
(B-1). after the operations staff confirms, management host statistical study operation note, the prompting operations staff can be restarted universal equipment, surpasses limit value if find to restart number of times, then proposes alarm, and prompting the operations staff process by catastrophic failure;
(B-2). equipment is restarted, and putting the system running state value during startup is 0, and system restarts time numerical value and progressively increases 1 time, starts that to finish rearmounted system running state value be 1, and whole variations of state variable are occured to management host;
(B-3). the restart procedure of management host surveillance equipment, show situation of change;
Described step C comprises:
(C-1) if. catastrophic failure, operator control backup device enter the operation state for the treatment of, and by UPnP hardware, operating system, software version coupling failed equipment and backup device, determine to take next step measure by joining the type result;
(C-2) if. join type success, show that backup device and failed equipment are the same model device, can adopt the mirror image mode to substitute faulty equipment, the operations staff downloads failed equipment CID model, device software, data file, configuration file to backup device, by management host control, first fault of stop device, then backup device puts into operation, after the failed equipment maintenance recovers, the backup device of stopping transport again, the failed equipment after the reparation that puts into operation;
(C-3) if. join type failure, show that backup device is general device, the operations staff downloads failed equipment CID model to backup device, control by management host, elder generation's fault of stop device, the backup device that then puts into operation is after the failed equipment maintenance recovers, the backup device of stopping transport again, failed equipment after repairing puts into operation;
Wherein, described failed equipment is the universal equipment that breaks down; Described backup device is universal equipment for subsequent use.
What need statement is that content of the present invention and embodiment are intended to prove the practical application of technical scheme provided by the present invention, should not be construed as the restriction to protection domain of the present invention.Those skilled in the art can do various modifications, be equal to and replace or improve inspired by the spirit and principles of the present invention.But these changes or modification are all in the protection domain that application is awaited the reply.