CN102900075B - 一种螺旋线混凝土管桩装置及其制备方法 - Google Patents

一种螺旋线混凝土管桩装置及其制备方法 Download PDF

Info

Publication number
CN102900075B
CN102900075B CN201210001664.0A CN201210001664A CN102900075B CN 102900075 B CN102900075 B CN 102900075B CN 201210001664 A CN201210001664 A CN 201210001664A CN 102900075 B CN102900075 B CN 102900075B
Authority
CN
China
Prior art keywords
pile
pile tube
helix
concrete tubular
tube body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210001664.0A
Other languages
English (en)
Other versions
CN102900075A (zh
Inventor
甘永辉
刘勇
甘坤
赵永任
沈家文
王明聪
杨国栋
孔芸
庄军国
严福明
周麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No1 Water Resources And Hydropower Construction Co ltd
Ycih No3 Construction Co ltd
Yunnan Construction Engineering Group Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Original Assignee
SECOND CONSTRUCTION Co Ltd OF YNJG
Third Construction Co Ltd Of Ynjg
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SECOND CONSTRUCTION Co Ltd OF YNJG, Third Construction Co Ltd Of Ynjg, YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd, Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd filed Critical SECOND CONSTRUCTION Co Ltd OF YNJG
Priority to CN201210001664.0A priority Critical patent/CN102900075B/zh
Publication of CN102900075A publication Critical patent/CN102900075A/zh
Application granted granted Critical
Publication of CN102900075B publication Critical patent/CN102900075B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及到建筑施工设备的技术领域,公开了一种螺旋线混凝土管桩装置及其制备方法,包括管桩本体,所述管桩本体设有桩身,所述管桩中间设有灌浆管,所述灌浆管与桩身是同一轴,所述管桩本体的表面上设有螺旋槽。该螺旋线混凝土管桩装置利用螺旋线作为孔隙水消散的通道,减小地面隆起,可提高桩的承载力。

Description

一种螺旋线混凝土管桩装置及其制备方法
技术领域
本发明涉及到建筑施工设备装置的技术领域。
背景技术
中国发明专利号:200910193702.5公开了一种混凝土管桩,所述管桩包括上桩身和下桩身,所述上桩身与下桩身为一体式结构,上桩身的横截面大于下桩身的横截面,上桩身的横截面为圆环形或中空方形,下桩身的横截面为圆环形。所述上桩身的长度L为所述管桩总长度H的1/3至1/2;所述上桩身与下桩身之间为过渡坡,所述过渡坡的角度B为30°至60°。中国发明专利号:200710143380.4公开了一种建筑基础工程专用的筋状管桩模,它包括模芯、上模和下模,上模和下模套在模芯上,上模和下模模腔内间隔开有环状梯形凹筋槽,环状梯形凹筋槽中的环状梯形凹筋槽的前坡面与模板面夹角A为10~60度、后坡面与模板面夹角B为60~10度,间隔分布的环状梯形凹筋槽间纵向设有一条或2条或多条凹筋槽且与环状梯形凹筋槽相通。
传统的管桩均为直线型,由于桩身截面无任何变化,因此在压桩过程中挤土效应明显,土中孔隙水无法消散,经常造成地面隆起,相邻桩上浮等质量通病。
发明内容
本发明目的旨在提供一种螺旋线混凝土管桩装置及其制备方法,用该螺旋线混凝土管桩装置制备方法制备出来的管桩利用螺旋线作为孔隙水消散的通道,减小地面隆起,可提高桩的承载力。
为实现上述目的,本发明采用的技术方案为:一种螺旋线混凝土管桩装置,包括管桩本体,所述管桩本体设有桩身,所述管桩中间设有灌浆管,所述灌浆管与桩身是同一轴,所述管桩本体的表面上设有螺旋槽,所述螺旋槽的槽深度为30毫米-50毫米,制备螺旋线混凝土管桩装置的方法为:
根据混凝土管桩设计长度,制作出跟管桩有相同长度的钢模模具,用钢板制成的管桩成型钢模模具,钢模模具成圆柱形状,钢模模具分为内模和外模;在钢模模具的内模中焊接有直径为30毫米-50毫米厚的钢筋,内模焊接的钢筋成螺旋线的形状;
由主钢筋和张拉钢筋的扎钢筋组成的钢筋骨架,该钢筋骨架与管桩的设计长度是相同,钢筋骨架为圆形的钢筋骨架;
将钢筋骨架放置到由钢板组成的管桩成型钢模模具里,再向钢模内浇筑混凝土,完成管桩本体的成型;
对管桩的混凝土采取养护、脱模,最后制备出螺旋线混凝土管桩装置。
所述一种螺旋线混凝土管桩装置及其制备方法,其钢模模具的内模中焊接有直径为40毫米厚的钢筋。所述一种螺旋线混凝土管桩装置及其制备方法,其管桩本体的表面上设有螺旋
槽的槽深度为40毫米。
该螺旋线混凝土管桩装置利用螺旋线作为孔隙水消散的通道,减小地面隆起,可提高桩的承载力。该螺旋线混凝土管桩装置适用于所有管桩,特别适用于地下水位高的图层。该螺旋线混凝土管桩装置可提高桩的承载力,消除孔隙水压力。该螺旋线混凝土管桩装置利用螺旋线作为孔隙水消散的通道,减小地面隆起。该螺旋线混凝土管桩装置采用在管桩表面增加螺旋线的工艺,使桩侧摩擦阻力增大,桩的承载能力提高,孔隙水消散有通道。
附图说明
图1本发明具体实施例中的示意图;
图2本发明具体实施例中的剖视图。
具体实施方式
下面结合附图及实施例对本发明作进一步描述。
如图1和图2所示:一种螺旋线混凝土管桩装置,包括管桩本体1、桩身2、灌浆管3、螺旋槽4,该螺旋线混凝土管桩装置采用在管桩表面增加螺旋线的工艺,使桩侧摩擦阻力增大,桩的承载能力提高,孔隙水消散有通道。所述管桩本体1设有桩身2,所述管桩本体1中间设有灌浆管3,所述灌浆管3与桩身2是同一轴,所述管桩本体1的表面上设有螺旋槽4。该螺旋线混凝土管桩装置利用螺旋线作为孔隙水消散的通道,减小地面隆起,可提高桩的承载力。一种螺旋线混凝土管桩装置,包括管桩本体1、桩身2、灌浆管3、螺旋槽4,该螺旋线混凝土管桩装置采用在管桩表面增加螺旋线的工艺,使桩侧摩擦阻力增大,桩的承载能力提高,孔隙水消散有通道。所述管桩本体1设有桩身2,所述管桩本体1中间设有灌浆管3,所述灌浆管3与桩身2是同一轴,所述管桩本体1的表面上设有螺旋槽4。其管桩本体的表面上设有螺旋槽的槽深度为30毫米-50毫米。对管桩成型模具进行改造,使其表面形成为30mm~50mm深螺旋线。其管桩本体的表面上设有螺旋槽的槽深度最佳的选择为40毫米。
制备该螺旋线混凝土管桩装置的方法的实施例1:
一种螺旋线混凝土管桩装置,包括管桩本体1、桩身2、灌浆管3、螺旋槽4,该螺旋线混凝土管桩装置采用在管桩表面增加螺旋线的工艺,使桩侧摩擦阻力增大,桩的承载能力提高,孔隙水消散有通道。所述管桩本体1设有桩身2,所述管桩本体1中间设有灌浆管3,所述灌浆管3与桩身2是同一轴,所述管桩本体1的表面上设有螺旋槽4。其管桩本体的表面上设有螺旋槽的槽深度为40毫米。制备螺旋线混凝土管桩装置的方法为:
根据混凝土管桩设计长度,制作出跟管桩有相同长度的钢模模具,用钢板制成的管桩成型钢模模具,钢模模具成圆柱形状,钢模模具分为内模和外模;在钢模模具的内模中焊接有直径为40毫米厚的钢筋,内模焊接的钢筋成螺旋线的形状;
由主钢筋和张拉钢筋的扎钢筋组成的钢筋骨架,该钢筋骨架与管桩的设计长度是相同,钢筋骨架为圆形的钢筋骨架;
将钢筋骨架放置到由钢板组成的管桩成型钢模模具里,再向钢模内浇筑混凝土,完成管桩本体的成型;
对管桩的混凝土采取养护、脱模,最后制备出螺旋槽的槽深度为40毫米的螺旋线混凝土管桩装置。
制备该螺旋线混凝土管桩装置的方法的实施例2:
一种螺旋线混凝土管桩装置,包括管桩本体1、桩身2、灌浆管3、螺旋槽4,该螺旋线混凝土管桩装置采用在管桩表面增加螺旋线的工艺,使桩侧摩擦阻力增大,桩的承载能力提高,孔隙水消散有通道。所述管桩本体1设有桩身2,所述管桩本体1中间设有灌浆管3,所述灌浆管3与桩身2是同一轴,所述管桩本体1的表面上设有螺旋槽4。其管桩本体的表面上设有螺旋槽的槽深度为35毫米。制备螺旋线混凝土管桩装置的方法为:
根据混凝土管桩设计长度,制作出跟管桩有相同长度的钢模模具,用钢板制成的管桩成型钢模模具,钢模模具成圆柱形状,钢模模具分为内模和外模;在钢模模具的内模中焊接有直径为35毫米厚的钢筋,内模焊接的钢筋成螺旋线的形状;
由主钢筋和张拉钢筋的扎钢筋组成的钢筋骨架,该钢筋骨架与管桩的设计长度是相同,钢筋骨架为圆形的钢筋骨架;
将钢筋骨架放置到由钢板组成的管桩成型钢模模具里,再向钢模内浇筑混凝土,完成管桩本体的成型;
对管桩的混凝土采取养护、脱模,最后制备出螺旋槽的槽深度为35毫米的螺旋线混凝土管桩装置。

Claims (3)

1.一种制备螺旋线混凝土管桩的方法,其特征在于所述螺旋线混凝土管桩包括管桩本体(1),管桩本体(1)设有桩身(2),所述管桩本体(1)中间设有灌浆管(3),所述灌浆管(3)与桩身(2)是同一轴,所述管桩本体(1)的表面上设有螺旋槽(4),其管桩本体(1)的表面上设有螺旋槽的槽深度为30毫米-50毫米,
根据混凝土管桩设计长度,制作出跟管桩有相同长度的钢模模具,用钢板制成的管桩成型钢模模具,钢模模具成圆柱形状,钢模模具分为内模和外模;在钢模模具的内模中焊接有直径为30毫米-50毫米的钢筋,内模焊接的钢筋成螺旋线的形状;
由主钢筋和张拉钢筋的扎钢筋组成的钢筋骨架,该钢筋骨架与管桩的设计长度是相同,钢筋骨架为圆形的钢筋骨架;
将钢筋骨架放置到由钢板组成的管桩成型钢模模具里, 再向钢模内浇筑混凝土,完成管桩本体的成型;
对管桩的混凝土采取养护、脱模,最后制备出螺旋线混凝土管桩。
2.根据权利要求1所述一种制备螺旋线混凝土管桩的方法,其特征在于,所述钢模模具的内模中焊接有直径为40毫米厚的钢筋。
3.根据权利要求1所述一种制备螺旋线混凝土管桩的方法,其特征在于,所述管桩本体的表面上设有螺旋槽的槽深度为40毫米。
CN201210001664.0A 2012-01-05 2012-01-05 一种螺旋线混凝土管桩装置及其制备方法 Active CN102900075B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210001664.0A CN102900075B (zh) 2012-01-05 2012-01-05 一种螺旋线混凝土管桩装置及其制备方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210001664.0A CN102900075B (zh) 2012-01-05 2012-01-05 一种螺旋线混凝土管桩装置及其制备方法

Publications (2)

Publication Number Publication Date
CN102900075A CN102900075A (zh) 2013-01-30
CN102900075B true CN102900075B (zh) 2015-09-09

Family

ID=47572542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210001664.0A Active CN102900075B (zh) 2012-01-05 2012-01-05 一种螺旋线混凝土管桩装置及其制备方法

Country Status (1)

Country Link
CN (1) CN102900075B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503346A (zh) * 2016-06-14 2017-12-22 五冶集团上海有限公司 Phc管桩桩头破损修复方法
EP3622121B1 (en) * 2017-05-10 2021-12-22 GCP Applied Technologies Inc. In-situ barrier device with internal injection conduit
RU183774U1 (ru) * 2018-05-18 2018-10-02 Семен Анатольевич Бидзиля Винтовая свая

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122129A (zh) * 2007-07-10 2008-02-13 郭兆泉 带砂衬的齿纹面排水桩
KR20080083604A (ko) * 2008-04-07 2008-09-18 아이에스동서 주식회사 콘크리트 파일 보강용 복합파일
CN101288979A (zh) * 2008-06-17 2008-10-22 郭兆泉 可拆装的齿形、异径齿形桩模具
CN201704685U (zh) * 2010-04-23 2011-01-12 上海中技桩业股份有限公司 一种基础方桩
CN201778324U (zh) * 2010-09-14 2011-03-30 盐城市同力新型建材有限公司 带槽预应力混凝土方桩
CN201972146U (zh) * 2011-02-17 2011-09-14 上海奥米制药装备有限公司 一种预制砼管桩
CN202390829U (zh) * 2011-11-28 2012-08-22 云南建工水利水电建设有限公司 一种螺旋线混凝土管桩装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122129A (zh) * 2007-07-10 2008-02-13 郭兆泉 带砂衬的齿纹面排水桩
KR20080083604A (ko) * 2008-04-07 2008-09-18 아이에스동서 주식회사 콘크리트 파일 보강용 복합파일
CN101288979A (zh) * 2008-06-17 2008-10-22 郭兆泉 可拆装的齿形、异径齿形桩模具
CN201704685U (zh) * 2010-04-23 2011-01-12 上海中技桩业股份有限公司 一种基础方桩
CN201778324U (zh) * 2010-09-14 2011-03-30 盐城市同力新型建材有限公司 带槽预应力混凝土方桩
CN201972146U (zh) * 2011-02-17 2011-09-14 上海奥米制药装备有限公司 一种预制砼管桩
CN202390829U (zh) * 2011-11-28 2012-08-22 云南建工水利水电建设有限公司 一种螺旋线混凝土管桩装置

Also Published As

Publication number Publication date
CN102900075A (zh) 2013-01-30

Similar Documents

Publication Publication Date Title
CN201843129U (zh) 带肋混凝土复合桩芯管
CN103711122A (zh) 一种布袋扩挤混凝土支盘桩及施工方法
CN102900075B (zh) 一种螺旋线混凝土管桩装置及其制备方法
CN203994171U (zh) 一种建筑预制构件成孔模具
CN210341897U (zh) 一种新型预制管桩结构
CN203238642U (zh) 基坑支护挡墙
CN204676525U (zh) 高强度刚性挤土复合桩
CN107700480B (zh) 一种适用于地基处理的混凝土桩
CN202152461U (zh) 一种先张法预应力楔形混凝土管桩
CN206752454U (zh) 一种灌注植入桩
CN202170506U (zh) 一种变截面高强度混凝土管桩
CN207419452U (zh) 一种适用于地基处理的混凝土桩
CN216379490U (zh) 一种适用于湿陷性黄土地区的梅花型刚柔组合桩
CN202390829U (zh) 一种螺旋线混凝土管桩装置
CN201713813U (zh) 预制混凝土管桩用扩张型钢桩尖
CN203639900U (zh) 空心桩
CN102235003B (zh) 预制混凝土管桩用扩张型钢桩尖及沉桩施工方法
CN104005427B (zh) 一种用于深水组合基础的可协调变形的连接装置
CN210216405U (zh) 一种螺旋加劲肋钢管混凝土桩
CN202164598U (zh) 预制挤扩桩
CN102888841A (zh) 一种端部螺纹五星形变截面预制管桩及其施工方法
CN204000846U (zh) 花管注浆抗拔桩
CN113513000A (zh) 尾矿库内排洪涵管的加固结构及方法
CN203594027U (zh) 一种布袋扩挤混凝土支盘桩
CN220469940U (zh) 一种带底座混凝土管的支模装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YUNNAN NO.2 CONSTRUCTION ENGINEERING CO., LTD.;YUN

Effective date: 20140328

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gan Yonghui

Inventor after: Yan Fuming

Inventor after: Zhou Lin

Inventor after: Liu Yong

Inventor after: Gan Kun

Inventor after: Zhao Yongren

Inventor after: Shen Jiawen

Inventor after: Wang Mingcong

Inventor after: Yang Guodong

Inventor after: Kong Yun

Inventor after: Zhuang Junguo

Inventor before: Gan Yonghui

Inventor before: Gan Kun

Inventor before: Zhao Yongren

Inventor before: Shen Jiawen

Inventor before: Wang Mingcong

Inventor before: Yang Guodong

Inventor before: Kong Yun

Inventor before: Zhuang Junguo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GAN YONGHUI GAN KUN ZHAO YONGREN SHEN JIAWEN WANG MINGCONG YANG GUODONG KONG YUN ZHUANG JUNGUO TO: GAN YONGHUI LIU YONG GAN KUN ZHAO YONGREN SHEN JIAWEN WANG MINGCONG YANG GUODONG KONG YUN ZHUANG JUNGUO YAN FUMING ZHOU LIN

TA01 Transfer of patent application right

Effective date of registration: 20140328

Address after: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant after: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Applicant after: THE THIRD CONSTRUCTION CO.,LTD. OF YNJG

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant before: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant before: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: YUNNAN NO.2 CONSTRUCTION ENGINEERING CO., LTD.;YUNNAN CHUNYING YAXITAIKE TEMPLATES MANUFACTURING CO. YUNNAN THIRD CONSTRUCTION ENGINEERING CO., LTD. YUNNAN CONSTRUCTION ENGINEERING GROUP CO., LTD. TO: YUNNAN JIANGONG NO.2 CONSTRUCTION CO., LTD. YUNNAN CONSTRUCTION ENGINEERING 3RD CONSTRUCTION CO., LTD. YUNNAN CONSTRUCTION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 650217 No. 196 Lin Xi Road, information industry base, Kunming economic and Technological Development Zone, Yunnan

Co-patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650041 east suburb Road, Guandu District, Kunming, Yunnan Province, No. 78

Co-patentee before: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Patentee before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Co-patentee before: THE THIRD CONSTRUCTION CO.,LTD. OF YNJG

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20181019

Address after: 650217 No. 196 Lin Xi Road, information industry base, Kunming economic and Technological Development Zone, Yunnan

Co-patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: 650217 No. 196 Lin Xi Road, information industry base, Kunming economic and Technological Development Zone, Yunnan

Co-patentee before: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee before: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee before: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right