CN102879552A - 一种冻融冻胀模型试验装置及其试验方法 - Google Patents

一种冻融冻胀模型试验装置及其试验方法 Download PDF

Info

Publication number
CN102879552A
CN102879552A CN2012104256145A CN201210425614A CN102879552A CN 102879552 A CN102879552 A CN 102879552A CN 2012104256145 A CN2012104256145 A CN 2012104256145A CN 201210425614 A CN201210425614 A CN 201210425614A CN 102879552 A CN102879552 A CN 102879552A
Authority
CN
China
Prior art keywords
freezing
model
test case
freeze
thawing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104256145A
Other languages
English (en)
Inventor
王柳江
刘斯宏
高军军
李卓
王子健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2012104256145A priority Critical patent/CN102879552A/zh
Publication of CN102879552A publication Critical patent/CN102879552A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

一种冻融冻胀模型试验装置。该装置是把不同形状、不同结构、不同工况、不同材料的渠道或路基按照一定比例尺寸和原状样密度制作成相应的渠道或路基模型分别放入1#模型箱和2#模型箱内,两个模型箱置于冻融试验箱中,通过橡胶软管分别与模型箱底部进水阀与马氏瓶底部出水阀连接,根据实际工况通过马氏瓶调节地下水位高度,把温度传感器、应变传感器分别放置在渠道内部和顶部,将传感器分别与温度采集仪、应变采集仪和计算机连接,设定冻结温度、融化温度及数据采集时间步长,并数据采集,进行冻结、融化试验。从而模拟渠道或路基的冻融冻胀特性。使用该装置能够快速了解渠道或路基冻胀融沉变化,同时,具有简单、方便、经济、实用等优点。

Description

一种冻融冻胀模型试验装置及其试验方法
一、技术领域
本发明属于一种在寒冷地区建造渠道或公路时,利用该模型试验装置了解渠道或路基冻融冻胀变化情况。
二、背景技术
寒冷地区,渠道或路基在冬季负温作用下会产生冻胀变形,在春季温度上升使其融化产生沉降变形,经过几年反复冻融循环作用后渠道、路基会产生破坏。冻融冻胀作用对各类工程及建筑物造成了很大危害。通常人们对冻胀冻融破坏从现场冻融冻胀试验开始,近年来,随着科技发展和人们对冻融冻胀问题的重视,提出了不同的防冻融冻胀结构形式、防冻胀材料和防冻胀方法,并应用于工程中,然而,防冻融冻胀结构形式、防冻胀材料和防冻胀方法需要通过现场试验后才可以应用到实际工程中,而现场试验过程周期较长、费用高,因此,开发一种快速、便捷的冻融冻胀模型试验装置,通过室内模型试验快速了解不同结构、不同材料和方法的渠道或路基的防冻胀效果,对寒冷地区渠道或路基防冻胀具有重要的现实意义。
三、发明内容
本发明所要解决的技术问题是提出一种冻融冻胀模型试验装置及其试验方法。
一种冻融冻胀模型试验装置,其特征在于该装置由冻融试验箱1、模型箱2、马氏瓶3、温度采集仪4、应变采集仪5、计算机6、应变传感器7、温度传感器8、模型箱底部进水阀门9、马氏瓶底部出水阀门10、橡胶软管11所制成;其中冻融试验箱1内放置2个模型箱2,模型箱底部进水阀门9通过橡胶软管11与马氏瓶3底部进水阀门10相连接,2个模型箱2内侧一边各垂直放置4个温度传感器8,温度传感器8通过导线与温度采集仪4相连接,2个模型箱2内水平面沿对角线各放置3个应变传感器7,应变传感器7通过导线与应变采集仪4相连接,温度采集仪4和应变采集仪5分别通过导线与计算机6相连接,冻融试验箱温度探头12通过导线与冻融试验箱温度控制器13相连接。
所述的冻融冻胀模型试验装置,其特征在所述的模型箱2内模拟渠道或路基密度为原状样的密度,分别在两个模型箱2内分别模拟不同形状、不同结构、不同工况、不同材料的渠道或路基模型并进行冻融冻胀试验。
一种使用冻融冻胀模型试验装置,进行冻融冻胀试验的方法步骤如下:
1)根据实际工况,确定渠道或路基模型的尺寸、形状、结构、材料;
2)按照工程原状密度分别在两个模型箱2内制作渠道或路基模型;
3)在模型箱2内不同位置埋设温度传感器8、应变传感器7,用马氏瓶3调节地下水位高度,打开马氏瓶底部出水阀门10和模型箱底部进水阀门9;
4)打开温度采集仪4、应变采集仪5、计算机6;
5)根据实际工况设定冻融试验箱1的冻结温度、冻结时间, 打开冻融试验箱1上的冻融试验箱制冷开关14,通过冻融试验箱温度控制器13设定冻结温度、冻结时间,关闭冻融试验箱1的箱盖开始冻结;
6)根据工程需要,在计算机6上设定温度、应变采集时间步长并开始数据采集;
7)计算机6上停止数据采集,冻结试验结束;
8)根据实际工况设定冻融试验箱1的融化温度、时间,关闭冻融试验箱1上的冻融试验箱制冷开关14、设定融化温度、时间,关闭冻融试验箱1的箱盖开始融化;
9)根据工程需要,在计算机6上设定温度、应变采集时间步长并开始数据采集;
10)计算机6上停止数据采集,融化试验结束;
采用该模型试验装置后能有效地缩短试验周期,减少试验费用,进一步了解不同形状、结构、材料的渠道或路基冻融冻胀特性。
本发明的原理如下:(1)根据实际渠道或路基的形状、结构、材料按一定比例制作模型。(2)按当地实际负温设定冻结温度,进行单向冻结。(3)根据实际工况设定地下水位高度。(4)模拟实际工况下渠道或路基的防冻胀效果。
本发明与传统的现场试验相比,具有如下优点:
1. 本发明通过室内模型试验,模拟实际工况条件下的渠道或路基的冻胀冻融变形情况。
2. 本发明可缩短试验周期,降低试验费用,快速了解渠道或路基在冻融循环作用下的冻胀冻融情况。
3. 本发明可以模拟不同类型、不同材料、不同结构渠道或路基,在现场试验前了解其冻融冻胀特性,有针对性的试验,以减少因现场试验失败而造成额外费用损失。
四、附图说明
图1 冻融冻胀模型试验装置示意图
附图标记:1—冻融试验箱; 2—模型箱; 3—马氏瓶;4—温度采集仪;5—应变采集仪; 6—计算机; 7—应变传感器; 8—温度传感器;9—模型箱底部进水阀门;10—马氏瓶底部出水阀门;11—橡胶软管;12—冻融试验箱温度探头;13—冻融试验箱温度控制器;14—冻融试验箱制冷开关;
五、具体实施方式
本发明主要是提供一种冻融冻胀模型试验装置,利用模型试验,认识渠道或路基在正负温冻融循环作用下的冻融冻胀特性,从而认识寒区渠道或公路的防冻胀效果。
实施例1. 
一种冻融冻胀模型试验装置,其特征在于该装置由冻融试验箱1、模型箱2、马氏瓶3、温度采集仪4、应变采集仪5、计算机6、应变传感器7、温度传感器8、模型箱底部进水阀门9、马氏瓶底部出水阀门10、橡胶软管11、冻融试验箱温度探头12、冻融试验箱温度控制器13、冻融试验箱制冷开关14所制成;其中冻融试验箱1内放置2个模型箱2,模型箱底部进水阀门9通过橡胶软管11与马氏瓶3底部进水阀门10相连接,2个模型箱2内侧一边各垂直放置4个温度传感器8,温度传感器8通过导线与温度采集仪4相连接,2个模型箱2内水平面沿对角线各放置3个应变传感器7,应变传感器7通过导线与应变采集仪4相连接,温度采集仪4和应变采集仪5分别通过导线与计算机6相连接,冻融试验箱温度探头12通过导线与冻融试验箱温度控制器13相连接。
其中:
1)冻融试验箱内有2个模型箱,冻融试验箱尺寸为L×W×H=170×60×90 (cm)(长×宽×高);模型箱尺寸为L×W×H=56×46×32 (cm)(长×宽×高), 冻融试验箱温度控制范围为50℃~-50℃;
2)模型箱由1.5cm厚高强度有机玻璃制成,模型箱侧面和下底面为5cm聚乙烯保温材料;模型箱底部进水阀门孔径为0.8cm;
3)马氏瓶尺寸为20×30cm(直径×高),马氏瓶由1cm厚高强度有机玻璃制成,马氏瓶底部出水阀门孔径为0.8cm, 出水阀门为铝合金材料;
4) 两个模型箱底部进水阀门通过橡胶软管分别与两个马氏瓶底部出水阀门连接,橡胶软管直径为0.8cm;
5)1个冻融试验箱温度探头及温度控制器型号FC-040(浙江),量程为50℃~-50℃,精度为0.01℃;
6)4个温度传感器分别置于2个模型箱内侧, 从底部到顶部高度依次为0cm、5cm、10cm、15cm、20cm、25cm、30cm,温度传感器型号为KZW/PF-121(北京),量程为50℃~-50℃,3个应变传感器沿对角线分别置于两个模型箱内渠道或路基模型的顶部,应变传感器型号为DTH-A-30Z8(日本),量程为10cm;
7)4个温度传感器分别于温度采集仪通过导线相连接,温度采集仪型号为KZL/A-12RS2V0,精度为0.01℃,3个应变传感器分别与应变采集仪通过导线相连接,应变采集仪型号为UCAM-500A,精度为0.0001mm;
8)温度采集仪、应变传感器分别与计算机连接,计算机型号为普通办公计算机;
实施例2. 
使用冻融冻胀模型试验装置进行冻融冻胀试验的方法,其试验步骤如下:
1)根据江苏某渠道实际工况,该渠道顶宽10m,底宽56m,高30m,长100m,密度1.6 g/cm3,渠道为梯形结构,由两段组成,第一段为普通粘土渠道,第二段为混凝土衬砌渠道,混凝土衬砌板厚度为0.08m,地下水位为3m,取上述渠道土样做冻融冻胀模型试验,按照1:100比例对上述渠道缩放,确定两段渠模型尺寸顶宽0.1m,底宽0.56m,高0.3m,长0.46m;
2)根据渠道模型尺寸计算模型的体积为0.0297 m3, 由原状样密度及模型体积计算模型质量为47.52 kg,把47.52kg土样按照梯形结构装入2个模型箱内,模型箱1内放置第一段渠道模型,模型箱2内放置第二段渠道模型,
3)在2个模型箱内分别0cm、10cm、20cm、30cm深度沿垂直方向埋设4个温度传感器,把8个温度传感器通过导线与温度采集仪连接,在渠道坡面沿对角线各放置3个应变传感器,把6个应变传感器通过导线与应变采集仪相连接,用马氏瓶调节地下水位高度为2cm,打开马氏瓶底部出水阀门和模型箱底部进水阀门;
4)打开温度采集仪电源、应变采集仪电源、计算机电源,使得温度采集仪、应变采集仪、计算机处于开机接通状态;
5)打开冻融试验箱制冷开关,在冻融试验箱温度控制器上设定冻结温度为-15℃、冻结时间为72小时,关闭冻融试验的箱盖开始冻结;
6)在计算机上设定温度采集仪采集温度时间步长为30分钟、应变采集仪采集应变时间步长为30分钟,并开始数据采集;
7)计算机上停止数据采集,冻结试验结束;
8)根据实际工况设定冻融试验箱的融化温度,关闭冻融试验箱制冷开关,在冻融试验箱温度控制器上设定为20℃、融化时间为72小时,关闭冻融试验箱的箱盖开始融化;
9)根据工程需要,在计算机上设定温度采集仪采集温度时间不长为30分钟、应变采集仪采集应变时间步长为30分钟,并开始数据采集;
10)计算机上停止数据采集,融化试验结束;
重复2)~10)步骤。

Claims (3)

1.一种冻融冻胀模型试验装置,其特征在于该装置由冻融试验箱(1)、模型箱(2)、马氏瓶(3)、温度采集仪(4)、应变采集仪(5)、计算机(6)、应变传感器(7)、温度传感器(8)、模型箱底部进水阀门(9)、马氏瓶底部出水阀门(10)、橡胶软管(11)、冻融试验箱温度探头(12)、冻融试验箱温度控制器(13)、冻融试验箱制冷开关(14)所制成;其中冻融试验箱(1)内放置2个模型箱(2),模型箱底部进水阀门(9)通过橡胶软管(11)与马氏瓶(3)底部进水阀门(10)相连接,2个模型箱(2)内侧一边各垂直放置4个温度传感器(8),温度传感器(8)通过导线与温度采集仪(4)相连接,2个模型箱(2)内水平面沿对角线各放置3个应变传感器(7),应变传感器(7)通过导线与应变采集仪(4)相连接,温度采集仪(4)和应变采集仪(5)分别通过导线与计算机(6)相连接,冻融试验箱温度探头(12)通过导线与冻融试验箱温度控制器(13)相连接。
2.根据权利要求1所述的冻融冻胀模型试验装置,其特征在所述的模型箱(2)内模拟渠道或路基密度为原状样的密度,分别在两个模型箱(2)内分别模拟不同形状、不同结构、不同工况、不同材料的渠道或路基模型并进行冻融冻胀试验。
3.一种使用权利要求1所述的冻融冻胀模型试验装置,进行冻融冻胀试验的方法步骤如下:
1)根据实际工况,确定渠道或路基模型的尺寸、形状、结构、材料;
2)按照工程原状密度分别在两个模型箱(2)内制作渠道或路基模型;
3)在模型箱(2)内不同位置埋设温度传感器(8)、应变传感器(7),用马氏瓶(3)调节地下水位高度,打开马氏瓶底部出水阀门(10)和模型箱底部进水阀门(9);
4)打开温度采集仪(4)、应变采集仪(5)、计算机(6);
5)根据实际工况设定冻融试验箱(1)的冻结温度、冻结时间, 打开冻融试验箱(1)上的冻融试验箱制冷开关(14),通过冻融试验箱温度控制器(13)设定冻结温度、冻结时间,关闭冻融试验箱(1)的箱盖开始冻结;
6)根据工程需要,在计算机(6)上设定温度、应变采集时间步长并开始数据采集;
7)计算机(6)上停止数据采集,冻结试验结束;
8)根据实际工况设定冻融试验箱(1)的融化温度、时间,打开冻融试验箱(1)上的冻融试验箱制冷开关(14)、设定融化温度、时间,关闭冻融试验箱(1)的箱盖开始融化;
9)根据工程需要,在计算机(6)上设定温度、应变采集时间步长并开始数据采集;
10)计算机(6)上停止数据采集,融化试验结束。
CN2012104256145A 2012-10-31 2012-10-31 一种冻融冻胀模型试验装置及其试验方法 Pending CN102879552A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104256145A CN102879552A (zh) 2012-10-31 2012-10-31 一种冻融冻胀模型试验装置及其试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104256145A CN102879552A (zh) 2012-10-31 2012-10-31 一种冻融冻胀模型试验装置及其试验方法

Publications (1)

Publication Number Publication Date
CN102879552A true CN102879552A (zh) 2013-01-16

Family

ID=47480953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104256145A Pending CN102879552A (zh) 2012-10-31 2012-10-31 一种冻融冻胀模型试验装置及其试验方法

Country Status (1)

Country Link
CN (1) CN102879552A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116014A (zh) * 2013-02-05 2013-05-22 中国矿业大学 大尺度高压土体冻融过程水-热-力耦合作用试验系统
CN103245771A (zh) * 2013-04-27 2013-08-14 同济大学 人工地层冻结法对周围环境效应的模型试验装置及方法
CN103969421A (zh) * 2014-05-06 2014-08-06 中国铁道科学研究院铁道建筑研究所 冻土冻胀实验装置以及测量冻土冻胀测量的方法
CN104142356A (zh) * 2014-06-26 2014-11-12 水利部交通运输部国家能源局南京水利科学研究院 咸寒区输水渠道冻融变形离心模拟系统
CN106680129A (zh) * 2017-02-24 2017-05-17 新华水力发电有限公司 岩样循环干湿冻融环境模拟及损伤劣化测试装置及其方法
CN107271473A (zh) * 2017-08-22 2017-10-20 中国科学院寒区旱区环境与工程研究所 冻融过程对土壤环境影响的室内模拟系统
CN108181446A (zh) * 2018-01-29 2018-06-19 中铁二院工程集团有限责任公司 一种冻土区隧道衬砌背后局部积水冻融循环作用模拟、监测装置
CN110108861A (zh) * 2019-05-30 2019-08-09 西北农林科技大学 一种研究渠基天热辅热热棒室内模型试验装置
CN111562283A (zh) * 2020-06-11 2020-08-21 水利部交通运输部国家能源局南京水利科学研究院 一种自动量测渠道全断面冻胀变形的仪器及测量安装方法
CN114740178A (zh) * 2022-03-24 2022-07-12 胡利航 一种边坡内部侵蚀失稳试验装置
CN114993839A (zh) * 2022-05-31 2022-09-02 国家石油天然气管网集团有限公司 一种沉降塌陷一体化的管土相互作用试验装置及试验方法
CN117949640A (zh) * 2024-03-27 2024-04-30 中国科学院地理科学与资源研究所 一种冻土退化过程的室内模拟试验装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551373A (zh) * 2009-05-25 2009-10-07 黑龙江省水利科学研究院 冻土力学模型试验装置
CN201359584Y (zh) * 2009-01-07 2009-12-09 吉林大学 冻融循环下路基材料力学参数测试试验机
CN101788552A (zh) * 2010-01-27 2010-07-28 北京师范大学 土壤冻融过程中污染物迁移转化的模拟装置及方法
CN101923085A (zh) * 2010-07-06 2010-12-22 中交第二公路勘察设计研究院有限公司 多功能公路土基冻融循环试验装置
CN102495195A (zh) * 2011-11-22 2012-06-13 中交第一公路勘察设计研究院有限公司 步入式多功能冻土路基模型试验箱
CN102590468A (zh) * 2011-11-29 2012-07-18 中国科学院寒区旱区环境与工程研究所 深部土冻融过程试验系统
CN202486125U (zh) * 2012-01-05 2012-10-10 中国科学院寒区旱区环境与工程研究所 室内冻土冻融循环过程试验装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201359584Y (zh) * 2009-01-07 2009-12-09 吉林大学 冻融循环下路基材料力学参数测试试验机
CN101551373A (zh) * 2009-05-25 2009-10-07 黑龙江省水利科学研究院 冻土力学模型试验装置
CN101788552A (zh) * 2010-01-27 2010-07-28 北京师范大学 土壤冻融过程中污染物迁移转化的模拟装置及方法
CN101923085A (zh) * 2010-07-06 2010-12-22 中交第二公路勘察设计研究院有限公司 多功能公路土基冻融循环试验装置
CN102495195A (zh) * 2011-11-22 2012-06-13 中交第一公路勘察设计研究院有限公司 步入式多功能冻土路基模型试验箱
CN102590468A (zh) * 2011-11-29 2012-07-18 中国科学院寒区旱区环境与工程研究所 深部土冻融过程试验系统
CN202486125U (zh) * 2012-01-05 2012-10-10 中国科学院寒区旱区环境与工程研究所 室内冻土冻融循环过程试验装置

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116014B (zh) * 2013-02-05 2015-05-06 中国矿业大学 大尺度高压土体冻融过程水-热-力耦合作用试验系统
CN103116014A (zh) * 2013-02-05 2013-05-22 中国矿业大学 大尺度高压土体冻融过程水-热-力耦合作用试验系统
CN103245771A (zh) * 2013-04-27 2013-08-14 同济大学 人工地层冻结法对周围环境效应的模型试验装置及方法
CN103245771B (zh) * 2013-04-27 2015-08-19 同济大学 人工地层冻结法对周围环境效应的模型试验装置及方法
CN103969421A (zh) * 2014-05-06 2014-08-06 中国铁道科学研究院铁道建筑研究所 冻土冻胀实验装置以及测量冻土冻胀测量的方法
CN103969421B (zh) * 2014-05-06 2016-05-11 中国铁路总公司 冻土冻胀实验装置以及测量冻土冻胀测量的方法
CN104142356A (zh) * 2014-06-26 2014-11-12 水利部交通运输部国家能源局南京水利科学研究院 咸寒区输水渠道冻融变形离心模拟系统
CN104142356B (zh) * 2014-06-26 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 咸寒区输水渠道冻融变形离心模拟系统
CN106680129B (zh) * 2017-02-24 2019-08-02 新华水力发电有限公司 岩样循环干湿冻融环境模拟及损伤劣化测试装置
CN106680129A (zh) * 2017-02-24 2017-05-17 新华水力发电有限公司 岩样循环干湿冻融环境模拟及损伤劣化测试装置及其方法
CN107271473A (zh) * 2017-08-22 2017-10-20 中国科学院寒区旱区环境与工程研究所 冻融过程对土壤环境影响的室内模拟系统
CN108181446A (zh) * 2018-01-29 2018-06-19 中铁二院工程集团有限责任公司 一种冻土区隧道衬砌背后局部积水冻融循环作用模拟、监测装置
CN110108861A (zh) * 2019-05-30 2019-08-09 西北农林科技大学 一种研究渠基天热辅热热棒室内模型试验装置
CN110108861B (zh) * 2019-05-30 2022-02-15 西北农林科技大学 一种研究渠基天然辅热热棒室内模型试验装置
CN111562283A (zh) * 2020-06-11 2020-08-21 水利部交通运输部国家能源局南京水利科学研究院 一种自动量测渠道全断面冻胀变形的仪器及测量安装方法
CN111562283B (zh) * 2020-06-11 2022-03-15 水利部交通运输部国家能源局南京水利科学研究院 一种自动量测渠道全断面冻胀变形的仪器及测量安装方法
CN114740178A (zh) * 2022-03-24 2022-07-12 胡利航 一种边坡内部侵蚀失稳试验装置
CN114740178B (zh) * 2022-03-24 2024-02-23 胡利航 一种边坡内部侵蚀失稳试验装置
CN114993839A (zh) * 2022-05-31 2022-09-02 国家石油天然气管网集团有限公司 一种沉降塌陷一体化的管土相互作用试验装置及试验方法
CN117949640A (zh) * 2024-03-27 2024-04-30 中国科学院地理科学与资源研究所 一种冻土退化过程的室内模拟试验装置
CN117949640B (zh) * 2024-03-27 2024-05-24 中国科学院地理科学与资源研究所 一种冻土退化过程的室内模拟试验装置

Similar Documents

Publication Publication Date Title
CN102879552A (zh) 一种冻融冻胀模型试验装置及其试验方法
CN103245771B (zh) 人工地层冻结法对周围环境效应的模型试验装置及方法
CN204877506U (zh) 一种寒区隧道室内试验装置
Park et al. Experimental and numerical analysis on thermal performance of large-diameter cast-in-place energy pile constructed in soft ground
Tang et al. Urbanization effect on soil temperature in Nanjing, China
CN110596177A (zh) 基于岩-水-冰力原位测试的岩质隧道冻胀力模型
CN104597222A (zh) 具有补水功能和冻胀测试功能的大型冻土模型试验系统
CN109344547B (zh) 一种组合地层渗流作用下冻结法模型设计方法及装置
CN103196753A (zh) 单向冻结冻融循环三轴仪及试验方法
CN110954675A (zh) 一种季节性冻土室内试验专用装置及研究方法
Ghanbari et al. Development of an empirical criterion for predicting the hydraulic fracturing in the core of earth dams
Shen et al. The impact of environmental temperature change on the interior temperature of quasi-sandstone in cold region: experiment and numerical simulation
CN116087472B (zh) 复杂环境耦合作用下隧洞口边坡物理模拟试验装置及方法
Tang et al. Effect mechanism of unfrozen water on the frozen soil-structure interface during the freezing-thawing process
CN109283086A (zh) 精准测算反复冻融损伤后寒区隧道岩石弹性模量的方法
CN106645261A (zh) 大型多功能人工冻结平台
CN203148869U (zh) 粗颗粒盐渍土冻融特性试验装置
CN104236623A (zh) 输水渠道冻胀多功能自动化监测系统
CN105372284A (zh) 一种标准击实功下土体冻胀参数的测试装置及其测试方法
Kurz et al. Thermal conductivities of frozen and unfrozen soils at three project sites in northern Manitoba
CN204479570U (zh) 一种适用于盐渍土冻胀性和溶陷性的快速检测装置
CN113532903B (zh) 一种冻融循环环境寒区隧道模拟试验平台
US11835508B2 (en) Model test device for ground collapse caused by pipeline leakage
CN110333138A (zh) 一种用于研究低温环境下冰与坝体相互作用的试验装置
CN111753360B (zh) 一种隧道局部存水冻胀力计算方法、计算系统、存储介质、季冻区隧道衬砌冻胀设计方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130116