CN102862254B - 消除汽阻的方法 - Google Patents

消除汽阻的方法 Download PDF

Info

Publication number
CN102862254B
CN102862254B CN201110463119.9A CN201110463119A CN102862254B CN 102862254 B CN102862254 B CN 102862254B CN 201110463119 A CN201110463119 A CN 201110463119A CN 102862254 B CN102862254 B CN 102862254B
Authority
CN
China
Prior art keywords
water
pipe
temperature
heater
stack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110463119.9A
Other languages
English (en)
Other versions
CN102862254A (zh
Inventor
梁同康
冯玉敏
王增欣
郝际臣
黄克峰
梁秀通
管丽
王仁龙
韩伟
宋德福
刘军华
李谋顺
迟源功
臧兆翠
于杨
冯文池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO HAIYI PLASTIC INDUSTRY Co.,Ltd.
Original Assignee
QINGDAO HONGDA PLASTICS CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO HONGDA PLASTICS CORP filed Critical QINGDAO HONGDA PLASTICS CORP
Priority to CN201110463119.9A priority Critical patent/CN102862254B/zh
Publication of CN102862254A publication Critical patent/CN102862254A/zh
Application granted granted Critical
Publication of CN102862254B publication Critical patent/CN102862254B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

消除汽阻的方法是在加热器上留有排气孔,排气孔与排气管、集水箱连接,其中,加热器与水泵、压延辊的进水端通过工艺水进管相连接,压延辊的出水端与冷热交换器通过工艺水出管连接,在加热器上装有排气管与集水箱连通,冷热交换器内串有冷却水管、工艺水管,工艺水出管连接工艺水管与加热器连通形成工艺水循环闭路。具有结构合理、维护方便、工艺可控、温度精确、无污染、成本低、效率高、随机排气、安全可靠等特点。水在加热过程中产生的汽阻通过排气管输送到集水箱中排放,彻底消除了加热循环水中的气阻,确保了水温的稳定性,使压延辊的温度误差缩小,达到理想的工艺温度,提高了压延产品的质量,是理想的加热控温压延设备的专用方法。

Description

消除汽阻的方法
技术领域
本发明涉及的是塑料加工辅助设备,更详细地讲是关于各类压延设备加热压辊的消除汽阻的方法。
背景技术
目前,生产塑料板材及片材的压延设备中加热压辊多数是用蒸气或热水直接加温,传统的加温方式在加热过程中由于水中产生的汽体,阻碍了水的流动,导致加热辊内循环水受阻,压辊的温度不均或达不到工艺要求的温度,满足不了生产要求的工艺温度。产品质量得不到保证,生产效率低,能耗增大、生产成本上升。因而满足不了目前压延产品生产加工的使用需求。
发明内容
本发明的目的在于提供一种能消除上述缺点,具有结构合理、维护方便、工艺可控、温控精确、无污染、成本低、效率高、随机排气、安全可靠等特点的消除汽阻的方法。尤其是采用开放式排气通道技术,确保了压延制品生产线的压延辊工艺温度,有效地克服了板材、片材生产中温度不均所存在的不足,提高了板材、片材的成品率,实现了工艺温度可调控之功效,提高了生产效率和一次下机率,节约了能源和原料,降低了生产成本,是理想的各类片材、板材等压延产品工艺温度可控的专用方法。
本发明的消除汽阻的方法主要由压延辊、加热器、冷热交换器、水泵、排气管、集水箱、工艺水进管、工艺水出管、冷却水进管、冷却水出管等构成,它是在加热器上留有排气孔,排气孔与排气管、集水箱连接,其中,加热器与水泵、压延辊的进水端通过工艺水进管相连接,压延辊的出水端与冷热交换器通过工艺水出管连接,在加热器上装有排气管与集水箱连通,冷热交换器内串有冷却水管、工艺水管,工艺水出管连接工艺水管与加热器连通形成工艺水循环闭路。所述的加热器、冷热交换器、水泵、排气管、集水箱、工艺水进管、工艺水出管、冷却水进管、冷却水出管与压延辊的数量相匹配。水在加热过程中产生的汽阻通过排气管输送到集水箱中排放,彻底消除了加热循环水中的气阻,确保了水温的稳定性,使压延辊的温度误差缩小,达到理想的工艺温度,提高了压延产品的质量,是理想的加热控温压延设备的专用方法。
它是在原有水加热器上的技术延伸,将原有加热器在加热器的上端改加以排气孔,用管道联接至集水箱,解决加热器在加热过程中所产生的汽阻问题,同时集水箱中的水可实现自动给加热器补充水量。解决了当加热器加热时产生的水蒸气所形成的汽阻现象,即水蒸汽可通过排汽管道将汽体排至集水箱。
通常,现有加热器装置无排汽装置在加热使用过程中水产生的汽体,无法排出加热器,加热时间越长,所产生的汽体越多,逐渐形成汽阻,阻碍了水体流动,针对这个问题,在加热器的上端加工一个排汽孔,并安装管道至集水箱,汽阻通过排汽管道排至集水箱,把加热器中的汽阻解决掉,解决了水的流畅问题。当生产工艺温度未能满足生产工艺需要时,温度传感器发出指令,加热器在接到温度传感器发出指令时,如果信息显示低于生产工艺温度时,加热器装置即刻起动为工艺用水进行加热,同时在加热过程中,即可产生蒸汽通过排汽管道进入集水箱,以保证了工艺用水通畅、充足、水温偏差小。
在生产过程中,塑料挤出机挤出的玻璃体塑料,通过受温控三辊压延机,压制出符合需要制品规格的冷热水交换装置就是为三辊压延机供给温水所配置的,三辊压延机的压延辊之温度是有冷热加热器交换装置通过水泵所供给,但挤出机挤出的塑料料材的温度远高于所供冷却水温度,所以,冷却水被塑料料材的温度提高,为此要使水温降至生产工艺温度就需要冷却水装置,故在水路上安装了三组冷热交换器和加热器装置,以满足生产工艺之需求,其冷却水工艺路线为按照图2所示的线路,完成一个循环在加热、冷却、排汽的过程,在周而复始的工作循环中工艺水受塑料温度的影响,工艺水温快速地得到了提高,此时在水泵的作用下,工艺水流通至冷热交换器进行冷却,再流通至加热器工艺水所产生的汽体通过设置在加热器上端的排气管道排至集水箱,工艺水被水泵送至三辊装置。
本发明的消除汽阻装置解决了长期以来水加热器装置的汽阻问题,以及自动补给问题提高生产工艺温度的稳定,供水量满足生产工艺要求。使生产工艺得到稳定,提高了产品的质量和产量,价格低廉,维修简单,安全可靠。
附图说明
图1:消除汽阻的方法工艺结构示意图
图2:消除汽阻的方法工艺流程示意图
图1中有:压延辊、加热器、冷热交换器、水泵、排气管、集水箱、工艺水进管、工艺水出管、冷却水进管、冷却水出管
具体实施方式
结合附图进一步说明本发明工艺方法:
如图1-2所示的消除汽阻的方法主要由压延辊、加热器、冷热交换器、水泵、排气管、集水箱、工艺水进管、工艺水出管、冷却水进管、冷却水出管等构成,其中,加热器与水泵、压延辊的进水端通过工艺水进管相连接,压延辊的出水端与冷热交换器通过工艺水出管连接,在加热器上装有排气管与集水箱连通,冷热交换器内串有冷却水管、工艺水管,工艺水出管连接工艺水管与加热器连通形成工艺水循环闭路。水在加热过程中产生的汽阻通过排气管输送到集水箱中排放,彻底消除了加热循环水中的气阻,确保了水温的稳定性,使压延辊的温度误差缩小,达到理想的工艺温度,提高了压延产品的质量,是理想的加热控温压延设备的专用方法。
解决了整个工艺水的流通工艺路线存在的主要矛盾,当挤出机挤出的塑料料材温度为200℃以上时要将塑料料材的温度降至60℃,就需要有冷却水为其降温,在降温的过程中冷却水被塑料料材的高温所提高,被升高温度的工艺水再进入冷热交换器,工艺水被迅速地降低温度至60℃以下,再进入加热器进行升温作为温度控制的方法,在此过程中即可产生气阻,当产生汽阻现象时,蒸汽即通过排汽管道,排入集水箱,使水中汽阻现象消失,工艺水通过水泵的作用进入三辊,使三辊温度稳定,实现整个工艺流程所达到的温度效果。

Claims (2)

1.一种消除汽阻方法的专用装置,主要由压延辊、加热器、冷热交换器、水泵、工艺水进管、工艺水出管、冷却水进管、冷却水出管构成,其特征在于在加热器上留有排气孔,排气孔与排气管、集水箱连接,其中,加热器与水泵、压延辊的进水端通过工艺水进管相连接,压延辊的出水端与冷热交换器通过工艺水出管连接,在加热器上装有排气管与集水箱连通,冷热交换器内串有冷却水管、工艺水管,工艺水出管连接工艺水管与加热器连通形成工艺水循环闭路。
2.如权利要求1所述的消除汽阻方法的专用装置,其特征在于所述的加热器、冷热交换器、水泵、排气管、集水箱、工艺水进管、工艺水出管、冷却水进管、冷却水出管与压延辊的数量相匹配。
CN201110463119.9A 2010-12-29 2011-12-29 消除汽阻的方法 Active CN102862254B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110463119.9A CN102862254B (zh) 2010-12-29 2011-12-29 消除汽阻的方法

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201010625121 2010-12-29
CN201010625121.7 2010-12-29
CN2010106251217 2010-12-29
CN201110463119.9A CN102862254B (zh) 2010-12-29 2011-12-29 消除汽阻的方法

Publications (2)

Publication Number Publication Date
CN102862254A CN102862254A (zh) 2013-01-09
CN102862254B true CN102862254B (zh) 2016-04-06

Family

ID=47441517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110463119.9A Active CN102862254B (zh) 2010-12-29 2011-12-29 消除汽阻的方法

Country Status (1)

Country Link
CN (1) CN102862254B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2075130U (zh) * 1990-06-16 1991-04-17 杨八康 热固成型压力机上的模具加热装置
US6261487B1 (en) * 1996-03-16 2001-07-17 Brunckner Maschinenbau Gmbh Method of and machine for controlling the nip of the rolls of a calender as an endless planar web is continuously passed through the nip
CN1495004A (zh) * 2002-09-24 2004-05-12 特电株式会社 热加工辊和用于该辊的温度控制设备
CN1987328A (zh) * 2005-12-21 2007-06-27 特电株式会社 载热体通流滚筒装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04173127A (ja) * 1990-11-02 1992-06-19 Nippon Steel Corp 高分子シートの積層方法
JP3378946B2 (ja) * 1992-12-15 2003-02-17 ミクロ電子株式会社 循環式の熱風加熱装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2075130U (zh) * 1990-06-16 1991-04-17 杨八康 热固成型压力机上的模具加热装置
US6261487B1 (en) * 1996-03-16 2001-07-17 Brunckner Maschinenbau Gmbh Method of and machine for controlling the nip of the rolls of a calender as an endless planar web is continuously passed through the nip
CN1495004A (zh) * 2002-09-24 2004-05-12 特电株式会社 热加工辊和用于该辊的温度控制设备
CN1987328A (zh) * 2005-12-21 2007-06-27 特电株式会社 载热体通流滚筒装置

Also Published As

Publication number Publication date
CN102862254A (zh) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102661672A (zh) 节能板式换热机组及其控制方法
CN106595026A (zh) 一种燃气壁挂炉、热水供应系统及控制方法
CN103673295A (zh) 直热式水箱加热水流路系统及其控制方法
CN201926023U (zh) 一种高效热水供应系统
CN102862254B (zh) 消除汽阻的方法
CN105385801B (zh) 一种高炉冷却壁余热利用系统及其应用方法
CN202792568U (zh) 直热式水箱加热水流路系统
CN107976017A (zh) 一种具有空气预热与回热功能的太阳能烘干房
CN201327106Y (zh) 变温变量采暖换热设备
CN106091476B (zh) 地埋管地源热泵与电蓄热水箱的联合系统
CN206064382U (zh) 反应釜的锅炉加热系统
CN105650879A (zh) 利用太阳能预热的热泵热水系统
CN206146023U (zh) 提取地下水热保温井筒系统
CN205373150U (zh) 利用矿井热源制取洗浴热水的热泵系统
CN106338145A (zh) 热量回收再利用系统
CN106957141A (zh) 一种生产双绒面玻璃压延机的冷却水加热恒温装置
CN202952416U (zh) 开炼机导热油给热系统
CN102072643B (zh) 利用回转窑窑筒体辐射热实现冷暖热水三联供的工艺系统
CN207648931U (zh) 一种工业热水供应装置
CN206337274U (zh) 一种多渠道沼气罐加热系统
CN207351234U (zh) 一种隧道窑窑外余热利用系统
CN206843312U (zh) 一种生产双绒面玻璃压延机的冷却水加热恒温装置
CN206708627U (zh) 一种新型水蒸气管道加热装置
CN206291511U (zh) 一种新型太阳能热水系统
CN206129542U (zh) 空压机循环水冷却再利用系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liang Tongkang

Inventor after: Song Defu

Inventor after: Liu Junhua

Inventor after: Li Moushun

Inventor after: Chi Yuangong

Inventor after: Cang Zhaocui

Inventor after: Yu Yang

Inventor after: Feng Wenchi

Inventor after: Feng Yumin

Inventor after: Wang Zengxin

Inventor after: Hao Jichen

Inventor after: Huang Kefeng

Inventor after: Liang Xiutong

Inventor after: Guan Li

Inventor after: Wang Renlong

Inventor after: Han Wei

Inventor before: Huang Kefeng

Inventor before: Liang Xiutong

Inventor before: Feng Yumin

Inventor before: Guan Li

Inventor before: Wang Renlong

Inventor before: Han Wei

Inventor before: Song Defu

Inventor before: Liu Junhua

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210507

Address after: 266109 International Airport Industrial Park, Chengyang District, Qingdao City, Shandong Province (Shuangyuan Road)

Patentee after: QINGDAO HAIYI PLASTIC INDUSTRY Co.,Ltd.

Address before: 266109 No.9 Songshan Road, Airport Industrial Park, Chengyang District, Qingdao City, Shandong Province

Patentee before: QINGDAO HONGDA PLASTICS Corp.

TR01 Transfer of patent right