CN102888986A - Aligned pull rod combination for formwork and formwork construction method - Google Patents

Aligned pull rod combination for formwork and formwork construction method Download PDF

Info

Publication number
CN102888986A
CN102888986A CN2012103958831A CN201210395883A CN102888986A CN 102888986 A CN102888986 A CN 102888986A CN 2012103958831 A CN2012103958831 A CN 2012103958831A CN 201210395883 A CN201210395883 A CN 201210395883A CN 102888986 A CN102888986 A CN 102888986A
Authority
CN
China
Prior art keywords
template
threaded rod
rod
formwork
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103958831A
Other languages
Chinese (zh)
Inventor
季学宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012103958831A priority Critical patent/CN102888986A/en
Publication of CN102888986A publication Critical patent/CN102888986A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses an aligned pull rod combined tool for formwork fixation used for fixing a construction formwork. The combined tool comprises a concrete rod and a threaded rod, wherein a core rod is arranged in the concrete rod; two ends of the core rod are provided with threads; two ends of the concrete rod are provided with connecting notches which are exposed out of the threaded at the two ends of the core rod; one end of the threaded rod is provided with a threaded hole; the tail end of the threaded rod penetrates through a reserved hole of the construction formwork, is screwed in the connecting notches of the concrete rod and is in threaded connection with the tail end of the core rod. The invention also provides a formwork construction method by using the aligned pull rod combination for the formwork. The formwork aligned pull rod is simple in structure, standard in manufacturing, easy to popularize and convenient in construction, and the formwork construction method has high construction efficiency.

Description

A kind of template is to pull bar combination and template construction method
Technical field
The invention belongs to building implements and construction field, specifically, the present invention relates to a kind of template fixing to the pull bar combination and use this pull bar to be fixed the job practices of construction to template.
Background technology
It mainly is that the carpenter processes according to the size at scene temporarily that the template of prior art adopts wooden form, then adopts nail to fix, and constructs and removes after complete.Weak point is to waste timber, and efficiency of construction is lower.
Using wider in the prior art is steel form, and steel form adopts snap close to be fixed, and constructs and removes after complete, weak point is that efficiency of construction is lower, and difficulty of construction is large, and the snap close spoilage is also higher, and steel form constant intensity when construction is limited, easily causes construction Deformation.
For the deficiencies in the prior art part, the present invention is proposed.
Summary of the invention
The object of the present invention is to provide the installation of stay in place formwork such as can be used for concrete column, beam, shear wall Large bridge beam column and beam to fix and reinforce fixedly job practices to pull bar and template.
For achieving the above object, the present invention a kind of template fixing to the pull bar combination tool, be used for the fixing of construction formwork, comprise a concrete rod, one core bar is arranged in the concrete rod, and there is screw thread at the core bar two ends, and there is the connection recess that exposes core bar two ends screw thread at the two ends of concrete rod; And threaded rod, an end of threaded rod has screwed hole, and the end of threaded rod passes the preformed hole of construction formwork, screws in the connection recess of concrete rod and being threaded of core bar end.
Described connection recess cross sectional shape is trapezoidal.The endface position at described core bar two ends is in the end face of concrete rod two ends.Described threaded rod is provided with a through hole for the torsion bar insertion of rotating threaded rod with respect to the other end of screwed hole.The end section shape that described threaded rod has a screwed hole be connected recess and cooperate.Comprise that also one screws on the threaded rod to prop up the nut of template.
The present invention also provides a kind of template of using to the template construction method of pull bar combination, may further comprise the steps:
Step 1: join template, according to the size of the selected template of working design;
Step 2: template preformed hole positional punch; Before the punching of template preformed hole, the template with pairing adopts unit's nail temporarily compound first, and unit's nail is carried out removing when template is installed in the job site.
Step 3: the connection recess of concrete rod is aimed at the outboard template preformed hole, at the opposite side of outboard template threaded rod is screwed on the core bar screw thread that connects indent, and nut is screwed on the threaded rod, until prop up template;
Step 4: repeating step 3, the inner side template of matching is installed.
Step 5: the template vertical direction in the outside is installed wooden a tree, used in making timber for boats, wooden a tree, used in making timber for boats is pushed down in the horizontal direction installation fixedly steel pipe, fixedly steel pipe on the horizontal direction is that the threaded rod of every row is installed respectively one in both sides up and down, and adopt E shape steel tube snap close to push down fixedly steel pipe, E shape steel tube snap close is installed on the threaded rod, and adopts nut to fix.
The invention has the beneficial effects as follows: template of the present invention is simple to Tiebar structure, the standardization manufacturing
Be easy to large-scale popularization, easy construction, template construction method efficiency of construction of the present invention is high.
Description of drawings
Fig. 1 is that template of the present invention is to the sectional view of the concrete rod of pull bar;
Fig. 2 is that template of the present invention is to the sectional view of the threaded rod of pull bar;
Fig. 3 is the state diagram of template of the present invention after to the installation of pull bar;
Fig. 4 is the schematic diagram of construction sequence 1 of the present invention;
Fig. 5 a, Fig. 5 b are the schematic diagram of construction sequence 2 of the present invention;
Fig. 6 is the schematic diagram of construction sequence 3 of the present invention;
Fig. 7 is the schematic diagram of construction sequence 5 of the present invention;
Fig. 8 is the schematic diagram that the present invention constructs and finishes.
The specific embodiment
The below carries out detailed description to the specific embodiment of the present invention.
Fig. 1 is that template of the present invention is to the sectional view of the concrete rod of pull bar, Fig. 2 is that template of the present invention is to the sectional view of the threaded rod of pull bar, Fig. 3 is the state diagram of template of the present invention after to the installation of pull bar, shown in Fig. 1,2,3, of the present invention for template fixing to the pull bar combination tool, comprise a concrete rod 1, one core bar 2 is arranged in the concrete rod 1, there is screw thread at core bar 2 two ends, it is trapezoidal connection recess 3 that there is the mouth cross sectional shape that exposes core bar 2 two ends screw threads at the two ends of concrete rod 1, and the endface position at core bar 2 two ends is in concrete rod 1 two ends end face; And threaded rod 4, one end of threaded rod 4 has screwed hole 9, threaded rod 4 is provided with a through hole 5 for torsion bar 6 insertions of rotating threaded rod with respect to the other end of screwed hole 9, the end of threaded rod 4 passes the preformed hole of construction formwork 8, screw in the connection recess 3 of concrete rod 1 with being threaded of core bar 2 ends after, on the screw-in threaded rod 4 to prop up the nut of template 8.Wherein, the end section shape of threaded rod 4 with screwed hole 9 be connected recess 3 and cooperate.
The present invention also provides a kind of template of using to the template construction method of pull bar combination, may further comprise the steps:
Step 1: as shown in Figure 4, at first select the size of template 8 according to working design, and template 8 is matched;
Step 2: shown in Fig. 5 a, 5b, template preformed hole positional punch; Before the punching of template preformed hole, the template with pairing adopts unit's nail temporarily compound first, and unit's nail is carried out removing when template is installed in the job site.
Step 3: as shown in Figure 6, the connection recess of concrete rod 1 is aimed at the outboard template preformed hole, at the opposite side of outboard template threaded rod 4 is screwed on the core bar screw thread that connects indent, and nut 7 is screwed on the threaded rod, until prop up template 8;
Step 4: repeating step 3, the inner side template of matching is installed.
Step 5: go out as shown in Figure 7, template vertical direction in the outside is installed wooden a tree, used in making timber for boats 10, wooden a tree, used in making timber for boats 10 is pushed down in the horizontal direction installation fixedly steel pipe 11, fixedly steel pipe 10 on the horizontal direction both sides is installed respectively one for the threaded rod of every row about in the of 4, and adopt E shape steel tube lock 12 to withhold fixedly steel pipe, E shape steel tube snap close 12 is installed on the threaded rod 4, and adopts nut to fix.Template after installing as shown in Figure 8.

Claims (10)

1. a template makes up pull bar, is used for the fixing of construction formwork, it is characterized in that, comprises a concrete rod, and a core bar is arranged in the concrete rod, and there is screw thread at the core bar two ends, and there is the connection recess that exposes core bar two ends screw thread at the two ends of concrete rod; And threaded rod, an end of threaded rod has screwed hole, and the end of threaded rod passes the preformed hole of construction formwork, screws in the connection recess of concrete rod and being threaded of core bar end.
2. a kind of template according to claim 1 makes up pull bar, it is characterized in that, described connection recess cross sectional shape is trapezoidal.
3. a kind of template according to claim 1 makes up pull bar, it is characterized in that, the endface position at described core bar two ends is in the end face of concrete rod two ends.
4. a kind of template according to claim 1 makes up pull bar, it is characterized in that, described threaded rod is provided with a through hole for the torsion bar insertion of rotating threaded rod with respect to the other end of screwed hole.
5. a kind of template according to claim 1 makes up pull bar, it is characterized in that, the end section shape that described threaded rod has a screwed hole be connected recess and cooperate.
6. a kind of template according to claim 1 makes up pull bar, it is characterized in that, comprises that also one screws on the threaded rod to prop up the nut of template.
7. one kind is used template as claimed in claim 1 to the template construction method of pull bar combination, it is characterized in that, may further comprise the steps:
Step 1: join template, according to the size of the selected template of working design;
Step 2: template preformed hole positional punch;
Step 3: the connection recess of concrete rod is aimed at the outboard template preformed hole, outboard template in addition
One side screws in threaded rod on the core bar screw thread that connects indent, and nut is screwed on the threaded rod, until prop up template;
Step 4: repeating step 3, the inner side template of matching is installed.
8. template construction method according to claim 7 is characterized in that, also comprises
Step 5: the template vertical direction in the outside is installed wooden a tree, used in making timber for boats, and wooden a tree, used in making timber for boats is pushed down in the horizontal direction installation fixedly steel pipe.
9. template construction method according to claim 8, it is characterized in that, in the described step 5, fixedly steel pipe on the horizontal direction is that the threaded rod of every row is installed respectively one in both sides up and down, and adopt E shape steel tube snap close to push down fixedly steel pipe, E shape steel tube snap close is installed on the threaded rod, and adopts nut to fix.
10. template construction method according to claim 7 is characterized in that, in the described step 2, before the punching of template preformed hole, the template with pairing adopts unit's nail temporarily compound first, and unit's nail is carried out removing when template is installed in the job site.
CN2012103958831A 2012-10-18 2012-10-18 Aligned pull rod combination for formwork and formwork construction method Pending CN102888986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103958831A CN102888986A (en) 2012-10-18 2012-10-18 Aligned pull rod combination for formwork and formwork construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103958831A CN102888986A (en) 2012-10-18 2012-10-18 Aligned pull rod combination for formwork and formwork construction method

Publications (1)

Publication Number Publication Date
CN102888986A true CN102888986A (en) 2013-01-23

Family

ID=47532650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103958831A Pending CN102888986A (en) 2012-10-18 2012-10-18 Aligned pull rod combination for formwork and formwork construction method

Country Status (1)

Country Link
CN (1) CN102888986A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2531739A1 (en) * 1982-08-11 1984-02-17 Chandellier Antoine Novel solid spacer for adjusting and clamping the faces of forms used for the construction of concrete or reinforced-concrete walls.
JPH02209561A (en) * 1989-02-03 1990-08-21 Shin Nippon Tool Kk Concrete form fastening device and fastening method thereof
CN1152067A (en) * 1995-08-30 1997-06-18 早川义行 Concrete form spacing fixture
CN2553032Y (en) * 2002-06-28 2003-05-28 朱争鸣 Steel-plastic composite water-stop connecting rod
CN101586394A (en) * 2008-05-27 2009-11-25 缪金云 Dual-conical (straight) sleeve threaded rod
CN101614076A (en) * 2009-07-28 2009-12-30 中建三局建设工程股份有限公司 A kind of civil engineering with syllogic to draw rod device and mounting method thereof
CN102409852A (en) * 2011-09-30 2012-04-11 中国二十二冶集团有限公司 Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge
CN202925900U (en) * 2012-10-18 2013-05-08 季学宏 Template opposite pull rod combination

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2531739A1 (en) * 1982-08-11 1984-02-17 Chandellier Antoine Novel solid spacer for adjusting and clamping the faces of forms used for the construction of concrete or reinforced-concrete walls.
JPH02209561A (en) * 1989-02-03 1990-08-21 Shin Nippon Tool Kk Concrete form fastening device and fastening method thereof
CN1152067A (en) * 1995-08-30 1997-06-18 早川义行 Concrete form spacing fixture
CN2553032Y (en) * 2002-06-28 2003-05-28 朱争鸣 Steel-plastic composite water-stop connecting rod
CN101586394A (en) * 2008-05-27 2009-11-25 缪金云 Dual-conical (straight) sleeve threaded rod
CN101614076A (en) * 2009-07-28 2009-12-30 中建三局建设工程股份有限公司 A kind of civil engineering with syllogic to draw rod device and mounting method thereof
CN102409852A (en) * 2011-09-30 2012-04-11 中国二十二冶集团有限公司 Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge
CN202925900U (en) * 2012-10-18 2013-05-08 季学宏 Template opposite pull rod combination

Similar Documents

Publication Publication Date Title
CN205400024U (en) Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare
CN204781970U (en) Template fixing device with adjustable
CN203613817U (en) Base device for steel-structured safety protection fence
CN209308406U (en) A kind of reinforcement of concrete post system
CN204960030U (en) A wall structure for reasonable in design of villa
CN205314534U (en) Frame post can't harm drawknot steel form structure
CN105525612A (en) High-efficiency tubular pile connector
CN204001665U (en) A kind of scaffold assembling wall-connecting piece
CN205742974U (en) A kind of architectural engineering fastener
CN104120874A (en) Assembly type scaffold and wall connecting piece
CN205314558U (en) Cave mould is used to prestress wire
CN102888986A (en) Aligned pull rod combination for formwork and formwork construction method
CN203939240U (en) A kind of for post or the fixing single-ended mantle fiber split bolt of shear wall formwork
CN104372939A (en) Scaffold
CN201377147Y (en) Assembly-type stair handrail with randomly-adjusted oblique angle
CN202925900U (en) Template opposite pull rod combination
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN201671339U (en) Fixing device for wall bodies and beam column templates of buildings
CN201635404U (en) Precise positioning structure of preserved pipeline
CN204252565U (en) One faces frontier defense protection unit
CN203924501U (en) Steel bar skeleton positioning
CN205591545U (en) Instrument is consolidated to log template
CN203779402U (en) Screw rod fastener for expansion nut
CN203347235U (en) Building outer wall column template root reinforcing recycled fastener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Ji Xuehong

Document name: Notification that Application Deemed to be Withdrawn

C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130123