CN102864867A - 一种双曲面拱形吊顶方法 - Google Patents
一种双曲面拱形吊顶方法 Download PDFInfo
- Publication number
- CN102864867A CN102864867A CN2011102439556A CN201110243955A CN102864867A CN 102864867 A CN102864867 A CN 102864867A CN 2011102439556 A CN2011102439556 A CN 2011102439556A CN 201110243955 A CN201110243955 A CN 201110243955A CN 102864867 A CN102864867 A CN 102864867A
- Authority
- CN
- China
- Prior art keywords
- guarantee
- installation
- hyperboloid
- arch
- vault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明提供了一种双曲面拱形吊顶方法,所述方法步骤为:A)钢架拼接稳定性控制;B)确保拱形曲面弧度顺畅;C)保证标高垂直度准确。使用本发明所述方法,工期缩短,成本降低,效率高,合格率提高。
Description
技术领域
本发明涉及一种双曲面拱形吊顶方法。
背景技术
双曲面拱形吊顶工艺复杂,题量大,拱顶层高;表面木纹漆及金箔饰面,对基层要求比较高;工期一般需要较长,施工难度大,空间结构复杂,拱形结构安装测量和定位困难,需尽快策划、找到一种好的施工方法。
发明内容
为了克服现有技术中存在的技术问题,本发明提供了一种。
为了实现上述目的,本发明提供以下技术方案:
一种双曲面拱形吊顶方法,所述方法步骤为:
A)钢架拼接稳定性控制;
B)确保拱形曲面弧度顺畅;
C)保证标高垂直度准确。
作为本发明的第一种优选技术方案,所述步骤A具体为:首先详细制定施工方案,确保操作方法正确:深化现场实际尺寸及设计方案,分析钢架所能承受的最大荷载及安装,同时考虑到钢骨架与基层梁安装稳定性的主要隐患,综合上面几点因素,最终决定将拱顶按人字梁分对进行拼接,在现场基座节点施工,见下面节点安装的施工图片;第二做好施工前的技术交底工作:①对钢结构加固处理,使用化学螺栓与膨胀螺丝混合使用保证钢骨架牢固;②对板面与钢龙骨接触面的固定采用传统的手枪钻固定法;③检查个接点的螺栓,确保牢固,保证施工质量。
作为本发明的第二种优选技术方案,所述步骤B具体为:小样流程控制,利用电脑CAD标注出圆弧的交接处与主控轴线之间的数据关系,每个圆弧内把圆弧分为若干段,分段标注出拱高和弦长,进行小样的精细制作;合理增加控制点的数量,检查固定配套安装系统的准确度,以防变形等因素的影响,确保钢龙骨及板面安装后弧度偏差在1mm以内。
作为本发明的第三种优选技术方案,所述步骤C具体为:做好现场放线工作,深化设计师原方案设计图,到现场复核水平标高、建筑尺寸,安排将顶面造型1∶1投影放线于地面上,确认空间比例是否协调,并确认拱顶是否与其他设备相抵触,将拱顶、墙柱面完成面1∶1放样于墙面上,并用墨线、红丹漆和黑漆喷好,以便查找;建立三维数据模型,利用红外线水准仪从地面、墙面、屋面建立三维空间进行定位。
本发明带来的有益效果是:工期缩短,成本降低,效率高,合格率提高。
具体实施方式
下面对本发明的较佳实施例作详细阐述,以使本发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围作出更为清楚明确的界定。
一种双曲面拱形吊顶方法,所述方法步骤为:
A)钢架拼接稳定性控制;
B)确保拱形曲面弧度顺畅;
C)保证标高垂直度准确。
所述步骤A具体为:首先详细制定施工方案,确保操作方法正确:深化现场实际尺寸及设计方案,分析钢架所能承受的最大荷载及安装,同时考虑到钢骨架与基层梁安装稳定性的主要隐患,综合上面几点因素,最终决定将拱顶按人字梁分对进行拼接,在现场基座节点施工,见下面节点安装的施工图片;第二做好施工前的技术交底工作:①对钢结构加固处理,使用化学螺栓与膨胀螺丝混合使用保证钢骨架牢固;②对板面与钢龙骨接触面的固定采用传统的手枪钻固定法;③检查个接点的螺栓,确保牢固,保证施工质量。
所述步骤B具体为:小样流程控制,利用电脑CAD标注出圆弧的交接处与主控轴线之间的数据关系,每个圆弧内把圆弧分为若干段,分段标注出拱高和弦长,进行小样的精细制作;合理增加控制点的数量,检查固定配套安装系统的准确度,以防变形等因素的影响,确保钢龙骨及板面安装后弧度偏差在1mm以内。
所述步骤C具体为:做好现场放线工作,深化设计师原方案设计图,到现场复核水平标高、建筑尺寸,安排将顶面造型1∶1投影放线于地面上,确认空间比例是否协调,并确认拱顶是否与其他设备相抵触,将拱顶、墙柱面完成面1∶1放样于墙面上,并用墨线、红丹漆和黑漆喷好,以便查找;建立三维数据模型,利用红外线水准仪从地面、墙面、屋面建立三维空间进行定位。
以上所述,仅为本发明的具体实施方式之一,但本发明的保护范围并不局限于此,任何熟悉本领域的技术人员在本发明所揭露的技术范围内,可不经过创造性劳动想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书所限定的保护范围为准。
Claims (4)
1.一种双曲面拱形吊顶方法,其特征在于,所述方法步骤为:
A)钢架拼接稳定性控制;
B)确保拱形曲面弧度顺畅;
C)保证标高垂直度准确。
2.根据权利要求1所述的一种双曲面拱形吊顶方法,其特征在于,所述步骤A具体为:首先详细制定施工方案,确保操作方法正确:深化现场实际尺寸及设计方案,分析钢架所能承受的最大荷载及安装,同时考虑到钢骨架与基层梁安装稳定性的主要隐患,综合上面几点因素,最终决定将拱顶按人字梁分对进行拼接,在现场基座节点施工,见下面节点安装的施工图片;第二做好施工前的技术交底工作:①对钢结构加固处理,使用化学螺栓与膨胀螺丝混合使用保证钢骨架牢固;②对板面与钢龙骨接触面的固定采用传统的手枪钻固定法;③检查个接点的螺栓,确保牢固,保证施工质量。
3.根据权利要求1所述的一种双曲面拱形吊顶方法,其特征在于,所述步骤B具体为:小样流程控制,利用电脑CAD标注出圆弧的交接处与主控轴线之间的数据关系,每个圆弧内把圆弧分为若干段,分段标注出拱高和弦长,进行小样的精细制作;合理增加控制点的数量,检查固定配套安装系统的准确度,以防变形等因素的影响,确保钢龙骨及板面安装后弧度偏差在1mm以内。
4.根据权利要求1所述的一种双曲面拱形吊顶方法,其特征在于,所述步骤C具体为:做好现场放线工作,深化设计师原方案设计图,到现场复核水平标高、建筑尺寸,安排将顶面造型1∶1投影放线于地面上,确认空间比例是否协调,并确认拱顶是否与其他设备相抵触,将拱顶、墙柱面完成面1∶1放样于墙面上,并用墨线、红丹漆和黑漆喷好,以便查找;建立三维数据模型,利用红外线水准仪从地面、墙面、屋面建立三维空间进行定位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102439556A CN102864867A (zh) | 2011-08-24 | 2011-08-24 | 一种双曲面拱形吊顶方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102439556A CN102864867A (zh) | 2011-08-24 | 2011-08-24 | 一种双曲面拱形吊顶方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102864867A true CN102864867A (zh) | 2013-01-09 |
Family
ID=47443975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102439556A Pending CN102864867A (zh) | 2011-08-24 | 2011-08-24 | 一种双曲面拱形吊顶方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102864867A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103122697A (zh) * | 2013-02-05 | 2013-05-29 | 山西太行建设开发有限公司 | 室内大型吊顶的安装方法 |
CN103669573A (zh) * | 2013-11-25 | 2014-03-26 | 中国建筑第二工程局有限公司 | 冰壶钢结构构造及其施工方法 |
CN103669733A (zh) * | 2013-12-26 | 2014-03-26 | 江苏省华建建设股份有限公司 | 一种叶片状双曲面屋盖棚饰面砖施工方法 |
CN104213686A (zh) * | 2014-09-04 | 2014-12-17 | 江苏沪宁钢机股份有限公司 | 一种叶片状屋面底部面砖的铺设方法 |
CN105133840A (zh) * | 2015-05-28 | 2015-12-09 | 南京长岛建设工程有限公司 | 一种双曲面吊顶的施工方法 |
CN106351425A (zh) * | 2016-08-30 | 2017-01-25 | 江苏嘉洋华联建筑装饰股份有限公司 | 一种重复造型吊顶施工流程 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2523833Y (zh) * | 2002-01-11 | 2002-12-04 | 吴建明 | 双曲面拱形梁 |
KR100470679B1 (ko) * | 2004-05-31 | 2005-02-21 | (주)휴인텍 | 욕실용 천장 패널과 그 시공방법 |
CN200992763Y (zh) * | 2007-01-04 | 2007-12-19 | 广东省建筑装饰工程有限公司 | 一种在双曲面网架下弦吊铝条板的吊顶单元结构 |
-
2011
- 2011-08-24 CN CN2011102439556A patent/CN102864867A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2523833Y (zh) * | 2002-01-11 | 2002-12-04 | 吴建明 | 双曲面拱形梁 |
KR100470679B1 (ko) * | 2004-05-31 | 2005-02-21 | (주)휴인텍 | 욕실용 천장 패널과 그 시공방법 |
CN200992763Y (zh) * | 2007-01-04 | 2007-12-19 | 广东省建筑装饰工程有限公司 | 一种在双曲面网架下弦吊铝条板的吊顶单元结构 |
Non-Patent Citations (3)
Title |
---|
余志祥等: "三维CAD技术在复杂钢结构工程中的应用", 《钢结构》, vol. 23, no. 7, 31 July 2008 (2008-07-31) * |
曾思成等: "超大型网架下弦双曲面铝条板吊顶施工工法", 《广东土木与建筑》, no. 10, 31 October 2006 (2006-10-31) * |
金虎根: "斜拉索吊117m主钢梁系双曲面网架安装", 《工业建筑》, no. 5, 31 May 1991 (1991-05-31) * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103122697A (zh) * | 2013-02-05 | 2013-05-29 | 山西太行建设开发有限公司 | 室内大型吊顶的安装方法 |
CN103669573A (zh) * | 2013-11-25 | 2014-03-26 | 中国建筑第二工程局有限公司 | 冰壶钢结构构造及其施工方法 |
CN103669573B (zh) * | 2013-11-25 | 2015-11-18 | 中国建筑第二工程局有限公司 | 冰壶钢结构构造及其施工方法 |
CN103669733A (zh) * | 2013-12-26 | 2014-03-26 | 江苏省华建建设股份有限公司 | 一种叶片状双曲面屋盖棚饰面砖施工方法 |
CN103669733B (zh) * | 2013-12-26 | 2016-01-13 | 江苏省华建建设股份有限公司 | 一种叶片状双曲面屋盖棚饰面砖施工方法 |
CN104213686A (zh) * | 2014-09-04 | 2014-12-17 | 江苏沪宁钢机股份有限公司 | 一种叶片状屋面底部面砖的铺设方法 |
CN104213686B (zh) * | 2014-09-04 | 2016-05-11 | 江苏沪宁钢机股份有限公司 | 一种叶片状屋面底部面砖的铺设方法 |
CN105133840A (zh) * | 2015-05-28 | 2015-12-09 | 南京长岛建设工程有限公司 | 一种双曲面吊顶的施工方法 |
CN106351425A (zh) * | 2016-08-30 | 2017-01-25 | 江苏嘉洋华联建筑装饰股份有限公司 | 一种重复造型吊顶施工流程 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102864867A (zh) | 一种双曲面拱形吊顶方法 | |
Banks et al. | Enhancing high-rise residential construction through design for manufacture and assembly–a UK case study | |
CN106320707A (zh) | 一种全投影放线方法 | |
CN101451378A (zh) | “水滴形”放射状单层钢管网壳分块及安装方法 | |
CN102828470A (zh) | 一种斜拉桥主梁拉索套管的定位方法 | |
CN109441034A (zh) | 一种bim辅助双曲面异形柱三角板安装的施工工艺 | |
CN105864524A (zh) | 预埋管件的施工定位装置及该预埋管件的施工方法 | |
CN114541264B (zh) | 一种斜拉桥索导管一体化测量定位方法 | |
CN104712141A (zh) | 现浇钢筋混凝土密肋梁楼板施工方法 | |
CN103437546B (zh) | 一种组合结构铝合金模板 | |
CN110847464A (zh) | 确保现浇结构顶板水平度的施工和测量方法 | |
CN104631819A (zh) | 一种弧形立面拱形砼门梁的模板体系及其搭设方法 | |
CN107605076A (zh) | 一种幕墙施工方法 | |
CN114934673B (zh) | 一种木结构体系玻璃幕墙施工方法 | |
CN106285028A (zh) | 基于bim技术的大跨度重型吊车梁拆除中厂房加固施工方法 | |
CN108071203A (zh) | 在家具厂房施工中快速对木基层进行施工的工艺 | |
CN103850374B (zh) | 构件式幕墙系统 | |
CN104196153A (zh) | 一种厚板l形钢板剪力墙柱及其制作方法 | |
CN105464215A (zh) | 一种无法设置竖向临时支撑的悬挂结构逆作法施工方法 | |
CN104389348A (zh) | 一种带蒙皮拱结构的安装方法 | |
CN114753649A (zh) | 基于bim免搭脚手架的双曲屋面挑檐幕墙施工方法 | |
CN209703936U (zh) | 一种适用于楼房内信息系统计算机房的楼板地面结构 | |
CN105926951A (zh) | 一种全装配式钢结构房屋的结构建造方法 | |
CN205243069U (zh) | 一种简易连接桥 | |
CN113587910B (zh) | 一种用于多圆心圆弧型异形结构的施工测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Applicant after: Suzhou Suming Decoration Co., Ltd. Address before: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Applicant before: Suzhou Suming Decoration Co.,Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130109 |