CN102865016A - Gluing connection method for corner combination of broken bridge aluminum doors and windows - Google Patents
Gluing connection method for corner combination of broken bridge aluminum doors and windows Download PDFInfo
- Publication number
- CN102865016A CN102865016A CN2012103705236A CN201210370523A CN102865016A CN 102865016 A CN102865016 A CN 102865016A CN 2012103705236 A CN2012103705236 A CN 2012103705236A CN 201210370523 A CN201210370523 A CN 201210370523A CN 102865016 A CN102865016 A CN 102865016A
- Authority
- CN
- China
- Prior art keywords
- windows
- doors
- glue
- corner brace
- horizontal frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to the field of aluminum profile doors and windows for buildings, and in particular relates to a gluing connection method for corner combination of broken bridge aluminum doors and windows. The method is characterized by comprising the following specific steps of: 1), sealing the two sides of a connection corner brace, putting the the connection corner brace with the sealed sides into inner cavities of transverse frame profiles and vertical frame profiles, and performing corner extruding operation to connect the two transverse frame profiles and the two vertical frame profiles to form a whole door and window sash; 2), drilling a gluing hole with the diameter of 3mm to 5mm on the transverse frame profile or the vertical frame profile at the outer corner of the connection corner brace, and injecting double-component glue in Germany Weishi into the cavities of the profiles from the gluing hole by a glue gun until glue liquid flows out from the extruding corners; and 3), naturally drying the glue liquid for no less than 24 hours and performing a next procedure. Compared with the prior art, the method has the beneficial effects that the connection intensity of the sash frames of the windows and the doors can be obviously improved, the problems that the doors and the windows are difficult to be closed and cannot be tightly sealed and the like because the doors and the windows sink are solved, the processing and assembly quality of the broken bridge aluminum doors and windows is improved, and the service life of the sash bodies of the doors and the windows is prolonged.
Description
Technical field
The present invention relates to building aluminium extruded sections door and window field, relate in particular to the method that a kind of bridge-cut-off aluminum door and window group subscript glue connects.
Background technology
At present, in bridge-cut-off aluminum door and window on the building processing assembling, door and window body upper transverse frame is connected connection and is all adopted and connect corner brace and squeeze angle technique with munnion.The defective of this connection technique is sinkage can occur after sash uses a period of time, makes sash difficulty, the series of problems such as poorly sealed occur closing.
Summary of the invention
The purpose of this invention is to provide the method that a kind of bridge-cut-off aluminum door and window group subscript glue connects, improve the sash bonding strength, reduce the series of problems that sinks to bringing because of sash.
For solving the problems of the technologies described above, technical scheme of the present invention is:
The method that bridge-cut-off aluminum door and window group subscript glue connects, its concrete operation step is as follows:
1) in the assembling process of door and window framework, to connect first in the inner chamber of pack into after the corner brace both sides are sealed horizontal frame section and mullion profile, require to connect between corner brace periphery and horizontal frame section or the mullion profile and be respectively equipped with the gap that is no less than 0.5mm, then squeeze the angle operation, make two horizontal frame sections and two mullion profiles connect into an integral door sash;
The hole for injecting glue of 2) boring a diameter 3-5mm at the horizontal frame section that connects place, corner brace exterior angle or mullion profile is injected two component cements of German bodyguard in the section bar cavity, until glue outflows from squeezing the angle by hole for injecting glue with the glue rifle;
3) after being no less than 24 hours natural drying, can entering next procedure hardware is installed.
Compared with prior art, the invention has the beneficial effects as follows: the bonding strength that can significantly improve the bar framework, avoid because of bar sink bring such as closing difficulty, the series of problems such as poorly sealed, improve bridge-cut-off aluminum door and window processing assembling quality, prolong the application life of door and window fan body.
Description of drawings
Fig. 1 is embodiment of the invention structural representation;
Fig. 2 is along the A-A sectional view among Fig. 1.
Among the figure: 1-mullion profile 2-connects the two horizontal frame section 5-of the component cement 4-hole for injecting glue 6-of corner brace 3-and squeezes the place, angle
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described further:
Seeing Fig. 1, Fig. 2, is the embodiment of the method structural representation that bridge-cut-off aluminum door and window group subscript glue of the present invention connects, and in order to improve the bonding strength of bar framework, avoids bar to occur sinking after use a period of time, and its concrete operation step is as follows:
1) in the assembling process of door and window framework, to connect first in the inner chamber of pack into after corner brace 2 cavity both sides are sealed with plastic sheet horizontal frame section 4 and mullion profile 1, require to connect between corner brace 2 peripheries and horizontal frame section 4 or mullion profile 1 section bar and be respectively equipped with the gap that is no less than 0.5mm, then squeeze the angle operation, two horizontal frame sections 4 and two mullion profiles 1 are connected into the integral door sash, this is conventional connected mode, along with the prolongation of service time, section bar the junction can occur and get loose under push-and-pull, wind-force, the effect of expanding with heat and contract with cold;
2) hole for injecting glue 5 that the horizontal frame section 4 of locating at connection corner brace 2 exterior angles or mullion profile 1 bore a diameter 3-5mm, injected two component cements 3 of German bodyguard in the section bar cavity by hole for injecting glue 5 with the glue rifle, until glue is filled two component cements 3 this moment from squeezing angle 6 outflows in the gap;
3) through after being no less than 24 hours natural drying, can entering next procedure hardware is installed.The dried bar of colloid, horizontal frame section 4 are connected with mullion profile and can be linked together securely with being connected corner brace 2, even use through long-time, also sinkage can not occur.
Claims (1)
1. the method for bridge-cut-off aluminum door and window group subscript glue connection is characterized in that, its concrete operation step is as follows:
1) in the assembling process of door and window framework, to connect first in the inner chamber of pack into after the corner brace both sides are sealed horizontal frame section and mullion profile, require to connect between corner brace periphery and horizontal frame section or the mullion profile and be respectively equipped with the gap that is no less than 0.5mm, then squeeze the angle operation, make two horizontal frame sections and two mullion profiles connect into an integral door sash;
The hole for injecting glue of 2) boring a diameter 3-5mm at the horizontal frame section that connects place, corner brace exterior angle or mullion profile is injected two component cements of German bodyguard in the section bar cavity, until glue outflows from squeezing the angle by hole for injecting glue with the glue rifle;
3) after being no less than 24 hours natural drying, can entering next procedure hardware is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103705236A CN102865016A (en) | 2012-09-28 | 2012-09-28 | Gluing connection method for corner combination of broken bridge aluminum doors and windows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103705236A CN102865016A (en) | 2012-09-28 | 2012-09-28 | Gluing connection method for corner combination of broken bridge aluminum doors and windows |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102865016A true CN102865016A (en) | 2013-01-09 |
Family
ID=47444119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012103705236A Pending CN102865016A (en) | 2012-09-28 | 2012-09-28 | Gluing connection method for corner combination of broken bridge aluminum doors and windows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102865016A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105149163A (en) * | 2015-08-17 | 2015-12-16 | 山东安德广厦新能源科技有限公司 | Door-window group-corner connection profile and glue injection method thereof |
CN109779465A (en) * | 2019-03-18 | 2019-05-21 | 四川爱斯兰特门窗科技有限公司 | A kind of door and window sash corner seamless connecting structure and method |
CN112354787A (en) * | 2020-10-15 | 2021-02-12 | 史新颜 | Glue injection sealing die for aluminum alloy door and window frame |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0616107A1 (en) * | 1993-03-17 | 1994-09-21 | SCHÜCO International KG | Connection for crossing member |
EP0716210A2 (en) * | 1994-10-13 | 1996-06-12 | Max Becker | Corner connector for plastic profiles |
CN201137425Y (en) * | 2007-12-19 | 2008-10-22 | 董呈明 | Water seepage prevention combined corner structure |
CN201176806Y (en) * | 2007-11-02 | 2009-01-07 | 才鸿均 | Architecture door and window corner connection structure |
CN101446164A (en) * | 2008-12-26 | 2009-06-03 | 北京嘉寓门窗幕墙股份有限公司 | Method for connecting corners of aluminium alloy doors and windows, and corner brace and riveting cutter |
-
2012
- 2012-09-28 CN CN2012103705236A patent/CN102865016A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0616107A1 (en) * | 1993-03-17 | 1994-09-21 | SCHÜCO International KG | Connection for crossing member |
EP0716210A2 (en) * | 1994-10-13 | 1996-06-12 | Max Becker | Corner connector for plastic profiles |
CN201176806Y (en) * | 2007-11-02 | 2009-01-07 | 才鸿均 | Architecture door and window corner connection structure |
CN201137425Y (en) * | 2007-12-19 | 2008-10-22 | 董呈明 | Water seepage prevention combined corner structure |
CN101446164A (en) * | 2008-12-26 | 2009-06-03 | 北京嘉寓门窗幕墙股份有限公司 | Method for connecting corners of aluminium alloy doors and windows, and corner brace and riveting cutter |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105149163A (en) * | 2015-08-17 | 2015-12-16 | 山东安德广厦新能源科技有限公司 | Door-window group-corner connection profile and glue injection method thereof |
CN109779465A (en) * | 2019-03-18 | 2019-05-21 | 四川爱斯兰特门窗科技有限公司 | A kind of door and window sash corner seamless connecting structure and method |
CN112354787A (en) * | 2020-10-15 | 2021-02-12 | 史新颜 | Glue injection sealing die for aluminum alloy door and window frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102865016A (en) | Gluing connection method for corner combination of broken bridge aluminum doors and windows | |
CN105804589A (en) | High energy-saving aluminum alloy door and window | |
CN103867087B (en) | A kind of movable glue injection type combined corner sheet devices | |
CN203476103U (en) | Wood-aluminum composite outward-opening window with waterproof, thermal-insulation and sound-insulation performance | |
CN104453561A (en) | Installation structure of door window auxiliary frame and door window | |
CN202788513U (en) | Bridge-cutoff aluminum door and window set corner glue injection and connection structure | |
CN109209146B (en) | Four-seal multi-break bridge heat insulation aluminum-plastic co-extrusion profile for passive house | |
CN205153906U (en) | Group's frame structure of wood door and window fan | |
CN104499882A (en) | Sealing and heat insulating aluminum alloy outward-opening window | |
CN202706809U (en) | Flat-open heat-preserving window with same profile structure | |
CN204984081U (en) | Whole prefabricated window of cladding panel | |
CN210003116U (en) | assembling type window structure | |
CN203050407U (en) | Composite wood-aluminum out-opening window structure | |
CN203603687U (en) | Aluminum-lining integrated PVC plastic window sectional material | |
CN203383668U (en) | Aluminium alloy profile for aluminum plastic door and window frames | |
CN206942540U (en) | A kind of vertical bilateral seal structures in window group angle | |
CN105781334A (en) | Energy-saving door/window with heat-insulating teeth | |
CN109138733B (en) | Detachable aluminum-plastic co-extrusion auxiliary frame profile for passive room | |
CN201486376U (en) | Wood-aluminum compound outward-opening window structure | |
CN203145759U (en) | Muntin connecting device for plastic-steel doors and windows | |
CN204200012U (en) | A kind of pack alloy corner brace | |
CN203201433U (en) | Glue-injection mullion plug for doors and windows | |
CN109838173A (en) | A kind of assembled window arrangement and construction method | |
CN203879288U (en) | Aluminum alloy broken bridge inswinging casement window mullion profile | |
CN203050384U (en) | Aluminum-clad-wood in-opening window structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130109 |