CN102867030A - Quasi-three-dimensional presentation method for environment and layout of machine room - Google Patents

Quasi-three-dimensional presentation method for environment and layout of machine room Download PDF

Info

Publication number
CN102867030A
CN102867030A CN2012103093687A CN201210309368A CN102867030A CN 102867030 A CN102867030 A CN 102867030A CN 2012103093687 A CN2012103093687 A CN 2012103093687A CN 201210309368 A CN201210309368 A CN 201210309368A CN 102867030 A CN102867030 A CN 102867030A
Authority
CN
China
Prior art keywords
machine room
equipment
layout
data
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103093687A
Other languages
Chinese (zh)
Inventor
张晋锋
李立京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dawning Information Industry Beijing Co Ltd
Original Assignee
Dawning Information Industry Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dawning Information Industry Beijing Co Ltd filed Critical Dawning Information Industry Beijing Co Ltd
Priority to CN2012103093687A priority Critical patent/CN102867030A/en
Publication of CN102867030A publication Critical patent/CN102867030A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention provides a quasi-three-dimensional presentation method for the environment and layout of a machine room. The method comprises the following steps of: reading raw data from a database; converting the raw data into presentation data; converting the presentation data into display data for display; modifying the layout of the machine room; and storing modification information. A user can timely know the environmental information of the machine room, device index information, alarm information and the like to realize intuitiveness and absolute clarity; once a device of the machine room is abnormal, abnormality can be fed back to the user at the first time, and the user can quickly give a response; and if the physical position of the device is changed, or the environment of the whole machine room is changed, the layout can be modified only by simply dragging the device through a mouse. According to the method, the working strength of machine room management and monitoring is weakened, and working efficiency is improved.

Description

The accurate three-dimensional representation method of a kind of building environment and layout
Technical field
The invention belongs to field of computer technology, be specifically related to the accurate three-dimensional representation method of a kind of building environment and layout.
Background technology
Center monitoring mainly is to carry out Centralized Monitoring and management for machine room all equipment and environment, and its monitored object consists of the subsystems of machine room: power system, environmental system, fire-fighting system, security system and network system etc.Machine room monitoring system comprehensive wiring system Network Based adopts control of centralizing and scattering, places monitoring host computer at the machine room monitoring room, operation monitoring software, with unified interface to the subsystems Centralized Monitoring.Running status and the running parameter of each system equipment of machine room monitoring system real time monitoring, find unit failure or abnormal parameters, immediately take the multiple type of alarms such as multimedia animation, voice, phone, short message, log history data and alert event provide intelligent expert diagnostic recommendations and remote monitoring and administration function and WEB to browse etc.
Center monitoring is divided into small communication station, middle-size and small-size machine room, large-scale machine room and networking center monitoring, this platform also widely expandable applications in the unmanned of the ATM of bank, remote real-time monitoring unmanned base station etc.Machine room monitoring system is widely used in every profession and trade field such as communication base station, medium-and-large-sized factory, important government department, the industrial and commercial tax, financial institution, hospital etc.; adopt and disperse deployment, centralized monitoring system to finish round-the-clock, unattended monitoring work; guarantee the stable operation of calculator room equipment; improve security performance and the degree of reliability of computer lab management, realized the scientific management of machine room.
But in the center monitoring management system, using visual formula to show building environment and layout is numerous and diverse process.This also manages machine room just, a difficult problem of monitoring room.If can not truly show machine room actual environment situation, can not accurately and timely navigate to so the information such as calculator room equipment alarm.If can not truly reduce machine room practical layout situation, managed so machine room and become very inconvenient, do not accomplish real Real Time Monitoring.Customize according to concrete machine room, running environment requires harsh, and cost is high.
The shortcoming of prior art is:
1) equipment location positioning in machine room is inaccurate, tends to occur error;
2) device location is revised complicated;
3) can not easily accomplish personalized customization;
4) extendability is relatively poor;
5) simulation building environment and truth gap out is larger.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides the accurate three-dimensional representation method of a kind of building environment and layout, make the user in time understand building environment information, equipment index information and warning information etc., accomplish directly perceived, very clear; In case calculator room equipment occurs unusual, can the very first time feed back to the user, can make a response rapidly.If the physical location of equipment changes, or variation occured in whole building environment, only need to simply draw the modification that operation can be finished layout to equipment by mouse.This method reduces the working strength of management, monitoring room, increases work efficiency.
In order to realize the foregoing invention purpose, the present invention takes following technical scheme:
The accurate three-dimensional representation method of a kind of building environment and layout said method comprising the steps of:
Step 1: from database, read former data;
Step 2: described former data are converted to display data;
Step 3: described display data is converted into the demonstration data shows;
Step 4: revise machine room layout;
Step 5: preserve modification information.
In the described step 1, former data comprise facility information in machine room data, the machine room, device configuration information and equipment index information; Described former data are with List<Map<String, Object〉〉 the set mode stores.
In the described step 2, resolve described former data by the function of page setting, thereby it is used by page-tag, be converted to display data.
In the described step 3, described display data comprises facility information, device configuration information, equipment index information and device coordinate value in the pictorial information, machine room of machine room data, machine room and equipment; Described display data is stored with the json form.
Described step 3 may further comprise the steps:
Step 3-1: reset facility information and device coordinate value in machine room data, the machine room according to screen size, and revise the pictorial information of machine room and equipment;
Step 3-2: the equipment picture is navigated to the relevant position according to the device coordinate value that resets;
Step 3-3: with the equipment index value with page properties value mode assignment in the page.
Described step 4 may further comprise the steps:
Step 4-1: set the position that function is revised equipment in the machine room by calling station;
Step 4-2: revise the machine room background picture; By the external interface that the page provides, upload the machine room background picture that to replace; Upload finish after, page layout background refreshes automatically, is replaced by new background picture;
Step 4-3: add calculator room equipment; Add in the navigation at equipment, the equipment that will add in the machine room is dragged on the target location, and namely finish calculator room equipment and add, and invocation facility interpolation function, will be dragged to the indices value assignment of the equipment in the machine room in the page;
Step 4-4: sweep equipment; Choose the equipment that to delete, finish the deletion of equipment in the machine room by calling the deletion function.
In the described step 5, modification information sent in the database preserve.
Compared with prior art, beneficial effect of the present invention is:
1. the method makes the user in time understand building environment information, equipment index information and warning information etc., accomplishes directly perceived, very clear;
2. in case calculator room equipment occurs unusually, can the very first time feed back to the user, can make a response rapidly;
3. if the physical location of equipment changes, or variation occured in whole building environment, only need to simply draw the modification that operation can be finished layout to equipment by mouse;
4. the change of building environment, the increase of calculator room equipment and minimizing, the change of physical location, these needs shirtsleeve operations just can be finished, and so both can satisfy general user's demand, also can carry out personalized customization for the special user;
5. this method reduces the working strength of management, monitoring room, increases work efficiency.
Description of drawings
Fig. 1 is the accurate three-dimensional representation method flow diagram of building environment and layout.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
Such as Fig. 1, the accurate three-dimensional representation method of a kind of building environment and layout said method comprising the steps of:
Step 1: from database, read former data;
Step 2: described former data are converted to display data;
Step 3: described display data is converted into the demonstration data shows;
Step 4: revise machine room layout;
Step 5: preserve modification information.
In the described step 1, former data comprise facility information in machine room data, the machine room, device configuration information and equipment index information; Described former data are with List<Map<String, Object〉〉 the set mode stores.
In the described step 2, resolve described former data by the function of page setting, thereby it is used by page-tag, be converted to display data.
In the described step 3, described display data comprises facility information, device configuration information, equipment index information and device coordinate value in the pictorial information, machine room of machine room data, machine room and equipment; Described display data is stored with the json form.Equipment uses X, Y coordinate setting mode in the machine room, take pixel as unit.This mode is located convenient and accurate.
Described step 3 may further comprise the steps:
Step 3-1: reset facility information and device coordinate value in machine room data, the machine room according to screen size, and revise the pictorial information of machine room and equipment;
Step 3-2: the equipment picture is navigated to the relevant position according to the device coordinate value that resets;
Step 3-3: with the equipment index value with page properties value mode assignment in the page.
Described step 4 may further comprise the steps:
Step 4-1: set the position that function is revised equipment in the machine room by calling station;
Step 4-2: revise the machine room background picture; By the external interface that the page provides, upload the machine room background picture that to replace; Upload finish after, page layout background refreshes automatically, is replaced by new background picture;
Step 4-3: add calculator room equipment; Add in the navigation at equipment, the equipment that will add in the machine room is dragged on the target location, and namely finish calculator room equipment and add, and invocation facility interpolation function, will be dragged to the indices value assignment of the equipment in the machine room in the page;
Step 4-4: sweep equipment; Choose the equipment that to delete, finish the deletion of equipment in the machine room by calling the deletion function.
In the described step 5, modification information sent in the database preserve.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (7)

1. the accurate three-dimensional representation method of a building environment and layout is characterized in that: said method comprising the steps of:
Step 1: from database, read former data;
Step 2: described former data are converted to display data;
Step 3: described display data is converted into the demonstration data shows;
Step 4: revise machine room layout;
Step 5: preserve modification information.
2. the accurate three-dimensional representation method of building environment according to claim 1 and layout, it is characterized in that: in the described step 1, former data comprise facility information in machine room data, the machine room, device configuration information and equipment index information; Described former data are with List<Map<String, Object〉〉 the set mode stores.
3. the accurate three-dimensional representation method of building environment according to claim 1 and layout is characterized in that: in the described step 2, resolve described former data by the function of page setting, thereby it is used by page-tag, be converted to display data.
4. the accurate three-dimensional representation method of building environment according to claim 1 and layout, it is characterized in that: in the described step 3, described display data comprises facility information, device configuration information, equipment index information and device coordinate value in the pictorial information, machine room of machine room data, machine room and equipment; Described display data is stored with the json form.
5. the accurate three-dimensional representation method of building environment according to claim 4 and layout, it is characterized in that: described step 3 may further comprise the steps:
Step 3-1: reset facility information and device coordinate value in machine room data, the machine room according to screen size, and revise the pictorial information of machine room and equipment;
Step 3-2: the equipment picture is navigated to the relevant position according to the device coordinate value that resets;
Step 3-3: with the equipment index value with page properties value mode assignment in the page.
6. the accurate three-dimensional representation method of building environment according to claim 1 and layout, it is characterized in that: described step 4 may further comprise the steps:
Step 4-1: set the position that function is revised equipment in the machine room by calling station;
Step 4-2: revise the machine room background picture; By the external interface that the page provides, upload the machine room background picture that to replace; Upload finish after, page layout background refreshes automatically, is replaced by new background picture;
Step 4-3: add calculator room equipment; Add in the navigation at equipment, the equipment that will add in the machine room is dragged on the target location, and namely finish calculator room equipment and add, and invocation facility interpolation function, will be dragged to the indices value assignment of the equipment in the machine room in the page;
Step 4-4: sweep equipment; Choose the equipment that needs deletion, finish the deletion of equipment in the machine room by calling the deletion function.
7. the accurate three-dimensional representation method of building environment according to claim 1 and layout is characterized in that: in the described step 5, modification information sent in the database preserve.
CN2012103093687A 2012-08-28 2012-08-28 Quasi-three-dimensional presentation method for environment and layout of machine room Pending CN102867030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103093687A CN102867030A (en) 2012-08-28 2012-08-28 Quasi-three-dimensional presentation method for environment and layout of machine room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103093687A CN102867030A (en) 2012-08-28 2012-08-28 Quasi-three-dimensional presentation method for environment and layout of machine room

Publications (1)

Publication Number Publication Date
CN102867030A true CN102867030A (en) 2013-01-09

Family

ID=47445899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103093687A Pending CN102867030A (en) 2012-08-28 2012-08-28 Quasi-three-dimensional presentation method for environment and layout of machine room

Country Status (1)

Country Link
CN (1) CN102867030A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618694A (en) * 2015-03-02 2015-05-13 国家电网公司 Three-dimensional dynamic monitoring method and system of machine room
CN105117835A (en) * 2015-08-18 2015-12-02 电子科技大学 A power grid information machine room three-dimensional visualized management platform based on a B/S framework
CN106656671A (en) * 2016-12-28 2017-05-10 郑州云海信息技术有限公司 Status information display method and device of virtual computer room
CN106953763A (en) * 2017-03-30 2017-07-14 山东中创软件商用中间件股份有限公司 A kind of edit methods and device of deployment topologies figure
CN107358324A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 A kind of IDC visualizations polling path automatically creates method
CN113225387A (en) * 2021-04-22 2021-08-06 国网山东省电力公司淄博供电公司 Visual monitoring method and system for machine room
CN113297715A (en) * 2021-07-26 2021-08-24 北京优锘科技有限公司 Method, device, equipment and storage medium for realizing pipeline link visualization
CN113360970A (en) * 2021-05-10 2021-09-07 贵州电网有限责任公司 Layout method of screen cabinet of electric power automation machine room

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101329564A (en) * 2008-07-25 2008-12-24 北京劲源信科技有限公司 Computer room management system
CN101446821A (en) * 2008-12-22 2009-06-03 山西省电力公司临汾供电分公司 Machine room security monitoring management system
CN101867494A (en) * 2010-06-18 2010-10-20 北京神州泰岳软件股份有限公司 Soft hardware performance monitoring method based on monitoring template, and system thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101329564A (en) * 2008-07-25 2008-12-24 北京劲源信科技有限公司 Computer room management system
CN101446821A (en) * 2008-12-22 2009-06-03 山西省电力公司临汾供电分公司 Machine room security monitoring management system
CN101867494A (en) * 2010-06-18 2010-10-20 北京神州泰岳软件股份有限公司 Soft hardware performance monitoring method based on monitoring template, and system thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618694A (en) * 2015-03-02 2015-05-13 国家电网公司 Three-dimensional dynamic monitoring method and system of machine room
CN104618694B (en) * 2015-03-02 2018-08-10 国家电网公司 A kind of method and system of computer room Three-Dimensional Dynamic monitoring
CN105117835A (en) * 2015-08-18 2015-12-02 电子科技大学 A power grid information machine room three-dimensional visualized management platform based on a B/S framework
CN105117835B (en) * 2015-08-18 2018-11-06 电子科技大学 A kind of electric network information computer room three-dimensional visualization management platform based on B/S frameworks
CN106656671A (en) * 2016-12-28 2017-05-10 郑州云海信息技术有限公司 Status information display method and device of virtual computer room
CN106953763A (en) * 2017-03-30 2017-07-14 山东中创软件商用中间件股份有限公司 A kind of edit methods and device of deployment topologies figure
CN107358324A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 A kind of IDC visualizations polling path automatically creates method
CN113225387A (en) * 2021-04-22 2021-08-06 国网山东省电力公司淄博供电公司 Visual monitoring method and system for machine room
CN113360970A (en) * 2021-05-10 2021-09-07 贵州电网有限责任公司 Layout method of screen cabinet of electric power automation machine room
CN113297715A (en) * 2021-07-26 2021-08-24 北京优锘科技有限公司 Method, device, equipment and storage medium for realizing pipeline link visualization

Similar Documents

Publication Publication Date Title
CN102867030A (en) Quasi-three-dimensional presentation method for environment and layout of machine room
CN102884532B (en) System and method for job site management and operation with building information modeling
US8321806B2 (en) Visualization of process control data
CN1936751B (en) Use of a really simple syndication communication format in process control
US20190087389A1 (en) Systems and methods for configuring display layout
CN108353034A (en) Framework for data center's infrastructure monitoring
CN108829746B (en) Main data management system and device based on memory database
US10599307B2 (en) Graphical user interface systems and methods for data integration with data-driven engineering drawings
US9984179B2 (en) Providing building information modeling data
CN106202406A (en) A kind of 3D visualization machine room assets information management method and system
US9178939B2 (en) Auto incorporation of new components into a hierarchical network
CN103646348B (en) Method for saving factory station wiring diagram panoramic inversion context
CN104281119A (en) Method and system to support technical tasks in distributed control systems
WO2016081628A1 (en) System and method for aggregating and analyzing data and creating a spatial and/or non-spatial graphical display based on the aggregated data
WO2014005149A2 (en) System and method for energy management information system reliability assurance
CN107273369A (en) A kind of table data modification method and device
CN103473041A (en) Visualized data processing method and system
US20160274646A1 (en) System and Method for a Database Layer for Managing a Set of Energy Consuming Devices
CN106844669A (en) Big data visual analyzing display frame construction method and visual analyzing display frame
CN103620626A (en) Modeled physical environment for information delivery
KR20190007649A (en) Method and Device for registering information and modeling ontology for searching smart factory
CN115546435A (en) Communication resource monitoring and early warning system and method based on three-dimensional model, electronic device and storage medium
EP3443475B1 (en) Database query creation
US9075501B1 (en) Visual planner for strategic planning
CN110222070A (en) Report archiving method, device, medium, electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130109