CN102888837A - 一种顺层岩质坡沿端承桩的施工方法 - Google Patents
一种顺层岩质坡沿端承桩的施工方法 Download PDFInfo
- Publication number
- CN102888837A CN102888837A CN2011104268398A CN201110426839A CN102888837A CN 102888837 A CN102888837 A CN 102888837A CN 2011104268398 A CN2011104268398 A CN 2011104268398A CN 201110426839 A CN201110426839 A CN 201110426839A CN 102888837 A CN102888837 A CN 102888837A
- Authority
- CN
- China
- Prior art keywords
- bearing pile
- end bearing
- pile
- slope
- along
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
本发明公开了一种顺层岩质坡沿端承桩的施工方法。该方法包括以下步骤:(1)根据端承桩的设计施工位置,在坡沿上开凿出水平的操作平台;(2)在操作平台上采用水磨钻机,先沿端承桩的外周钻孔,再将其中间部分划分为若干并列的区域,并在每个区域内钻孔;(3)将钻孔后形成的石柱取出,再采用工具将桩孔内剩余的岩石破碎并清除残渣;(4)按照步骤(2)(3)的顺序逐层作业,直到端承桩的持力层;(5)将桩孔底部凿平,完成端承桩的施工。本发明易于在简单狭小的施工环境下操作、产生的振动和噪音极小,充分保证了岩石结构的稳定性,施工造价费用低廉,具有较好的操作实用性。
Description
技术领域
本发明涉及建筑工程施工领域,特别是一种顺层岩质坡沿端承桩的施工方法。
背景技术
随着我国国民经济的迅速发展,山体空间的利用成为城市建筑和交通都不可忽视的重要因素。因此,位于山体坡沿上的端承桩的施工对整个构筑物的结构和安全越来越重要。对于顺层岩质坡沿上的端承桩施工,一般施工环境简单狭小,施工过程中需要避免噪音对城市环境的影响,需要避免振动产生,需要严格控制桩孔的开挖深度,施工难度较大。现有技术的常规施工方法难以满足需求,特别是采用爆破作业,甚至会造成岩石松动而影响基础结构的安全。
发明内容
本发明要解决的技术问题是:提供一种适于简单狭小的施工环境,施工过程中振动和噪音极小,能充分保证岩石结构安全、控制桩孔开挖深度的顺层岩质坡沿端承桩的施工方法,以克服现有技术的不足。
本发明是这样实现的:该方法包括以下步骤:
(1)根据端承桩的设计施工位置,在坡沿上开凿出水平的操作平台;
(2)在操作平台上采用水磨钻机,先沿端承桩的外周钻孔,再将其中间部分划分为若干并列的区域,并在每个区域内钻孔;
(3)将钻孔后形成的石柱取出,再采用工具将桩孔内剩余的岩石破碎并清除残渣;
(4) 按照步骤(2)(3)的顺序逐层作业,直到端承桩的持力层;
(5)将桩孔底部凿平,完成端承桩的施工。
上述的顺层岩质坡沿端承桩的施工方法中,在端承桩的桩孔中心固定有线坠。
前述的顺层岩质坡沿端承桩的施工方法中,在端承桩的桩孔口外周绑扎钢筋,并浇筑混凝土。
前述的顺层岩质坡沿端承桩的施工方法中,在操作平台上架设安全防护棚。
由于采用了上述技术方案,与现有技术比较,本发明主要采用水磨钻机施工,体积较小,适易于运输至坡沿上,并且易于在简单狭小的施工环境下操作。另外,本发明采用水磨钻机先从桩孔每一层外周至中间逐点钻孔,进而逐层作业,一方面产生的振动和噪音极小,充分保证了顺层岩质坡沿岩石结构的稳定性,并且增加了桩孔内侧壁的粗糙系数,为构筑物的结构和安全打下了坚实的基础,同时避免了噪音对城市环境的影响;另一方面,使得桩孔的开挖深度易于控制。再就是,本发明施工造价费用低廉,具有较好的操作实用性。
附图说明:
图1是实施本发明的示意图;
图2是本发明钻孔施工的示意图;
图3是图1的A-A向示意图;
附图的标记为:1-顺层岩质坡沿,2-端承桩桩孔,3-操作平台,4-水磨钻机,5-安全防护棚,6-岩石,7-水磨钻机施工的钻孔。
具体实施方式:
下面结合附图和实施例对本发明作进一步的说明。
本发明的实施例:本发明在实施时如图1所示,该方法包括以下步骤:(1)根据端承桩的设计施工位置,在坡沿上开凿出水平的操作平台。(2)在操作平台上采用现有市售的水磨钻机,先沿端承桩的外周钻孔,再将其中间部分划分为若干并列的区域,并在每个区域内钻孔(根据端承桩的中间部分的尺寸、岩石的坚硬程度等实际施工情况,将其划分为若干并列的区域。例如图2、3所示,将端承桩的中间部分划分为并列的四个区域)。现有市售的水磨钻机钻头直径通常是150mm左右,远小于端承桩的直径,所以合理确定钻孔线路是本发明的突出之处。(3)将钻孔后形成的石柱取出(水磨钻机是空心钻头,钻孔后中间形成石柱,可用现有工具套住石柱并取出),再采用工具(如钢锤,风镐等现有市售的破碎工具)将桩孔内剩余的岩石破碎并清除残渣。(4) 按照步骤(2)(3)的顺序逐层作业(由于现有市售的水磨钻机长度有限,需要逐层施工作业),直到端承桩的持力层。(5)将桩孔底部凿平,完成端承桩的施工。为了保证桩孔的垂直度,可在端承桩的桩孔中心固定常规的线坠。为了防止石块与雨水落入孔桩,影响施工质量和进度,可在端承桩的桩孔口外周绑扎钢筋,并浇筑混凝土。为了保证施工人员的安全,可在操作平台上架设安全防护棚,安全防护棚可采用现有的常规结构。
本发明经过实际施工操作验证,可以每天下挖0.5~1米,完全能够满足顺层岩质坡沿端承桩的施工要求。
本发明的实施方式不限于上述实施例,在不脱离本发明宗旨的前提下做出的各种变化均属于本发明的保护范围。
Claims (4)
1.一种顺层岩质坡沿端承桩的施工方法,其特征在于:该方法包括以下步骤:
(1)根据端承桩的设计施工位置,在坡沿上开凿出水平的操作平台;
(2)在操作平台上采用水磨钻机,先沿端承桩的外周钻孔,再将其中间部分划分为若干并列的区域,并在每个区域内钻孔;
(3)将钻孔后形成的石柱取出,再采用工具将桩孔内剩余的岩石破碎并清除残渣;
(4) 按照步骤(2)(3)的顺序逐层作业,直到端承桩的持力层;
(5)将桩孔底部凿平,完成端承桩的施工。
2.根据权利要求1所述的顺层岩质坡沿端承桩的施工方法,其特征在于:在端承桩的桩孔中心固定有线坠。
3.根据权利要求1所述的顺层岩质坡沿端承桩的施工方法,其特征在于:在端承桩的桩孔口外周绑扎钢筋,并浇筑混凝土。
4.根据权利要求1所述的顺层岩质坡沿端承桩的施工方法,其特征在于:在操作平台上架设安全防护棚。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104268398A CN102888837A (zh) | 2011-12-19 | 2011-12-19 | 一种顺层岩质坡沿端承桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104268398A CN102888837A (zh) | 2011-12-19 | 2011-12-19 | 一种顺层岩质坡沿端承桩的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102888837A true CN102888837A (zh) | 2013-01-23 |
Family
ID=47532504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104268398A Pending CN102888837A (zh) | 2011-12-19 | 2011-12-19 | 一种顺层岩质坡沿端承桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102888837A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541737A (zh) * | 2013-10-18 | 2014-01-29 | 罗师竹 | 一种隧道掘进方法及掘进机 |
CN103758171A (zh) * | 2014-01-07 | 2014-04-30 | 国家电网公司 | 一种输电线路铁塔掏挖式岩石基础机械挖掘方法 |
CN113266016A (zh) * | 2021-05-28 | 2021-08-17 | 五冶集团上海有限公司 | 一种采石坑抗滑桩水磨钻的施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080041610A (ko) * | 2008-04-22 | 2008-05-13 | 한동덕 | 중심관체를 이용한 암반 굴착공법 |
KR20090089137A (ko) * | 2008-02-18 | 2009-08-21 | 이재민 | 마이크로파일의 케이싱제거식 스탭그라우팅에 의한지지력보강방법 |
CN102071683A (zh) * | 2011-02-15 | 2011-05-25 | 中交第四公路工程局有限公司 | 水钻挖孔桩施工方法 |
-
2011
- 2011-12-19 CN CN2011104268398A patent/CN102888837A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090089137A (ko) * | 2008-02-18 | 2009-08-21 | 이재민 | 마이크로파일의 케이싱제거식 스탭그라우팅에 의한지지력보강방법 |
KR20080041610A (ko) * | 2008-04-22 | 2008-05-13 | 한동덕 | 중심관체를 이용한 암반 굴착공법 |
CN102071683A (zh) * | 2011-02-15 | 2011-05-25 | 中交第四公路工程局有限公司 | 水钻挖孔桩施工方法 |
Non-Patent Citations (3)
Title |
---|
曹鑫锋: "锚固桩水磨钻施工工艺及技术经济分析", 《山西建筑》 * |
李大纪等: "水磨钻在下赶场沟大桥桩基施工的应用", 《西部交通科技》 * |
黄司: "超大直径岩石桩水钻取芯成孔的施工技术", 《交通标准化》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541737A (zh) * | 2013-10-18 | 2014-01-29 | 罗师竹 | 一种隧道掘进方法及掘进机 |
CN103541737B (zh) * | 2013-10-18 | 2016-06-08 | 罗师竹 | 掘进机 |
CN103758171A (zh) * | 2014-01-07 | 2014-04-30 | 国家电网公司 | 一种输电线路铁塔掏挖式岩石基础机械挖掘方法 |
CN113266016A (zh) * | 2021-05-28 | 2021-08-17 | 五冶集团上海有限公司 | 一种采石坑抗滑桩水磨钻的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107842368B (zh) | 城市隧道钻凿铣机械组合非爆开挖工艺 | |
CN104947690B (zh) | 地下连续墙入岩成槽施工方法 | |
CN203625893U (zh) | 嵌岩灌注桩 | |
CN111379516A (zh) | 一种钻孔灌注桩的成孔方法 | |
CN204753674U (zh) | 适用于水下礁石清除的破碎系统 | |
CN101736755B (zh) | 清水孔桩基施工方法 | |
CN102071683A (zh) | 水钻挖孔桩施工方法 | |
CN106545007A (zh) | 在下部为硬质岩层的地层中成桩的方法 | |
CN104963346A (zh) | 复杂地质的深基坑围护施工方法 | |
CN102182399B (zh) | 反循环钻机钻孔、锤击成孔、扩孔、清渣的施工法及设备 | |
CN103277037A (zh) | 孤石群地质条件下管桩引孔施工方法 | |
CN204299468U (zh) | 一种潜孔钻钻孔的定位导向系统装置 | |
CN110984132B (zh) | 复杂地质条件下地下连续墙成槽的施工方法 | |
CN116220546A (zh) | 一种超厚硬岩条件大直径长桩组合成孔施工方法 | |
CN102888837A (zh) | 一种顺层岩质坡沿端承桩的施工方法 | |
CN112901074A (zh) | 一种海上大直径斜桩旋挖机嵌岩钻进成孔工艺 | |
CN202559338U (zh) | 一种气旋桩 | |
CN204492660U (zh) | 一种地连墙施工矩形冲击钻钻头 | |
CN103334449A (zh) | 方孔环切刀具及利用其进行深路堑桩板墙成孔施工的方法 | |
CN102628268A (zh) | 气旋桩 | |
CN205100226U (zh) | 地下连续墙入岩成槽施工设备 | |
CN204782730U (zh) | 钢丝刷钻头回旋钻机 | |
CN210163888U (zh) | 一种大直径嵌岩桩快速施工结构 | |
CN114370234A (zh) | 一种裸岩河床钢管桩施工设备及施工方法 | |
CN114215066A (zh) | 一种明挖基坑侧壁防坍塌开挖施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130123 |