CN102883348A - System and method for wireless network testing by intelligent terminals - Google Patents

System and method for wireless network testing by intelligent terminals Download PDF

Info

Publication number
CN102883348A
CN102883348A CN2012103731052A CN201210373105A CN102883348A CN 102883348 A CN102883348 A CN 102883348A CN 2012103731052 A CN2012103731052 A CN 2012103731052A CN 201210373105 A CN201210373105 A CN 201210373105A CN 102883348 A CN102883348 A CN 102883348A
Authority
CN
China
Prior art keywords
test
anthropomorphic
intelligent
terminal
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103731052A
Other languages
Chinese (zh)
Other versions
CN102883348B (en
Inventor
江华
许力多
吴鹏
李光明
王贵坚
姚宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU POWEROPT SOFTWARE Co Ltd
Original Assignee
CHENGDU POWEROPT SOFTWARE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU POWEROPT SOFTWARE Co Ltd filed Critical CHENGDU POWEROPT SOFTWARE Co Ltd
Priority to CN201210373105.2A priority Critical patent/CN102883348B/en
Publication of CN102883348A publication Critical patent/CN102883348A/en
Application granted granted Critical
Publication of CN102883348B publication Critical patent/CN102883348B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a system and a method for wireless network testing by intelligent terminals. The system comprises intelligent testing terminals and a central control server, wherein the intelligent testing terminals are in charge of receiving commands issued by the central control server to humanized testing or initially launch humanized testing and collecting humanized testing information and response information simultaneously, and the central control server is in charge of distributing humanized testing plans to the various intelligent testing terminals and analyzing specific wireless network states according to the collected humanized testing information and the response information of the intelligent testing terminals. The method utilizing the system includes that the intelligent testing terminals initially launch the humanized testing or the central control server distributes the humanized testing plans and the intelligent testing terminals received the plans can perform the humanized testing. The system and the method for wireless network testing by the intelligent terminals are efficient, free of limits of time and space affection and wide in application range and can show practical internet experiences of users.

Description

A kind of with the system and method for intelligent terminal as the wireless network network test
Technical field
The present invention relates to wireless network network test and monitoring technique field, relate in particular to a kind of with the system and method for intelligent terminal as the wireless network network test.
Background technology
Mobile communication is the focus of IT industry all the time, has become the pillar industry of Chinese national economy.Day by day universal along with 3G, the 3G technology such as HSPA and EV-DO begins accelerated development, operator has strengthened dynamics of investment, and more high-stage is arrived in network upgrade, and more the data traffic of high-stage increases severely, and rate descend, therefore, 3G subscription also begins to increase, and the user is also sharply being risen to the use amount of 3G, the surge of 3G wireless network data flow, 3G steps into main flow.Therefore network is optimized, improves network service level, service quality, radio spectrum efficiency, become the important topic of mobile communications network development.
And at present, the wireless network network test mode of each large operator mainly is divided into " drive test " and " manual testing " two kinds, and the below will be introduced these two kinds of method of testings.
Drive test: drive test is present each large operator wireless network network condition test mode commonly used, is mainly initiated by operator, is generally test in 1 month once.Also can do the specific aim test because of some special circumstances in addition, tracking and testing is done in the zone that goes wrong.The test mode of drive test is by special tester the test terminal to be installed on the testing vehicle, when road travels between urban highway, highway, counties and townships by vehicle, test terminal in the car is test network signal on the way automatically, by wireless network test result is sent to system server simultaneously.
The manual testing: the manual testing is similar with drive test on test mode, unique different be that testing vehicle has been changed into by collect the mode of detecting information with artificial medium.The manual testing mainly is at indoor scene, carries out such as facilities such as market, office building, museums.
And adopt above two kinds of method of testings, the operation commercial city need to send on special messenger/special train band the test terminal to go to test to test zone, thus can not reach wide covering, take drive test and manual testing as example, can only test testing vehicle the zone of process; The manual testing can only test the zone of tester's process.And the human cost and the material resources cost that need because of drive test and manual testing are larger, can't carry out on a large scale, frequently test job.It is relative narrow that drive test covers in the space with the manual testing, be not easy also to realize that same time point makes a plurality of test terminals test a residential quarter on ageing, or a plurality of residential quarter is tested at one time.And the limitation of space aspects and time aspect has directly caused workload that network optimization and net build and the rising of work difficulty.
Build as example with net, the net of present stage is built the staff when carrying out the base station planning of highway periphery, is to plan by drive test and manual testing's data.And in zone that drive test and manual testing can't cover, it then is by contrasting the distribution of base station, neighboring area that net is built the staff, then carry out preliminary base station construction planning according to experience in the past, send again relevant tester to test the rear final base station construction position of determining to the scene.Its shortcoming is that net is built the staff and can only the dependence experience be judged when the preliminary planning of base station, if judge inaccurately, then easily produces the workload that repeats, thereby produces extra human and material resources cost.
Take network optimization as example, when certain regional abnormal, the network optimization meeting sends the tester to arrive on-the-spot test according to actual conditions, and arrive the final test result that produces in this time in dispatch personnel, because some objective factor, data when finally collecting data with the problem of generation may there are differences, thereby cause network optimization that the accurate location of problem has been increased work difficulty.
Eventually the above, present drive test and manual testing exist long, collection information deficiency of test period, can't reach wide covering, the shortcoming such as can't initiatively pinpoint the problems in real time.And present drive test and manual testing test in the situation that can't not collect the effective information of application layer by the third party system at every turn, such as the average speed of download of HTTP, HTTP downloads success rate, the HTTP average response time, FTP on average uploads/speed of download, FTP uploads/downloads success rate, the FTP average response time, PING average response time-delay, the PING success rate, can only collect the moment data, such as HTTP moment speed of download, FTP moment uploading speed, thereby cause test result can't reflect the user in the situation of application layer operation, and application layer is only and affect the in fact key point tested of dictyosome of user.
Summary of the invention
The problem that the present invention solves provides and a kind ofly efficiently, is not subjected to time and spacial influence, the wide covering, and can embody in fact wireless network network test system and the method tested of dictyosome of user.
The invention provides a kind of with the system of intelligent terminal as the wireless network network test, this system comprises base station cell, core net, router, the Internet, this system also comprises Intelligent test terminal, central control server, and described Intelligent test terminal is responsible for initiatively initiating the instruction that personification is tested or the reception central control server sends and is carried out the personification test; Intelligent test terminal also passes through base station cell, core net, router sends request to the Internet, the Internet request of receiving is also passed through router with corresponding response message, core net, base station cell is passed to Intelligent test terminal, anthropomorphic detecting information and response message that Intelligent test terminal will be collected are passed through base station cell, core net, router is passed to central control server, described central control server is responsible for distributing anthropomorphic test plan to each intelligent terminal, and anthropomorphic detecting information and the response message analysis concrete wireless network network condition collected according to Intelligent test terminal.
Intelligent test terminal is the equipment with wireless networking capabilities.
Described equipment is smart mobile phone, personal desktop computer, notebook computer, intelligent advertisement board, vehicle electronic device.
Be provided with fire compartment wall between described the Internet and the router.
Described anthropomorphic detecting information is the information that drive test and manual testing can collect, and the information that described drive test and manual testing can collect comprises that the band of position indicates (LAC), the residential quarter indicates (Cell ID), received signal strength (RSSI), received signal code power (RSCP), signal to noise ratio (Ec/No), testing time information, test space information, HTTP moment speed of download, FTP moment uploading speed, PING average response time-delay.
Described response message is the effective information of internet, applications layer, the effective information of described application layer comprise the average speed of download of HTTP, HTTP download success rate, HTTP average response time, FTP and on average upload/speed of download, FTP upload/download success rate, FTP average response time, PING average response time-delay, PING success rate.
Intelligent test terminal of the present invention only need to be the equipment with wireless networking capabilities, so that the present invention efficiently, is not subjected to time and spacial influence, can be easily forms huge test network reaching the purpose of wide covering with numerous common intelligent terminals, and just can analyze concrete wireless network network condition according to the collected information of Intelligent test terminal by central control server.
The present invention also provides a kind of employing with the method for intelligent terminal as the test network flow of wireless network network test system, following steps:
1) Intelligent test terminal is initiatively initiated anthropomorphic test or is received anthropomorphic test plan;
2) Intelligent test terminal sends request in the anthropomorphic test process to the Internet, and the Internet request of receiving is also passed to Intelligent test terminal with corresponding response message;
3) if Intelligent test terminal initiatively sends anthropomorphic test, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in test process, upload at last central control server, and a test period finishes, and carries out loop test by above-mentioned steps;
4) if Intelligent test terminal receives the anthropomorphic test plan that central control server distributes, Intelligent test terminal is waken up after receiving anthropomorphic test plan, and all anthropomorphic test plans are carried out following detection: whether Intelligent test terminal detects anthropomorphic test plan is interim anthropomorphic test plan;
41) if interim anthropomorphic test plan, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of stage, central control server arranges cycle time in the anthropomorphic test plan of stage, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the anthropomorphic test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, again initiate anthropomorphic test to next one test period time point Intelligent test terminal, carry out loop test by the anthropomorphic test plan of above-mentioned stage;
42) if the anthropomorphic test plan of non-stage, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of non-stage, Intelligent test terminal is collected anthropomorphic detecting information and response message in the test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, and carries out loop test by the anthropomorphic test plan of above-mentioned non-stage;
5) central control server is according to anthropomorphic detecting information and the concrete wireless network network condition of response message analysis of Intelligent test terminal collection.
Step 41) the anthropomorphic test plan of described stage is that Intelligent test terminal is initiated at set intervals once anthropomorphic test or initiated once anthropomorphic test at certain time point.
Step 42) the anthropomorphic test plan of described non-stage carries out loop test for several test periods.
Intelligent test terminal if receive the newly assigned anthropomorphic test plan of central control server, then stops current anthropomorphic test plan when carrying out anthropomorphic test plan, carry out new anthropomorphic test plan.
The personification test of described Intelligent test terminal can come plan of distribution according to central control server, so when working as the test plan of central Control Server allocated phase, Intelligent test terminal just can be realized regardless of space time, carry out at any time test job, this is for finding that initiatively the wireless network network problem has also played crucial effect.
And net is built, in the impact of network optimization.Build as example with net, when carrying out base station planning, can plan by the collected data of wide covering, effectively avoided wrong, invalid, inaccurate base station planning, thereby reduced workload and work difficulty that net is built.
The term that the present invention relates to is as follows:
Wireless network: refer to comprise second generation mobile communication technology 2G here, general packet radio service technology GPRS, third generation mobile communication technology 3G, the mobile wireless network of the 4th generation mobile communication technology 3G.
Core net: with service supplier and Access Network, perhaps, the network with Access Network and other Access Networks link together refers to the network that is comprised of RNC and SGSN/GGSN here.
Intelligent terminal: the handheld device, personal desktop computer, notebook computer, intelligent advertisement board, the vehicle electronic device that refer to be connected to wireless network here.
Intelligent test terminal: refer to here intelligent terminal be become the equipment that to test the wireless network network condition by the present invention.
Central control server: point to each Intelligent test terminal here and distribute anthropomorphic test plan, and analyze the server of the information that each Intelligent test terminal collects in anthropomorphic test process.
Anthropomorphic test: refer to by specific algorithm the wireless network network test method of simulating human agenda here.
Drive test: drive test is present each large operator wireless network network condition test mode commonly used, is mainly initiated by operator, is generally test in 1 month once.Also can do the specific aim test because of some special circumstances in addition, tracking and testing is done in the zone that goes wrong.The test mode of drive test is by special tester the test terminal to be installed on the testing vehicle, when road travels between urban highway, highway, counties and townships by vehicle, test terminal in the car is test network signal on the way automatically, by wireless network test result is sent to system server simultaneously.
The manual testing: the manual testing is similar with drive test on test mode, unique different be that testing vehicle has been changed into by collect the mode of detecting information with artificial medium.The manual testing mainly is at indoor scene, carries out such as facilities such as market, office building, museums.
Network quality test and evaluating system: refer to here for the treatment of the system that analyzes the data of in test process, being collected by Intelligent test terminal.
The base station: the base station is that the public mobile communication base station is a kind of form of radio station, refers in certain area of radio coverage, and by mobile switching center, and the radio station is believed in the transceiving that the information of carrying out between the mobile telephone terminal is transmitted.The construction of mobile communication base station is the pith of China mobile communication carrier investment, and the construction of mobile communication base station generally all is to carry out around coverage rate, speech quality, returns of investment, construction difficulty or ease, the key element such as easy to maintenance.Along with the mobile communications network business to datumization, packetizing future development, the development trend of mobile communication base station also must be broadband, large coverage rate construction and IPization.
The residential quarter: refer to that a base station serves with the area of a circle under the radius.
Network optimization: i.e. radio network optimization, by the network that has now moved being carried out the means such as traffic data analysis, field test data collection, parameter analysis, hardware check, find out the reason that affects network quality, and the adjustment of the modification by parameter, the adjustment of network configuration, equipment configuration and take some technological means (adopting the methods of planning of MRP etc.), guarantee the high-quality operation of system, make conventional network resources obtain optimum efficiency, obtain maximum value with most economical input.
Net is built: i.e. wireless network construction in indoor, the outdoor base station of setting up, provides the most basic wireless network support to be reached for various wireless devices by base station planning.
The Internet: namely wide area network, local area network (LAN) and unit are according to the International Computer Network of certain communications protocol composition.The Internet refers to result that two computers or the terminal more than two, client, the service end means by computer information technology are interknited, people can with mutually send mail far away from thousands of miles away friend, jointly finish a job, common amusement.
 
Description of drawings
Fig. 1 is the signal flow graph of radio network test system of the present invention;
Fig. 2 is the wireless network test method flow diagram that Intelligent test terminal is initiatively initiated anthropomorphic test;
Fig. 3 is the wireless network test method flow diagram that Intelligent test terminal receives anthropomorphic test plan;
Fig. 4 be obtain after the better case study on implementation test of the present invention based on the wide covering of locus figure as a result;
Fig. 5 is the wide covering figure as a result of the time-based information that obtains after the better case study on implementation test of the present invention;
Fig. 6 is traditional drive test/manual testing's space coverage diagram;
Fig. 7 is a better case study on implementation of Intelligent test terminal of the present invention space coverage diagram.
Specific embodiment
For making the purpose, technical solutions and advantages of the present invention more clear, below in conjunction with accompanying drawing the present invention's situation in actual applications is described in further detail, here take 3G network as example.
Referring to Fig. 1; the invention provides that a kind of this system comprises base station cell, core net, router, the Internet with the system of intelligent terminal as the wireless network network test, be provided with fire compartment wall between described the Internet and the router; be used for filtering the information through it, the protection in-house network is not encroached on.This system also comprises Intelligent test terminal, central control server, and Intelligent test terminal is the equipment with wireless networking capabilities, and described equipment is smart mobile phone, personal desktop computer, notebook computer, intelligent advertisement board, vehicle electronic device.Described Intelligent test terminal is responsible for receiving the instruction that central control server sends and is carried out the personification test or initiatively initiate anthropomorphic test; In the anthropomorphic test process, Intelligent test terminal also passes through base station cell, core net, fire compartment wall, router sends request to the Internet, the Internet request of receiving is also passed through router with corresponding response message, core net, base station cell is passed to Intelligent test terminal, described response message is the effective information of internet, applications layer, and the effective information of described application layer comprises the average speed of download of HTTP, HTTP downloads success rate, the HTTP average response time, FTP on average uploads/speed of download, FTP uploads/downloads success rate, the FTP average response time, PING average response time-delay, the PING success rate.Anthropomorphic detecting information is collected in the Intelligent test terminal personification in test process, Intelligent test terminal can indicate (LAC) in the assembling position zone by carrying function system, the residential quarter indicates (Cell ID), testing time information, test space information, Intelligent test terminal is when the access the Internet, also can collect HTTP moment speed of download, FTP moment uploading speed, PING average response time-delay, base station cell also can be collected test space information simultaneously, can also collect received signal strength (RSSI) by base station cell, received signal code power (RSCP), signal to noise ratio (Ec/No).Anthropomorphic detecting information and response message that Intelligent test terminal will be collected are passed through base station cell, core net, router is passed to central control server, Intelligent test terminal is connected by wireless network with base station cell, base station cell is connected by cable network with core net, core net is connected by cable network with router, router is connected cable network with fire compartment wall with central control server and is connected, fire compartment wall cable network connecting Internet, described central control server is responsible for distributing anthropomorphic test plan to each intelligent terminal, and anthropomorphic detecting information and the response message analysis concrete wireless network network condition collected according to Intelligent test terminal, simultaneously operational network quality test and evaluating system can be checked the wide covering figure and based on the wide covering of locus figure as a result as a result of the actual time-based dimension of generation in network quality test and evaluating system.
Fig. 4 be obtain after the better case study on implementation test of the present invention based on the wide covering of locus figure as a result, in embodiments of the present invention, Intelligent test terminal 10 has a plurality of, uses respectively 10-1,10-2,10-3 ... represent; Base station cell 20 has a plurality of, uses respectively 20-1,20-2,20-3 ... represent; The circular coverage that represents base station cell 20 theories, but in the mobile communcations systems such as WCMDA, CDMA2000, TD-SWCDA, Intelligent test terminal 10 may stride across the coverage of base station cell 20, this situation is called as more district of base station cell, and the Intelligent test terminal 10-6 of the present embodiment is more district of base station cell.
Wherein, Intelligent test terminal 10 is after the personification test, and the data that report comprise: the signal strength signal intensity of the signal strength signal intensity of current connection base station cell 20, current visual base station cell 20, the spatial information of Intelligent test terminal.Need to prove, in the mobile communcations systems such as WCMDA, CDMA2000, TD-SWCDA, Intelligent test terminal 10 can connect a plurality of cell base stations 20 simultaneously, but the actual base station cell 20 that carries out transfer of data only has one, is called the serving BS residential quarter; Other base station cells 20 are called visual base station cell, connect simultaneously 20-1 and 20-4 such as 10-2, and 20-1 carries out transfer of data, and 20-1 is the serving BS residential quarter, and 20-4 is visual base station cell.
In embodiments of the present invention, carry out automatically anthropomorphic test by a large amount of Intelligent test terminal 10, after central controller 30 is analyzed, can generate as a result figure of actual wide covering based on the locus.Referring to Fig. 4:
10-1 is only in the coverage of 20-1, so 10-1 has been connected to 20-1;
10-2 is in the coverage of 20-1 and 20-4, so 10-2 simultaneously visual 20-1 and 20-4,10-2 is from the close together of 20-1, so 10-2 has been connected to 20-1, with 20-4 as its visual base station cell; 10-3 is only in the scope of 20-4, so 10-3 has been connected to 20-4;
10-6 is in the coverage of 20-4 and 20-3, and in theory, 10-6 is visual 20-4 and 20-3 simultaneously, and be connected on 20-4 or the 20-3, with remaining one as its visual base station cell, but here 10-6 but be connected on the 20-1, this just the problem of area covered occurred;
10-4 is in the coverage of 20-3 and 20-2, so 10-4 simultaneously visual 20-3 and 20-2,10-4 has been connected on the 20-2, with 20-3 as its visual base station cell;
10-7 is only in the coverage of 20-2, so 10-7 has been connected to 20-2;
10-5 is in the coverage of 20-2 and 20-1, in theory, 10-5 is visual 20-2 and 20-1 simultaneously, and 10-5 is connected on 20-2 or the 20-1, with remaining one as its visual base station cell, here 10-5 has been connected on the 20-1, but 10-5 may cover some problems of existence with regard to explanation 20-2 here not with the visual base station cell of 20-2 as it.
In sum, the networking of mobile operator and maintenance department can easily compare actual coverage and theoretical coverage scope, adjust network parameter according to the result.
Fig. 5 is the wide covering figure as a result of the time-based information that obtains after the better case study on implementation test of the present invention, and in the invention process case, Intelligent test terminal 10 has a plurality of at time dimension, uses respectively 10-1-t1,10-1-t2, t0-1-t3 ... represent; Base station cell 20 has a plurality of, uses respectively 20-1,20-2,20-3 ... represent; The circular coverage that represents base station cell 20 theories, dotted line represents the situation of movement in certain time of Intelligent test terminal 10.
Referring to Fig. 5, the 10-1 action behavior is as follows:
10-1 was present in the coverage of 20-1 in this time of t1, so 10-1 has been connected to 20-1 when t1, this is normal;
10-1 moved in the intersection region of 20-4 and 20-2 overlay area in this time of t2, and the 10-1 during t2 has been connected to 20-4, and this is normal;
10-1 moved in the overlay area of 20-2 in this time of t3, and the 10-1 during t3 has been connected to 20-2, and this is normal;
10-1 moved in the overlay area of 20-3 in this time of t4, and the 10-1 during t4 has been connected to 20-3, and this is normal;
10-1 moved in the intersection region of 20-3 and 20-4 overlay area in this time of t5, and the 10-1 during t5 has been connected to 20-3, and this is normal;
10-1 has moved to the coverage of 20-4 in this time of t6, should be connected to 20-4 in theory, but has been connected to 20-1 here, illustrates that the situation of area covered has appearred in 20-1.
Put into practice in the case in the present invention, by a large amount of Intelligent test terminal 10, carry out automatically anthropomorphic test in the different time, after central controller 30 was analyzed, the wide covering that can generate actual time-based dimension is figure as a result.The networking of mobile computing and maintenance department can be very easily analyze at time dimension for different base station residential quarter 20, also can analyze very easily the user behavior process of Intelligent test terminal 10.
Among two embodiment of the present invention, because the quantity of mobile test terminal 10 is very many, and Data Collection is in real time and believable, and it is true and effective therefore coming the equipment of common smart mobile phone, 3G radio networking device and embedded 3G wireless networking capabilities the wide covering in realization time and space to gather the test result of 3G wireless network test data relative as the test terminal.
Intelligent test terminal of the present invention only need to be the equipment with wireless networking capabilities, so that the present invention efficiently, is not subjected to time and spacial influence, can forms huge test network to reach the purpose of wide covering with numerous common intelligent terminals easily, and just can analyze concrete wireless network network condition according to the collected detecting information of Intelligent test terminal by central control server, embodiment user in fact dictyosome tests.
Referring to Fig. 2 to Fig. 3, the present invention also provides a kind of employing with the method for intelligent terminal as the test network flow of wireless network network test system, have the following steps: the present invention also provides a kind of employing with the method for intelligent terminal as the test network flow of wireless network network test system, 1) Intelligent test terminal initiatively initiates anthropomorphic test or receives anthropomorphic test plan;
2) Intelligent test terminal sends request in the anthropomorphic test process to the Internet, and the Internet request of receiving is also passed to Intelligent test terminal with corresponding response message;
3) if Intelligent test terminal initiatively sends anthropomorphic test, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in test process, upload at last central control server, and a test period finishes, and carries out loop test by above-mentioned steps;
4) if Intelligent test terminal receives the anthropomorphic test plan that central control server distributes, Intelligent test terminal is waken up after receiving anthropomorphic test plan, and all anthropomorphic test plans are carried out following detection: whether Intelligent test terminal detects anthropomorphic test plan is interim anthropomorphic test plan;
41) if interim anthropomorphic test plan, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of stage, central control server arranges cycle time in the anthropomorphic test plan of stage, can be 0.5 hour cycle time, 1 hour, 2 hours etc., Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the anthropomorphic test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, again initiating personification to next one test period time point Intelligent test terminal tests, carry out loop test by the anthropomorphic test plan of above-mentioned stage, Intelligent test terminal is when carrying out interim anthropomorphic test plan, if receive the anthropomorphic test plan of the newly assigned stage of central control server, then stop current interim anthropomorphic test plan, press the new cycle time that central control server arranges, carry out new interim anthropomorphic test plan, if receive the new anthropomorphic test plan of non-stage that distributes of central control server, then stop current interim anthropomorphic test plan, carry out the new anthropomorphic test plan of non-stage;
Embodiment 1, the present embodiment every test in 1 hour once, such as 9 anthropomorphic tests of Intelligent test terminals initiation every day, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the test process, upload at last central control server, a test period finishes, Intelligent test terminal detects the anthropomorphic test plan that central control server sends, if the anthropomorphic test plan identical with the front, then again initiate personification to 10 Intelligent test terminals and test, by carrying out above-mentioned loop test the cycle time that arranges; If the anthropomorphic test plan not identical with the front, then Intelligent test terminal is carried out new anthropomorphic test plan.A test period finishes to the following period of time of next one test period time point, and Intelligent test terminal does not carry out the personification test.
Embodiment 2,13 tests of the present embodiment every day once, initiate anthropomorphic test such as 13 Intelligent test terminals of first day, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the test process, upload at last central control server, a test period finishes, Intelligent test terminal detects the anthropomorphic test plan that central control server sends, if the anthropomorphic test plan identical with the front, again initiate personification to 13 Intelligent test terminals of second day and test, by carrying out above-mentioned loop test the cycle time that arranges; If the anthropomorphic test plan not identical with the front, then Intelligent test terminal is carried out new anthropomorphic test plan.A test period finishes to the following period of time of next one test period time point, and Intelligent test terminal does not carry out the personification test.
42) if the anthropomorphic test plan of non-stage, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of non-stage, Intelligent test terminal is collected anthropomorphic detecting information and response message in the test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, carry out loop test by the anthropomorphic test plan of above-mentioned non-stage, Intelligent test terminal is when carrying out the anthropomorphic test plan of non-stage, if receive the anthropomorphic test plan of the newly assigned stage of central control server, then stop the current anthropomorphic test plan of non-stage, carry out new interim anthropomorphic test plan, if receive the anthropomorphic test plan of the newly assigned non-stage of central control server, then stop the current anthropomorphic test plan of non-stage, carry out the new anthropomorphic test plan of non-stage;
Embodiment 3, some time, Intelligent test terminal is received the anthropomorphic test plan of non-stage of central control server, Intelligent test terminal begins to carry out the personification test, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the test process, anthropomorphic detecting information and solicited message that last Intelligent test terminal will be collected upload to central control server, and a test period finishes; Intelligent test terminal detects the anthropomorphic test plan that central control server sends, if the anthropomorphic test plan identical with the front, follow last test period, Intelligent test terminal is initiated anthropomorphic test again, carry out the test of next cycle, by above-mentioned loop test, if the anthropomorphic test plan not identical with the front, then Intelligent test terminal is carried out new anthropomorphic test plan.
5) central control server is according to anthropomorphic detecting information and the concrete wireless network network condition of response message analysis of Intelligent test terminal collection.
Step 41) the anthropomorphic test plan of described stage is that Intelligent test terminal is initiated at set intervals once anthropomorphic test or initiated once anthropomorphic test at certain time point.
Step 42) the anthropomorphic test plan of described non-stage carries out loop test for several test periods.
The personification test of described Intelligent test terminal can come plan of distribution according to central control server, so when working as the test plan of central Control Server allocated phase, Intelligent test terminal just can be realized regardless of space time, carry out at any time test job, this is for finding that initiatively the wireless network network problem has also played crucial effect.
And net is built, in the impact of network optimization.Build as example with net, when carrying out base station planning, can plan by the collected detecting information of wide covering, effectively avoided wrong, invalid, inaccurate base station planning, thereby reduced workload and work difficulty that net is built.
Referring to Fig. 4 to Fig. 5, drive test/manual testing's space covers the zone that has only covered near Highway.Because drive test and manual testing are the tests of initiatively being initiated by operator, be generally one month once, also can do the specific aim test because of some special circumstances in addition, tracking and testing is done in the zone that goes wrong.Drive test wherein, by special tester the test terminal to be installed on the testing vehicle, when road travels between urban highway, highway, counties and townships by vehicle, test terminal in the car is test network signal on the way automatically, by wireless network test result is sent to system server simultaneously; The manual testing is similar with drive test on test mode, unique different be that testing vehicle has been changed into by collect the mode of detecting information with artificial medium.The manual testing mainly is at indoor scene, carries out such as facilities such as market, office building, museums.So can find out on scheming, the overlay area of test can only cover neighboring area or some special chamber inner region such as " museum " " market " of highway.And Intelligent test terminal has covered most of zone above the map.And relative, the overlay area is more, and test data is also more comprehensive more accurate, also more easily reaches quick location to problem.And because the personification of Intelligent test terminal test can come plan of distribution according to central control server, so when working as the test plan of central Control Server allocated phase, Intelligent test terminal just can be realized regardless of space time, carry out at any time test job, this is for finding that initiatively the wireless network network problem has also played crucial effect.
Figure 810829DEST_PATH_IMAGE001
Table 1. the present invention and drive test/manual testing's difference.

Claims (10)

1. one kind with the system of intelligent terminal as the wireless network network test, this system comprises base station cell, core net, router, the Internet, it is characterized in that: this system also comprises Intelligent test terminal, central control server, and described Intelligent test terminal is responsible for initiatively initiating the instruction that personification is tested or the reception central control server sends and is carried out the personification test; Intelligent test terminal also passes through base station cell, core net, router sends request to the Internet, the Internet request of receiving is also passed through router with corresponding response message, core net, base station cell is passed to Intelligent test terminal, anthropomorphic detecting information and response message that Intelligent test terminal will be collected are passed through base station cell, core net, router is passed to central control server, described central control server is responsible for distributing anthropomorphic test plan to each intelligent terminal, and anthropomorphic detecting information and the response message analysis concrete wireless network network condition collected according to Intelligent test terminal.
2. system according to claim 1, it is characterized in that: Intelligent test terminal is the equipment with wireless networking capabilities.
3. system according to claim 2, it is characterized in that: described equipment is smart mobile phone, personal desktop computer, notebook computer, intelligent advertisement board, vehicle electronic device.
4. system according to claim 1 is characterized in that: be provided with fire compartment wall between described the Internet and the router.
5. system according to claim 1, it is characterized in that: described anthropomorphic detecting information is the information that drive test and manual testing can collect, and the information that described drive test and manual testing can collect comprises that the band of position indicates (LAC), the residential quarter indicates (Cell ID), received signal strength (RSSI), received signal code power (RSCP), signal to noise ratio (Ec/No), testing time information, test space information, HTTP moment speed of download, FTP moment uploading speed, PING average response time-delay.
6. system according to claim 1, it is characterized in that: described response message is the effective information of internet, applications layer, the effective information of described application layer comprise the average speed of download of HTTP, HTTP download success rate, HTTP average response time, FTP and on average upload/speed of download, FTP upload/download success rate, FTP average response time, PING average response time-delay, PING success rate.
7. a method that adopts the test network flow of the described system of claim 1-6 is characterized in that, has the following steps:
1) Intelligent test terminal is initiatively initiated anthropomorphic test or is received anthropomorphic test plan;
2) Intelligent test terminal sends request in the anthropomorphic test process to the Internet, and the Internet request of receiving is also passed to Intelligent test terminal with corresponding response message;
3) if Intelligent test terminal initiatively sends anthropomorphic test, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in test process, upload at last central control server, and a test period finishes, and carries out loop test by above-mentioned steps;
4) if Intelligent test terminal receives the anthropomorphic test plan that central control server distributes, Intelligent test terminal is waken up after receiving anthropomorphic test plan, and all anthropomorphic test plans are carried out following detection: whether Intelligent test terminal detects anthropomorphic test plan is interim anthropomorphic test plan;
41) if interim anthropomorphic test plan, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of stage, central control server arranges cycle time in the anthropomorphic test plan of stage, Intelligent test terminal is collected anthropomorphic detecting information and solicited message in the anthropomorphic test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, again initiate anthropomorphic test to next one test period time point Intelligent test terminal, carry out loop test by the anthropomorphic test plan of above-mentioned stage;
42) if the anthropomorphic test plan of non-stage, then Intelligent test terminal carries out the personification test according to the anthropomorphic test plan of non-stage, Intelligent test terminal is collected anthropomorphic detecting information and response message in the test process, anthropomorphic detecting information and response message that last Intelligent test terminal will be collected upload to central control server, a test period finishes, and carries out loop test by the anthropomorphic test plan of above-mentioned non-stage;
5) central control server is according to anthropomorphic detecting information and the concrete wireless network network condition of response message analysis of Intelligent test terminal collection.
8. method according to claim 7 is characterized in that: step 41) the anthropomorphic test plan of described stage is that Intelligent test terminal is initiated at set intervals once anthropomorphic test or initiated once anthropomorphic test at certain time point.
9. method according to claim 7 is characterized in that: step 42) the anthropomorphic test plan of described non-stage carries out loop test for several test periods.
10. method according to claim 7, it is characterized in that: Intelligent test terminal is when carrying out anthropomorphic test plan, if receive the newly assigned anthropomorphic test plan of central control server, then stop current anthropomorphic test plan, carry out new anthropomorphic test plan.
CN201210373105.2A 2012-09-29 2012-09-29 A kind of system and method that intelligent terminal is tested as wireless network Active CN102883348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210373105.2A CN102883348B (en) 2012-09-29 2012-09-29 A kind of system and method that intelligent terminal is tested as wireless network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210373105.2A CN102883348B (en) 2012-09-29 2012-09-29 A kind of system and method that intelligent terminal is tested as wireless network

Publications (2)

Publication Number Publication Date
CN102883348A true CN102883348A (en) 2013-01-16
CN102883348B CN102883348B (en) 2015-09-23

Family

ID=47484449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210373105.2A Active CN102883348B (en) 2012-09-29 2012-09-29 A kind of system and method that intelligent terminal is tested as wireless network

Country Status (1)

Country Link
CN (1) CN102883348B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103117907A (en) * 2013-03-11 2013-05-22 星云融创(北京)信息技术有限公司 Network speed test method and system and method and system for selecting accelerating server
CN103198727A (en) * 2013-04-10 2013-07-10 中国人民解放军总政治部直属工作部卫生局 Electronic mobile training and test system of hygienic knowledge for public service staff
CN104113870A (en) * 2014-07-29 2014-10-22 中国联合网络通信集团有限公司 Network testing method and mobile terminal
CN104468288A (en) * 2015-01-04 2015-03-25 中国联合网络通信集团有限公司 Terminal network data testing method and device
CN106131872A (en) * 2016-08-08 2016-11-16 上海斐讯数据通信技术有限公司 A kind of system and method in order to wireless gateway device covering performance is compared
CN106656365A (en) * 2015-11-04 2017-05-10 国网辽宁省电力有限公司本溪供电公司 GPRS signal strength test method
CN106937303A (en) * 2015-12-30 2017-07-07 中国移动通信集团河南有限公司 A kind of base station test method and system, terminal, Cloud Server
CN107645727A (en) * 2016-07-20 2018-01-30 大唐移动通信设备有限公司 A kind of method and device of testing base station
CN109491899A (en) * 2018-10-23 2019-03-19 深圳市吉祥腾达科技有限公司 A kind of method for testing reliability of Wireless Communication Equipment multiple terminals attack
CN109951865A (en) * 2017-12-21 2019-06-28 深圳Tcl新技术有限公司 The diagnosis of WIFI performance and feedback method, storage medium and mobile terminal
CN110719605A (en) * 2019-11-22 2020-01-21 广西科技师范学院 Network speed detection system based on 5G technology
CN111988800A (en) * 2020-08-27 2020-11-24 几维通信技术(深圳)有限公司 Automatic wireless communication network optimization method, terminal equipment and access network equipment
CN113473503A (en) * 2020-08-27 2021-10-01 几维通信技术(深圳)有限公司 Network parameter optimization processing system based on NAS, terminal equipment and optimization method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556660A (en) * 2004-01-05 2004-12-22 杨大成 Road testing system of mobile communication network based on positioning technology
CN101395850A (en) * 2006-03-02 2009-03-25 诺基亚公司 Supporting an access to a destination network via a wireless access network
CN101431764A (en) * 2008-10-28 2009-05-13 中国移动通信集团福建有限公司 Automatic testing equipment for mobile network quality and network coverage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556660A (en) * 2004-01-05 2004-12-22 杨大成 Road testing system of mobile communication network based on positioning technology
CN101395850A (en) * 2006-03-02 2009-03-25 诺基亚公司 Supporting an access to a destination network via a wireless access network
CN101431764A (en) * 2008-10-28 2009-05-13 中国移动通信集团福建有限公司 Automatic testing equipment for mobile network quality and network coverage

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103117907A (en) * 2013-03-11 2013-05-22 星云融创(北京)信息技术有限公司 Network speed test method and system and method and system for selecting accelerating server
CN103117907B (en) * 2013-03-11 2016-09-28 星云融创(北京)科技有限公司 The method and system of server is accelerated in network speed method of testing and system, selection
CN103198727A (en) * 2013-04-10 2013-07-10 中国人民解放军总政治部直属工作部卫生局 Electronic mobile training and test system of hygienic knowledge for public service staff
CN104113870B (en) * 2014-07-29 2019-01-08 中国联合网络通信集团有限公司 Network test method and mobile terminal
CN104113870A (en) * 2014-07-29 2014-10-22 中国联合网络通信集团有限公司 Network testing method and mobile terminal
CN104468288A (en) * 2015-01-04 2015-03-25 中国联合网络通信集团有限公司 Terminal network data testing method and device
CN106656365A (en) * 2015-11-04 2017-05-10 国网辽宁省电力有限公司本溪供电公司 GPRS signal strength test method
CN106937303A (en) * 2015-12-30 2017-07-07 中国移动通信集团河南有限公司 A kind of base station test method and system, terminal, Cloud Server
CN106937303B (en) * 2015-12-30 2020-07-07 中国移动通信集团河南有限公司 Base station testing method and system, terminal and cloud server
CN107645727A (en) * 2016-07-20 2018-01-30 大唐移动通信设备有限公司 A kind of method and device of testing base station
CN107645727B (en) * 2016-07-20 2020-04-03 大唐移动通信设备有限公司 Method and device for testing base station
CN106131872A (en) * 2016-08-08 2016-11-16 上海斐讯数据通信技术有限公司 A kind of system and method in order to wireless gateway device covering performance is compared
CN109951865A (en) * 2017-12-21 2019-06-28 深圳Tcl新技术有限公司 The diagnosis of WIFI performance and feedback method, storage medium and mobile terminal
CN109951865B (en) * 2017-12-21 2022-04-22 深圳Tcl新技术有限公司 WIFI performance diagnosis and feedback method, storage medium and mobile terminal
CN109491899A (en) * 2018-10-23 2019-03-19 深圳市吉祥腾达科技有限公司 A kind of method for testing reliability of Wireless Communication Equipment multiple terminals attack
CN110719605A (en) * 2019-11-22 2020-01-21 广西科技师范学院 Network speed detection system based on 5G technology
CN110719605B (en) * 2019-11-22 2020-07-24 广西科技师范学院 Network speed detection system based on 5G technology
CN111988800A (en) * 2020-08-27 2020-11-24 几维通信技术(深圳)有限公司 Automatic wireless communication network optimization method, terminal equipment and access network equipment
CN111988800B (en) * 2020-08-27 2021-05-28 几维通信技术(深圳)有限公司 Automatic wireless communication network optimization method, terminal equipment and access network equipment
CN113179527A (en) * 2020-08-27 2021-07-27 几维通信技术(深圳)有限公司 Wireless communication network optimization method and computer-readable storage medium
CN113179526A (en) * 2020-08-27 2021-07-27 几维通信技术(深圳)有限公司 Terminal equipment and access network equipment for optimizing wireless communication network
CN113473503A (en) * 2020-08-27 2021-10-01 几维通信技术(深圳)有限公司 Network parameter optimization processing system based on NAS, terminal equipment and optimization method
CN113179526B (en) * 2020-08-27 2023-02-24 几维通信技术(深圳)有限公司 Terminal equipment and access network equipment for optimizing wireless communication network
CN113179527B (en) * 2020-08-27 2023-02-24 几维通信技术(深圳)有限公司 Wireless communication network optimization method and computer-readable storage medium
CN113473503B (en) * 2020-08-27 2024-02-02 几维通信技术(深圳)有限公司 NAS-based network parameter optimization processing system, terminal equipment and optimization method

Also Published As

Publication number Publication date
CN102883348B (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN102883348B (en) A kind of system and method that intelligent terminal is tested as wireless network
CN107819645B (en) Internet of things testing method based on software simulation
CN101217770B (en) An automatic evaluating and analyzing device and method for mobile communication network quality
Vannieuwenborg et al. Choosing IoT‐connectivity? A guiding methodology based on functional characteristics and economic considerations
CN103796227B (en) Carry out the method and system of wireless signal covering analyzing
CN103068035A (en) Wireless network location method, device and system
Yu et al. Study on the feasibility of LoRaWAN for smart city applications
CN102833778B (en) System and method for testing wireless access controller
CN106992902B (en) Wireless network coverage blind area detection method and system
CN102362517A (en) Radio wave state measurement system, radio wave state measurement method, and storage medium in which radio wave state measurement program is stored
CN103686818A (en) Simulation test method and equipment
CN114240031A (en) 5G network bearing quality evaluation method facing power service
Oransirikul et al. Feasibility of analyzing Wi-Fi activity to estimate transit passenger population
CN105611535A (en) Positioning device and positioning method for pseudo base-station
CN103748921A (en) Capacity allocation in communications
Tanaka et al. Trace‐based simulation for 6TiSCH
CN102056194A (en) Wireless local area network (WLAN) network quality monitoring system method based on code division multiple access (CDMA) network
Smura et al. Future scenarios for local area access: industry structure and access fragmentation
CN106332163B (en) A kind of functional module test method and system
Sorokin et al. Multifunction measuring system for monitoring of coverage area of mobile network operator
CN102065457B (en) WLAN (Wireless Local Access Network) quality monitoring system and method based on GSM/EDGE (Global System of Mobile Communication/Enhanced Data Rate for GSM Evolution) network
Meyer et al. Wi-fi coverage and propagation for localization purposes in permanently changing urban areas
CN110177105A (en) Monitoring method, device, system, storage medium and the processor of media file
CN116866976B (en) Method and electronic equipment for rural area mobile network service
CN219761212U (en) Intelligent supervision system is kept apart at home

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant