CN102864941A - Openable jig frame for assembling triangular truss and construction method - Google Patents

Openable jig frame for assembling triangular truss and construction method Download PDF

Info

Publication number
CN102864941A
CN102864941A CN2012103751535A CN201210375153A CN102864941A CN 102864941 A CN102864941 A CN 102864941A CN 2012103751535 A CN2012103751535 A CN 2012103751535A CN 201210375153 A CN201210375153 A CN 201210375153A CN 102864941 A CN102864941 A CN 102864941A
Authority
CN
China
Prior art keywords
side opening
opening frame
openable
moulding bed
assembly unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103751535A
Other languages
Chinese (zh)
Inventor
洪国松
孙加德
项杰
陈水祥
黄利顺
孙锋
董永强
杜杰
邱小军
童小青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Co., Ltd.
Original Assignee
Zhejiang Jinggong Steel Structure Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Co., Ltd. filed Critical Zhejiang Jinggong Steel Structure Co., Ltd.
Priority to CN2012103751535A priority Critical patent/CN102864941A/en
Publication of CN102864941A publication Critical patent/CN102864941A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an openable jig frame for assembling a triangular truss and a construction method. The openable jig frame comprises a jig frame base and opening frames, each pair of opening frames comprises a left-side opening frame and a right-side opening frame, and bottoms of the left-side opening frames and bottoms of the right-side opening frames are respectively pivotally connected with the left side and the right side of the jig frame base so as to rotate. During construction, components of the integral jig frame base are combined at first, then the left-side opening frames and the right-side openings are opened, the jig frame is opened, upper chords are placed on movable longitudinal beams to be abutted in place, web members among the upper chords are assembled, a lower chord is hoisted into the openable jig frame, then the left-side opening frames and the right-side opening frames are closed, the lower chord is lifted up by chain blocks, oblique web members among the upper chords and the lower chord are assembled, the left-side opening frames and the right-side opening frames are opened after welding is completed, and the welded triangular truss is removed from a mold. The openable jig frame overcomes shortcomings of complexity of an assembly process, high quantity of assembly overhead work, low safety, inconvenience in mold removal and the like in the prior art, construction cost is lowered, continuity of welding and mold removal is guaranteed, and work efficiency is improved.

Description

The openable moulding bed and the job practices that are used for the triangular truss assembly unit
Technical field
The present invention relates to the construction steel structure technical field of construction, relevant with the openable moulding bed and the job practices that are used for the triangular truss assembly unit especially.
Background technology
In recent years, along with development and the maturation of steel work technology, particularly the application of large-span truss structure is more and more extensive.Simultaneously because triangular structure stability is high, handsome in appearance, thus in many large-span truss structures, being most widely used of triangular truss, and the triangular truss structure often needs to carry out to carry out behind the segmented assembly on ground the lifting in high-altitude.This has just brought a large amount of installation on ground work, development along with enterprise, the progress of technology, enterprise in charge of construction also improves constantly the requirement of construction economy, construction high efficiency, this just requires enterprise to improve for construction technology, and the assembly unit moulding bed of the triangular truss of Pre-tensioned Steel Structures has been undergone technological transformation into a kind of inevitable and trend.
The conventional erection method of triangular truss mainly adopts just piecing together with sleeping pieces together two kinds, mainly be to make up adjusting according to specific assembly unit size with traditional assembly unit moulding bed, not only operating process is complicated, and need to carry out adjustment and the modification of moulding bed for the splicing structure of each different size, work progress is very inconvenient, particularly large for the assembly unit cross section, the truss that assembly unit is highly high, the assembly unit process has produced a large amount of work high above the ground, potential safety hazard is large, and operation easier is high, uses simultaneously traditional erection method also lower on the efficient of tread flaking, often need to cut off original fixed structure and just can carry out tread flaking, can't reach the purpose that i.e. assembly is namely taken off.
In order to realize the unification of construction economy, high efficiency, safety, need to propose and design a kind of rational constructure scheme.The present invention proposes a kind of openable moulding bed and job practices for triangular truss for this reason.Not only the operation of diabolo truss construction is convenient, construction cost is low for this job practices, and high efficiency in reducing construction cost, helps to shorten the construction period simultaneously, and this case produces thus.
Summary of the invention
The purpose of this invention is to provide a kind of openable moulding bed and job practices for the triangular truss assembly unit, it is complicated to overcome traditional triangle shape truss assembly unit process, the assembly unit amount of high-altitude operation is large, the characteristics such as the low and tread flaking process inconvenience of safety, reducing construction cost, guarantee to weld, the continuity of tread flaking, increase work efficiency.
In order to achieve the above object, the present invention is achieved through the following technical solutions:
A kind of openable moulding bed for the triangular truss assembly unit comprises moulding bed pedestal and at least two pairs of opening frames; Every pair of opening frame comprises left side opening frame and right side opening frame, the bottom of left side opening frame and right side opening frame articulates to form with the moulding bed pedestal left and right sides respectively and rotates, the middle part of left side opening frame and right side opening frame all bends inwards, be fixed with respectively on both tops that a left side closes up end plate and the right side closes up end plate, a left side closes up end plate and the right side closes up the end plate applying, be connected and fixed by fixture, left side opening frame and right side opening frame are combined into triangular structure.
Described moulding bed pedestal comprises the underframe frame that cross member and bottom girder are spliced to form, and fixes some middle vertical rods at cross member, and middle rod end connects the upper beam parallel with cross member; Between upper beam and cross member arrangement for adjusting height is installed, the removable longeron two ends parallel with bottom girder are installed on the arrangement for adjusting height.
Described arrangement for adjusting height comprises two fixing chuck plates, bearing pin; Offer the pin shaft hole of vertical arrangement at fixing chuck plate, the bearing pin latch is on pin shaft hole.
It is symmetrical that shelf structure is opened on described left side opening frame and right side, and the left side opening frame comprises the side rod that lays respectively at both sides and is fixed on some cross bars that are parallel to each other between the side rod.
Between described left side opening frame and the upper beam, and all adopt U-shaped connector to be connected between right side opening frame and the upper beam; The openend of U-shaped connector is connected in the rotating shaft on fixing and the upper beam, is inserted in left side opening in the cavity of U-shaped connector and opens crossbeam on frame or the right side opening frame.
After a described left side closed up end plate and is connected end plate with the right side and connects, the bottom was equipped with jack.
Between described left side opening frame and the upper beam, and be provided with stopping means between right side opening frame and the upper beam; Stopping means comprises the limiting plate that is installed in the strap bolt hole on left side opening frame or the right side opening frame, the location-plate that is installed in upper beam, is bolted between limiting plate and the location-plate.
A kind of job practices of utilizing the openable moulding bed to carry out the triangular truss assembly unit comprises the following steps:
The first step, moulding bed pedestal, left side opening frame and the right side opening frame of installation openable moulding bed are installed simultaneously U-shaped connector and are connected and stopping means, and left side opening frame and right side opening frame are open state;
Second step utilizes arrangement for adjusting height to be adjusted to predetermined assembly unit height removable longeron, upper chord is placed on the removable longeron docking finishes in place;
The 3rd step, on the openable moulding bed that the web member assembly unit between the upper chord is good;
The 4th step lifted lower chord to the openable moulding bed, then closed up left and right sides opening frame, a left side is closed up end plate and the right side close up end plate and be connected and fixed;
The 5th step, close up end plate and the right side on a left side and close up under the end plate and hang jack, lower chord is mentioned with jack, adjusts the position of lower chord, make its with assembly unit sampling point overlap;
The 6th step, the diagonal web member between the assembly unit top-bottom chord;
The 7th step, after welding is finished, unclamp that a left side closes up end plate and the right side closes up end plate, and stopping means, remove the top jack, open left side opening frame and right side opening frame, with the triangular truss tread flaking that welds, prepare next Pin of assembly unit.
In described the 5th step, in order to prevent that the lower chord position changes in subsequent installation, increase the jack that is hung on left side opening frame, the right side opening frame in the lower chord both sides.
After adopting such scheme, the present invention has many beneficial effects:
It is complicated that the present invention has remedied traditional moulding bed assembly unit process, and the assembly unit amount of high-altitude operation is large, and the shortcomings such as the low and tread flaking process inconvenience of safety are designed the retractable structure of opening frame, and after the triangular truss assembly unit was finished, tread flaking was freely convenient.
Jack and assembly pulley carry out the location of high-altitude chord member, guarantee the continuity of whole triangular truss assembly unit, welding, tread flaking, realize the efficient and convenient of construction, the safety that has improved the assembly unit process.
Description of drawings
Fig. 1 is the schematic diagram of moulding bed pedestal in the preferred embodiment of the present invention;
Fig. 2 is the schematic diagram of opening frame opening in the preferred embodiment of the present invention;
Fig. 3 is the schematic diagram of opening frame closure state in the preferred embodiment of the present invention;
Fig. 4 is the schematic diagram of installing chord member in the preferred embodiment of the present invention;
Fig. 5 is the schematic diagram that web member is installed in the preferred embodiment of the present invention;
Fig. 6 is the schematic diagram that lower chord is installed in the preferred embodiment of the present invention;
Fig. 7 installs lower chord to hang and rise view in the preferred embodiment of the present invention;
Fig. 8 is the schematic diagram that diagonal web member is installed in the preferred embodiment of the present invention;
Fig. 9 is the schematic diagram of tread flaking in the preferred embodiment of the present invention;
Figure 10 is the schematic diagram of preferred embodiment intermediate cam shape truss of the present invention;
Figure 11 is arrangement for adjusting height lateral view in the preferred embodiment of the present invention;
Figure 12 is jack installation side view in the preferred embodiment of the present invention;
Figure 13 is opening frame open mode schematic diagram in the preferred embodiment of the present invention;
Figure 14 is stopping means schematic diagram in the preferred embodiment of the present invention.
The specific embodiment
By reference to the accompanying drawings, preferred embodiment of the present invention is described in further details.
Openable moulding bed among the present invention referring to Fig. 1 to Fig. 3, comprises moulding bed pedestal 1 and at least two pairs of opening frames 2, is provided with 4 pairs in the present embodiment, and every pair of opening frame comprises left side opening frame 21 and the right side opening frame 22 of symmetrical configuration.
Moulding bed pedestal 1 is the base component of whole moulding bed, mainly includes cross member 11, bottom girder 12, middle vertical rod 13, upper beam 14, arrangement for adjusting height 3, removable longeron 15.Cross member 11, bottom girder 12 are spliced to form the underframe frame of rectangle, can a plurality of support stringers 15 be set at the underframe frame according to actual needs and reinforce.On cross member 11, vertically set up some middle vertical rods 13 that are parallel to each other, connect upper beam 14, keeping parallelism between upper beam 14 and the cross member 11 at the top of middle vertical rod 13.
Arrangement for adjusting height 3 comprises two fixing chuck plates 31, bearing pin 32 in conjunction with Figure 11.Two fixing chuck plates 31 adopt angle steel, and parallel with middle vertical rod 13, solid welding is between upper beam 14 and cross member 11.Offer respectively some pin shaft holes 33 of vertical arrangement on the fixing chuck plate 31, bearing pin 32 two ends are inserted in the pin shaft hole 33, and setting is the level of state.Removable longeron 15 is parallel with bottom girder 12, and two ends are shelved on respectively to form on the bearing pin 32 and install.
Left side opening frame 21 is installed in respectively on the different cross member 11 with right side opening frame 22, because both symmetrical configuration are launched to describe with regard to one of them left side opening frame 21 here.
Left side opening frame 21 comprises that mainly the side rod 211 that lays respectively at both sides, cross bar 212 and a left side that is connected between the side rod 211 close up end plate 213.The bottom of side rod 211 is installed on cross member 11 by hinge, so that left side opening frame 21 can rotate around tie point.The bottom of side rod 211 and the part shape that exceeds upper beam 14 are in an angle, specifically exceed the part of upper beam 14 to moulding bed pedestal 1 interior lateral buckling, when left side opening frame 21 and right side opening frame 22 close up, form the structure of an isosceles triangle like this.Spacing between two side rods 211 diminishes from below to up gradually simultaneously, is similar to ladder.Connect a left side at the top of side rod 211 and close up end plate 213, close up end plate 223 and on right side opening frame 22, equally also be provided with the right side, after a left side closes up end plate 213 and the right side and closes up end plate 223 and fit, be connected and fixed by securing members such as bolts.
After a left side closes up end plate 213 and the right side and closes up end plate 223 and be connected and fixed, the jack 6 that is carried as 5T is installed in its bottom.
When opening, have one fixed width in order to ensure left side opening frame 21 and limit, adopt U-shaped connector 4 that left side opening frame 21 is connected with upper beam in the present embodiment and connect.The U-shaped chamber cover of U-shaped connector 4 is therein on cross bar 212, and then the peristome of U-shaped connector 4 is connected the formation rotation with a rotating shaft on the upper beam 14.When left side opening frame 21 is opened, by U-shaped connector 4 it is caught on spacingly, it is excessive to be unlikely to open degree.The opening frame 22 same modes of same principle that adopt in right side connect by U-shaped connector 4.The state of opening can be in conjunction with shown in Figure 13.
In addition, the firmness during in order to ensure left side opening frame 21 closure is equipped with stopping means 5 between left side opening frame 21 and upper beam 14.Stopping means 5 mainly comprises limiting plate 51, location-plate 52, and the bolt 53 that connects both.Limiting plate 51 is fixed on the side rod 211, and location-plate 52 is fixed on the upper beam 14 simultaneously.Limiting plate 51 and location-plate 52 all offer bolt hole, and bolt 53 passes two bolts hole limiting plate 51, location-plate 52 are realized connecting.The opening frame 22 same modes of same principle that adopt in right side connect spacing by stopping means 5.
The job practices that adopts above-mentioned openable moulding bed to carry out the triangular truss assembly unit in conjunction with Fig. 4 to Figure 10, comprises the following steps:
The first step at first can be installed moulding bed pedestal 1, left side opening frame 21 and the right side opening frame 22 of openable moulding bed according to the structure of Fig. 1 to Fig. 3, and U-shaped connector 4 and stopping means 5 are installed simultaneously, and left side opening frame and right side opening frame are open state.
Second step utilizes arrangement for adjusting height 3 to be adjusted to predetermined assembly unit height removable longeron 15, with upper chord 81 be placed on the removable longeron 15 docking finish in place, such as Fig. 4.Can limited block and cushion block be set at removable longeron 15, regulate the position of upper chord 81.
The 3rd step is good with web member 82 assembly units between the upper chord 81 on the openable moulding bed, such as Fig. 5.
The 4th step lifted lower chord 83 to the openable moulding bed, then closed up left and right sides opening frame 21,22, a left side is closed up end plate 213 and the right side close up end plate 223 and be connected and fixed.The mode of closing up can adopt wire rope in both sides left and right sides opening frame 21,22 to be drawn close to the centre, closing up end plate 213 and the right side until top left closes up and naturally closes up after end plate 223 enters the angle steel chute aloft, a left side being closed up end plate 213 and the right side closes up end plate 223 and uses bolt tightening again, prevent its slip, referring to Fig. 6, then lock stopping means 5.
The 5th step, close up end plate 213 on a left side and rightly close up end plate and hang the jack 6 that is carried as 5T for 223 times, lower chord 83 usefulness jacks 6 are mentioned, and adjust the position of lower chord 83, make its with assembly unit sampling point overlap, as shown in Figure 7.In order to prevent that lower chord 83 positions change in subsequent installation, increase the jack 6 that is hung on left side opening frame 21, the right side opening frame 22, is carried as 2T in lower chord 83 both sides, in conjunction with Figure 12.Such three tie points have been guaranteed the registration of lower chord 83.
In the 6th step, the diagonal web member 84 between assembly unit upper chord 81 and the lower chord 83 is in conjunction with Fig. 8.Can hang temporary operating platform with regard near position on both sides opening frame 2 during the chord member node installation, the assembly unit personnel are in place with lower edge web member node on operating platform, because the lower-chord panel point position is less, need the time of work high above the ground relative with the position less.
In the 7th step, after welding is finished, unclamp a left side and close up end plate 213 and the right bolt that closes up on end plate 223 and the stopping means 5, remove jack 6, open left side opening frame 21 and right side opening frame 22, as shown in Figure 9, with 7 tread flakings of triangular truss as shown in figure 10 that weld, prepare next Pin of assembly unit.
Above-described embodiment only is used for explaining inventive concept of the present invention, but not to the restriction of rights protection of the present invention, allly utilizes this design that the present invention is carried out the change of unsubstantiality, all should fall into protection scope of the present invention.

Claims (9)

1. an openable moulding bed that is used for the triangular truss assembly unit is characterized in that: comprise moulding bed pedestal and two pairs of opening frames at least; Every pair of opening frame comprises left side opening frame and right side opening frame, the bottom of left side opening frame and right side opening frame articulates to form with the moulding bed pedestal left and right sides respectively and rotates, the middle part of left side opening frame and right side opening frame all bends inwards, be fixed with respectively on both tops that a left side closes up end plate and the right side closes up end plate, a left side closes up end plate and the right side closes up the end plate applying, be connected and fixed by fixture, left side opening frame and right side opening frame are combined into triangular structure.
2. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1, it is characterized in that: described moulding bed pedestal comprises the underframe frame that cross member and bottom girder are spliced to form, fix some middle vertical rods at cross member, middle rod end connects the upper beam parallel with cross member; Between upper beam and cross member arrangement for adjusting height is installed, the removable longeron two ends parallel with bottom girder are installed on the arrangement for adjusting height.
3. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1, it is characterized in that: described arrangement for adjusting height comprises two fixing chuck plates, bearing pin; Offer the pin shaft hole of vertical arrangement at fixing chuck plate, the bearing pin latch is on pin shaft hole.
4. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1, it is characterized in that: it is symmetrical that shelf structure is opened on described left side opening frame and right side, and the left side opening frame comprises the side rod that lays respectively at both sides and is fixed on some cross bars that are parallel to each other between the side rod.
5. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1 is characterized in that: between described left side opening frame and the upper beam, and all adopt U-shaped connector to be connected between right side opening frame and the upper beam; The openend of U-shaped connector is connected in the rotating shaft on fixing and the upper beam, is inserted in left side opening in the cavity of U-shaped connector and opens crossbeam on frame or the right side opening frame.
6. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1 is characterized in that: after a described left side closed up end plate and is connected end plate with the right side and connects, the bottom was equipped with jack.
7. a kind of openable moulding bed for the triangular truss assembly unit as claimed in claim 1 is characterized in that: between described left side opening frame and the upper beam, and be provided with stopping means between right side opening frame and the upper beam; Stopping means comprises the limiting plate that is installed in the strap bolt hole on left side opening frame or the right side opening frame, the location-plate that is installed in upper beam, is bolted between limiting plate and the location-plate.
8. a job practices of utilizing the openable moulding bed to carry out the triangular truss assembly unit is characterized in that: comprise the following steps:
The first step, moulding bed pedestal, left side opening frame and the right side opening frame of installation openable moulding bed are installed simultaneously U-shaped connector and are connected and stopping means, and left side opening frame and right side opening frame are open state;
Second step utilizes arrangement for adjusting height to be adjusted to predetermined assembly unit height removable longeron, upper chord is placed on the removable longeron docking finishes in place;
The 3rd step, on the openable moulding bed that the web member assembly unit between the upper chord is good;
The 4th step lifted lower chord to the openable moulding bed, then closed up left and right sides opening frame, a left side is closed up end plate and the right side close up end plate and be connected and fixed;
The 5th step, close up end plate and the right side on a left side and close up under the end plate and hang jack, lower chord is mentioned with jack, adjusts the position of lower chord, make its with assembly unit sampling point overlap;
The 6th step, the diagonal web member between the assembly unit top-bottom chord;
The 7th step, after welding is finished, unclamp that a left side closes up end plate and the right side closes up end plate, and stopping means, remove the top jack, open left side opening frame and right side opening frame, with the triangular truss tread flaking that welds, prepare next Pin of assembly unit.
9. a kind of job practices of utilizing the openable moulding bed to carry out the triangular truss assembly unit as claimed in claim 8, it is characterized in that: in described the 5th step, in order to prevent that the lower chord position changes in subsequent installation, increase the jack that is hung on left side opening frame, the right side opening frame in the lower chord both sides.
CN2012103751535A 2012-09-29 2012-09-29 Openable jig frame for assembling triangular truss and construction method Pending CN102864941A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103751535A CN102864941A (en) 2012-09-29 2012-09-29 Openable jig frame for assembling triangular truss and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103751535A CN102864941A (en) 2012-09-29 2012-09-29 Openable jig frame for assembling triangular truss and construction method

Publications (1)

Publication Number Publication Date
CN102864941A true CN102864941A (en) 2013-01-09

Family

ID=47444048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103751535A Pending CN102864941A (en) 2012-09-29 2012-09-29 Openable jig frame for assembling triangular truss and construction method

Country Status (1)

Country Link
CN (1) CN102864941A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266778A (en) * 2013-05-08 2013-08-28 北京城建精工钢结构工程有限公司 Detachable triangular scaffold and steel truss assembly construction method
CN106284092A (en) * 2016-08-31 2017-01-04 中铁四局集团第二工程有限公司 Steel anchor beam suspender and using method thereof
CN106609561A (en) * 2015-10-22 2017-05-03 江苏沪宁钢机股份有限公司 A spherical net shell block stacked assembly method
CN106703187A (en) * 2017-01-23 2017-05-24 合肥饰界金属制品有限公司 Truss
CN106996143A (en) * 2017-05-17 2017-08-01 中建局钢结构工程有限公司 A kind of Steel Truss Beam stands up the construction method of sliding in place
CN108890561A (en) * 2018-06-28 2018-11-27 中船澄西船舶修造有限公司 A kind of moulding bed and shelf production method for the production of large-scale shelf
CN110521649A (en) * 2019-08-12 2019-12-03 上海振华重工启东海洋工程股份有限公司 Far-reaching sea cage culture equipment infrastructure truss construction technique

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008073849A2 (en) * 2006-12-08 2008-06-19 Flexible Lifeline Systems, Inc. Enclosed track system for a fall protection system
JP2010275739A (en) * 2009-05-27 2010-12-09 Shigeru Yaguchi Reinforced structure and reinforced construction method
CN201771197U (en) * 2010-07-08 2011-03-23 中建钢构有限公司 Assembly jig frame with function of elevation adjustment
CN102155096A (en) * 2011-03-02 2011-08-17 攀钢集团冶金工程技术有限公司 Enormous-span steel tube house truss assembling construction method
CN202788008U (en) * 2012-09-29 2013-03-13 浙江精工钢结构有限公司 Openable jig for assembly of triangular truss

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008073849A2 (en) * 2006-12-08 2008-06-19 Flexible Lifeline Systems, Inc. Enclosed track system for a fall protection system
JP2010275739A (en) * 2009-05-27 2010-12-09 Shigeru Yaguchi Reinforced structure and reinforced construction method
CN201771197U (en) * 2010-07-08 2011-03-23 中建钢构有限公司 Assembly jig frame with function of elevation adjustment
CN102155096A (en) * 2011-03-02 2011-08-17 攀钢集团冶金工程技术有限公司 Enormous-span steel tube house truss assembling construction method
CN202788008U (en) * 2012-09-29 2013-03-13 浙江精工钢结构有限公司 Openable jig for assembly of triangular truss

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜杰等: "可开启式三角桁架正立拼装技术", 《施工技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266778A (en) * 2013-05-08 2013-08-28 北京城建精工钢结构工程有限公司 Detachable triangular scaffold and steel truss assembly construction method
CN103266778B (en) * 2013-05-08 2015-06-10 北京城建精工钢结构工程有限公司 Detachable triangular scaffold and steel truss assembly construction method
CN106609561A (en) * 2015-10-22 2017-05-03 江苏沪宁钢机股份有限公司 A spherical net shell block stacked assembly method
CN106284092A (en) * 2016-08-31 2017-01-04 中铁四局集团第二工程有限公司 Steel anchor beam suspender and using method thereof
CN106284092B (en) * 2016-08-31 2018-05-15 中铁四局集团第二工程有限公司 Steel anchor beam suspender and its application method
CN106703187A (en) * 2017-01-23 2017-05-24 合肥饰界金属制品有限公司 Truss
CN106996143A (en) * 2017-05-17 2017-08-01 中建局钢结构工程有限公司 A kind of Steel Truss Beam stands up the construction method of sliding in place
CN106996143B (en) * 2017-05-17 2019-03-22 中建一局钢结构工程有限公司 A kind of Steel Truss Beam turns over the construction method of sliding in place
CN108890561A (en) * 2018-06-28 2018-11-27 中船澄西船舶修造有限公司 A kind of moulding bed and shelf production method for the production of large-scale shelf
CN108890561B (en) * 2018-06-28 2023-12-26 中船澄西船舶修造有限公司 Jig frame for manufacturing large-scale shelf and shelf manufacturing method
CN110521649A (en) * 2019-08-12 2019-12-03 上海振华重工启东海洋工程股份有限公司 Far-reaching sea cage culture equipment infrastructure truss construction technique
CN110521649B (en) * 2019-08-12 2021-08-17 上海振华重工启东海洋工程股份有限公司 Construction process of deep open sea cage culture equipment infrastructure truss

Similar Documents

Publication Publication Date Title
CN102864941A (en) Openable jig frame for assembling triangular truss and construction method
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
CN102659029B (en) Combined type movable hanger
KR101118526B1 (en) Construction method of steel tower of bridge and dismantling method of lifting frame
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN202788008U (en) Openable jig for assembly of triangular truss
CN108374348A (en) Adapt to the Bridge Erector steering method that wide formula beam car passes through
CN107574924A (en) The component and construction method of a kind of assembly concrete framework for the connection of steel joint
CN111976918B (en) Assembled scaffold for shipbuilding
CN205775888U (en) A kind of supporting structure of auxiliary boom beam construction
CN205636474U (en) Assembled bracket structure
CN107190860B (en) Automatic jacking system for steel structure installation
CN115787487B (en) Construction method of continuous beam variable cross-section bridge fabrication machine
CN209778099U (en) Lifting and mounting integrated device for steel truss between sections of arc-shaped roof
CN208044135U (en) A kind of distribution cross-connecting box mounting bracket
CN213262861U (en) Assembled scaffold for shipbuilding
CN111188273A (en) Large-section steel truss girder erection system of large-span steel-concrete composite bridge and construction method
JP3988937B2 (en) Steel tower raising method
CN205998861U (en) A kind of locking stone tongs for lifting cross-saddle single-track traffic PC track girder
CN210286440U (en) A transport hoist for hoisting bridge girder erection machine
CN209430211U (en) One kind hanging mould support device for shield end well to be closed
CN209538040U (en) Support system
CN209429498U (en) A kind of portable Steel Structure Installation welding operating platform
CN204081548U (en) Cantilever frame temporary support and main couple joint portion device
CN209760040U (en) Make things convenient for removal of high strength bolt construction to hang basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 312030 Zhejiang city of Shaoxing province Shaoxing County Keqiao Jianhu Road No. 1587

Applicant after: ZHEJIANG JINGGONG STEEL STRUCTURE GROUP CO., LTD.

Address before: 312030 Zhejiang city of Shaoxing province Shaoxing County Keqiao Jianhu Road No. 1587

Applicant before: Zhejiang Jinggong Steel Structure Co., ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG JINGGONG STEEL STRUCTURE CO., LTD. TO: ZHEJIANG JINGGONG STEEL STRUCTURE GROUP CO., LTD.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130109