CN102889087A - 单洞双层电缆隧道的施工方法 - Google Patents

单洞双层电缆隧道的施工方法 Download PDF

Info

Publication number
CN102889087A
CN102889087A CN2012103937337A CN201210393733A CN102889087A CN 102889087 A CN102889087 A CN 102889087A CN 2012103937337 A CN2012103937337 A CN 2012103937337A CN 201210393733 A CN201210393733 A CN 201210393733A CN 102889087 A CN102889087 A CN 102889087A
Authority
CN
China
Prior art keywords
tunnel
steel frame
layer
shaped steel
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103937337A
Other languages
English (en)
Inventor
田生财
赵立丰
刘宏健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hebei Power Transmission and Transformation Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2012103937337A priority Critical patent/CN102889087A/zh
Publication of CN102889087A publication Critical patent/CN102889087A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种单洞双层电缆隧道的施工方法,所述单洞电缆隧道的高度为隧道宽度的两倍,单洞电缆隧道包括通过隔板层分层设置的上层隧道和下层隧道,隔板层的骨架采用H型钢架结构;所述单洞双层电缆隧道的施工方法包括以下步骤:采用常规掘进法贯通上层隧道,在上层隧道的底板上安装H型钢架并与上层隧道的钢架固定连接;采用常规掘进法贯通下层隧道,将下层隧道的钢架与H型钢架的下端固定连接。本发明从根本上解决了由于混凝土和槽钢收缩不一致而引起的隧道变形,使单洞隧道牢固可靠;降低了施工的难度,并且占用空间较小,容纳的电缆较多,大大降低了工程造价。

Description

单洞双层电缆隧道的施工方法
技术领域
本发明涉及一种隧道施工方法,特别是一种电力电缆隧道的施工方法。
背景技术
目前用于铺设电缆的隧道多为单洞管型隧道,在单洞管型隧道施工过程中,首先在隧道的掌子面开始掘进,为防止前端掌子面发生塌方或者松动的土、石块从隧道上方落至隧道中,通常采用喷混凝土施工法或者采用有掩护的支架进行支撑。当电缆数量较多时,需要加大单洞管型隧道的高度,或者采用双洞隧道进行铺设(两条平行的单洞隧道)。如采用加大单洞管型隧道的高度方法,则必须要在隧道的直墙段中间位置安装槽钢,再在槽钢上铺设花纹钢板(便于巡视、检修规定),以防止隧道在使用过程中发生收敛变形,此种施工方法不仅增加了建设成本,而且施工难度也大大增加;如采用双洞隧道,掌子面的宽度相当于两条隧道的宽度,掘进时易造成掌子面土体塌方或冒顶事故,危险系数较高,并且在隧道掘进过程中必须将中间隔墙钢架及时安装,否则易造成已锚喷隧道的拱顶收敛变形,此种方法施工难度较大。
发明内容
本发明需要解决的技术问题是提供一种单洞双层电缆隧道的施工方法,用于掘进一种能够容纳较多电缆的单洞隧道,在保证电缆隧道牢固可靠的基础上,降低占位空间、施工难度以及工程造价。
为解决上述技术问题,本发明所采取的技术方案如下。
单洞双层电缆隧道的施工方法,其特征在于:所述单洞电缆隧道的高度为隧道宽度的两倍,单洞电缆隧道包括通过隔板层分层设置的上层隧道和下层隧道,隔板层的骨架采用H型钢架结构;所述单洞双层电缆隧道的施工方法包括以下步骤:
1)采用常规掘进法贯通上层隧道,并在上层隧道的拱顶和侧壁上安设钢架;
2)在上层隧道的底板上安装H型钢架,通过高强螺栓将H型钢架与上层隧道的钢架固定连接,然后对上层隧道以及H型钢架整体进行锚喷混凝土;
3)采用常规掘进法贯通下层隧道,将下层隧道的钢架与H型钢架的下端固定连接,同样对下层隧道以及H型钢架的下端面进行锚喷混凝土。
本发明的改进在于:所述H型钢架位于上、下层隧道的部分长度为90cm。
由于采用本发明取得的技术进步如下。
本发明通过隔板层将单洞隧道分割为上下重叠设置的上层隧道和下层隧道,隧道的宽度没有增加,仅是增加了隧道的高度,并在隧道的拱顶和侧壁上均设置了钢架结构,使拱顶和侧壁的钢架与隔板层的H型钢架固定连接为一体,从根本上解决了由于混凝土和槽钢收缩不一致而引起的隧道变形,使单洞隧道牢固可靠;同时,本发明的实施能够节省后期维护槽钢和花纹钢板的费用,降低了施工的难度,并且占用空间较小,容纳的电缆较多,大大降低了工程造价。
附图说明
图1为本发明所述隧道的示意图。
其中:1.上层隧道,2.H型钢架,3.下层隧道。
具体实施方式
下面结合附图和具体实施例对本发明作进一步详细说明。
本发明所述的单洞双层电缆隧道如图1所示,为重叠设置的上层隧道1和下层隧道3,隧道的整体高度为隧道宽度的两倍,上层隧道和下层隧道通过隔板层2分层设置。隔板层的骨架采用H型钢架结构,H型钢架位于上、下层隧道的部分长度为90cm。
单洞双层电缆隧道的施工方法包括以下步骤:
1)采用常规掘进法贯通上层隧道,并在上层隧道的拱顶和侧壁上安设钢架;
2)在上层隧道的底板安装H型钢架,通过高强螺栓将H型钢架与上层隧道的钢架固定连接牢固,然后对上层隧道以及H型钢架整体进行锚喷混凝土;
3)采用常规掘进法贯通下层隧道,将下层隧道的钢架与H型钢架的下端固定连接牢固,同样对下层隧道以及H型钢架的下端面进行锚喷混凝土。

Claims (2)

1.单洞双层电缆隧道的施工方法,其特征在于:所述单洞电缆隧道的高度为隧道宽度的两倍,单洞电缆隧道包括通过隔板层分层设置的上层隧道和下层隧道,隔板层的骨架采用H型钢架结构;所述单洞双层电缆隧道的施工方法包括以下步骤:
1)采用常规掘进法贯通上层隧道,并在上层隧道的拱顶和侧壁上安设钢架;
2)在上层隧道的底板上安装H型钢架,通过高强螺栓将H型钢架与上层隧道的钢架固定连接,然后对上层隧道以及H型钢架整体进行锚喷混凝土;
3)采用常规掘进法贯通下层隧道,将下层隧道的钢架与H型钢架的下端固定连接,同样对下层隧道以及H型钢架的下端面进行锚喷混凝土。
2.根据权利要求1所述的单洞双层电缆隧道的施工方法,其特征在于:所述H型钢架位于上、下层隧道的部分长度为90cm。
CN2012103937337A 2012-10-17 2012-10-17 单洞双层电缆隧道的施工方法 Pending CN102889087A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103937337A CN102889087A (zh) 2012-10-17 2012-10-17 单洞双层电缆隧道的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103937337A CN102889087A (zh) 2012-10-17 2012-10-17 单洞双层电缆隧道的施工方法

Publications (1)

Publication Number Publication Date
CN102889087A true CN102889087A (zh) 2013-01-23

Family

ID=47532750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103937337A Pending CN102889087A (zh) 2012-10-17 2012-10-17 单洞双层电缆隧道的施工方法

Country Status (1)

Country Link
CN (1) CN102889087A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2856417Y (zh) * 2005-12-27 2007-01-10 上海市隧道工程轨道交通设计研究院 一种具有控制变形装置的双层结构圆隧道
JP2011196135A (ja) * 2010-03-23 2011-10-06 Metropolitan Expressway Co Ltd シールドトンネル、シールドトンネル構築方法
WO2012028051A1 (zh) * 2010-08-30 2012-03-08 中铁第四勘察设计院集团有限公司 大型空溶洞隧道支护体系
CN102704980A (zh) * 2012-06-07 2012-10-03 中铁十一局集团第四工程有限公司 隧腔分隔式巷道通风方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2856417Y (zh) * 2005-12-27 2007-01-10 上海市隧道工程轨道交通设计研究院 一种具有控制变形装置的双层结构圆隧道
JP2011196135A (ja) * 2010-03-23 2011-10-06 Metropolitan Expressway Co Ltd シールドトンネル、シールドトンネル構築方法
WO2012028051A1 (zh) * 2010-08-30 2012-03-08 中铁第四勘察设计院集团有限公司 大型空溶洞隧道支护体系
CN102704980A (zh) * 2012-06-07 2012-10-03 中铁十一局集团第四工程有限公司 隧腔分隔式巷道通风方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林红星: "双层隧道施工方案比选与研究", 《西部探矿工程》 *
王新霞: "双层隧道施工工法及设计方案的研究", 《北京建筑工程学院硕士学位论文》 *

Similar Documents

Publication Publication Date Title
CN103437567A (zh) 利用原有桩基础支撑既有建筑地下增层的方法
CN102704949A (zh) 地下隧道无拉杆侧墙施工方法及施工用模板台车
CN202596743U (zh) 地下隧道无拉杆侧墙施工用模板台车
CN102913248B (zh) 全圆整体倒悬挂模板及其立模、脱模方法
CN103643971B (zh) 隧道仰拱定型端模快速施工方法
CN105544587A (zh) 复合式塔机基础及其施工方法
CN103510469B (zh) 一种制造薄壁空心墩的施工方法
CN104234082A (zh) 深基坑跃层逆作施工方法
CN102953385B (zh) 一种坡道异形处基坑换撑施工方法
CN103485794B (zh) 马头门复合支护结构及其施工方法
CN105064381A (zh) 一种高低刃脚双壁钢围堰钢筋混凝土一次封底施工方法
CN102979040A (zh) 一种桥隧相连的隧道出口处造桥机的拼装方法
CN105804115B (zh) 装配式地连墙或预制桩与装配式地下车站一体化施工装置及施工方法
CN203855967U (zh) 斜坡廊道钻灌台车
CN204311457U (zh) 一种地铁车站基坑开挖施工用组合式支护体系
CN102889087A (zh) 单洞双层电缆隧道的施工方法
CN204000885U (zh) 地铁深基坑混凝土支撑吊模模具
CN108118728B (zh) 异形深基坑高效挖土装置及挖土方法
CN103215965A (zh) 层板式高桩承台塔吊基础结构及施工方法
CN203213140U (zh) 层板式高桩承台塔吊基础结构
CN204385743U (zh) 一种深水桩基钢护筒施工系统
CN202925551U (zh) 一种坡道异形处基坑换撑施工结构
CN205296173U (zh) 利用基坑支撑体系承托塔吊的结构
CN204225503U (zh) 大跨度钢桁架高空散装转换梁胎架
CN211621667U (zh) 一种管桩承台钢梁轨道式塔机行走式基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130123