CN102853418B - Gas combustion chamber - Google Patents

Gas combustion chamber Download PDF

Info

Publication number
CN102853418B
CN102853418B CN201210113708.9A CN201210113708A CN102853418B CN 102853418 B CN102853418 B CN 102853418B CN 201210113708 A CN201210113708 A CN 201210113708A CN 102853418 B CN102853418 B CN 102853418B
Authority
CN
China
Prior art keywords
gas
combustion
combustion chamber
rod
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210113708.9A
Other languages
Chinese (zh)
Other versions
CN102853418A (en
Inventor
朱永彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshui Boheng Textile Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210113708.9A priority Critical patent/CN102853418B/en
Publication of CN102853418A publication Critical patent/CN102853418A/en
Application granted granted Critical
Publication of CN102853418B publication Critical patent/CN102853418B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Incineration Of Waste (AREA)

Abstract

Gas combustion chamber, a large amount of heat discharged after utilizing gas fuel burning, after water vapor, pushing turbine generates electricity.Use gas generates electricity, and is the second time regenerative ratio of combustible gas energy, can plays huger benefit.Facilitate industrial or agricultural, transportation production; And daily life.Avoid the harm that nuclear pollution causes to the mankind and life on earth.Renewable, inexpensive, environmental protection, efficiently, can save a large amount of coal and oil.

Description

Gas combustion chamber
One, technical field
The present invention designs a kind of gas combustion chamber.
Two, background technology
According to the golden project sunshine-agricultural synthesis technology series " gas Development and utilization 300 is asked " of Central Plains peasant publishing house, with reference to the new forms of energy book series " gas practical technique guide " that Henan science tech publishing house publishes, through long-term research and exploration, to production technology reform and the innovation of this energy.On existing production technology basis, develop skill content, impels gas yield and quality greatly to improve.Moreover, also can reduce greenhouse gas emission, purify air, improve and protection of the environment.
Three, the content of invention gas combustion chamber
The object of this invention:
Object of the present invention, is to provide a kind of gas combustion chamber, a large amount of heat discharged after utilizing gas combustion, and after water vapor, pushing turbine generates electricity.Use gas generates electricity, and is the second time regenerative ratio of gas energy, can plays huger benefit.Facilitate industrial or agricultural, transportation production; And daily life.Avoid the harm that nuclear pollution causes to the mankind and life on earth.Renewable, inexpensive, environmental protection, efficiently, can save a large amount of non-renewable coal and petroleum resources.
Gas combustion chamber, generates electricity for gas combustion.This room can give full play to the great function of natural energy source gas, has increased considerably energy wealth, promotes social development.Particularly, replacing nuclear power station, reduces core crisis.
The technical scheme of the gas combustion chamber that this invention provides:
Combustion chamber provided by the invention, is characterized in that, this room is cuboid, also can be designed to cylinder, cone, stage body, spheroid, the body of spheroid etc. and combination mutually thereof.It is an overall water tank in combustion chamber.Reserved cylinder is designed in water tank, or prism, or stage body, in order to install combustion rod.Steam pushing turbine generating after vaporization.If a combustion chamber can not be up to standard, can multiplely be connected, multistage combustion is vaporized.
The waste gas that combustion chamber is discharged, is rich in a large amount of heat, flows through cooling tower cooling.Hot cooling fluid can be vaporized for preparing natural pond liquid and being back to generating tube.As a cooling tower can not reach requirement, can be passed through the multistage cooling of multiple cooling tower.
Heat more than needed collected by cooling tower, recycles.
The brief introduction of gas combustion chamber:
1. combustion chamber, moulding is cuboid or square, also can be designed to the solid of other shapes, as cylinder, cone, spheroid, spheroid, the appearance such as stage body, and the spatial modelling mutually combined by these solids.Its size needs to determine according to practice.This room, its large I builds up long 8 meters, and wide 4 meters, the combustion chamber of high 5 meters, also can build up other greater or lesser specifications.
2. during methane normal combustion, the highest temperature can reach 1200 DEG C, and discharges a large amount of heat energy.Under the 1 cubic meter of gas status of criterion, the heat of 17911-25075 kilojoule can be discharged, be roughly equivalent to 0.7 kilogram of gasoline, or the heat that the raw coal of 1 kilogram provides.
3. biogas is entered rod outer space by pipeline, then by the intensive pin hole release burning on outer wall.Its waste gas is discharged by top vent pipeline.
4., by the double wall space of cold air by pipeline input rod, treat combustion gas body with what cool outer next door, prevent gas to be heated, meet accident.After this gas enters internal layer keeping warmth space by rod top, be diverted to by bottom pipe in the discharge duct being attached to rod outer wall, outwards discharged by this discharge duct release aperture.With the gas and vapor permeation burning of combustion wall release.
5. the wall of keeping warmth space air duct is double-deck.Interior is vacuum, carries out convection of heat to block with the cold air of its external space.Better reach the function of cooling combusting gas.
6. gas combustion rod being arranged on water tank reserves in cylinder, and this rod is namely in this cylinder combustion, and feed-tank heats.A water tank can install multiple rod as required.On the wall that waterwall in cylinder reserved by this water tank, the depression smokejack that appropriate design is some.
The design principle of combustion front is substantially identical with the theory of combustion of existing gas range.Under combustion front, be from top to bottom, the gas nozzle of longitudinally embarking on journey, nozzle is connected with the gas pipeline be fixed under combustion front.Gas pipeline is longitudinally embarked on journey, and is fixed on combustion front.These capillary channels of longitudinally embarking on journey, are connected with the main pipeline of outside.
In like manner, being intervally arranged with gas nozzle, is the air nozzle of embarking on journey.A line gas nozzle, side by side a line air nozzle.Interlaced, organic composition combustion front, mixed combustion.
Line-spacing is determined as required.Also can be designed to crisscross jet pipe if desired, form latticed inlet zone, its idle place is air drainage area.
7., if one-level heating is not up to standard, can design several water tanks and be interconnected, current flow mutually, and Multi-stage heating is until reach gasification standard.
8. top, combustion chamber is hemisphere, treats waste air in order to assemble.Under hemispherical cover, it is smoke evacuation wall with holes.The flame of combustion chamber combustion is blocked in its effect on the one hand, makes it Thorough combustion.The waste gas in combustion chamber can be got rid of rapidly on the other hand, reduce its pressure.
9. appropriate design smokejack is wanted in combustion chamber, guarantees that waste gas is unimpeded, reduces room pressure, and Accident prevention occurs.Shi Ding center arranges main smokejack, and remainder arranges multiple secondary smokejack at rational position.Main smokejack is established two or more shunting by-paths, also will assist on this by-path and major-minor two exhaust pumps are set.When main smokejack is got rid of not smooth naturally, major-minor exhaust pump can be driven according to situation and accelerate exhaust, to reduce indoor pressure.In like manner, as required, each secondary smokejack also can arrange major-minor exhaust pump, auxiliary acceleration is vented.Indoor are made to have the safe pressure values of a constant range, to keep the safety in production.
10. combustion chamber internal layer is one deck flame retardant coating, and centre is high pressure resistant steel construction, and skin is overcoat.Between flame retardant coating and steel construction, there is one deck insulating.Prevent steel construction from reducing its voltage endurance capability because being heated.Some big-and-middle-sized combustion chambers, on steel construction, design crisscross girder steel, mutually be connected between each girder steel, with enhanced burning room compression strength and stability.
11. hot gases of discharging from major-minor smokejack, through cooling tower by its heat absorption.Hot water waits until and produces natural pond liquid use, or vaporize water is used as in backflow.
Beneficial effect of the present invention:
Impel gas can play larger effect, efficient, energy-saving and environmental protection, valency are low, convenient, and save a large amount of fire coals and oil, facilitate industrial or agricultural and transportation to produce, and the life of the people.Greatly enhance productivity, increase the wealth of society, promote social development.Prior, alternative nuclear power station generating, reduces core crisis.
Four. accompanying drawing illustrates:
1. Fig. 1, attached fixing on rod props up air duct.Wherein: 1. gas channel; 2. air spray position.
2. the top view of Fig. 2, Fig. 1.Wherein: 1. air duct; 2. air spray portion.
3. Fig. 3, rod profilograph.Wherein: 3. supply blast tube; 4. cooling air passage; 5. vacuum wall; 6. return air plenums.
4. Fig. 4, profilograph bottom rod.Wherein: 3. supply blast tube; 4. cooling air passage; 5. vacuum wall; 6. return air plenums.
5. Fig. 5 combustion chamber cross-sectional view.Wherein: 7. tank outer wall; 8. storage area; 9. the reserved cylinder of install combustion rod; delivery port; water inlet.
6. Fig. 6, rod is arranged on cross-sectional view in reserved cylinder.Wherein: 3. supply blast tube; 4. cooling air passage; 5. vacuum wall; 6. return air plenums; 9. combustion zone; 10. smokejack; air duct shown in Fig. 1; water tank water retaining wall, heating surface; rod combustion front.
7. Fig. 7, combustion chamber profilograph.Wherein: 7. outer wall of combustion chamber; 8. storage area; 9. the reserved cylinder of rod is settled; outlet flue; ju Yan district; combustion chamber circular top; delivery port; water inlet.
Five, detailed description of the invention
Gas combustion chamber production procedure
1. gas is even by pipeline input rod, Thorough combustion.The hot gas flow of discharging cools through cooling tower, and cooling fluid can make natural pond liquid or the use as vaporize water.
2. refrigerating gas is inputted rod by pipeline, cool heated gas by convection current.Then by burning with combustion gas mixing in pipeline shunt to combustion chamber.
3. the steam pushing turbine generating of vaporization in combustion chamber.

Claims (4)

1. gas combustion chamber, is characterized in that: this room is cuboid, is an integrated water tank in combustion chamber, the reserved cylinder of design in water tank; Or prism; Or stage body, in order to install combustion rod; On the wall that waterwall in cylinder reserved by this water tank, design some depression smokejacks;
This rod is namely in this cylinder combustion, and feed-tank heats; Multiple rod installed by a water tank;
Rod periphery is combustion front, under combustion front, is from top to bottom, the gas nozzle of longitudinally embarking on journey; Nozzle is connected with the gas pipeline be fixed under combustion front; Gas pipeline is longitudinally embarked on journey, and is fixed on combustion front; These capillary channels of longitudinally embarking on journey, are connected with the main pipeline of outside;
Being intervally arranged with gas nozzle, is the air nozzle of embarking on journey; A line gas nozzle, side by side a line air nozzle; Interlaced, organic composition combustion front, mixed combustion; Line-spacing is determined as required;
Insulation air duct and return air plenums, its wall is double-deck, and interior is vacuum, carries out convection of heat, reach the function of cooling combusting gas to block with the cold air of its external space;
Top, combustion chamber is hemisphere, treats waste air in order to assemble; Shi Ding center arranges main smokejack, and remainder arranges multiple secondary smokejack;
Combustion chamber internal layer is one deck flame retardant coating, and centre is high pressure resistant steel construction, and skin is overcoat; Between flame retardant coating and steel construction, design one deck insulating, prevents steel construction from reducing its voltage endurance capability because being heated; Big-and-middle-sized combustion chamber, on steel construction, designs crisscross girder steel, is mutually connected between each beam, enhanced burning room compression strength and stability;
Or it is connected to design multiple combustion chamber, multistage combustion is vaporized;
Combustion chamber or be designed to cylinder; Or cone; Or stage body; Or spheroid; Or spheroid; Or its shape mutually combined;
The waste gas that combustion chamber is discharged, flows through cooling tower; Or through the multistage cooling of multiple cooling tower.
2. gas combustion chamber according to claim 1, is characterized in that: be designed to crisscross jet pipe, forms latticed inlet zone, and its idle place is air drainage area.
3. gas combustion chamber according to claim 1, is characterized in that: double wall space cold air being input to rod by pipeline from bottom, and combustion gas body is treated in cooling; After this cold air enters internal layer keeping warmth space by rod top, be diverted to by bottom pipe the row of air tubes release aperture being attached to rod outer wall and outwards discharge; With the combustion gas mixing burning of combustion wall release.
4. gas combustion chamber according to claim 1, is characterized in that: the hot flue gas of discharging from major-minor smokejack, and flow through cooling tower by its heat absorption, hot water is waited until and produced natural pond liquid, or vaporize water is used as in backflow.
CN201210113708.9A 2011-06-29 2012-04-10 Gas combustion chamber Expired - Fee Related CN102853418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210113708.9A CN102853418B (en) 2011-06-29 2012-04-10 Gas combustion chamber

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201110188395 2011-06-29
CN201110188395.9 2011-06-29
CN201210113708.9A CN102853418B (en) 2011-06-29 2012-04-10 Gas combustion chamber

Publications (2)

Publication Number Publication Date
CN102853418A CN102853418A (en) 2013-01-02
CN102853418B true CN102853418B (en) 2015-12-09

Family

ID=47400240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210113708.9A Expired - Fee Related CN102853418B (en) 2011-06-29 2012-04-10 Gas combustion chamber

Country Status (1)

Country Link
CN (1) CN102853418B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103423726B (en) * 2012-05-26 2017-08-01 朱永彪 Gas combustion chamber
CN108019941A (en) * 2017-11-28 2018-05-11 崔秀萍 A kind of heat medium water vacuum boiler and its method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2371477Y (en) * 1999-03-31 2000-03-29 陈子康 Evaporated cooling type high-efficient energy-saving gas range
CN2588225Y (en) * 2002-07-28 2003-11-26 邹吉光 Waste-utilizing energy-saving water-boiling furnace
CN101586513B (en) * 2009-01-05 2011-01-26 中国华电工程(集团)有限公司 Method and device for recycling waste heat in discharged smoke of marsh gas power generation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080050800A1 (en) * 2006-08-23 2008-02-28 Mckeeman Trevor Method and apparatus for a multi-system bioenergy facility

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2371477Y (en) * 1999-03-31 2000-03-29 陈子康 Evaporated cooling type high-efficient energy-saving gas range
CN2588225Y (en) * 2002-07-28 2003-11-26 邹吉光 Waste-utilizing energy-saving water-boiling furnace
CN101586513B (en) * 2009-01-05 2011-01-26 中国华电工程(集团)有限公司 Method and device for recycling waste heat in discharged smoke of marsh gas power generation

Also Published As

Publication number Publication date
CN102853418A (en) 2013-01-02

Similar Documents

Publication Publication Date Title
CN202382288U (en) Fan-free alcohol-based fuel stove
CN102853418B (en) Gas combustion chamber
CN201093753Y (en) Low energy consumption and high heat cold heat converter
CN201973885U (en) Water and air heating double-function efficient energy-saving hot water boiler
CN102865569B (en) Gas combustion chamber
CN103322406B (en) Immersed gasification device
CN211177026U (en) High-efficient temperature control machine that can rapid heating up
CN102767815B (en) Biogas combustion chamber
CN102853416B (en) Gas combustion chamber
CN102853417B (en) Gas combustion chamber
CN202361345U (en) Gas combustor
CN203744238U (en) Tangential and direct flows combined combustion stabilizing and heat storage combusting device suitable for low-calorific-value fuel gas
CN202303312U (en) Gas combustion chamber
CN201137991Y (en) Evaporation furnace of unsolicited gas
CN202303311U (en) Gas combustion chamber
CN202338888U (en) Biogas combustion chamber
CN102927584B (en) Industrial furnace for plasma water fuel
CN202938282U (en) Gas combustion chamber
CN103423726B (en) Gas combustion chamber
CN1995818B (en) Aqueous oxyhydrogen source gas burner multipurpose machine
CN203249382U (en) Automatic circulating energy-saving hot water furnace
CN103216808A (en) Alcohol group steam generator
CN103411219A (en) Turbulent micro burner preheated by exhaust gas
CN103307597B (en) A kind of Gasification-type oven core adopting alcohol-group fuel
CN201944900U (en) Liquid fuel gasification device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Grain Bureau of Anhui Province Wang Fu Road Station 236000 Fuyang City Yingzhou District

Applicant after: Zhu Yongbiao

Address before: 236300, Anhui province Fuyang Funan County town Xu Peng administrative village

Applicant before: Zhu Yongbiao

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201022

Address after: 224600 Jiangsu province Yancheng City Xiangshui Park Road No. 4, Xiangshui Bank of China real estate two floor

Patentee after: XIANGSHUI GESIQI TECHNOLOGY Co.,Ltd.

Address before: Grain Bureau of Anhui Province Wang Fu Road Station 236000 Fuyang City Yingzhou District

Patentee before: Zhu Yongbiao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230315

Address after: 224,611 Venture Park, Xiaojian Town, Xiangshui County, Yancheng City, Jiangsu Province

Patentee after: Xiangshui Boheng Textile Co.,Ltd.

Address before: 224600 2nd floor, Xiangshui Zhongxing real estate, No.4, Shuangyuan Middle Road, Xiangshui County, Yancheng City, Jiangsu Province

Patentee before: XIANGSHUI GESIQI TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee