CN102900057B - Under-pressure non-full opening method for main water inlet ball valve of hydropower station - Google Patents

Under-pressure non-full opening method for main water inlet ball valve of hydropower station Download PDF

Info

Publication number
CN102900057B
CN102900057B CN201210408852.5A CN201210408852A CN102900057B CN 102900057 B CN102900057 B CN 102900057B CN 201210408852 A CN201210408852 A CN 201210408852A CN 102900057 B CN102900057 B CN 102900057B
Authority
CN
China
Prior art keywords
main water
ball valve
water intake
valve
intake ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210408852.5A
Other languages
Chinese (zh)
Other versions
CN102900057A (en
Inventor
袁冰峰
蒋春钢
李长胜
任青旭
陈鹏
程剑林
赵永行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING PUSHIHE WATER-STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
LIAONING PUSHIHE WATER-STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING PUSHIHE WATER-STORAGE Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical LIAONING PUSHIHE WATER-STORAGE Co Ltd
Priority to CN201210408852.5A priority Critical patent/CN102900057B/en
Publication of CN102900057A publication Critical patent/CN102900057A/en
Application granted granted Critical
Publication of CN102900057B publication Critical patent/CN102900057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Control Of Water Turbines (AREA)

Abstract

The invention belongs to the technical field of a hydropower station and especially relates to an under-pressure non-full opening method for a main water inlet ball valve of the hydropower station. The under-pressure non-full opening method is suitable for the hydraulic locking maintenance of a large-size main water inlet ball valve in front of a volute or the non-full opening operation for the main water inlet ball valve under the other conditions of bearing higher water pressure of a high-head hydropower station when a draining pipeline is not emptied. The non-full opening problem of the main water inlet ball valve of the high-head hydropower station is solved by the under-pressure non-full opening method provided by the invention; the under-pressure non-full opening method has the advantages of simple and easily implemented method, safety, reliability, greatly reduced construction period, capability of saving cost, and the like; the under-pressure non-full opening method is especially suitable for the hydropower station with higher water head, bigger volume and heavier heavy of the main water inlet ball valve and higher pressure bearing value; the under-pressure non-full opening method is approved by multi-parties and is practically checked; the practical check confirms that the method is safe and reliable; the operation process is systematic and perfect; the reference significance is great; and the popularization value is high.

Description

The method of a kind of water power station owner water intake ball valve not standard-sized sheet with pressure
Technical field
The invention belongs to the technical field in power station, relate in particular to the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure.Be applicable to high head hydroelectric power plant, do not needing when conduit pipe is emptying, to large-scale main water intake ball valve hydraulic locking maintenance before spiral case or other, need to main water intake ball valve, carry out the not operation of standard-sized sheet bearing in larger hydraulic pressure situation.
Background technology
The main water intake ball valve in high head hydroelectric power plant ran into ball valve body parts in the past needs maintenance, require ball valve not during the special circumstances of standard-sized sheet, because ball valve deadweight is large and high head water power plant diversion tunnel pressure is larger, for guaranteeing that safety can only be in the situation that all emptying by the water of conduit pipe, starting petrol station opens ball valve to required aperture, then close that ball valve servomotor enters draining valve or locked ball valve main distributing valve enters oil-discharging cavity, guarantee that ball valve process oil pipeline pressure oil remains unchanged, and makes ball valve rest on required aperture.
Because the general volume weight of main water intake ball valve of the employing before high head hydroelectric power plant's spiral case inlet is huge, and in order to guarantee the safety of unit, general this main water intake ball valve has the trend of closing voluntarily in the stress-free situation of pressure oil pipeline in structure design, so also only allow to rest under normal circumstances the position of complete shut-down or standard-sized sheet.While needing not standard-sized sheet as processed ball valve hydraulic locking or other parts, for guaranteeing safety, can only wait diversion tunnel emptying, under anhydrous condition, carry out, and water-filling after emptying diversion tunnel emptying and maintenance often needs the time in twenty or thirty sky, doing is like this effort again consuming time.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure is provided.
The technical scheme of object that the present invention realizes invention is as follows:
A method for water power station owner water intake ball valve not standard-sized sheet with pressure, it comprises water power station owner water intake ball valve, suspender belt, bridge machine or crane; Concrete implementation step is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into generator motor mechanical braking, and check that input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into position, prevent that stator from surprisingly opening caused unit and rotating;
(6) on oil gear switch board, open governor pressure oil tank isolating valve, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) at electricity, adjust and check that stator clamping stroke keeps normal in a long time cashier's office in a shop;
(8) extract governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and exit plug, prevent that stator guide vane servomotor from automatically locking malfunction and exiting;
(9) pull up governor emergency shutdown electromagnetic valve, prevent unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, while finally guaranteeing main water intake ball valve unlatching, speed is slow, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is standby to " zero load ";
(12) on oil gear switch board, open main water intake ball valve pressure oil tank isolating valve, pressure oil is provided to main water intaking valve oil pipe line;
(13) the manual main water intake ball valve hydraulic locking electromagnetic valve of excitation receding side, inspection is extracted after exiting to exit and is dropped into both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal exits correctly;
(15) check that owner's water intake ball valve manual locking exits correctly;
(16) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " terrain " position by " distant place ";
(17) on main water intake ball valve and setting-out switch board, open main water intake ball valve bypass valve, make main water intaking valve pressure at both sides balance;
(18) on main water intake ball valve and setting-out switch board, exit the sealing of main water intake ball valve downstream;
(19) check that main water intake ball valve received concora crush signal;
(20) on main water intake ball valve and setting-out switch board, press the manually opened button of main water intake ball valve, make main water intaking valve open to the aperture position needing;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, maintain the current aperture of main water intaking valve constant;
(22) at main water intake ball valve and setting-out switch board, close main water intake ball valve bypass valve, recover bypass valve closed condition;
(23) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " excision " position by " terrain ", prevent malfunction;
(24) on oil gear switch board, close main water intake ball valve pressure oil tank isolating valve, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed to chamber oil pipe line pressure release, and keep pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after abnormal, with bridge machine or lifting appliance, coordinate corresponding suspender belt to protect the pivoted arm of main water intake ball valve, this state 10 minutes and without after abnormal, can carry out relevant upkeep operation;
(28) after service work completes, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check each equipment normally.
Advantage of the present invention and good effect are:
The research that the present invention is deep ball valve operating principle and through a large amount of practice, under the premise that security is guaranteed, all utilize on-the-spot existing equipment, utilize brand-new method, do not need emptying conduit pipe, can solve the not standard-sized sheet problem under main water intake ball valve specific (special) requirements.
The solution of the invention the not standard-sized sheet problem with pressure of the main water intake ball valve in high head hydroelectric power plant, there is simple, safe and reliable, the great reduction of erection time of method, the advantage such as reduce expenses.Be particularly suitable for higher, the main water intake ball valve volume weight of head large and bear the power station that force value is higher.The present invention has passed through approval in many ways, and has passed through the check of practice, confirms that the method is safe and reliable, operating process system, perfect, and reference is large, has very strong promotional value.
Below in conjunction with specific embodiments of the invention, the present invention is described in detail.
The specific embodiment
Embodiment 1:
The present invention is the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure, and when implementing, needed auxiliary security instrument comprises: one, one applicable of suspender belt, applicable bridge machine or crane.
The concrete implementation step of the present invention is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into generator motor mechanical braking, and check that input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into position, prevent that stator from surprisingly opening caused unit and rotating;
(6) on oil gear switch board, open governor pressure oil tank isolating valve, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) at electricity, adjust and check that stator clamping stroke keeps normal in a long time cashier's office in a shop;
(8) extract governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and exit plug, prevent that stator guide vane servomotor from automatically locking malfunction and exiting;
(9) pull up governor emergency shutdown electromagnetic valve, prevent unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, while finally guaranteeing main water intake ball valve unlatching, speed is slow, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is standby to " zero load ";
(12) on oil gear switch board, open main water intake ball valve pressure oil tank isolating valve, pressure oil is provided to main water intaking valve oil pipe line;
(13) the manual main water intake ball valve hydraulic locking electromagnetic valve of excitation receding side, inspection is extracted after exiting to exit and is dropped into both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal exits correctly;
(15) check that owner's water intake ball valve manual locking exits correctly;
(16) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " terrain " position by " distant place ";
(17) on main water intake ball valve and setting-out switch board, open main water intake ball valve bypass valve, make main water intaking valve pressure at both sides balance;
(18) on main water intake ball valve and setting-out switch board, exit the sealing of main water intake ball valve downstream;
(19) check that main water intake ball valve received concora crush signal;
(20) on main water intake ball valve and setting-out switch board, press the manually opened button of main water intake ball valve, make main water intaking valve open to the aperture position needing;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, maintain the current aperture of main water intaking valve constant;
(22) at main water intake ball valve and setting-out switch board, close main water intake ball valve bypass valve, recover bypass valve closed condition;
(23) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " excision " position by " terrain ", prevent malfunction;
(24) on oil gear switch board, close main water intake ball valve pressure oil tank isolating valve, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed to chamber oil pipe line pressure release, and keep pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after abnormal, with bridge machine or lifting appliance, coordinate corresponding suspender belt to protect the pivoted arm of main water intake ball valve, this state 10 minutes and without after abnormal, can carry out relevant upkeep operation;
(28) after service work completes, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check each equipment normally.
In the specific implementation, the present invention also need to be in whole operating process, high pressure oil jacking device, and unit brake switch board, governor switch board, water wheel chamber preferably has special messenger to nurse.When there are favourable turn abnormal conditions in unit, hydraulic oil jack-up can be dropped into, brake exits, and closes in time main water intake ball valve.In whole process, the rotating part of unit is forbidden construction.Need unified command, guarantee the unimpeded of communication.

Claims (1)

1. a method for water power station owner water intake ball valve not standard-sized sheet with pressure, it comprises water power station owner water intake ball valve, suspender belt, bridge machine or crane; It is characterized in that: concrete implementation step is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into generator motor mechanical braking, and check that input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into position, prevent that stator from surprisingly opening caused unit and rotating;
(6) on oil gear switch board, open governor pressure oil tank isolating valve, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) at electricity, adjust and check that stator clamping stroke keeps normal in a long time cashier's office in a shop;
(8) extract governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and exit plug, prevent that guide vane servomotor from automatically locking malfunction and exiting;
(9) pull up governor emergency shutdown electromagnetic valve, prevent unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, while finally guaranteeing main water intake ball valve unlatching, speed is slow, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is standby to " zero load ";
(12) on oil gear switch board, open main water intake ball valve pressure oil tank isolating valve, pressure oil is provided to main water intaking valve oil pipe line;
(13) the manual main water intake ball valve hydraulic locking electromagnetic valve of excitation receding side, inspection is extracted after exiting to exit and is dropped into both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal exits correctly;
(15) check that owner's water intake ball valve manual locking exits correctly;
(16) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " terrain " position by " distant place ";
(17) on main water intake ball valve and setting-out switch board, open main water intake ball valve bypass valve, make main water intaking valve pressure at both sides balance;
(18) on main water intake ball valve and setting-out switch board, exit the sealing of main water intake ball valve downstream;
(19) check that main water intake ball valve received concora crush signal;
(20) on main water intake ball valve and setting-out switch board, press the manually opened button of main water intake ball valve, make main water intaking valve open to the aperture position needing;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, maintain the current aperture of main water intaking valve constant;
(22) at main water intake ball valve and setting-out switch board, close main water intake ball valve bypass valve, recover bypass valve closed condition;
(23) main water intake ball valve and the main water intake ball valve system of setting-out switch board electromagnetic valve terrain/distant place selector switch are switched to " excision " position by " terrain ", prevent malfunction;
(24) on oil gear switch board, close main water intake ball valve pressure oil tank isolating valve, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed to chamber oil pipe line pressure release, and keep pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after abnormal, with bridge machine or lifting appliance, coordinate corresponding suspender belt to protect the pivoted arm of main water intake ball valve, this state 10 minutes and without after abnormal, can carry out relevant upkeep operation;
(28) after service work completes, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check each equipment normally.
CN201210408852.5A 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station Active CN102900057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210408852.5A CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210408852.5A CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Publications (2)

Publication Number Publication Date
CN102900057A CN102900057A (en) 2013-01-30
CN102900057B true CN102900057B (en) 2014-10-08

Family

ID=47572524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210408852.5A Active CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Country Status (1)

Country Link
CN (1) CN102900057B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388552B (en) * 2013-05-23 2015-12-02 国家电网公司 Hydropower Unit valve control device and controlling method thereof
CN103453199B (en) * 2013-09-13 2016-09-07 国家电网公司 The method that unit normally starts is ensured during main water intaking valve bypass valve position dropout
CN104005389B (en) * 2014-05-15 2015-09-09 国家电网公司 The unlatching of water intaking valve and method for closing, device and water intaking valve control system
CN104846794A (en) * 2015-04-22 2015-08-19 杭州富春江水电设备有限公司 Water inlet main valve for hydropower station and operation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3238556A1 (en) * 1981-10-24 1983-05-11 Kinemura, Masao, Hiroshima Water-power station
SU1714035A1 (en) * 1990-06-11 1992-02-23 Восточно-Сибирское отделение Всесоюзного проектно-изыскательского и научно-исследовательского объединения "Гидропроект" им.С.Я.Жука Method for inspection and repair of pressure tunnel of hydroelectric station
CN101430358A (en) * 2008-12-10 2009-05-13 河南国网宝泉抽水蓄能有限公司 Head-machine first water pump behavior full-group start test method for pump storage plant
CN101550900A (en) * 2009-05-12 2009-10-07 福建万新发电设备有限公司 Valve control device and control method thereof
CN201933473U (en) * 2010-06-09 2011-08-17 水利部农村电气化研究所 Small-sized water wheel power station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3238556A1 (en) * 1981-10-24 1983-05-11 Kinemura, Masao, Hiroshima Water-power station
SU1714035A1 (en) * 1990-06-11 1992-02-23 Восточно-Сибирское отделение Всесоюзного проектно-изыскательского и научно-исследовательского объединения "Гидропроект" им.С.Я.Жука Method for inspection and repair of pressure tunnel of hydroelectric station
CN101430358A (en) * 2008-12-10 2009-05-13 河南国网宝泉抽水蓄能有限公司 Head-machine first water pump behavior full-group start test method for pump storage plant
CN101550900A (en) * 2009-05-12 2009-10-07 福建万新发电设备有限公司 Valve control device and control method thereof
CN201933473U (en) * 2010-06-09 2011-08-17 水利部农村电气化研究所 Small-sized water wheel power station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张春等.高水头抽水蓄能电站球阀与导叶联动的关闭规律研究.《水电能源科学》.2011,第29卷(第12期),128-131.
高水头抽水蓄能电站球阀与导叶联动的关闭规律研究;张春等;《水电能源科学》;20111231;第29卷(第12期);128-131 *

Also Published As

Publication number Publication date
CN102900057A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900057B (en) Under-pressure non-full opening method for main water inlet ball valve of hydropower station
CN202789784U (en) Hydraulic system with fine adjustment function
CN208363053U (en) A kind of long diversion power station high head and large flow energy dissipating decompression drainage system
CN102767165B (en) Gate system for hydropower station
CN105840480B (en) A kind of closed level Four connection in series-parallel pumping station system and its control method
CN203499979U (en) Device for reducing water hammer effect of high-lift water pump station
CN111441896A (en) System and method for eliminating pressure rise in hydraulic transition process of hydropower station
CN208502852U (en) Generating set heat pump shaft end seal water automatic voltage regulating system
CN108240490A (en) The quick flap valve of decompression type
CN103486317A (en) Weighted hydraulic control butterfly valve
CN102733360B (en) Emergency operation device and gate system of winch hoist
CN113202479B (en) Shaft heading machine and mud circulation system thereof
CN201776404U (en) Pressure-maintaining overflow device used for pressure-maintaining water system
CN201746567U (en) Hydraulic quick-acting switching-off control device for gas switching-off valve used for blast stove
CN212406929U (en) System for eliminating pressure rise in hydraulic transition process of hydropower station
CN205314233U (en) Multi -functional sump pit structure in power station
CN113623127A (en) Method for controlling working state of electric control system of speed regulator of hydroelectric generating set in one-key opening guide vane drainage mode of monitoring system
CN206738065U (en) A kind of hydrostatic storage formula hydraulic drive type wind power generating set
CN104595287A (en) Energy-reclaiming constant deceleration hydraulic station
CN108468312B (en) High-head high-flow energy dissipation pressure reduction drainage system of long drainage power station
CN206738078U (en) A kind of hydraulic drive type wind power generating set
CN202900621U (en) Intelligent pump control valve
CN201713345U (en) Anti-siphon type water outlet opening structure
CN201588194U (en) Piston single hoisting-point hydraulic hoist
CN205172802U (en) Supplementary governing system of small hydropower station hydraulic pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: LIAONING PUSHIHE WATER-STORAGE CO., LTD.

Effective date: 20130922

Owner name: STATE GRID XINYUAN CO., LTD. LIAONING PUSHIHE WATE

Effective date: 20130922

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 118216 DANDONG, LIAONING PROVINCE TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130922

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Co., Ltd.

Applicant after: Liaoning Pushihe Water-Storage Co., Ltd.

Address before: 118216 Liaoning province Dandong City Zhen'an District Taiping Bay

Applicant before: Liaoning Pushihe Water-Storage Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant