CN102899450A - Method for avoiding separation of fracture test samples - Google Patents

Method for avoiding separation of fracture test samples Download PDF

Info

Publication number
CN102899450A
CN102899450A CN2012103885332A CN201210388533A CN102899450A CN 102899450 A CN102899450 A CN 102899450A CN 2012103885332 A CN2012103885332 A CN 2012103885332A CN 201210388533 A CN201210388533 A CN 201210388533A CN 102899450 A CN102899450 A CN 102899450A
Authority
CN
China
Prior art keywords
steel
stacking
slow cooling
steel plate
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103885332A
Other languages
Chinese (zh)
Other versions
CN102899450B (en
Inventor
刘丹
韦明
李红文
刘利香
胡丽周
林建农
韩全军
郑京辉
刘小军
张威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuyang Iron and Steel Co Ltd
Hebei Iron and Steel Group Co Ltd
Original Assignee
Wuyang Iron and Steel Co Ltd
Hebei Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuyang Iron and Steel Co Ltd, Hebei Iron and Steel Group Co Ltd filed Critical Wuyang Iron and Steel Co Ltd
Priority to CN201210388533.2A priority Critical patent/CN102899450B/en
Publication of CN102899450A publication Critical patent/CN102899450A/en
Application granted granted Critical
Publication of CN102899450B publication Critical patent/CN102899450B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)
  • Continuous Casting (AREA)
  • Metal Rolling (AREA)

Abstract

The invention discloses a method for avoiding the separation of fracture test samples of steel plates. The method comprises the following steps of: smelting, casting, stacking steel blanks for cooling slowly and stacking the steel plates for cooling slowly. By a smelting process, the quality of molten steel is improved, and the content of harmful elements of slag inclusion and the like is reduced; the quality of continuous casting blanks and the segregation are improved by means of the accelerated cooling of the continuous casting solidification tail end, the optimal distribution of continuous casting water-cooling amount, reasonable casting speed and the like; the problems of the internal stress, segregation and the like of the steel plates can be solved according to a stacking process of the steel plates; and for the steel plates of which the rolled thicknesses are more than or equal to 40 millimeters, the stacking process of the steel plates is added, so that the fracture separation of the steel plates of the thickness specifications is avoided.

Description

A kind of method that solves fracture sample separation phenomenon
Technical field
The present invention relates to a kind of method that solves fracture sample separation phenomenon.
Background technology
Along with being growing more intense of steel industry competition, quality product becomes the focus of competition among enterprises, more and more obtains the attention of each side.Ship plate is widely used in making the structure such as transport pipe, coastal power station, terminal facilities in ocean, coastal and navigating area, inland river boats and ships hull structure, dock, production vessel, the ocean.The internal soundness direct relation of ship plate security and the work-ing life of boats and ships, production vessel etc., is one of very strict steel sheet product of specification of quality." separation " (fracture layering and side crackle) in the deck of boat check refers to that the tension specimen separation that occurs tears phenomenon in the tension test process.The detachment defects of ship plate is the significant problem that the restriction steel plate uses, and the product that has had a strong impact on the deck of boat is paid and economic benefit.
Summary of the invention
For the problems referred to above, the object of the present invention is to provide a kind of processing method that solves fracture sample separation phenomenon.
In order to achieve the above object, the present invention has adopted a kind of technical scheme that solves the processing method of fracture sample separation phenomenon, and concrete steps are as follows:
(1) smelt: molten steel is first through electrosmelting, and electrosmelting does not allow to see the slag tapping; Then send into the refining of LF stove, feed the Al line more than 550 meters, white slag hold-time 〉=40min, lime consumption 〉=16kg/t steel, process and [Al] 〉=0.010% of skimming; The vacuum-treat of the complete rear bull ladle VD stove of refining, vacuum tightness is not more than 66Pa, destroys vacuum during vacuum hold-time 〉=10min, reduces to greatest extent nonmetallic inclusionsin steel, harmful element content, guarantees the purity of molten steel, and the control argon flow amount is at 100L/min;
(2) casting: after the vacuum breaking, water the steel superheating temperature and be controlled at 15~40 ℃, two cold-zone solidification end water strengthen, and steel billet are carried out cold by force, are about to continuous casting billet solidifying end, and the 13rd section to the 16th section water yield of continuous caster doubles;
(3) steel billet stacking slow cooling: after the steel billet casting, with company's steel billet of well cutting stacking slow cooling immediately, temperature is 700~800 ℃, and the slow cooling time is more than 30 hours, 150~170 ℃ of de-stacking temperature, steel billet cool to room temperature;
(4). the steel plate stacking slow cooling: heating steel billet is rolling to be carried out according to normal process, when steel plate is pricked rolling thickness 〉=40mm, steel plate stacking slow cooling, require steel plate head or shoulder to align as far as possible during stacking, stacking temperature 〉=500 ℃, the stacking time is more than 48 hours, 80 ℃ of de-stackings; When steel plate thickness<40mm, need not stacking slow cooling.
Suitably can reduce some draw ring speed during the described continuous casting of step (2), the reduction amplitude is in 0.5m/min.
The described steel billet slow cooling time of step (3) is optimized, and the general slow cooling time is 36 hours.
This technique is fit to all steel grades (except containing the Cu steel), can effectively reduce steel plate internal stress, component segregation, improves the steel plate quality, and the fracture surface of sample pattern is normal, without separation phenomenon.By smelting technology, improve the content of the harmful elements such as steel quality and reduction inclusion; Accelerate cooling by the continuous casting and solidifying end, and the means such as continuous casting water-cooled amount optimization distribution and rational pulling rate, well improved continuous casting billet quality, improve segregation phenomena; Can solve the problems such as steel plate internal stress and segregation according to steel plate stacking technique; For the steel plate of rolling thickness 〉=40mm, increased steel plate stacking technique, successful solution the separation phenomenon of this thickness specification steel plate.
Embodiment
Embodiment 1
Steel grade AB/A specification: 18mm * 2650mm * 8000mm
A kind of processing method that solves fracture sample separation phenomenon of present embodiment, concrete steps are:
(1) smelt: molten steel is first through electrosmelting, and electrosmelting does not allow to see the slag tapping; Then send into the refining of LF stove, feed 578 meters on Al line, white slag hold-time 50min, lime consumption 1650kg, Si-Fe powder 82kg, process and [Al] 〉=0.010% of skimming; Add CaSi piece 70kg before the vacuum-treat of the complete rear bull ladle VD stove of refining, Fruit storage, vacuum tightness 66Pa, vacuum hold-time 15min, the control argon flow amount is at 100L/min;
(2) casting: after the vacuum breaking, water the steel superheating temperature and be controlled at 20 ℃, two cold-zone solidification end water strengthen, and steel billet are carried out cold by force, are about to continuous casting billet solidifying end, and the 13rd section to the 16th section water yield summation of continuous caster is increased to 1600m 3
(3) steel billet stacking slow cooling: after the steel billet casting, with the continuously cast bloom of well cutting stacking slow cooling immediately, temperature is 746 ℃, and the slow cooling time is 36 hours, 170 ℃ of de-stacking temperature, steel billet cool to room temperature; Heating steel billet, rolling technology are normally carried out.
The performance of the steel plate that the present embodiment method is produced: the thick performance 52%, 55%, 57% of drawing of steel plate.Reached the Z35 rank, (fracture layering and side crackle) phenomenon does not appear separating in steel plate tensile test piece.
Embodiment 2
Steel grade CCS/A specification: 53mm * 2470mm * 9620mm
A kind of processing method that solves fracture sample separation phenomenon of present embodiment, concrete steps are:
(1) smelt: molten steel is first through electrosmelting, and electrosmelting does not allow to see the slag tapping; Then send into the refining of LF stove, feed 620 meters on Al line, white slag hold-time 55min, lime consumption 1762kg, Si-Fe powder 75kg, process and [Al] 〉=0.010% of skimming; Add CaSi piece 85kg before the vacuum-treat of the complete rear bull ladle VD stove of refining, Fruit storage, vacuum tightness 66Pa, vacuum hold-time 18min, the control argon flow amount is at 100L/min;
(2) casting: after the vacuum breaking, water the steel superheating temperature and be controlled at 22 ℃, two cold-zone solidification end water strengthen, and steel billet are carried out cold by force, are about to continuous casting billet solidifying end, and the 13rd section to the 16th section water yield summation of continuous caster is increased to 1562m 3
(3) steel billet stacking slow cooling: after the steel billet casting, with the continuously cast bloom of well cutting stacking slow cooling immediately, temperature is 782 ℃, and the slow cooling time is 36 hours, 163 ℃ of de-stacking temperature, steel billet cool to room temperature;
(4) heating steel billet, rolling technology are normally carried out, rolling after, the steel plate stacking slow cooling requires steel plate head or shoulder to align as far as possible during stacking, 553 ℃ of stacking temperature, 50 hours stacking time, 80 ℃ of de-stackings, flaw detection, normalizing after the de-stacking.
The plate property that the present embodiment method is produced: the thick performance 39%, 42%, 50% of drawing of steel plate, reached the Z35 rank, (fracture layering and side crackle) phenomenon does not appear separating in steel plate tensile test piece.

Claims (5)

1. a method that solves fracture sample separation phenomenon is characterized in that, comprises the steps:
(1) smelt: then molten steel sends into the refining of LF stove first through electrosmelting, feeds the Al line more than 550 meters, white slag hold-time 〉=40min, lime consumption 〉=16kg/t steel, process and [Al] 〉=0.010% of skimming; The vacuum-treat of the complete rear bull ladle VD stove of refining, vacuum tightness is not more than 66Pa, destroys vacuum during vacuum hold-time 〉=10min, and the control argon flow amount is at 100L/min;
(2) casting: after the vacuum breaking, water the steel superheating temperature and be controlled at 15~40 ℃, the 13rd section to the 16th section water yield of continuous caster doubles;
(3) steel billet stacking slow cooling: after the steel billet casting, with company's steel billet of well cutting stacking slow cooling immediately, temperature is 700~800 ℃, and the slow cooling time is more than 30 hours, 150~170 ℃ of de-stacking temperature, steel billet cool to room temperature;
The steel plate stacking slow cooling: heating steel billet is rolling, and when steel plate is pricked rolling thickness 〉=40mm, the steel plate stacking slow cooling requires steel plate head or shoulder to align as far as possible during stacking, stacking temperature 〉=500 ℃, and the stacking time is more than 48 hours; When steel plate thickness<40mm, need not stacking slow cooling.
2. the method for solution fracture sample separation phenomenon according to claim 1 is characterized in that, step (1) also adds in the LF stove the Si-Fe powder, and consumption is at the 0.5kg/t steel.
3. the method for solution fracture sample separation phenomenon according to claim 1 is characterized in that, adds CaSi piece, consumption 〉=50kg/ stove in the step (1) before Fruit storage.
4. the method for solution fracture sample separation phenomenon according to claim 1 is characterized in that, casting speed reduces amplitude in 0.5m/min during the described continuous casting of step (2).
5. the method for solution fracture sample separation phenomenon according to claim 1 is characterized in that, the described steel billet slow cooling time of step (3) is 34~38 hours.
CN201210388533.2A 2012-10-12 2012-10-12 Method for avoiding separation of fracture test samples Expired - Fee Related CN102899450B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210388533.2A CN102899450B (en) 2012-10-12 2012-10-12 Method for avoiding separation of fracture test samples

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210388533.2A CN102899450B (en) 2012-10-12 2012-10-12 Method for avoiding separation of fracture test samples

Publications (2)

Publication Number Publication Date
CN102899450A true CN102899450A (en) 2013-01-30
CN102899450B CN102899450B (en) 2014-10-22

Family

ID=47571935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210388533.2A Expired - Fee Related CN102899450B (en) 2012-10-12 2012-10-12 Method for avoiding separation of fracture test samples

Country Status (1)

Country Link
CN (1) CN102899450B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111715861A (en) * 2020-05-26 2020-09-29 武汉钢铁有限公司 Full thickness segregation control method for medium-high carbon steel casting blank in thin slab continuous casting
CN111763885A (en) * 2020-06-30 2020-10-13 南京钢铁股份有限公司 Steel plate for ship and production method for avoiding segregation
CN114934234A (en) * 2022-06-20 2022-08-23 广东韶钢松山股份有限公司 Method for controlling fracture of ship plate steel tensile sample not to be layered
CN115466830A (en) * 2022-09-20 2022-12-13 包头钢铁(集团)有限责任公司 Method for improving Q355ME wind power steel strip-shaped structure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239547A (en) * 1992-02-26 1993-09-17 Kansai Seiko Kk Manufacture of high tension steel material
CN101186994A (en) * 2007-10-15 2008-05-28 莱芜钢铁集团有限公司 Micro-alloying steel for oil gas transport seamless pipeline and its preparation method
CN101363101A (en) * 2008-09-25 2009-02-11 舞阳钢铁有限责任公司 Large thickness quenched high strength steel and production method thereof
CN101412183A (en) * 2008-11-28 2009-04-22 首钢总公司 Method for producing high-carbon chromium bearing steel by double retarded cooling process
CN101709425A (en) * 2009-12-26 2010-05-19 舞阳钢铁有限责任公司 High-strength steel plate for super-thick 80,000-ton large-scale forging press brackets, and production method thereof
CN101921953A (en) * 2010-09-08 2010-12-22 湖南华菱湘潭钢铁有限公司 Production method of anti-corrosion and high strength ultra-thick steel plates
KR20110046681A (en) * 2009-10-29 2011-05-06 현대제철 주식회사 Continuous casting method for rolled steel products
CN102181804A (en) * 2011-05-16 2011-09-14 舞阳钢铁有限责任公司 Steel plate for Class I nuclear key equipment and manufacturing method thereof
CN102534416A (en) * 2012-01-05 2012-07-04 莱芜钢铁集团有限公司 Steel for freight train connecting piece and preparation method thereof
CN102653846A (en) * 2012-04-26 2012-09-05 舞阳钢铁有限责任公司 Large-thickness easy-to-weld quenched and tempered high-strength steel plate for hydroelectricity and manufacturing method thereof
CN102660711A (en) * 2012-05-23 2012-09-12 莱芜钢铁集团有限公司 Steel for petroleum casing connecting piece and manufacturing method thereof

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239547A (en) * 1992-02-26 1993-09-17 Kansai Seiko Kk Manufacture of high tension steel material
CN101186994A (en) * 2007-10-15 2008-05-28 莱芜钢铁集团有限公司 Micro-alloying steel for oil gas transport seamless pipeline and its preparation method
CN101363101A (en) * 2008-09-25 2009-02-11 舞阳钢铁有限责任公司 Large thickness quenched high strength steel and production method thereof
CN101412183A (en) * 2008-11-28 2009-04-22 首钢总公司 Method for producing high-carbon chromium bearing steel by double retarded cooling process
KR20110046681A (en) * 2009-10-29 2011-05-06 현대제철 주식회사 Continuous casting method for rolled steel products
CN101709425A (en) * 2009-12-26 2010-05-19 舞阳钢铁有限责任公司 High-strength steel plate for super-thick 80,000-ton large-scale forging press brackets, and production method thereof
CN101921953A (en) * 2010-09-08 2010-12-22 湖南华菱湘潭钢铁有限公司 Production method of anti-corrosion and high strength ultra-thick steel plates
CN102181804A (en) * 2011-05-16 2011-09-14 舞阳钢铁有限责任公司 Steel plate for Class I nuclear key equipment and manufacturing method thereof
CN102534416A (en) * 2012-01-05 2012-07-04 莱芜钢铁集团有限公司 Steel for freight train connecting piece and preparation method thereof
CN102653846A (en) * 2012-04-26 2012-09-05 舞阳钢铁有限责任公司 Large-thickness easy-to-weld quenched and tempered high-strength steel plate for hydroelectricity and manufacturing method thereof
CN102660711A (en) * 2012-05-23 2012-09-12 莱芜钢铁集团有限公司 Steel for petroleum casing connecting piece and manufacturing method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111715861A (en) * 2020-05-26 2020-09-29 武汉钢铁有限公司 Full thickness segregation control method for medium-high carbon steel casting blank in thin slab continuous casting
CN111715861B (en) * 2020-05-26 2022-05-31 武汉钢铁有限公司 Full thickness segregation control method for medium-high carbon steel casting blank in thin slab continuous casting
CN111763885A (en) * 2020-06-30 2020-10-13 南京钢铁股份有限公司 Steel plate for ship and production method for avoiding segregation
CN114934234A (en) * 2022-06-20 2022-08-23 广东韶钢松山股份有限公司 Method for controlling fracture of ship plate steel tensile sample not to be layered
CN115466830A (en) * 2022-09-20 2022-12-13 包头钢铁(集团)有限责任公司 Method for improving Q355ME wind power steel strip-shaped structure
CN115466830B (en) * 2022-09-20 2024-03-22 包头钢铁(集团)有限责任公司 Method for improving Q355ME wind power steel band structure

Also Published As

Publication number Publication date
CN102899450B (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN103938108B (en) A kind of 460MPa level low compression ratio high-tenacity steel plate for ocean engineering and production method
CN102409236B (en) Method for producing super-thick steel plate
CN102912221B (en) Large-thickness structural steel plate for high-rise building and production method thereof
CN102899450B (en) Method for avoiding separation of fracture test samples
CN103436784B (en) Steel plate for offshore platform and preparation method thereof
CN104404384A (en) 550 MPa-grade low-compression-ratio high-toughness steel plate for ocean engineering platform and production method
CN111455271B (en) Steel plate with thickness of S355G10+ N for ocean structure and production method thereof
CN109628853A (en) A kind of ocean engineering S355G10 super-thick steel plate and manufacturing method
CN103194677A (en) Steel plates for 355MPa-level easy-to-weld ocean platform and production process of steel plates
CN105458205B (en) The production method of high nickel steel Gr.8 continuous cast round billets
CN102925806B (en) Y55 mark free-cutting steel plate and manufacture method thereof
CN101713009A (en) Method for improving pass percent of medium plate flaw detection
CN102041431A (en) Q345B protected flaw detection steel plate and production method thereof
CN102041436A (en) Steel plate for low-alloy high-strength structured steel Q460C and production method thereof
CN101050502A (en) Soldering boat deck steel in high intensity by large line energy, and manufacturing method
CN103361551A (en) V-N microalloying-based high-strength and high-toughness ship plate and manufacturing method thereof
CN109487155B (en) Non-quenched and tempered steel for hydraulic rod of high-pressure oil cylinder and production method thereof
CN113462950B (en) Production process of 410S martensitic stainless steel
CN102041433A (en) X70 steel plate for low-cost pipe fittings and production method thereof
CN109022661B (en) Method for reducing heavy rail steel rail damage rate
CN109175279B (en) YQ450NQR 1B-shaped steel bloom continuous casting production method
CN107630172B (en) Method for preventing surface cracks of low-carbon boron-containing steel
CN108286013A (en) A kind of cut deal Vessel Steels 15CrMnR steel-making continuous casting production methods
CN109332619B (en) YQ450NQR 1B-shaped steel bloom shell quality control method
CN103509925A (en) Low-cost production process for increasing fault detection qualification rate of Q345R steel plates

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20171012

CF01 Termination of patent right due to non-payment of annual fee