CN102841269A CN2011101680009A CN201110168000A CN102841269A CN 102841269 A CN102841269 A CN 102841269A CN 2011101680009 A CN2011101680009 A CN 2011101680009A CN 201110168000 A CN201110168000 A CN 201110168000A CN 102841269 A CN102841269 A CN 102841269A
Authority
CN
China
Prior art keywords
distribution wire
bus
important person
guarantor
comprehensive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101680009A
Other languages
Chinese (zh)
Other versions
CN102841269B (en
Inventor
刘日亮
冯洋
郭建府
海涛
赵奕
武兴强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhuhai XJ Electric Co Ltd
Beijing Electric Power Corp
Original Assignee
Zhuhai XJ Electric Co Ltd
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai XJ Electric Co Ltd, Beijing Electric Power Corp filed Critical Zhuhai XJ Electric Co Ltd
Priority to CN201110168000.9A priority Critical patent/CN102841269B/en
Publication of CN102841269A publication Critical patent/CN102841269A/en
Application granted granted Critical
Publication of CN102841269B publication Critical patent/CN102841269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a comprehensive power protection method and a comprehensive power protection device which are used for helping scheduling workers to more rapidly and accurately complete manufacture work of a power protection scheme. The comprehensive power protection method comprises a step S20 of determining important clients needing power protection and generating a bus load lead-out scheme for each important client, a step S40 of calculating a power supply radius of a distribution wire where the important clients are, and generating a reduction scheme for the power supply radius exceeding a scheduled length, and a step S60 of executing the lead-out scheme and the reduction scheme and monitoring power supply situations of scheduled power protection users in real time according to execution results. The comprehensive power protection method has the beneficial effects of rapidly judging influences including single power supply, power supply reduction, flicker and other situation of power distribution network failures on the important clients needing power protection through comprehensive analysis of failure information, and picking up emergency plans of associated transformer substations, lockage stations and clients for scheduling workers for reference, thereby providing helps for rapid recovery of power supply for the important clients.

Description

Comprehensive method for electrically and the device protected
Technical field
The invention belongs to electric system, relate to a kind of comprehensive guarantor's method for electrically and device.
Background technology
In electric system; Need comprehensively protect Very Important Person; Prior art is to utilize the power supply to the client to chase after the first day of the lunar month; Adopting artificial mode that the bus of client's power supply is loaded then derives and radius of electricity supply is dwindled, and at the Very Important Person place during line failure, manual work is transferred relevant emergency preplan and carried out reference process.
Obviously there is following shortcoming in prior art: 1) to derivations of loading of the bus of client's power supply, line powering reduced radius scheme can not generate automatically, most ofly relies on artificial completion; 2) when line failure, though can show the power failure client, the Very Important Person to influence does not carry out special sign.When 3) accident occurring, though system judges accident, corresponding emergency preplan is not associated with on the accident information interface, also need transfer separately, delays the processing time.
For manual type Very Important Person is comprehensively protected electricity in the prior art and have the problems referred to above, do not propose effective solution at present as yet.
Summary of the invention
Fundamental purpose of the present invention provides comprehensive guarantor's method for electrically and device, Very Important Person is comprehensively protected the problem of electricity in order to solve manual type.
To achieve these goals, the present invention has adopted following technical scheme:
Comprehensive guarantor's method for electrically provided by the invention comprises: step S20: confirm the Very Important Person of needs guarantor electricity, generate the bus load export plan of each Very Important Person; Step S40: calculate the radius of electricity supply of the distribution wire at each Very Important Person place, the radius of electricity supply that surpasses predetermined length is generated reduction scheme; And step S60: carry out export plan and reduction scheme, and according to the predetermined power supply situation of protecting electric user of execution result monitoring in real time.
Further; Step S20 comprises: step S21: the distribution wire and the bus that obtain first Very Important Person; All pole lines to bus are carried out following steps: step S211: whether first distribution wire of judging pole line has second Very Important Person; And under the situation of denying, find out second distribution wire that communication relationship is arranged with first distribution wire; Step S213: judge whether second distribution wire has the 3rd important client, and under the situation of denying, find out the affiliated bus of second distribution wire; And step S215: judge whether the bus of second distribution wire and the bus of first distribution wire belong to a bus under the transformer; And continuing under the situation of denying to judge that whether having quadruple on the bus of second distribution wire wants the client; And under the situation of denying; Continue to judge whether the load capacity of second distribution wire satisfies predetermined commentaries on classics band requirement; And when the satisfied predetermined commentaries on classics band of the load capacity of second distribution wire requires, generate the pole line export plan that second distribution wire is given the power supply of first distribution wire.
Further, step S40 comprises: S41: all switches that find each Very Important Person place conducting line segment load side; S43: analyze the service area of switch from the near to the remote according to topological order, find and satisfy the predetermined switch that changes the confession condition, generate the radius of electricity supply reduction scheme.
Further, step S43 also comprises: finding out and changeing the confession interval has the 3rd distribution wire of communication relationship, and carries out following steps: S431 successively: judge whether the 3rd distribution wire has Very Important Person, and under the situation of denying, find the bus of the 3rd distribution wire; S433: whether the same bus that surpasses the distribution wire of predetermined length of bus of judging the 3rd distribution wire is the bus under the same transformer; And under the situation of denying; Continue to judge on all distribution wires of bus of the 3rd distribution wire whether have Very Important Person, and under the situation of denying, judge whether the 3rd distribution wire satisfies to change to be with requirement; And under the situation that is, generate the commentaries on classics supplier case of the 3rd distribution wire.
Further, step S60 comprises: the failure message according to the supply line that monitors is transferred emergency preplan; Emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of portable terminal feedback is sent to the predetermined electric user of guarantor.
According to another aspect of the present invention, a kind of comprehensive guarantor's electric installation is provided, and realizes through following technical scheme:
Comprehensive guarantor's electric installation that the present invention proposes comprises: first generation module, be used for confirming the electric Very Important Person of needs guarantor, and generate the bus load export plan of each Very Important Person; Second generation module is used to calculate the radius of electricity supply of the distribution wire at each Very Important Person place, and the radius of electricity supply that surpasses predetermined length is generated reduction scheme; And execution module, be used to carry out export plan and reduction scheme, and according to the predetermined power supply situation of protecting electric user of execution result monitoring in real time.
Further, first generation module comprises: determination module is used for confirming the electric Very Important Person of needs guarantor.
Further, second generation module comprises: computing module is used to calculate the radius of electricity supply of the distribution wire at each Very Important Person place.
Further, execution module comprises: transfer module, be used for transferring emergency preplan according to the failure message of the supply line that monitors; Sending module is used for emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of portable terminal feedback is sent to the predetermined electric user of guarantor.
Further, transfer module and comprise: monitoring module is used for transferring emergency preplan according to the failure message of the supply line that monitors.
Compared with prior art; The invention has the beneficial effects as follows:, judge that fast distribution network failure to protecting the influence of electric Very Important Person, comprises single supply through analysis-by-synthesis to failure message; Power supply reduces; Situation such as flash, and transfer related transformer station in real time, the emergency preplan that opens and closes station, client supplies dispatcher's reference, for restoring electricity fast of Very Important Person provides help.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is a main process flow diagram of comprehensively protecting method for electrically according to the embodiment of the invention;
Fig. 2 derives algorithm flow chart according to the load of the power supply buses in the embodiment of the invention;
Fig. 3 is at the process flow diagram that dwindles algorithm according to the radius of electricity supply in the embodiment of the invention;
Fig. 4 is the processing flow chart when breaking down according to the supply line in the embodiment of the invention;
Fig. 5 is the snapshot of deriving the result according to the load of the power supply buses in the embodiment of the invention;
Fig. 6 is according to the snapshot that dwindles the radius of electricity supply result in the embodiment of the invention; And
Fig. 7 is a comprehensive structural representation of protecting electric installation in according to the embodiment of the invention.
Embodiment
Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.Below with reference to accompanying drawing and combine embodiment to specify the present invention.
Fig. 1 is a main process flow diagram of comprehensively protecting method for electrically according to the embodiment of the invention.
Referring to shown in Figure 1, comprehensively protect method for electrically and comprise: step S20: confirm the Very Important Person of needs guarantor electricity, generate the bus load export plan of each Very Important Person;
Step S40: calculate the radius of electricity supply of the distribution wire at each Very Important Person place, the radius of electricity supply that surpasses predetermined length is generated reduction scheme; And
Step S60: carry out export plan and reduction scheme, and according to the predetermined power supply situation of protecting electric user of execution result monitoring in real time.
Very Important Person and power supply situation thereof according to above-mentioned steps is protected electricity with each needs are carried out the combing analysis; Automatically analysis provides with the bus export plan and dwindles the radius of electricity supply scheme, when accident appears in circuit, can analyze the guarantor electricity client and the auto-associating emergency preplan of accident impact automatically.The bus export plan is meant client's power supply buses loaded and derive analyzes, and makes circuit and the bus export plan that satisfies the place, makes the load of Very Important Person further reduce, and failure risk further descends.Dwindle the radius of electricity supply scheme and be meant the radius of electricity supply of Very Important Person is dwindled, it is that pole line radius of electricity supply with the Very Important Person place reduces that this radius of electricity supply is dwindled the algorithm fundamental purpose, has so just reduced the probability that has an accident.
Fig. 2 derives algorithm flow chart according to the load of the power supply buses in the embodiment of the invention.
Preferably, referring to shown in Figure 2, concrete power supply buses load is derived algorithm and is comprised: step 201, definite as required Very Important Person that needs to protect electricity; Then, step 202 is calculated to each client: step 203, the distribution wire and the 10KV bus that find the client to supply power as follows; Step 204:, handle as follows successively to removing on this bus to all pole lines outside the pole line of client's power supply: step 205, judge whether this distribution wire is with Very Important Person, if this distribution wire can not be derived, finish the derivation of this distribution line; If not, setting up procedure 207, find out and this distribution wire have communication relationship distribution wire and handle as follows successively: step 208, judge whether this distribution wire is with Very Important Person; If finish this circuit export plan, if not; Carry out step 210, find the affiliated 10KV bus of this distribution wire, and carry out step 211; Judge whether this bus and above-mentioned bus are the bus under the same transformer, if, loop ends.If not, carry out step 213, judge on all distribution wires of this bus whether be with Very Important Person, if; Loop ends if not, carry out step 215, judges that can the load capacity of distribution wire satisfy the requirement of commentaries on classics band; And under the situation that is, carry out step 217, generate export plan.
It is that the pole line load of the 10KV bus under the Very Important Person is derived that the power supply buses load of Very Important Person is derived the algorithm fundamental purpose; Because the probability that has an accident of pole line is higher; Can cause flashing of busbar voltage during the appearance accident, the voltage of Very Important Person is impacted.Derivation is following with the principle of bus-bar frame ceases to be busy: the derivation circuit is a pole line; Change the circuit of band and must not be with Very Important Person; The capacity that changes the circuit of band can meet the demands; Change all outlets of the bus of band circuit and be not with Very Important Person; Changeing the bus of band circuit and the bus at Very Important Person place can not be the bus under the same transformer.
Fig. 3 is at the process flow diagram that dwindles algorithm according to the radius of electricity supply in the embodiment of the invention.
Preferably, referring to shown in Figure 3, calculate the radius of electricity supply of first distribution wire, first distribution wire that radius of electricity supply is surpassed predetermined length carries out radius of electricity supply to be dwindled.
Preferably, step 301 confirms to need to protect electric Very Important Person as required; Step 302; Calculate the radius of electricity supply that each client belongs to distribution wire; Circuit to surpassing designated length carries out following calculating successively: step 303, find all switches of Very Important Person place conducting line segment load side, and analyze the service area of above-mentioned switch from the near to the remote according to topological order; Find the switch that to derive load, and generate said radius of electricity supply reduction scheme; Step 304, the service area that calculates assigned switch supplies the interval as changeing; Step 305, find out and this commentaries on classics confession scope has the distribution wire of communication relationship to handle as follows successively: step 306, judge whether this distribution wire has Very Important Person; If not, carry out step 308, find the affiliated 10KV bus of this distribution wire; And carry out step 309; Whether this bus and client's bus belongs to the bus of same transformer, and under the situation of denying, carry out step 311, judges on all distribution wires of this bus whether have Very Important Person; And under the situation of denying, carry out step 313, and judge that can the load capacity of distribution wire satisfy the requirement of commentaries on classics band, and under the situation that is, carry out step 315, generate this radius of electricity supply reduction scheme.
It is with the pole line radius of electricity supply minimizing at Very Important Person place that the radius of electricity supply of Very Important Person is dwindled the algorithm fundamental purpose, has so just reduced the probability that has an accident.The calculating principle is following: the circuit that need reduce radius of electricity supply is a pole line; Change the circuit of band and must not be with Very Important Person; The capacity that changes the circuit of band can meet the demands; Change all outlets of the bus of band circuit and be not with Very Important Person; Changeing the bus of band circuit and the bus at Very Important Person place can not be the bus under the same transformer; Change the descending calculating of scope of band.
Fig. 4 is the processing flow chart when breaking down according to the supply line in the embodiment of the invention.
Preferably, referring to shown in Figure 4, step S60 comprises: the failure message according to the supply line that monitors is transferred emergency preplan; Emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of portable terminal feedback is sent to the predetermined electric user of guarantor.
Fig. 5 is the snapshot of deriving the result according to the load of the power supply buses in the embodiment of the invention.
Fig. 5 is that two Conferences in 2011 is protected electric spy/L 1 customer with the bus load export plan; Referring to shown in Figure 5; In interface 50, click " with the bus load export plan "; System can obtain " deriving the power transformation name of station " " female wire size ", " main transformer ", " switch number ", " load " and " road name " automatically, and obtains the relevant information of " pouring the power transformation name of station into ", according to the algorithm of the embodiment of the invention; System can provide with the bus load export plan whether satisfy the derivation condition, and provides concrete export plan.
Fig. 6 is according to the snapshot that dwindles the radius of electricity supply result in the embodiment of the invention.
Fig. 6 is that two Conferences in 2011 guarantor electricity dwindles the radius of electricity supply export plan; Referring to shown in Figure 6; In interface 60, click " dwindling the radius of electricity supply export plan "; System can obtain " deriving the power transformation name of station " " female wire size ", " main transformer ", " switch number ", " load " and " road name " automatically, and obtains the relevant information of " pouring the power transformation name of station into ", according to the algorithm of the embodiment of the invention; System can provide and dwindle the radius of electricity supply export plan and whether satisfy the derivation condition, and provides concrete export plan.
Can find out; Technical scheme of the present invention was Beijing two Conferences period of the protection of electricity in 2011; Carried out power analysis, bus load derivation, the long circuit of indivedual radius of electricity supplys has been carried out the operation that radius of electricity supply is dwindled through two Conferences being related to the Very Important Person of protecting electricity, thereby the power supply safety that has ensured Very Important Person is reliable.Idiographic flow is:
1) at first, according to the electric Very Important Person of concrete guarantor of two Conferences, combing the place distribution wire and the bus of Very Important Person.
2) derive algorithm according to the power supply buses load of the Very Important Person that provides, Very Important Person has been generated the bus load export plan, and operated according to scheme.
3) dwindle algorithm according to the radius of electricity supply of the Very Important Person that provides, the long circuit of radius of electricity supply has been generated the radius of electricity supply reduction scheme, and operated according to scheme.
4) important line and Very Important Person have all been formulated detailed emergency preplan.
Through above measure, during two Conferences, protect the equal safe and stable operation of Very Important Person of electricity, satisfactorily accomplished the task that electricity is protected in two Conferences.
Fig. 7 is a comprehensive structural representation of protecting electric installation in according to the embodiment of the invention.
Referring to shown in Figure 7, comprehensive guarantor's electric installation that the present invention proposes comprises: first generation module 71, be used for confirming the electric Very Important Person of needs guarantor, and generate the bus load export plan of each Very Important Person; Second generation module 73 is used to calculate the radius of electricity supply of the distribution wire at each Very Important Person place, and the radius of electricity supply that surpasses predetermined length is generated reduction scheme; And execution module 75, be used to carry out export plan and reduction scheme, and according to the predetermined power supply situation of protecting electric user of execution result monitoring in real time.
Alternatively, first generation module 71 comprises determination module, is used for confirming the Very Important Person of needs guarantor electricity.
Alternatively, second generation module 73 comprises computing module, is used to calculate the radius of electricity supply of the distribution wire at each Very Important Person place.
Alternatively, execution module 75 comprises transfers module, is used for transferring emergency preplan according to the failure message of the supply line that monitors; Sending module is used for emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of portable terminal feedback is sent to the predetermined electric user of guarantor.
Alternatively, transfer module and comprise monitoring module, be used for transferring emergency preplan according to the failure message of the supply line that monitors.
The present embodiment technical scheme at first confirms to need to protect the Very Important Person of electricity on function, these clients are carried out power supply chase after north the analysis, obtains its power supply buses, transformer, information such as transformer station.Analyzing in derivation that client's power supply buses is loaded then, then is the analysis that the client belongs to the radius of electricity supply reduction scheme of circuit.After operating according to analysis result, the circuit at Very Important Person place and the load of bus further reduce, and failure risk further descends.When breaking down; The guarantor of the automatic analyzing influence of system electricity Very Important Person, and transfer related transformer station, the emergency preplan that opens and closes station, client supplies dispatcher's reference, fault location position on GIS; Scheduling repairing resource commander repairing is through SMS platform and client connection.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. the comprehensive method for electrically of protecting is characterized in that, comprising:
Step S20: confirm to need to protect the Very Important Person of electricity, generate the bus load export plan of each said Very Important Person;
Step S40: calculate the radius of electricity supply of the distribution wire at each said Very Important Person place, the said radius of electricity supply that surpasses predetermined length is generated reduction scheme; And
Step S60: carry out said export plan and said reduction scheme, and monitor the electric user's of said predetermined guarantor power supply situation in real time according to execution result.
2. comprehensive guarantor's method for electrically according to claim 1 is characterized in that said step S20 comprises:
Step S21: obtain the distribution wire and the bus of said first Very Important Person, all pole lines of said bus are carried out following steps:
Step S211: whether first distribution wire of judging said pole line has second Very Important Person, and under the situation of denying, finds out second distribution wire that communication relationship is arranged with said first distribution wire;
Step S213: judge whether said second distribution wire has the said the 3rd important client, and under the situation of denying, find out the affiliated bus of said second distribution wire; And
Step S215: judge whether the bus of said second distribution wire and the bus of said first distribution wire belong to a bus under the transformer; And continuing under the situation of denying to judge that whether having quadruple on the bus of said second distribution wire wants the client; And under the situation of denying; Continue to judge whether the load capacity of said second distribution wire satisfies predetermined commentaries on classics band requirement; And when the satisfied predetermined commentaries on classics band of the load capacity of said second distribution wire requires, generate the pole line export plan that said second distribution wire is given said first distribution wire power supply.
3. comprehensive guarantor's method for electrically according to claim 1 is characterized in that said step S40 comprises:
S41: all switches that find said each Very Important Person place conducting line segment load side;
S43: analyze the service area of said switch from the near to the remote according to topological order, find and satisfy predetermined the commentaries on classics and supply to carry the switch of condition, and generate said radius of electricity supply reduction scheme.
4. comprehensive guarantor's method for electrically according to claim 3 is characterized in that said step S43 also comprises: find out with said commentaries on classics and supply interval the 3rd distribution wire that communication relationship is arranged, and carry out following steps successively:
S431: judge whether said the 3rd distribution wire has Very Important Person, and under the situation of denying, find the described bus of said the 3rd distribution wire;
S433: whether the bus of judging said the 3rd distribution wire is the bus under the same transformer with the said bus that surpasses the distribution wire of predetermined length; And under the situation of denying; Continue to judge on all distribution wires of bus of said the 3rd distribution wire whether have Very Important Person, and under the situation of denying, judge whether said the 3rd distribution wire satisfies to change to be with requirement; And under the situation that is, generate the commentaries on classics supplier case of said the 3rd distribution wire.
5. comprehensive guarantor's method for electrically according to claim 1 is characterized in that said step S60 comprises:
Failure message according to the supply line that monitors is transferred emergency preplan;
Said emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of said portable terminal feedback is sent to the electric user of said predetermined guarantor.
6. the comprehensive electric installation of protecting is characterized in that, comprising:
First generation module (71) is used for confirming the electric Very Important Person of needs guarantor, generates the bus load export plan of each said Very Important Person;
Second generation module (73) is used to calculate the radius of electricity supply of the distribution wire at each said Very Important Person place, and the said radius of electricity supply that surpasses predetermined length is generated reduction scheme; And
Execution module (75) is used to carry out said export plan and said reduction scheme, and monitors the electric user's of said predetermined guarantor power supply situation in real time according to execution result.
7. comprehensive guarantor's electric installation according to claim 6 is characterized in that, said first generation module comprises:
Determination module is used for confirming the electric Very Important Person of needs guarantor.
8. comprehensive guarantor's electric installation according to claim 6 is characterized in that, said second generation module comprises:
Computing module is used to calculate the radius of electricity supply of the distribution wire at each said Very Important Person place.
9. comprehensive guarantor's electric installation according to claim 6 is characterized in that said execution module comprises:
Transfer module, be used for transferring emergency preplan according to the failure message of the supply line that monitors;
Sending module is used for said emergency preplan is sent to remote mobile terminal automatically, and the repairing progress of said portable terminal feedback is sent to the electric user of said predetermined guarantor.
10. comprehensive guarantor's electric installation according to claim 9 is characterized in that, the said module of transferring comprises:
Monitoring module is used for transferring emergency preplan according to the failure message of the supply line that monitors.
CN201110168000.9A 2011-06-21 2011-06-21 Comprehensive power protection method Active CN102841269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110168000.9A CN102841269B (en) 2011-06-21 2011-06-21 Comprehensive power protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110168000.9A CN102841269B (en) 2011-06-21 2011-06-21 Comprehensive power protection method

Publications (2)

Publication Number Publication Date
CN102841269A true CN102841269A (en) 2012-12-26
CN102841269B CN102841269B (en) 2015-02-04

Family

ID=47368811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110168000.9A Active CN102841269B (en) 2011-06-21 2011-06-21 Comprehensive power protection method

Country Status (1)

Country Link
CN (1) CN102841269B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108471115A (en) * 2018-04-26 2018-08-31 国网上海市电力公司 A kind of electric managing and control system of guarantor
CN111654024A (en) * 2020-06-05 2020-09-11 广东电网有限责任公司 Power protection, supply and management control method, device and equipment for power system
CN114091885A (en) * 2021-11-16 2022-02-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power consumption customer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6489693B1 (en) * 1999-02-15 2002-12-03 Isabellenhutte Heusler Gmbh Kg Method and device for current monitoring in a current supply system
CN101902077A (en) * 2010-07-13 2010-12-01 杭州交联电气工程有限公司 Operating data monitoring and alarming system of converting stations
CN201742159U (en) * 2010-05-05 2011-02-09 杭州交联电气工程有限公司 Online detection and operation and maintenance system for transformer station

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6489693B1 (en) * 1999-02-15 2002-12-03 Isabellenhutte Heusler Gmbh Kg Method and device for current monitoring in a current supply system
CN201742159U (en) * 2010-05-05 2011-02-09 杭州交联电气工程有限公司 Online detection and operation and maintenance system for transformer station
CN101902077A (en) * 2010-07-13 2010-12-01 杭州交联电气工程有限公司 Operating data monitoring and alarming system of converting stations

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108471115A (en) * 2018-04-26 2018-08-31 国网上海市电力公司 A kind of electric managing and control system of guarantor
CN111654024A (en) * 2020-06-05 2020-09-11 广东电网有限责任公司 Power protection, supply and management control method, device and equipment for power system
CN114091885A (en) * 2021-11-16 2022-02-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power consumption customer
CN114091885B (en) * 2021-11-16 2023-08-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power utilization clients

Also Published As

Publication number Publication date
CN102841269B (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN103336220B (en) The method and apparatus of distribution network failure being monitored and locating
CN102340180B (en) Remote forced monitoring system for transformer station switching operation
Tarhuni et al. Autonomous control strategy for fault management in distribution networks
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN111835002B (en) Power distribution network reliability assessment method, device and storage medium
CN103683511A (en) Method and system for processing fault of integrated monitoring platform based on power distribution network
CN105470928A (en) Zoned and layered load transferring method based on urban power transmission network fault recovery
CN110086251A (en) A kind of monitoring method and system improving electric grid operating safety
WO2019021627A1 (en) Power supply monitoring data processing device, power supply monitoring data processing method, and power supply monitoring data processing program
CN102841269A (en) Comprehensive power protection method and device
CN113537836A (en) Live working scheduling method and device and computer equipment
CN104578299A (en) Charging processing method and device
CN117424224A (en) Power failure plan balance optimization method, device, equipment and storage medium
JP5714518B2 (en) Accident information collection method and system
CN103454994B (en) Adapt to the control method of many 500kV transformer substation remote-control transmission
CN111224396A (en) Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information
CN103235224B (en) Grid fault analytical method
CN107767566B (en) Negative control terminal tripping loop control device and control method based on dynamic instructions
KR102036041B1 (en) Power acquisition monitoring system
CN110309992B (en) Distribution network reliability-based measurement equipment point distribution method and system
CN107104508B (en) Power cut-off and power transmission time automatic calculation system integrating interactive communication function
CN104297679A (en) Early warning method of breaker tripping messages
CN111355598A (en) Cloud platform power electrical configuration method based on Internet of things and intelligent cloud gateway
CN203491785U (en) Direct-current monitoring system based on PMU

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: BEIJING ELECTRIC POWER CORP.

Effective date: 20130105

Owner name: BEIJING ELECTRIC POWER CORP. ZHUHAI XJ ELECTRIC CO

Free format text: FORMER OWNER: ZHUHAI XJ ELECTRIC CO., LTD.

Effective date: 20130105

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100031 XICHENG, BEIJING TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130105

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: Beijing Electric Power Corp.

Applicant after: Zhuhai XJ Electric Co., Ltd.

Address before: 100031 Beijing Qianmen West Street, Xicheng District, No. 41

Applicant before: Beijing Electric Power Corp.

Applicant before: Zhuhai XJ Electric Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant