CN102821389B - 一种用于变电站设备监测的认知无线电系统及相关方法 - Google Patents
一种用于变电站设备监测的认知无线电系统及相关方法 Download PDFInfo
- Publication number
- CN102821389B CN102821389B CN201210193221.6A CN201210193221A CN102821389B CN 102821389 B CN102821389 B CN 102821389B CN 201210193221 A CN201210193221 A CN 201210193221A CN 102821389 B CN102821389 B CN 102821389B
- Authority
- CN
- China
- Prior art keywords
- thresholding
- cognitive
- frequency range
- communication terminal
- frequency spectrum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210193221.6A CN102821389B (zh) | 2012-06-12 | 2012-06-12 | 一种用于变电站设备监测的认知无线电系统及相关方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210193221.6A CN102821389B (zh) | 2012-06-12 | 2012-06-12 | 一种用于变电站设备监测的认知无线电系统及相关方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102821389A CN102821389A (zh) | 2012-12-12 |
CN102821389B true CN102821389B (zh) | 2016-01-20 |
Family
ID=47305187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210193221.6A Active CN102821389B (zh) | 2012-06-12 | 2012-06-12 | 一种用于变电站设备监测的认知无线电系统及相关方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102821389B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104050515A (zh) * | 2014-06-18 | 2014-09-17 | 中国水利水电科学研究院 | 一种基于年周期序贯决策的水资源配置方法 |
CN106253960B (zh) * | 2016-08-05 | 2019-11-26 | 华为技术有限公司 | 通信方法、终端与基站 |
CN107197443B (zh) * | 2017-06-21 | 2020-09-25 | 深圳市盛路物联通讯技术有限公司 | 一种基于物联网的数据传输控制方法及系统 |
CN112468248B (zh) * | 2020-11-25 | 2022-08-09 | 云南电网有限责任公司信息中心 | 基于电力无线专网的认知无线电频谱检测方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102437867A (zh) * | 2011-10-19 | 2012-05-02 | 上海炜呈智能电力科技有限责任公司 | 基于信道认知技术的电力线通信设备 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007094604A1 (en) * | 2006-02-14 | 2007-08-23 | Electronics And Telecommunications Research Institute | Method for sensing spectrum and arranging quiet period in cognitive radio system, customer premise equipment, base station and superframe structure using the same |
-
2012
- 2012-06-12 CN CN201210193221.6A patent/CN102821389B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102437867A (zh) * | 2011-10-19 | 2012-05-02 | 上海炜呈智能电力科技有限责任公司 | 基于信道认知技术的电力线通信设备 |
Non-Patent Citations (3)
Title |
---|
一种用于变电站内频谱感知的双门限加权序贯检测方法;姚继明等;《计算机与现代化》;20120331(第3期);正文第1-6页、附图1-2 * |
认知无线电中多节点协作频谱感知及其融合算法;宫润胜等;《西南大学学报(自然科学版)》;20081130;第30卷(第11期);全文 * |
认知无线电网络中的频谱感知方法研究;姚继明;《中国优秀硕士学位论文全文数据库信息科技辑》;20120415(第04期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN102821389A (zh) | 2012-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
de Souza et al. | Detection and identification of energy theft in advanced metering infrastructures | |
CN102938106B (zh) | 基于电网停电计划的主网n-1风险评估方法和系统 | |
CN102821389B (zh) | 一种用于变电站设备监测的认知无线电系统及相关方法 | |
CN103219727B (zh) | 基于pmu实测的分区电网结构动态调整方法 | |
Bian et al. | Performance evaluation of communication technologies and network structure for smart grid applications | |
CN114391106A (zh) | 用于确定电网的电参数的系统 | |
CN101763598A (zh) | 电能管理系统 | |
CN107463732A (zh) | 一种多端交直流主动配电网调度控制仿真系统及方法 | |
Carratù et al. | Performance analysis of wm-bus networks for smart metering | |
CN108520362A (zh) | 一种农村智能电网水平的综合评价方法 | |
CN108418302A (zh) | 一种基于大数据分析的配电网平台 | |
Elphick et al. | Characteristics of power quality disturbances in Australia: voltage dips at low‐voltage sites | |
CN116505656A (zh) | 基于5g物联网技术的风-光-储多能互补智慧用电系统 | |
CN203135572U (zh) | 变电站直流装置状态监测系统 | |
Ezeigweneme et al. | Smart grids in industrial paradigms: a review of progress, benefits, and maintenance implications: analyzing the role of smart grids in predictive maintenance and the integration of renewable energy sources, along with their overall impact on the industri | |
CN106530653B (zh) | 用电信息采集方法 | |
CN108303924A (zh) | 基于共享式光伏信息采集云平台监控系统及监控方法 | |
Liu et al. | False data injection attacks on smart grid voltage regulation with stochastic communication model | |
Zhou et al. | Design and application of condition monitoring for power transmission and transformation equipment based on smart grid dispatching control system | |
Huang et al. | Resilience assessment of active distribution systems considering microgrid formation based on grid‐edge DERs | |
Gao et al. | Concepts, structure and developments of high-reliability cyber-physical fusion based coordinated planning for distribution system | |
CN117366483A (zh) | 基于窄带物联网的供水管网水压水量耦合监测方法及系统 | |
CN116799949A (zh) | 一种低压台区电力监测的方法及装置 | |
CN111638046A (zh) | 一种gis设备在线监测系统及方法 | |
Quirós‐Tortós et al. | Multi‐year planning of LV networks with EVs accounting for customers, emissions and techno‐economics aspects: A practical and scalable approach |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171026 Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee after: State Grid Smart Grid Institute Patentee after: China Electric Power Research Institute Co-patentee after: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Co-patentee after: North China Grid Co., Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee before: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Patentee before: China Electric Power Research Institute Co-patentee before: North China Grid Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee after: Global energy Internet Institute, Inc. Patentee after: China Electric Power Research Institute Co-patentee after: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Co-patentee after: North China Grid Co., Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee before: State Grid Smart Grid Institute Patentee before: China Electric Power Research Institute Co-patentee before: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Co-patentee before: North China Grid Co., Ltd. |