CN102900057A - Under-pressure non-full opening method for main water inlet ball valve of hydropower station - Google Patents

Under-pressure non-full opening method for main water inlet ball valve of hydropower station Download PDF

Info

Publication number
CN102900057A
CN102900057A CN2012104088525A CN201210408852A CN102900057A CN 102900057 A CN102900057 A CN 102900057A CN 2012104088525 A CN2012104088525 A CN 2012104088525A CN 201210408852 A CN201210408852 A CN 201210408852A CN 102900057 A CN102900057 A CN 102900057A
Authority
CN
China
Prior art keywords
main water
ball valve
water intake
valve
intake ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104088525A
Other languages
Chinese (zh)
Other versions
CN102900057B (en
Inventor
袁冰峰
蒋春钢
李长胜
任青旭
陈鹏
程剑林
赵永行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING PUSHIHE WATER-STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
LIAONING PUSHIHE WATER-STORAGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING PUSHIHE WATER-STORAGE Co Ltd filed Critical LIAONING PUSHIHE WATER-STORAGE Co Ltd
Priority to CN201210408852.5A priority Critical patent/CN102900057B/en
Publication of CN102900057A publication Critical patent/CN102900057A/en
Application granted granted Critical
Publication of CN102900057B publication Critical patent/CN102900057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Control Of Water Turbines (AREA)

Abstract

The invention belongs to the technical field of a hydropower station and especially relates to an under-pressure non-full opening method for a main water inlet ball valve of the hydropower station. The under-pressure non-full opening method is suitable for the hydraulic locking maintenance of a large-size main water inlet ball valve in front of a volute or the non-full opening operation for the main water inlet ball valve under the other conditions of bearing higher water pressure of a high-head hydropower station when a draining pipeline is not emptied. The non-full opening problem of the main water inlet ball valve of the high-head hydropower station is solved by the under-pressure non-full opening method provided by the invention; the under-pressure non-full opening method has the advantages of simple and easily implemented method, safety, reliability, greatly reduced construction period, capability of saving cost, and the like; the under-pressure non-full opening method is especially suitable for the hydropower station with higher water head, bigger volume and heavier heavy of the main water inlet ball valve and higher pressure bearing value; the under-pressure non-full opening method is approved by multi-parties and is practically checked; the practical check confirms that the method is safe and reliable; the operation process is systematic and perfect; the reference significance is great; and the popularization value is high.

Description

The method of a kind of water power station owner water intake ball valve not standard-sized sheet with pressure
Technical field
The invention belongs to the technical field in power station, relate in particular to the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure.Be applicable to the high head hydroelectric power plant, do not needing when conduit pipe is emptying, need to carry out the not operation of standard-sized sheet to main water intake ball valve bearing in the larger hydraulic pressure situation to large-scale main water intake ball valve hydraulic locking maintenance before the spiral case or other.
Background technology
The master of high head hydroelectric power plant water intake ball valve ran into the ball valve body parts in the past needs maintenance, require ball valve not during the special circumstances of standard-sized sheet, because the ball valve deadweight is large and high head water power plant diversion tunnel pressure is larger, for guaranteeing that safety can only be with the water of conduit pipe all in the emptying situations, starting petrol station opens ball valve to required aperture, then close that ball valve servomotor advances draining valve or locked ball valve main distributing valve advances oil-discharging cavity, guarantee that ball valve process oil pipeline pressure oil remains unchanged, and makes ball valve rest on required aperture.
Because the general volume weight of main water intake ball valve of the employing before high head hydroelectric power plant's spiral case inlet is huge, and in order to guarantee the safety of unit, general this main water intake ball valve has the trend of closing voluntarily in the structure design in the stress-free situation of pressure oil pipeline, so also only allow to rest under normal circumstances the position of complete shut-down or standard-sized sheet.When needing not standard-sized sheet as processing ball valve hydraulic locking or other parts, for guaranteeing safety, can only wait diversion tunnel emptying, under anhydrous condition, carry out, and the water-filling after the emptying and maintenance of emptying diversion tunnel often needs the time in twenty or thirty sky, and doing like this is again effort consuming time.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure is provided.
The present invention realizes that the technical scheme of the purpose of inventing is as follows:
The method of a kind of water power station owner water intake ball valve not standard-sized sheet with pressure, it comprises water power station owner water intake ball valve, suspender belt, bridge machine or crane; The implementation step is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) the governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into the generator motor mechanical braking, and check that the input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into the position, prevent that the stator accident from opening the unit that causes and rotating;
(6) open governor pressure oil tank isolating valve at the oil gear switch board, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) check cashier's office in a shop that at the electricity accent stator clamping stroke keeps normal in a long time;
(8) extract the governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and withdraw from plug, prevent that the stator guide vane servomotor from automatically locking malfunction and withdrawing from;
(9) pull up governor emergency shutdown electromagnetic valve, prevent the unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, speed is slow when finally guaranteeing main water intake ball valve unlatching, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is for subsequent use to " zero load ";
(12) open main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, pressure oil is provided for main water intaking valve oil pipe line;
(13) manual excitation master water intake ball valve hydraulic locking electromagnetic valve receding side is extracted to withdraw from after inspection is withdrawed from and is dropped into the both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal withdraws from correctly;
(15) check that owner's water intake ball valve manual locking withdraws from correctly;
(16) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " terrain " position by " distant place ";
(17) open main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, make main water intaking valve pressure at both sides balance;
(18) withdraw from the sealing of main water intake ball valve downstream at main water intake ball valve and setting-out switch board;
(19) the main water intake ball valve of inspection has been received the concora crush signal;
(20) press the manually opened button of main water intake ball valve at main water intake ball valve and setting-out switch board, make the aperture position that main water intaking valve opens to be needed;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, keep the current aperture of main water intaking valve constant;
(22) close main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, recover the bypass valve closed condition;
(23) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " excision " position by " terrain ", prevented malfunction;
(24) close main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed chamber oil pipe line pressure release, and keep the pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after unusual, cooperate corresponding suspender belt that the pivoted arm of main water intake ball valve is protected with bridge machine or lifting appliance, this state 10 minutes and without after unusual, the upkeep operation that can be correlated with;
(28) after service work is finished, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check that each equipment normally gets final product.
Advantage of the present invention and good effect are:
The research that the present invention is deep ball valve operating principle and through a large amount of practice, under the premise that security is guaranteed, all utilize on-the-spot existing equipment, utilize brand-new method, do not need emptying conduit pipe, can solve the not standard-sized sheet problem under the main water intake ball valve specific (special) requirements.
The solution of the invention the not standard-sized sheet problem with pressure of the master of high head hydroelectric power plant water intake ball valve, have simple, safe and reliable, the great reduction of erection time of method, the advantage such as reduce expenses.Be particularly suitable for higher, the main water intake ball valve volume weight of head large and bear the higher power station of force value.The present invention has passed through approval in many ways, and has passed through the check of practice, confirms that the method is safe and reliable, operating process system, perfect, and reference is large, has very strong promotional value.
Below in conjunction with specific embodiments of the invention, the present invention is described in detail.
The specific embodiment
Embodiment 1:
The present invention is the method for a kind of water power station owner water intake ball valve not standard-sized sheet with pressure, and needed auxiliary security instrument comprises when implementing: one in one of the suspender belt that is fit to, the bridge machine that is fit to or crane.
Implementation step of the present invention is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) the governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into the generator motor mechanical braking, and check that the input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into the position, prevent that the stator accident from opening the unit that causes and rotating;
(6) open governor pressure oil tank isolating valve at the oil gear switch board, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) check cashier's office in a shop that at the electricity accent stator clamping stroke keeps normal in a long time;
(8) extract the governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and withdraw from plug, prevent that the stator guide vane servomotor from automatically locking malfunction and withdrawing from;
(9) pull up governor emergency shutdown electromagnetic valve, prevent the unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, speed is slow when finally guaranteeing main water intake ball valve unlatching, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is for subsequent use to " zero load ";
(12) open main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, pressure oil is provided for main water intaking valve oil pipe line;
(13) manual excitation master water intake ball valve hydraulic locking electromagnetic valve receding side is extracted to withdraw from after inspection is withdrawed from and is dropped into the both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal withdraws from correctly;
(15) check that owner's water intake ball valve manual locking withdraws from correctly;
(16) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " terrain " position by " distant place ";
(17) open main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, make main water intaking valve pressure at both sides balance;
(18) withdraw from the sealing of main water intake ball valve downstream at main water intake ball valve and setting-out switch board;
(19) the main water intake ball valve of inspection has been received the concora crush signal;
(20) press the manually opened button of main water intake ball valve at main water intake ball valve and setting-out switch board, make the aperture position that main water intaking valve opens to be needed;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, keep the current aperture of main water intaking valve constant;
(22) close main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, recover the bypass valve closed condition;
(23) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " excision " position by " terrain ", prevented malfunction;
(24) close main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed chamber oil pipe line pressure release, and keep the pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after unusual, cooperate corresponding suspender belt that the pivoted arm of main water intake ball valve is protected with bridge machine or lifting appliance, this state 10 minutes and without after unusual, the upkeep operation that can be correlated with;
(28) after service work is finished, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check that each equipment normally gets final product.
In the specific implementation, the present invention also need to be in whole operating process, high pressure oil jacking device, and unit brake switch board, governor switch board, water wheel chamber preferably have the special messenger to nurse.When the favourable turn abnormal conditions appear in unit, hydraulic oil jack-up can be dropped into, brake withdraws from, and in time closes main water intake ball valve.The rotating part of unit is forbidden construction in whole process.Need unified command, guarantee the unimpeded of communication.

Claims (1)

1. the method for a water power station owner water intake ball valve not standard-sized sheet with pressure, it comprises water power station owner water intake ball valve, suspender belt, bridge machine or crane; It is characterized in that: the implementation step is as follows:
(1) main water intake ball valve tank pressure is beaten to rated value, guaranteed that main water inlet valve system has enough operation oil pressure;
(2) the governor oil pressure tank is beaten to rated value, guaranteed that stator has clamping stroke;
(3) little stator pressure is beaten to rated value, guaranteed that little stator has clamping stroke;
(4) manually drop into the generator motor mechanical braking, and check that the input cavity pressure is normal, guarantee that unit can not rotate;
(5) stator is hydraulically locked in and drops into the position, prevent that the stator accident from opening the unit that causes and rotating;
(6) open governor pressure oil tank isolating valve at the oil gear switch board, make guide vane servomotor compress stator, prevent that unit from rotating;
(7) check cashier's office in a shop that at the electricity accent stator clamping stroke keeps normal in a long time;
(8) extract the governor guide vane servomotor and automatically lock to throw and move back electromagnetic valve and withdraw from plug, prevent that the stator guide vane servomotor from automatically locking malfunction and withdrawing from;
(9) pull up governor emergency shutdown electromagnetic valve, prevent the unit malfunction;
(10) adjust main water intake ball valve servomotor on-off valve both sides bolt to the desired location of working, speed is slow when finally guaranteeing main water intake ball valve unlatching, and aperture is controlled;
(11) 1 large oil pump of unlatching oil gear is for subsequent use to " zero load ";
(12) open main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, pressure oil is provided for main water intaking valve oil pipe line;
(13) manual excitation master water intake ball valve hydraulic locking electromagnetic valve receding side is extracted to withdraw from after inspection is withdrawed from and is dropped into the both sides plug, prevents the malfunction of main water intake ball valve hydraulic locking electromagnetic valve;
(14) check that main water intake ball valve upstream seal withdraws from correctly;
(15) check that owner's water intake ball valve manual locking withdraws from correctly;
(16) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " terrain " position by " distant place ";
(17) open main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, make main water intaking valve pressure at both sides balance;
(18) withdraw from the sealing of main water intake ball valve downstream at main water intake ball valve and setting-out switch board;
(19) the main water intake ball valve of inspection has been received the concora crush signal;
(20) press the manually opened button of main water intake ball valve at main water intake ball valve and setting-out switch board, make the aperture position that main water intaking valve opens to be needed;
(21) adjust main water intake ball valve servomotor on-off valve both sides bolt, close main water intake ball valve servomotor on-off valve, block main water intaking valve servomotor pressure oil loop, keep the current aperture of main water intaking valve constant;
(22) close main water intake ball valve bypass valve at main water intake ball valve and setting-out switch board, recover the bypass valve closed condition;
(23) main water intake ball valve and setting-out switch board master water intake ball valve system electromagnetic valve terrain/distant place selector switch are cut to " excision " position by " terrain ", prevented malfunction;
(24) close main water intake ball valve pressure oil tank isolating valve at the oil gear switch board, cut off main water intaking valve oil pipe line pressure oil-source, prevent main water intaking valve action;
(25) main water intake ball valve servomotor is closed chamber oil pipe line pressure release, and keep the pressure release state, the pressure oil that prevents from closing in the oil pipe line of chamber is closed main water intaking valve;
(26) monitor the larger displacement of nothing in the stator normal and main water intake ball valve servomotor piston rod long period of clamping stroke, prevent the main water intaking valve action situation appearance that pipe valve is not closed completely and causes;
(27) observe certain hour without after unusual, cooperate corresponding suspender belt that the pivoted arm of main water intake ball valve is protected with bridge machine or lifting appliance, this state 10 minutes and without after unusual, the upkeep operation that can be correlated with;
(28) after service work is finished, recover main water intake ball valve and close chamber oil pipe line pressure release place, open main water intake ball valve pressure oil tank isolating valve, slowly open main water intake ball valve servomotor on-off valve both sides bolt, make main water intake ball valve slowly closing, drop into main water intake ball valve working seal and locking, and check that each equipment normally gets final product.
CN201210408852.5A 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station Active CN102900057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210408852.5A CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210408852.5A CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Publications (2)

Publication Number Publication Date
CN102900057A true CN102900057A (en) 2013-01-30
CN102900057B CN102900057B (en) 2014-10-08

Family

ID=47572524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210408852.5A Active CN102900057B (en) 2012-10-24 2012-10-24 Under-pressure non-full opening method for main water inlet ball valve of hydropower station

Country Status (1)

Country Link
CN (1) CN102900057B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388552A (en) * 2013-05-23 2013-11-13 国家电网公司 Ball valve control device for hydroelectric generating set and control method thereof
CN103453199A (en) * 2013-09-13 2013-12-18 国家电网公司 Method for ensuring normal starting of unit in case of loss of position signals of bypass valve of main water inlet valve
CN104005389A (en) * 2014-05-15 2014-08-27 国家电网公司 Device and method for opening water inlet valve, device and method for closing water inlet valve and water inlet valve control system
CN104846794A (en) * 2015-04-22 2015-08-19 杭州富春江水电设备有限公司 Water inlet main valve for hydropower station and operation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3238556A1 (en) * 1981-10-24 1983-05-11 Kinemura, Masao, Hiroshima Water-power station
CN101430358A (en) * 2008-12-10 2009-05-13 河南国网宝泉抽水蓄能有限公司 Head-machine first water pump behavior full-group start test method for pump storage plant
CN101550900A (en) * 2009-05-12 2009-10-07 福建万新发电设备有限公司 Valve control device and control method thereof
CN201933473U (en) * 2010-06-09 2011-08-17 水利部农村电气化研究所 Small-sized water wheel power station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1714035A1 (en) * 1990-06-11 1992-02-23 Восточно-Сибирское отделение Всесоюзного проектно-изыскательского и научно-исследовательского объединения "Гидропроект" им.С.Я.Жука Method for inspection and repair of pressure tunnel of hydroelectric station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3238556A1 (en) * 1981-10-24 1983-05-11 Kinemura, Masao, Hiroshima Water-power station
CN101430358A (en) * 2008-12-10 2009-05-13 河南国网宝泉抽水蓄能有限公司 Head-machine first water pump behavior full-group start test method for pump storage plant
CN101550900A (en) * 2009-05-12 2009-10-07 福建万新发电设备有限公司 Valve control device and control method thereof
CN201933473U (en) * 2010-06-09 2011-08-17 水利部农村电气化研究所 Small-sized water wheel power station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张春等: "高水头抽水蓄能电站球阀与导叶联动的关闭规律研究", 《水电能源科学》, vol. 29, no. 12, 31 December 2011 (2011-12-31), pages 128 - 131 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388552A (en) * 2013-05-23 2013-11-13 国家电网公司 Ball valve control device for hydroelectric generating set and control method thereof
CN103388552B (en) * 2013-05-23 2015-12-02 国家电网公司 Hydropower Unit valve control device and controlling method thereof
CN103453199A (en) * 2013-09-13 2013-12-18 国家电网公司 Method for ensuring normal starting of unit in case of loss of position signals of bypass valve of main water inlet valve
CN103453199B (en) * 2013-09-13 2016-09-07 国家电网公司 The method that unit normally starts is ensured during main water intaking valve bypass valve position dropout
CN104005389A (en) * 2014-05-15 2014-08-27 国家电网公司 Device and method for opening water inlet valve, device and method for closing water inlet valve and water inlet valve control system
CN104846794A (en) * 2015-04-22 2015-08-19 杭州富春江水电设备有限公司 Water inlet main valve for hydropower station and operation method thereof

Also Published As

Publication number Publication date
CN102900057B (en) 2014-10-08

Similar Documents

Publication Publication Date Title
CN102900057B (en) Under-pressure non-full opening method for main water inlet ball valve of hydropower station
CN202789784U (en) Hydraulic system with fine adjustment function
CN102767165B (en) Gate system for hydropower station
CN208363053U (en) A kind of long diversion power station high head and large flow energy dissipating decompression drainage system
CN201427122Y (en) Pipeline oil flushing device of hydraulic lubricating system
CN108240490A (en) The quick flap valve of decompression type
CN103486317A (en) Weighted hydraulic control butterfly valve
CN2782974Y (en) Overpressure proof warter pumping energy storage power generating system
CN102733360B (en) Emergency operation device and gate system of winch hoist
CN201535385U (en) Hammer/energy accumulator composite hydraulic control slowly closing valve actuator
CN201660396U (en) Hydraulic station of hydraulic delay braking hoisting machine
CN201776404U (en) Pressure-maintaining overflow device used for pressure-maintaining water system
CN202900621U (en) Intelligent pump control valve
CN209530281U (en) A kind of Large Hydroelectric Set water pilot bearing online oil filtration system
CN104595287A (en) Energy-reclaiming constant deceleration hydraulic station
CN106401858B (en) Control mechanism for preventing automatic exit of working seal of water inlet ball valve of generator set and use method thereof
CN202733131U (en) Ball valve servomotor with hydraulic locking device
CN102529928A (en) Aerodynamic braking hydraulic system
CN205172802U (en) Supplementary governing system of small hydropower station hydraulic pressure
CN108468312B (en) High-head high-flow energy dissipation pressure reduction drainage system of long drainage power station
CN216841834U (en) Turbine anti-skip system
CN105201737A (en) Hydraulic auxiliary adjusting system of small-size hydropower station
CN108799606B (en) Emergency valve closing circuit of unit water inlet heavy hammer butterfly valve
CN202867073U (en) Hydraulic locking device with open degree limiting function
CN203846459U (en) Water conservancy system radial gate drive device with emergency operation mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: LIAONING PUSHIHE WATER-STORAGE CO., LTD.

Effective date: 20130922

Owner name: STATE GRID XINYUAN CO., LTD. LIAONING PUSHIHE WATE

Effective date: 20130922

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 118216 DANDONG, LIAONING PROVINCE TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130922

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Co., Ltd.

Applicant after: Liaoning Pushihe Water-Storage Co., Ltd.

Address before: 118216 Liaoning province Dandong City Zhen'an District Taiping Bay

Applicant before: Liaoning Pushihe Water-Storage Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant