CN102767815B - Biogas combustion chamber - Google Patents

Biogas combustion chamber Download PDF

Info

Publication number
CN102767815B
CN102767815B CN201110120473.1A CN201110120473A CN102767815B CN 102767815 B CN102767815 B CN 102767815B CN 201110120473 A CN201110120473 A CN 201110120473A CN 102767815 B CN102767815 B CN 102767815B
Authority
CN
China
Prior art keywords
combustion chamber
combustion
vaporization
flame
biogas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110120473.1A
Other languages
Chinese (zh)
Other versions
CN102767815A (en
Inventor
朱永彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshui Chenguang Bearing Bracket Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110120473.1A priority Critical patent/CN102767815B/en
Publication of CN102767815A publication Critical patent/CN102767815A/en
Application granted granted Critical
Publication of CN102767815B publication Critical patent/CN102767815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Biogas combustion chamber, a large amount of heat of release after utilizing methane gas to burn, after water vapor, pushing turbine generates electricity.Use marsh gas power generation, be the second time regenerative ratio of methane energy, huger benefit can be played.Facilitate industrial or agricultural, transportation production; And daily life.Avoid the harm that nuclear pollution causes to the mankind and life on earth.Renewable, inexpensive, environmental protection, efficiently, can save a large amount of coal and oil.

Description

Biogas combustion chamber
One, technical field
The present invention designs a kind of biogas combustion chamber.
Two, background technology
According to the golden project sunshine-agricultural synthesis technology series of Central Plains peasant publishing house " biogas construction with utilize 300 to ask ", with reference to the new forms of energy book series " biogas practical technique guide " that Henan science tech publishing house publishes, through long-term research and exploration, to production technology reform and the innovation of this energy.On existing production technology basis, develop skill content, impels biogas output and quality greatly to improve.Moreover, also can reduce greenhouse gas emission, purify air, improve and protection of the environment.
Three, the content of invention biogas combustion chamber
The object of this invention:
Object of the present invention, is to provide a kind of biogas combustion chamber, a large amount of heat of release after utilizing methane gas to burn, and after water vapor, pushing turbine generates electricity.Use marsh gas power generation, be the second time regenerative ratio of methane energy, huger benefit can be played.Facilitate industrial or agricultural, transportation production; And daily life.Avoid the harm that nuclear pollution causes to the mankind and life on earth.Renewable, inexpensive, environmental protection, efficiently, can save a large amount of non-renewable coal and petroleum resources.
Biogas combustion chamber, generates electricity for biogas combustion.This room can give full play to the great function of natural energy source biogas, has increased considerably energy wealth, promotes social development.Particularly, replacing nuclear power station, reduces core crisis.
The technical scheme of the biogas combustion chamber that this invention provides:
Combustion chamber provided by the invention, is characterized in that, this room is cuboid, also can be designed to accumbency Pear-Shaped, terrace with edge, the body of round platform etc. and combination mutually thereof.Elliptical cylinder-shape vaporization water pipe is arranged with in combustion chamber.Steam pushing turbine generating after vaporization.If a combustion chamber can not be up to standard, can multiplely be connected, multistage combustion is vaporized.
The waste gas that combustion chamber is discharged, is rich in a large amount of heat, flows through cooling tower cooling.Hot cooling fluid can be vaporized for preparing natural pond liquid and being back to generating tube.As a cooling tower can not reach requirement, can be passed through the multistage cooling of multiple cooling tower.
The vaporization water pipe of the elliptical cylinder-shape laid in combustion chamber, can expand heating surface, impels gasification rate to accelerate.
Heat more than needed collected by cooling tower, recycles.
The brief introduction of biogas combustion chamber:
1. combustion chamber, moulding is cuboid or square, also can be designed to the solid of other shapes, as appearance such as spherical, round platform, terrace with edges, and the spatial modelling mutually combined by these solids.Its size needs to determine according to practice.This room, its large I builds up long 8 meters, and wide 4 meters, the combustion chamber of high 5 meters, also can build up other greater or lesser specifications.The bottom surface of each combustion chamber, arranges burner and combustion spray gun, by biogas and air by 1: 10 ratio evenly spray in combustion chamber, make it Thorough combustion, generation heat.The gas of base injcction, its intensity differs.The both sides of wall, Ye You secondary injection district.
Design pressure meter in combustion chamber, surveys the indoor pressure of meter at any time.
2. during methane normal combustion, the highest temperature can reach 1200 DEG C, and discharges a large amount of heat energy.Under 1 cubic metre of biogas status of criterion, the heat of 17911-25075 kilojoule can be discharged, be roughly equivalent to 0.7 kilogram of gasoline, or the heat that the raw coal of 1 kilogram provides.
3., in the bottom of combustion chamber, the air-flow of the varying strength ejected, the mist that intensity is high can make flame rising combustion, has flame at middle part and top.Burner has combustion front, and the gas of injection is more weak, at base burning.In addition, for increasing the effect of indoor even flame burning, before and after combustion chamber, the suitable position of two walls, rationally arranges spray-hole, suitably sprays varying strength mist, makes up the defect of indoor non-uniform combustion and combustion quantity not sufficient.
4. natural pond oxygen gas mixture sprays into and wants evenly, combustion gas physical efficiency be made to spread apart.Cause gas when burning, strong and weak according to air-flow, limit is spread, and burns in limit, and homogenous combustion.Such vaporization water pipe that can make is heated evenly.This just requires there is higher requirement technically, reaches suitable, in right amount; Power, size is different.Sufficient combustion, calorific value reaches requirement, and indoor invariablenes pressure of liquid is within the scope of certain numerical value.
5. combustion chamber, also will arrange peep hole in many places, to open observation ward's combustion situation at any time.
6. the hot-water line of discharge in combustion chamber, claims vaporization water pipe.Be advisable with ellipse.The laterally interlaced arrangement of vaporization water pipe multilayer.Rising flame can not be blocked, interior flame homogenous combustion can be impelled again, increase heating surface area.Arrangement generating tube, perpendicular vertical vertical with wide of this cylindroid cross section, towards locular wall, parallel with it.So not only should not block rising flame, can also heating surface area be increased simultaneously, better absorb heat, accelerate the vaporization of the aqueous solution, and when making flame increase, curve rises, and increases the utilization rate of heat.
7., as a combustion chamber does not reach the effect needed for vaporization, can be connected multiple combustion chamber, increase vapourizing temperature step by step.The circulating water pipeline be connected with each room, outer surface is provided with attemperator, prevents the heat losses of vaporize water.
8. top, combustion chamber is hemisphere, treats waste air in order to assemble.Under hemispherical cover, it is smoke evacuation wall with holes.The flame of combustion chamber combustion is blocked in its effect on the one hand, makes it Thorough combustion.The waste gas in combustion chamber can be got rid of rapidly on the other hand, reduce its pressure.
9. appropriate design smokejack is wanted in combustion chamber, guarantees that waste gas is unimpeded, reduces room pressure, and Accident prevention occurs.Interior space part is combustion zone, is also the vaporize water area under control of placement of multiple layers arrangement.Shi Ding center arranges main smokejack, and remainder arranges multiple secondary smokejack at rational position.Main smokejack is established two or more shunting by-paths, also will assist on this by-path and major-minor two exhaust pumps are set.When main smokejack is got rid of not smooth naturally, major-minor exhaust pump can be driven according to situation and accelerate exhaust, to reduce indoor pressure.In like manner, as required, each secondary smokejack also can arrange major-minor exhaust pump, auxiliary acceleration is vented.Indoor are made to have the safe pressure values of a constant range, to keep the safety in production.
10. combustion chamber internal layer is one deck flame retardant coating, and centre is high pressure resistant steel construction, and skin is overcoat.Between flame retardant coating and steel construction, there is one deck insulating.Prevent steel construction from reducing its voltage endurance capability because being heated.Some big-and-middle-sized combustion chambers, on steel construction, design crisscross girder steel, mutually be connected between each girder steel, with enhanced burning room compression strength and stability.
11. hot gases of discharging from major-minor smokejack, through cooling tower by its heat absorption.Hot water waits until and produces natural pond liquid use, or vaporize water is used as in backflow.
Beneficial effect of the present invention:
Impel biogas can play larger effect, efficient, energy-saving and environmental protection, valency are low, convenient, and save a large amount of fire coals and oil, facilitate industrial or agricultural and transportation to produce, and the life of the people.Greatly enhance productivity, increase the wealth of society, promote social development.Prior, alternative nuclear power station generating, reduces core crisis.
Four. accompanying drawing illustrates:
1. Fig. 1, elliptical cylinder-shape heat of vaporization water pipe.
2. Fig. 2, combustion chamber.Wherein: 1. main smokejack; 2. the vaulted poly-cigarette top cover in combustion chamber; 3. to discharge fume wall; 4. elliptical cylinder-shape vaporization water pipe; 5. water inlet; 6. at the bottom of room, combustion chamber; 7. delivery port; 8. locular wall.
3. Fig. 3, disjunctor combustion chamber.Wherein: 1. main smokejack; 3. to discharge fume wall; 4. elliptical cylinder-shape vaporization water pipe; 5. water inlet; 7. delivery port.
4. Fig. 4, cooling tower.Wherein: 9. delivery port; 10. smoke intaking hole; inlet opening; flue; outlet flue.
Five, detailed description of the invention
Biogas combustion chamber production procedure
1. biogas is inputted combustion chamber evenly, Thorough combustion.And the pressure in combustion chamber will remain in a constant range, too high too low all will passing through adjust in time for natural pond system and gas extraction system.
2. the hot gas flow of discharging cools through cooling tower, and cooling fluid can make natural pond liquid or the use as vaporize water.
3. the steam pushing turbine generating of vaporization in combustion chamber.

Claims (2)

1. biogas combustion chamber, is characterized in that: this room is cuboid-type, or accumbency Pear-Shaped, or terrace with edge, or round platform, and its shape mutually combined; Elliptical cylinder-shape vaporization water pipe is arranged with in combustion chamber; Water vapour pushing turbine generating after vaporization;
A combustion chamber can not be up to standard, and design multiple being connected, multistage combustion is vaporized;
At bottom of combustion chamber, the air-flow of the varying strength ejected, the mist that intensity is high can make flame rising combustion, has flame at middle part and top;
Burner has combustion front, and the gas of injection is more weak, at base burning;
Before and after combustion chamber, the suitable position of two walls, rationally arranges spray-hole;
Combustion chamber arranges peep hole in many places;
The laterally interlaced arrangement of vaporization water pipe multilayer; Arrangement vaporization water pipe, vertically vertical towards locular wall, parallel with it with wide of this cylindroid cross section; When making flame increase, curve rises;
Top, combustion chamber is hemisphere, treats waste air in order to assemble; Under hemispherical cover, be smoke evacuation wall with holes, block the flame of combustion chamber combustion on the one hand, get rid of rapidly the waste gas in combustion chamber on the other hand;
Combustion chamber appropriate design smokejack; Shi Ding center arranges main smokejack, and remainder arranges multiple secondary smokejack at rational position; Namely interior space part is combustion zone, is also the vaporize water area under control of placement of multiple layers arrangement;
Combustion chamber internal layer is one deck flame retardant coating, and centre is high pressure resistant steel construction, and skin is overcoat; Between refractory steel structure, there is one deck insulating; Some big-and-middle-sized combustion chambers, on steel construction, design crisscross girder steel, mutually be connected between each girder steel, enhanced burning room compression strength and stability;
The waste gas that combustion chamber is discharged, is rich in a large amount of heat, flows through cooling tower cooling; Hot cooling fluid is for preparation natural pond liquid and be back to generating tube vaporization;
A cooling tower can not reach requirement, through the multistage cooling of multiple cooling tower.
2. biogas combustion chamber according to claim 1, is characterized in that: heat more than needed collected by cooling tower, recycles.
CN201110120473.1A 2011-05-04 2011-05-04 Biogas combustion chamber Active CN102767815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110120473.1A CN102767815B (en) 2011-05-04 2011-05-04 Biogas combustion chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110120473.1A CN102767815B (en) 2011-05-04 2011-05-04 Biogas combustion chamber

Publications (2)

Publication Number Publication Date
CN102767815A CN102767815A (en) 2012-11-07
CN102767815B true CN102767815B (en) 2016-02-03

Family

ID=47095313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110120473.1A Active CN102767815B (en) 2011-05-04 2011-05-04 Biogas combustion chamber

Country Status (1)

Country Link
CN (1) CN102767815B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412614A (en) * 2018-04-09 2018-08-17 李良杰 Convenient combustion power generation device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6277508A (en) * 1985-09-30 1987-04-09 Taihoo Kogyo Kk Control method for generation of slag in petroleum coke burning
US6410283B1 (en) * 2001-06-07 2002-06-25 Endesco Clean Harbors, L.L.C. Conversion of sewage sludge into electric power
CN101586513A (en) * 2009-01-05 2009-11-25 中国华电工程(集团)有限公司 Method and device for recycling waste heat in discharged smoke of marsh gas power generation
CN201574162U (en) * 2009-12-18 2010-09-08 南京凯盛开能环保能源有限公司 Converter flue gas complementary-energy generating system with gas combustion device
CN101874104A (en) * 2007-11-28 2010-10-27 Dlmr民用公司 Methanation is handled the method that is used for processing of waste combine with thermophilic aerobic treatment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080050800A1 (en) * 2006-08-23 2008-02-28 Mckeeman Trevor Method and apparatus for a multi-system bioenergy facility

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6277508A (en) * 1985-09-30 1987-04-09 Taihoo Kogyo Kk Control method for generation of slag in petroleum coke burning
US6410283B1 (en) * 2001-06-07 2002-06-25 Endesco Clean Harbors, L.L.C. Conversion of sewage sludge into electric power
CN101874104A (en) * 2007-11-28 2010-10-27 Dlmr民用公司 Methanation is handled the method that is used for processing of waste combine with thermophilic aerobic treatment
CN101586513A (en) * 2009-01-05 2009-11-25 中国华电工程(集团)有限公司 Method and device for recycling waste heat in discharged smoke of marsh gas power generation
CN201574162U (en) * 2009-12-18 2010-09-08 南京凯盛开能环保能源有限公司 Converter flue gas complementary-energy generating system with gas combustion device

Also Published As

Publication number Publication date
CN102767815A (en) 2012-11-07

Similar Documents

Publication Publication Date Title
CN102777898A (en) Special gasification burner for biological liquid fuel and combustion method
CN202382288U (en) Fan-free alcohol-based fuel stove
CN102767815B (en) Biogas combustion chamber
CN102853418B (en) Gas combustion chamber
CN202338888U (en) Biogas combustion chamber
CN102865569B (en) Gas combustion chamber
CN202973155U (en) Plasma water fuel industrial furnace
CN102853416B (en) Gas combustion chamber
CN202303311U (en) Gas combustion chamber
CN202902345U (en) Smokeless environment friendly stove
CN1995818B (en) Aqueous oxyhydrogen source gas burner multipurpose machine
CN102853417B (en) Gas combustion chamber
CN202303312U (en) Gas combustion chamber
CN202361345U (en) Gas combustor
CN201753980U (en) Dimethyl ether gas water heater
CN202835350U (en) Novel biology liquid fuel combustor
CN202938282U (en) Gas combustion chamber
CN203309937U (en) Novel smokeless environment-friendly energy-saving stove
CN207648761U (en) Fire formaldehyde tail gas steam boiler
CN204962697U (en) Energy -saving and environment -friendly boiler
CN103423726B (en) Gas combustion chamber
CN203928013U (en) Cage type hearth energy-saving, environmental protection boiler
CN202769717U (en) Efficient and energy-saving heating boiler of cooking range
CN105716067B (en) A kind of energy-conserving steam boiler for dual purpose
CN201555257U (en) Biological waste gasification multi-purpose stove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 236000 Anhui city of Fuyang province Funan County Jiao Po Zhen Xu Peng Cun

Applicant after: Zhu Yongbiao

Address before: 236000 Beijing East Road Hedong law service center, Yingdong District, Fuyang, Anhui

Applicant before: Zhu Yongbiao

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201019

Address after: 224600 Jiangsu province Yancheng City Xiangshui Park Road No. 4, Xiangshui Bank of China real estate two floor

Patentee after: XIANGSHUI GESIQI TECHNOLOGY Co.,Ltd.

Address before: 236000 Anhui city of Fuyang province Funan County Jiao Po Zhen Xu Peng Cun

Patentee before: Zhu Yongbiao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230411

Address after: 224622 LiuTao Central Community Industrial Park, Xiangshui County, Yancheng City, Jiangsu Province

Patentee after: XIANGSHUI CHENGUANG BEARING BRACKET CO.,LTD.

Address before: 224600 2nd floor, Xiangshui Zhongxing real estate, No.4, Shuangyuan Middle Road, Xiangshui County, Yancheng City, Jiangsu Province

Patentee before: XIANGSHUI GESIQI TECHNOLOGY CO.,LTD.