CN102896131A - Pre-buried elevating landfill gas collecting well - Google Patents

Pre-buried elevating landfill gas collecting well Download PDF

Info

Publication number
CN102896131A
CN102896131A CN2012103355336A CN201210335533A CN102896131A CN 102896131 A CN102896131 A CN 102896131A CN 2012103355336 A CN2012103355336 A CN 2012103355336A CN 201210335533 A CN201210335533 A CN 201210335533A CN 102896131 A CN102896131 A CN 102896131A
Authority
CN
China
Prior art keywords
gas collecting
pipe
landfill
floral tube
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103355336A
Other languages
Chinese (zh)
Inventor
吕运之
张松元
张向兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN BCCY INDUSTRIAL CO LTD
Original Assignee
HENAN BCCY INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN BCCY INDUSTRIAL CO LTD filed Critical HENAN BCCY INDUSTRIAL CO LTD
Priority to CN2012103355336A priority Critical patent/CN102896131A/en
Publication of CN102896131A publication Critical patent/CN102896131A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Abstract

The invention relates to a landfill gas collecting well which is used for collection of garbage landfill gas. A pre-buried elevating landfill gas collecting well provided by the invention comprises a gas collection pipe and an exhaust pipe, wherein the exhaust pipe is installed at the upper part of the gas collection pipe and is used for connecting a branch exhaust pipe to realize gas collection, a well mouth valve is arranged on the exhaust pipe and is used for controlling negative pressure and collection flow of the landfill gas collecting well, the gas collection pipe is composed of an outer gas collection pipe and an inner gas collection floral pipe, the outer gas collection pipe is composed of an outer gas collection solid pipe at an upper part and an outer gas collection floral pipe at a lower part, and the inner gas collection floral pipe is arranged in the outer gas collection pipe. According to the invention, the pre-buried elevating landfill gas collecting well has a simple structure and reasonable design, the characteristics of a simple process, convenient construction, a fast well forming speed, a mature construction process, strong environmental adaptability and a good gas collection effect are obtained, and low cost and economic benefits are achieved.

Description

A kind of pre-buried lift landfill-gas collecting well
Technical field
The present invention relates to a kind of landfill-gas collecting well, particularly relate to a kind of built-in type lift landfill-gas collecting well, be used for rubbish landfill gas and collect.
Background technology
Refuse landfill gas refers in the garbage loading embeading process, piled up or the domestic waste of landfill in the gas that generated through microbiological anaerobic digestion, degraded of contained large amount of organic.Rubbish landfill gas is a kind of mist, and its generation and release are by conditional decisions such as the water regime in the component of rubbish, soot, rubbish temperature, pH value, meteorological condition, rubbish age, soot structure and environmental geologies.
Rubbish landfill gas has multiple release approach generally speaking: on the one hand can be by the landfill yard surface to the unordered diffusion of atmosphere; On the other hand, landfill gas can be by the geological structure in the underground ground,, landfill gas is moved to from the place of landfill yard away from then discharge into atmosphere to the transverse horizontal diffusion mobility of landfill yard surrounding area such as crack etc.So how to effectively utilize the collection landfill gas, concern using energy source and environmental protection, be a problem that economic worth and social effect are arranged very much.
Most garbage power project all is to utilize vertical shaft to collect landfill gas basically, but vertical shaft has a drawback, after this layer rubbish is filled out the formulation height, rubbish need continue up to increase, at present existing gas collection well just faces and the phenomenon such as is buried, be removed, so not only cause the waste of human, financial, and material resources, and have a short time and get the landfill gas collection and blank time occurs, a large amount of landfill gas is directly dissipated in the air.Therefore how guaranteeing to keep our original vertical shaft when the follow-up rubbish scope of operation is increased, is vital.
Summary of the invention
The present invention is directed to the prior art deficiency, overcome a present technique difficult problem, a kind of mode of landfill-gas collecting well is provided.When the follow-up rubbish scope of operation is increased, can keep our original vertical shaft, reduce the waste of human, financial, and material resources.It is simple in structure, easy construction, cost are low, good in economic efficiency.
The technical solution adopted in the present invention:
A kind of pre-buried lift landfill-gas collecting well, comprise the gas collecting pipe, exhaust tube, described exhaust tube is installed in gas collecting pipe top, be used for connecting suction branch and carry out gas collecting, exhaust tube is provided with head valve, head valve is used for control and collects the negative pressure of well and gather flow, it is characterized in that: described gas collecting pipe is comprised of gas collecting outer tube and the inner floral tube of gas collecting, described gas collecting outer tube is comprised of the outside floral tube of gas collecting of the outside real pipe of the gas collecting on top and bottom, and the inner floral tube of described gas collecting is arranged in the described gas collecting outer tube.
Described pre-buried lift landfill-gas collecting well, contain the High Pressure Drain pipe, high-pressure pipe, described High Pressure Drain pipe, high-pressure pipe promote well head and enter and stretch into the inner floral tube of gas collecting bottom from gas collecting pipe top, described high-pressure pipe places High Pressure Drain pipe bottom, to utilize the percolate in the air pressure discharge gas collection well.
Described pre-buried lift landfill-gas collecting well, the inner floral tube of described gas collecting upper end is provided with the lifting flange head, in the outside floral tube of described gas collecting lower end, apart from bottom 20-30cm place 3-6 piece of elevator bolt is installed, bolt length is advisable apart from the inner floral tube outer wall of gas collecting 2-3cm with its end.
Described pre-buried lift landfill-gas collecting well, the outside real pipe of described gas collecting, the outside floral tube of gas collecting and the inner floral tube of gas collecting are selected HDPE tubing, the outside real pipe of gas collecting is than about 2 meters of landfill heap height, less than 3 meters, the inner floral tube length of gas collecting is suitable with the junk-heap body height than landfill height for the outside floral tube of gas collecting.
Described pre-buried lift landfill-gas collecting well, the outside real length of tube of gas collecting is 3-4 rice, remaining part is outside floral tube, the lifting when selecting HDPE tubing mainly to be convenient to follow-up junk-heap body rising.
Described pre-buried lift landfill-gas collecting well, the outside floral tube of gas collecting and the inner floral tube of the gas collecting upper and lower every interval 5-10cm in surface are manufactured with Φ 20-26mm flower hole, and 6~10 rows punch on the every HDPE tubing.
Beneficial effect of the present invention:
1, the pre-buried lift landfill-gas collecting well of the present invention is simple in structure, reasonable in design, has that technique is simple, an easy construction, Completed advance rate is fast, construction technology is ripe, environmental suitability is strong, gas collection is effective characteristics, and cost is low, good in economic efficiency.Its advantage be make things convenient for percolate to discharge, the maintenance expense is low, reduce rubbish landfill gas dissipation, collect well arranges maneuverability.
2, the pre-buried lift landfill-gas collecting well of the present invention, be specially adapted to successively landfill of rubbish, the first floor is more than 10 meters, the successively raising of follow-up rubbish, the vertical external pipe of gas collecting then can progressively promote according to the rubbish height, when not affecting landfill operation, reduce the time of beating vertical shaft, increase rate of air sucked in required.When the follow-up rubbish scope of operation is increased, can keep original vertical shaft, reduce the waste of human, financial, and material resources.
Description of drawings
Fig. 1: the sectional structure schematic diagram of the pre-buried lift landfill-gas collecting well of the present invention.
The specific embodiment
Embodiment one: referring to Fig. 1, the pre-buried lift landfill-gas collecting well of the present invention, comprise the gas collecting pipe, exhaust tube, described exhaust tube 3 is installed in gas collecting pipe top, be used for connecting suction branch and carry out gas collecting, exhaust tube is provided with head valve 4, head valve is used for control and collects the negative pressure of well and gather flow, described gas collecting pipe is comprised of gas collecting outer tube 8 and the inner floral tube 7 of gas collecting, described gas collecting outer tube 8 is comprised of the outside floral tube of gas collecting of the outside real pipe of the gas collecting on top and bottom, and the inner floral tube 7 of described gas collecting is arranged in the described gas collecting outer tube.
Embodiment two: referring to Fig. 1, the pre-buried lift landfill-gas collecting well of present embodiment, different from embodiment one is: contain High Pressure Drain pipe 1, high-pressure pipe 2, described High Pressure Drain pipe 1, high-pressure pipe 2 promote the bottom that well head 5 entered and stretched into the inner floral tube 7 of gas collecting from gas collecting pipe top, described high-pressure pipe 2 places the bottom of High Pressure Drain pipe 1, to utilize the percolate in the air pressure discharge gas collection well.
Embodiment three: referring to Fig. 1, the pre-buried lift landfill-gas collecting well of present embodiment, different from embodiment one or embodiment two is: be provided with in the inner floral tube of described gas collecting 7 upper ends and promote flange head 6, in the outside floral tube of described gas collecting lower end, apart from bottom 20-30cm place 3-6 piece of elevator bolt 9 is installed, the length of described elevator bolt 9 is advisable apart from the inner floral tube outer wall of gas collecting 2-3cm with its end.
Embodiment four: the pre-buried lift landfill-gas collecting well of present embodiment, different from aforementioned each embodiment is: the outside real pipe of described gas collecting, the outside floral tube of gas collecting and the inner floral tube of gas collecting are selected HDPE tubing, the outside real pipe of gas collecting is than about 2 meters of landfill heap height, less than 3 meters, the inner floral tube length of gas collecting is suitable with the junk-heap body height than landfill height for the outside floral tube of gas collecting.
Described pre-buried lift landfill-gas collecting well, the outside real length of tube of gas collecting is 3-4 rice, remaining part is outside floral tube, the lifting when selecting HDPE tubing mainly to be convenient to follow-up junk-heap body rising.
Described pre-buried lift landfill-gas collecting well, the outside floral tube of gas collecting and the inner floral tube of the gas collecting upper and lower every interval 5-10cm in surface are manufactured with Φ 20-26mm flower hole, and 6~10 rows punch on the every HDPE tubing.
Built-in type vertical lifting formula landfill-gas collecting well of the present invention, its use procedure is:
(1) in the part refuse landfill, the landfill height is higher first, and is about more than 10 meters, and we make a collection of vertical shaft in this zone, but very fast landfill yard will carry out the secondary landfill in this zone, even three landfills, increase 4-5 rice at every turn, the vertical shaft of originally doing not only can not well come into operation, and face at any time and buried, the possibility that is removed, in order better to utilize these vertical shafts, we have invented built-in type vertical lifting formula landfill-gas collecting well.(2) when junk-heap body is filled out first ten meters, we are just the pre-buried vertical lifting formula landfill-gas collecting well of making, in the side slope placement in landfill zone, when rubbish heap was filled to herein, we and refuse landfill consulted to avoid the tube head part along just, separate landfill along the tube head both sides, after filling and presenting V-type, treat that rubbish encases pre-buried vertical lifting formula landfill-gas collecting well gradually, can normally carry out landfill operation, after this mouthful well ferments normally, can come into operation.When (3) treating that second layer rubbish is filled to herein, we remove trunk line and suction branch, with the DN250 pump-line of the outside landfill height according to rubbish, up promote, remain outside gas production floral tube apart from the earth's surface 3 meters get final product.(4) garbage loading embeading can be constructed in the manner described above to this moment, after outside pump-line promotes, only needed internal high pressure drainpipe and high-pressure pipe are prolonged, and reconnected to trunk line to get final product.
The manufacturing process of pre-buried lift landfill-gas collecting well: the real pipe that (1) outside pump-line welding is more about 2 meters than landfill heap height gets final product than the floral tube of landfill height less than 3 meters.(2) the internal air exhausting pipeline all is welded as floral tube, and its length equates to get final product with the junk-heap body height.Internal air exhausting pipeline top welding DN200 flange head as the lifting flange head of internal air exhausting pipeline, promotes outside DN250 pipeline and gets final product during lifting.(3) outside pump-line is installed 3~6 pieces of elevator bolts apart from bottom 20-30CM place bottom, and bolt selects diameter 22-24mm to get final product, and bolt length gets final product from internal pipeline 2-3cm.

Claims (8)

1. pre-buried lift landfill-gas collecting well, comprise the gas collecting pipe, exhaust tube, described exhaust tube is installed in gas collecting pipe top, be used for connecting suction branch and carry out gas collecting, exhaust tube is provided with head valve, head valve is used for control and collects the negative pressure of well and gather flow, it is characterized in that: described gas collecting pipe is comprised of gas collecting outer tube and the inner floral tube of gas collecting, described gas collecting outer tube is comprised of the outside floral tube of gas collecting of the outside real pipe of the gas collecting on top and bottom, and the inner floral tube of described gas collecting is arranged in the described gas collecting outer tube.
2. pre-buried lift landfill-gas collecting well according to claim 1, it is characterized in that: contain the High Pressure Drain pipe, high-pressure pipe, described High Pressure Drain pipe, high-pressure pipe promote well head and enter and stretch into the inner floral tube of gas collecting bottom from gas collecting pipe top, described high-pressure pipe places High Pressure Drain pipe bottom, to utilize the percolate in the air pressure discharge gas collection well.
3. pre-buried lift landfill-gas collecting well according to claim 1 and 2, it is characterized in that: the inner floral tube of described gas collecting upper end is provided with the lifting flange head, in the outside floral tube of described gas collecting lower end, apart from bottom 20-30cm place 3-6 piece of elevator bolt is installed, bolt length is advisable apart from the inner floral tube outer wall of gas collecting 2-3cm with its end.
4. pre-buried lift landfill-gas collecting well according to claim 3, it is characterized in that: the outside real pipe of described gas collecting, the outside floral tube of gas collecting and the inner floral tube of gas collecting are selected HDPE tubing, the outside real pipe of gas collecting is than about 2 meters of landfill heap height, less than 3 meters, the inner floral tube length of gas collecting is suitable with the junk-heap body height than landfill height for the outside floral tube of gas collecting.
5. pre-buried lift landfill-gas collecting well according to claim 4 is characterized in that: the outside real length of tube of gas collecting is 3-4 rice, and remaining part is outside floral tube, the lifting when selecting HDPE tubing mainly to be convenient to follow-up junk-heap body to raise.
6. pre-buried lift landfill-gas collecting well according to claim 1 and 2, it is characterized in that: the outside real pipe of described gas collecting, the outside floral tube of gas collecting and the inner floral tube of gas collecting are selected HDPE tubing, the outside real pipe of gas collecting is than about 2 meters of landfill heap height, less than 3 meters, the inner floral tube length of gas collecting is suitable with the junk-heap body height than landfill height for the outside floral tube of gas collecting.
7. pre-buried lift landfill-gas collecting well according to claim 6 is characterized in that: the outside real length of tube of gas collecting is 3-4 rice, and remaining part is outside floral tube, the lifting when selecting HDPE tubing mainly to be convenient to follow-up junk-heap body to raise.
8. according to claim 1,2,4,5 or 7 described pre-buried lift landfill-gas collecting wells, it is characterized in that: the outside floral tube of gas collecting and the inner floral tube of the gas collecting upper and lower every interval 5-10cm in surface, be manufactured with Φ 20-26mm flower hole, 6~10 rows punch on the every HDPE tubing.
CN2012103355336A 2012-09-12 2012-09-12 Pre-buried elevating landfill gas collecting well Pending CN102896131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103355336A CN102896131A (en) 2012-09-12 2012-09-12 Pre-buried elevating landfill gas collecting well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103355336A CN102896131A (en) 2012-09-12 2012-09-12 Pre-buried elevating landfill gas collecting well

Publications (1)

Publication Number Publication Date
CN102896131A true CN102896131A (en) 2013-01-30

Family

ID=47568789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103355336A Pending CN102896131A (en) 2012-09-12 2012-09-12 Pre-buried elevating landfill gas collecting well

Country Status (1)

Country Link
CN (1) CN102896131A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104995372A (en) * 2013-01-02 2015-10-21 Q.E.D.环境系统公司 Devices and methods for landfill gas well monitoring and control
US10029291B2 (en) 2013-01-02 2018-07-24 Q.E.D. Environmental Systems, Inc. Devices and methods for landfill gas well monitoring and control
US10662941B2 (en) 2017-01-18 2020-05-26 Q.E.D. Environmental Systems, Inc. Modular pneumatic well pump system
CN113522922A (en) * 2021-07-12 2021-10-22 中兰环保科技股份有限公司 Device and method for collecting gas in garbage pile body of storage garbage landfill

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070104540A1 (en) * 2005-11-10 2007-05-10 Tfh Holdings, Llc Adaptive coupling and method
CN201100122Y (en) * 2007-09-29 2008-08-13 东莞市康达机电工程有限公司 A suction well structure for gas filling and gas collection pipe for gas suction well
JP2008274688A (en) * 2007-05-02 2008-11-13 Asahi Kasei Construction Materials Co Ltd Buried device
CN102191166A (en) * 2010-03-01 2011-09-21 北京环卫集团环境研究发展有限公司 System and method for guiding discharge and collection of landfill gas
CN202082174U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Air pressure drainage device for landfill gas collecting well
CN202081101U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Landfill gas collecting system
CN202081430U (en) * 2011-05-26 2011-12-21 河南百川畅银实业有限公司 Movable well head for vertical collecting well
CN202824071U (en) * 2012-09-12 2013-03-27 河南百川畅银实业有限公司 Embedded lifting type landfill gas collecting well

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070104540A1 (en) * 2005-11-10 2007-05-10 Tfh Holdings, Llc Adaptive coupling and method
JP2008274688A (en) * 2007-05-02 2008-11-13 Asahi Kasei Construction Materials Co Ltd Buried device
CN201100122Y (en) * 2007-09-29 2008-08-13 东莞市康达机电工程有限公司 A suction well structure for gas filling and gas collection pipe for gas suction well
CN102191166A (en) * 2010-03-01 2011-09-21 北京环卫集团环境研究发展有限公司 System and method for guiding discharge and collection of landfill gas
CN202082174U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Air pressure drainage device for landfill gas collecting well
CN202081101U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Landfill gas collecting system
CN202081430U (en) * 2011-05-26 2011-12-21 河南百川畅银实业有限公司 Movable well head for vertical collecting well
CN202824071U (en) * 2012-09-12 2013-03-27 河南百川畅银实业有限公司 Embedded lifting type landfill gas collecting well

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104995372A (en) * 2013-01-02 2015-10-21 Q.E.D.环境系统公司 Devices and methods for landfill gas well monitoring and control
US10029291B2 (en) 2013-01-02 2018-07-24 Q.E.D. Environmental Systems, Inc. Devices and methods for landfill gas well monitoring and control
US10144043B2 (en) 2013-01-02 2018-12-04 Q.E.D. Environmental Systems, Inc. Devices and methods for landfill gas well monitoring and control
CN104995372B (en) * 2013-01-02 2019-05-31 Q.E.D.环境系统公司 For filling the device and method of gas well monitoring and control
US10662941B2 (en) 2017-01-18 2020-05-26 Q.E.D. Environmental Systems, Inc. Modular pneumatic well pump system
CN113522922A (en) * 2021-07-12 2021-10-22 中兰环保科技股份有限公司 Device and method for collecting gas in garbage pile body of storage garbage landfill

Similar Documents

Publication Publication Date Title
CN102896131A (en) Pre-buried elevating landfill gas collecting well
CN202450537U (en) Composite dewatering device of vacuum tube well
CN202824071U (en) Embedded lifting type landfill gas collecting well
CN101890420B (en) Landfill gas collecting method and system thereof
CN202824073U (en) Excavation type landfill gas collecting well
CN103628466A (en) Soft soil foundation treatment method and vacuum-breaking water draining water vapor separating device thereof
CN113087060A (en) Underground water air injection well group
CN202175589U (en) Artificial wetland test device
CN102861747B (en) Four-way horizontal landfill gas collecting well
CN201433461Y (en) Polyethylene plastic-steel winding pipe for landfill
CN202824055U (en) Four-way type horizontal landfill gas collection well
CN205089545U (en) Automatic air water pumper
CN207211232U (en) A kind of hydraulic engineering Accrete clearing device
CN205887653U (en) Petroleum -contaminated soil's repairing machine constructs
CN205098817U (en) Garbage disposal station
CN202893788U (en) Pre-buried landfill gas side slope collecting well
CN208200944U (en) A kind of refuse landfill gas gathering system
CN204174594U (en) Hydropower station construction ventilation well construction
CN202369035U (en) Compressible garbage room convenient to realize efficient transportation of garbage truck
CN203608536U (en) Well cellar machine for planting tobacco
CN201770979U (en) Energy-saving automatic vacuum water pumping device
CN201317769Y (en) Low-cost collecting device for methane generated by landfill of municipal refuse
CN206503170U (en) A kind of cross exhaust apparatus
CN205114847U (en) Rubbish grab bucket of area brush strip
CN204894504U (en) Quick -witted work platform of silk is planted to hot melt cover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130130