CN102900026A - 隧道开挖地段加固高架桥基保护桥面的施工方法 - Google Patents

隧道开挖地段加固高架桥基保护桥面的施工方法 Download PDF

Info

Publication number
CN102900026A
CN102900026A CN2012104300557A CN201210430055A CN102900026A CN 102900026 A CN102900026 A CN 102900026A CN 2012104300557 A CN2012104300557 A CN 2012104300557A CN 201210430055 A CN201210430055 A CN 201210430055A CN 102900026 A CN102900026 A CN 102900026A
Authority
CN
China
Prior art keywords
bridge
jacking
abutment
tunnel excavation
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104300557A
Other languages
English (en)
Other versions
CN102900026B (zh
Inventor
金宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201210430055.7A priority Critical patent/CN102900026B/zh
Publication of CN102900026A publication Critical patent/CN102900026A/zh
Application granted granted Critical
Publication of CN102900026B publication Critical patent/CN102900026B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明的隧道开挖地段加固高架桥基保护桥面的施工方法,其特殊之处在于:在高架桥墩顶的支座旁边放入超薄千斤顶对桥梁进行顶升,顶升后在支座顶部塞入钢板或直接更换支座来抵消因桥基沉降值,以调整相邻桥基沉降差值,满足桥梁的线性稳定;并在允许范围内预顶升一定高度,在后续开挖过程中沉降到稳定值。本发明的有益效果是,隧道开挖地段,在高架桥墩上安设超薄千斤顶顶升、采用袖阀管对桥基周围土体多序跟踪注浆的顶注结合方法,结合了顶升和注浆的优势,既降低了桥基的不均匀沉降,同时固结桥基周围土体,增加对桥基的摩阻力,起到很好的承托作用。该技术在广州地铁五号线西村站等项目上应用达到了较好的效果。

Description

隧道开挖地段加固高架桥基保护桥面的施工方法
技术领域
    本发明属于建筑领域,涉及一种隧道开挖地段加固高架桥基保护桥面的施工方法。
背景技术
    地铁暗挖隧道施工时对邻近高架桥产生扰动,造成桥基不均匀沉降,当前对桥基的加固方法,诸如桩基托换、地面注浆等在某些工程中取得有一定的成果,托换过程有可能对现有结构会造成一定的破坏,桩基施工风险高,造价较高;注浆在方案实施贯穿隧道施工影响期内都要进行,工期较长。因此传统的加固方法如桥基托换、地面注浆等对周边交通、环境等影响较大,而且施工成本较高等。
发明内容
    本发明为了弥补现有技术的不足,提供了一种加固效果好、对周边交通影响小、施工成本低的隧道开挖地段加固高架桥基保护桥面的施工方法。
本发明是通过如下技术方案实现的:
本发明的隧道开挖地段加固高架桥基保护桥面的施工方法,其特殊之处在于:在高架桥墩顶的支座旁边放入超薄千斤顶对桥梁进行顶升,顶升后在支座顶部塞入钢板或直接更换支座来抵消因桥基沉降值,以调整相邻桥基沉降差值,满足桥梁的线性稳定;并在允许范围内预顶升一定高度,在后续开挖过程中沉降到稳定值。
本发明的隧道开挖地段加固高架桥基保护桥面的施工方法,还包括以下步骤:在已开挖隧道洞内,对掌子面沿前进方向进行全段注浆,同时对隧道壁处位于桥基周边受扰动的土体进行横向和/或倾斜方向注浆,固结土体。
本发明的有益效果是,隧道开挖地段,在高架桥墩上安设超薄千斤顶顶升、采用袖阀管对桥基周围土体多序跟踪注浆的顶注结合方法,结合了顶升和注浆的优势,既降低了桥基的不均匀沉降,同时固结桥基周围土体,增加对桥基的摩阻力,起到很好的承托作用。该技术在广州地铁五号线西村站等项目上应用达到了较好的效果。
附图说明
图1为千斤顶顶升纵剖面示意图,图2为千斤顶顶升横剖面示意图,图3为隧道壁采用袖阀管多序跟踪注浆示意图,图4为隧道掌子面全断面注浆示意图,图5为隧道内桩侧壁注浆横截面图。
图中,1超薄千斤顶,2钢板,3并联工字钢,4上层钢垫板,5下层钢垫板,6隧道,7高架桥墩,8注浆孔,9地面。
具体实施方式
附图为本发明的一种具体实施例。
本发明的隧道开挖地段加固高架桥基保护桥面的施工方法:
地面上,直接在高架墩顶的支座旁边采用超薄千斤顶1对桥梁进行顶升,然后在支座顶部与桥梁之间加塞钢板2或更换支座来抵消因桥基沉降值,以调整相邻桥基沉降差值,满足桥梁的线性稳定;并在允许范围内预顶升一定高度,在后续开挖过程中沉降到稳定值。
在已开挖隧道洞内,对掌子面沿前进方向进行全段注浆,同时对隧道壁处位于桥基周边受扰动的土体进行横向和/或倾斜方向注浆,采用可重复式袖阀管多序跟踪注浆,固结土体,有效增加对桥基的摩阻力,减小因隧道开挖扰动引起的桥基沉降。
本发明的隧道开挖地段加固高架桥基保护桥面的施工方法,是一种加固高架桥基的新技术,利用超薄千斤顶直接顶升高架桥来抵消因隧道开挖引起的桥基沉降,控制不均匀沉降,同时结合采用可重复式袖阀管对桥基周围土体多序跟踪注浆,固结受扰动土层,增加对桥基的摩阻力,达到减小沉降的目的。
施工步骤:测量放线→隧道开挖→暂时封闭掌子面→洞外顶升→测量放线→打折并安装掌子面全断面注浆管→打折并安装侧向桥基注浆管→袖阀管注浆→土体固结→隧道开挖掘进→施工监测→重复注浆……→通过桥基→监测稳定→封堵注浆管→正常开挖
本技术的优越性:与传统施工工艺相比,该技术能有效解决占用地面交通道路,减少地面施工环境污染,有施工简易,建设成本低,施工周期短,快捷高效,动态控制等特点。隧道开挖过桥基地段,解决因隧道开挖对相邻桥基周边土体扰动而引起的桥基下沉,每根桥基加固可节约施工质量管理成本(预防成本、鉴定成本、不合格成本、内部故障成本、外部故障成本)100000元,社会经济效益是相当显著的。

Claims (2)

1.一种隧道开挖地段加固高架桥基保护桥面的施工方法,其特征在于:在高架桥墩顶的支座旁边放入超薄千斤顶对桥梁进行顶升,顶升后在支座顶部塞入钢板或直接更换支座来抵消因桥基沉降值,以调整相邻桥基沉降差值,满足桥梁的线性稳定;并在允许范围内预顶升一定高度,在后续开挖过程中沉降到稳定值。
2.根据权利要求1所述的隧道开挖地段加固高架桥基保护桥面的施工方法,其特征在于:还包括以下步骤:在已开挖隧道洞内,对掌子面沿前进方向进行全段注浆,同时对隧道壁处位于桥基周边受扰动的土体进行横向和/或倾斜方向注浆,固结土体。
CN201210430055.7A 2012-11-01 2012-11-01 隧道开挖地段加固高架桥基保护桥面的施工方法 Active CN102900026B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210430055.7A CN102900026B (zh) 2012-11-01 2012-11-01 隧道开挖地段加固高架桥基保护桥面的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210430055.7A CN102900026B (zh) 2012-11-01 2012-11-01 隧道开挖地段加固高架桥基保护桥面的施工方法

Publications (2)

Publication Number Publication Date
CN102900026A true CN102900026A (zh) 2013-01-30
CN102900026B CN102900026B (zh) 2015-08-05

Family

ID=47572493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210430055.7A Active CN102900026B (zh) 2012-11-01 2012-11-01 隧道开挖地段加固高架桥基保护桥面的施工方法

Country Status (1)

Country Link
CN (1) CN102900026B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741605A (zh) * 2013-11-01 2014-04-23 北京市重大项目建设指挥部办公室 抑制梁体产生裂缝和抑制梁体裂缝扩大的方法
CN108951612A (zh) * 2018-07-20 2018-12-07 中铁三局集团有限公司 一种地铁隧道盾构端头加固方法
CN109667276A (zh) * 2018-12-22 2019-04-23 广州市天作建筑规划设计有限公司 一种溶洞处理及跟踪注浆施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068816A (ja) * 2003-08-25 2005-03-17 Railway Technical Res Inst 橋梁改築に伴う橋台の構築工法およびその橋台構造物
CN101565955A (zh) * 2009-06-01 2009-10-28 北京科技大学 一种微型应力隔离桩基础加固方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068816A (ja) * 2003-08-25 2005-03-17 Railway Technical Res Inst 橋梁改築に伴う橋台の構築工法およびその橋台構造物
CN101565955A (zh) * 2009-06-01 2009-10-28 北京科技大学 一种微型应力隔离桩基础加固方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
王明年等: "广州地铁西村站近接高架桥桩基影响分区及应用研究", 《岩石力学与工程学报》 *
路云等: "地铁车站隧道与既有近接桩基相互影响研究", 《工程与建设》 *
金宝: "袖阀管注浆技术在广州地铁某桥基加固中的应用", 《施工技术》 *
金宝: "过桥基地段隧道台阶法开挖技术", 《铁道标准设计》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741605A (zh) * 2013-11-01 2014-04-23 北京市重大项目建设指挥部办公室 抑制梁体产生裂缝和抑制梁体裂缝扩大的方法
CN103741605B (zh) * 2013-11-01 2016-05-11 北京市重大项目建设指挥部办公室 抑制梁体产生裂缝和抑制梁体裂缝扩大的方法
CN108951612A (zh) * 2018-07-20 2018-12-07 中铁三局集团有限公司 一种地铁隧道盾构端头加固方法
CN109667276A (zh) * 2018-12-22 2019-04-23 广州市天作建筑规划设计有限公司 一种溶洞处理及跟踪注浆施工方法

Also Published As

Publication number Publication date
CN102900026B (zh) 2015-08-05

Similar Documents

Publication Publication Date Title
CN103556579B (zh) 一种综合注浆保压加管幕支护的箱涵顶推工法
CN102277898B (zh) 排水管顶进施工方法
CN104452809A (zh) 一种超浅埋隧道盖挖施工方法
CN105239586B (zh) 一种采用支撑结构支护基坑的方法
CN102966122B (zh) 在桥梁的基础附近建造隧道时控制桥梁变形的方法
CN202416195U (zh) 一种桥墩偏位纠正与加固系统
CN203222809U (zh) 一种输电线路杆塔预应力混凝土管桩基础
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN105201516A (zh) 一种地铁车站主体结构及其四联拱pba暗挖施工方法
CN105089670B (zh) 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法
CN210887325U (zh) 地铁隧道的保护结构
CN102900026B (zh) 隧道开挖地段加固高架桥基保护桥面的施工方法
CN111411992A (zh) 穿越巨型溶洞的一体化结构体系及其施工方法
CN203716046U (zh) 一种基坑土方运输钢栈桥
CN205036380U (zh) 一种四联拱pba暗挖地铁车站主体结构
CN105625446B (zh) 一种隧道下穿铁路的施工方法
CN107558489A (zh) 一种盾构下穿既有建筑物的施工方法
CN202644591U (zh) 在富水流砂地质条件隧道施工中被加固的桥桩基
CN103967052B (zh) 一种防护新旧框构桥基底高差土体的方法
CN110055973B (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN208803460U (zh) 一种增强水泥土搅拌桩截水效果的预制砼板桩
CN104453915A (zh) 大断面竖井预注浆加固快速开挖方法
CN206768832U (zh) 一种钢管前撑、锚索后拉h型构件围护结构
CN203685271U (zh) 地铁暗挖区间隧道预留通道保护结构
CN114033388B (zh) 富水粉砂层地下隧道顶管用竖井施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant