CN102820675A - Automatic running recovery method considering real measured air speed for wind turbine generator - Google Patents

Automatic running recovery method considering real measured air speed for wind turbine generator Download PDF

Info

Publication number
CN102820675A
CN102820675A CN2012101717949A CN201210171794A CN102820675A CN 102820675 A CN102820675 A CN 102820675A CN 2012101717949 A CN2012101717949 A CN 2012101717949A CN 201210171794 A CN201210171794 A CN 201210171794A CN 102820675 A CN102820675 A CN 102820675A
Authority
CN
China
Prior art keywords
wind
idle
meritorious
energy turbine
turbine set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101717949A
Other languages
Chinese (zh)
Other versions
CN102820675B (en
Inventor
邵俊松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CHUANGHANG ELECTRICAL CO., LTD.
Original Assignee
邵俊松
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 邵俊松 filed Critical 邵俊松
Priority to CN201210171794.9A priority Critical patent/CN102820675B/en
Publication of CN102820675A publication Critical patent/CN102820675A/en
Application granted granted Critical
Publication of CN102820675B publication Critical patent/CN102820675B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Abstract

The invention relates to an automatic running recovery method considering a real measured air speed fora wind turbine generator, and is applicable to rapidly and effectively recover parallel running of an off-line wind turbine generator according to certain principles after the large-scale wind turbine generator is off-line and the fault is solved. The automatic running recovery method considering the real measured air speed for the wind turbine generator is aimed to ensure which stopped generators in a wind power plant need to be recovered and linked to the network and define the active power and reactive power for parallel operation of each stopped wind turbine generator, at the premise that the power grid is safe when the stopped wind turbine generator is linked to the network. The method works out the total active power and the total reactive power distributed to the wind power plant group on the basis of the maximum acceptable active power and reactive power of a wind power system and the real measured air speed of each wind power plant firstly, then distributes to the total active power and the total reactive power distributed to each wind power plant according to the real measured operation capacity ratio of the stopped wind turbine generators in the wind power plant, and at last capacity is equally distributed to each stopped wind turbine generators of a feeder line according to an equal power allocation plan by the wind power plant, so that the purpose of recovering the appointed stopped wind turbine generator is realized.

Description

The method that the wind-powered electricity generation unit of consideration actual measurement wind speed resumes operation automatically
Technical field
The invention belongs to the Power System and its Automation technical field, the present invention relates to the method that a kind of wind-powered electricity generation unit of considering to survey wind speed resumes operation automatically more precisely.
Background technology
The wind-powered electricity generation unit normally is designed with automatic restarting function, and when external fault caused the wind-powered electricity generation unit to be closed, in case the condition permission, the wind-powered electricity generation unit can be reset automatically or through distant place control.But at present, when wind energy turbine set inserts electrical network, because effective automatic AC of shortage and system side; For avoiding impact to system, normally do not use its automatic restart function, but after understanding the electrical network situation through operation person; And according to dispatching command; The operation that manually recovers the wind-powered electricity generation unit one by one causes the wind-powered electricity generation unit off-grid time considerably beyond failure recovery time, has caused many wind of abandoning.The basic reason of this phenomenon is short of reliable information exchange between electrical network and the wind energy turbine set, and promptly the wind-powered electricity generation unit is not understood the running status of electrical network automatically, also restarting automatically just.
The present invention is based on for this reason the maximum receivability of wind power system actual measurement anemometer meritorious, idle and each wind energy turbine set that the control centre issues calculate the platform number of the stoppage in transit wind group that each wind energy turbine set need recover and gain merit, idle numerical value.Meritorious and idle control have been considered simultaneously in the also network process of recovery off-grid wind-powered electricity generation unit; Can solve frequency and the out-of-limit problem of voltage in the wind energy turbine set unit recovery process effectively synchronously; Adopted being incorporated into the power networks of automatic recovery off-grid wind-powered electricity generation unit simultaneously; Shorten the idle time of wind-powered electricity generation unit, can effectively reduce the economic loss of wind-powered electricity generation owner and operation of power networks unit.
Summary of the invention
The present invention seeks to: the power grid security problem of stoppage in transit unit recovery process behind the solution wind power system electric network fault, ensure the rapid combination operation of stoppage in transit unit, reduce the idle time of wind-powered electricity generation unit.
The present invention adopts following technical scheme to realize, comprises the steps:
1) obtains critical data: the meritorious P of the maximum receivability of wind power system that comprises control centre's real time down Acce MaxWith idle Q Acce.MaxAnd the actual measurement wind speed of each wind energy turbine set;
2) statistics is surveyed real-time meritorious P op of wind energy turbine set operation unit under the wind speed respectively.i, idle Q Op.iThe meritorious P that sum and stoppage in transit unit are possible Stop.iWith idle Q Stop.iSum;
3) according to step 2) information calculations can distribute to the meritorious P of wind farm group PlanWith idle Q Plan, P wherein Plan=P Acce.max-∑ Pop.iQ Plan=Q Acce.max-∑ Q Op.i-∑ Q Sv.i, ∑ P in the formula Op.iRepresent the real-time active power sum of all wind energy turbine set operation units, ∑ Q Op.iRepresent the real-time reactive power sum of all wind energy turbine set operation units, ∑ Q Sv.iThe actual reactive capability sum of reactive-load compensation equipment that the expression wind power system has dropped into;
4) than dividing equally the meritorious and idle of wind farm group, what false wind electric field i was assigned to gains merit and the idle P of being respectively wind energy turbine set according to stoppage in transit unit actual measurement working capacity F.plan.iWith idle Q F.plan.i, the stoppage in transit unit actual measurement working capacity of wind energy turbine set i is than being K i, then
Figure BSA00000725179700021
∑ P in the formula F.stop.iAll stoppage in transit units of expression wind energy turbine set i possible active power sum under current wind speed, then P F.plan.i=P Plan* K i, Q F.plan.i=Q Plan* K i
5) each wind energy turbine set P that will gain merit F.plan.iWith idle Q F.plan.iBy constant power factor allocative decision capacity is all assigned in every stoppage in transit blower fan of feeder line and gone, constant power factor allocative decision need be considered the bound that the wind-powered electricity generation unit is meritorious, idle and the scope of power factor;
6) the wind energy turbine set power of distributing to the stoppage in transit unit according to step 5) recovers and net operation;
7) the output wind farm group wind-powered electricity generation unit details of resuming operation comprise active power and reactive power after resuming operation each wind energy turbine set every stoppage in transit unit recovering under which stoppage in transit unit and the current wind speed.
3, beneficial effect
This method has overcome current wind-powered electricity generation unit if want to resume operation, and can only manually recover the shortcoming of wind-powered electricity generation unit operation through dispatching command one by one.The present invention considers to survey wind speed and adopts the automatic method of recovering the stoppage in transit unit to shorten the time of wind-powered electricity generation unit fault recovery, can improve the economic benefit of wind energy turbine set; Consider meritorious and idle Collaborative Control in the recovery process, ensured the security and stability of power system restoration transient process operation.
Description of drawings
Fig. 1 is the flow chart of the inventive method.
Embodiment
Below in conjunction with accompanying drawing 1, the inventive method is described in detail.
What step 1 was described among Fig. 1 is to obtain to recover the input data that stoppage in transit machine set of calculated is used, and comprises meritorious P acce of the maximum receivability of wind power system of control centre's real time down.MaxWith idle Q Acce.MaxAnd the power of every typhoon group of motors under the actual measurement wind speed of each wind energy turbine set and the corresponding wind speed.
That step 2 is described among Fig. 1 is the real-time meritorious sum ∑ P of wind energy turbine set operation unit under the statistics actual measurement wind speed Op.iWith idle sum ∑ Q Op.iAnd the possible meritorious sum ∑ P of stoppage in transit unit Stop.iWith idle sum ∑ Q Stop.i
Step 3 is described among Fig. 1 according to meritorious P acce of the maximum receivability of wind power system.MaxWith idle Q Acce.MaxCalculate the meritorious P that can distribute to wind farm group with the power information that step 2 is calculated PlanWith idle Q Plan, computing formula is following: P Plan=P Acce.max-∑ Pop.iQ Plan=Q Acce.max-∑ Q Op.i-∑ Q Sv.i, ∑ Q in the formula Op.iRepresent the real-time reactive power sum of all wind energy turbine set operation units, ∑ Q Sv.iThe actual reactive capability sum of reactive-load compensation equipment that the expression wind power system has dropped into.
Each wind energy turbine set that step 4 is described among Fig. 1 is surveyed working capacity than the meritorious P that divides equally wind farm group according to the stoppage in transit unit PlanWith idle Q Plan, the meritorious and idle P of being respectively that false wind electric field i is assigned to F.plan.iWith idle Q F.plan.i, then the stoppage in transit unit of wind energy turbine set i is surveyed the working capacity ratio ∑ P in the formula F.stop.iAll stoppage in transit units of expression wind energy turbine set i possible active power sum under current wind speed, then P F.plan.iAnd Q F.plan.iAvailable computes P F.plan.i=P Plan* K i, Q F.plan.i=Q Plan* K i
Each wind energy turbine set that step 5 is described among Fig. 1 P that will gain merit F.plan.iWith idle Q F.plan.iBy constant power factor allocative decision capacity is all assigned in every stoppage in transit blower fan of feeder line, established by meritorious P F.plan.iWith idle Q F.plan.iThe public transport of decision is α, and j platform stoppage in transit blower fan is arranged among the wind energy turbine set i, and what then every stoppage in transit blower fan was assigned to meritoriously does P w . Plan . i . j = P F . Plan . l j * Cos α , Idlely do Q w . Plan . i . j = Q F . Plan . l j * Sin α ,
P in addition W.plan.i.j, Q W.plan.i.jAlso need verification whether to satisfy the bound of meritorious, idle and power factor respectively with cos α, if satisfied then be as the criterion with the upper limit or lower limit;
What step 6 was described among Fig. 1 is that the stoppage in transit power of the assembling unit that wind energy turbine set calculates according to step 5 is recovered and net operation.
What step 7 was described among Fig. 1 is the wind-powered electricity generation unit details that the output wind farm group resumes operation, and comprises each wind energy turbine set which stoppage in transit unit that need resume operation, active power and reactive power after every stoppage in transit unit recovers under the current actual measurement wind speed.

Claims (6)

1. consider the method that the wind-powered electricity generation unit of actual measurement wind speed resumes operation automatically, it is characterized in that comprising the following steps:
1) obtains meritorious P acce of the maximum receivability of wind power system of control centre's real time down.MaxWith idle Q Acce.MaxAnd the actual measurement wind speed of each wind energy turbine set;
2) each wind energy turbine set is according to real-time meritorious Q op of actual measurement wind speed statistics this wind energy turbine set operation unit.i, idle P Op. iSum and stoppage in transit wind-powered electricity generation unit are according to the possible meritorious P of actual measurement wind speed operation Stop.iWith idle
Q stop。iSum;
3) calculate the meritorious P that can distribute to wind farm group PlanWith idle Q Plan, meritorious P PlanEqual
P acce。MaxDeduct the meritorious summation of each wind energy turbine set operation unit, idle Q PlanEqual Q Acce.MaxDeduct the idle summation of each wind energy turbine set operation unit, deduct the actual reactive capability sum of reactive-load compensation equipment that wind power system has dropped into again;
4) each wind energy turbine set is surveyed working capacity than the meritorious P that divides equally wind farm group according to the stoppage in transit unit PlanWith idle Q Plan, the meritorious and idle P of being respectively that false wind electric field i is assigned to F.plan.iWith idle Q F.plan.i
5) wind energy turbine set is according to the meritorious P that is assigned to F.plan.iWith idle Q F.plan.iBy constant power factor allocative decision capacity is all assigned in every stoppage in transit blower fan of feeder line and gone, constant power factor allocative decision need be considered the bound that the wind-powered electricity generation unit is meritorious, idle and the scope of power factor;
6) wind energy turbine set is recovered the wind-powered electricity generation set grid-connection of stoppage in transit according to the constant power factor;
7) add up every active power and reactive power of recovering unit under unit that all wind energy turbine set resume operation and the current wind speed.
2. the method that the wind-powered electricity generation unit of consideration according to claim 1 actual measurement wind speed resumes operation automatically is characterized in that considering simultaneously in the step 1) meritorious P acce of the maximum receivability of wind power system of control centre's real time down.MaxWith idle Q Acce.MaxCarry out resuming operation of wind-powered electricity generation unit, and whether blower fan need resume operation and need to consider the actual measurement wind speed, the unit that the wind field that wind friction velocity is good resumes operation is more, otherwise just few.
3. the method that the wind-powered electricity generation unit of consideration according to claim 1 actual measurement wind speed resumes operation automatically is characterized in that step 2) in each wind energy turbine set according to real-time meritorious P op of actual measurement wind speed statistics this wind energy turbine set operation unit.i, idle Q Op.iSum; Need be when the purpose of the power of statistics operation unit is that step 3) is fallen into a trap point counting dispensing wind energy turbine set total meritorious with the maximum admissible meritorious meritorious summation of each wind energy turbine set operation unit that deduct of wind power system, need be when distributing to wind energy turbine set total idle with the maximum admissible idle idle summation of each wind energy turbine set operation unit that deducts of wind power system.
4. the method that the wind-powered electricity generation unit of consideration according to claim 1 actual measurement wind speed resumes operation automatically is characterized in that step 2) in each wind energy turbine set according to this wind energy turbine set of actual measurement wind speed statistics stoppage in transit wind-powered electricity generation unit according to possible meritorious P stop of actual measurement wind speed operation.iWith idle Q Stop.iSum, and calculate the working capacity ratio of wind farm group stoppage in transit unit with it is so that recently divide equally the meritorious P of wind farm group with the stoppage in transit unit operation capacity of wind farm group actual measurement in step 4) PlanWith idle Q Plan
5. the method that the wind-powered electricity generation unit of consideration actual measurement wind speed according to claim 1 resumes operation automatically; Considered simultaneously when it is characterized in that calculating the unit that wind energy turbine set resumes operation meritorious and idle capacity can solve frequency and the out-of-limit problem of voltage in the wind energy turbine set unit recovery process effectively synchronously.
6. the method that the wind-powered electricity generation unit of consideration actual measurement wind speed according to claim 1 resumes operation automatically; It is characterized in that going in wind energy turbine set in the step 5) all assigns to capacity feeder line according to the meritorious PF.plan.i that is assigned to and idle QF.plan.i by constant power factor allocative decision every stoppage in transit blower fan, constant power factor allocative decision has considered that simultaneously bound that the wind-powered electricity generation unit is meritorious, idle and power factor scope can guarantee to distribute to the meritorious and idle of stoppage in transit unit and not cross the border.
CN201210171794.9A 2012-05-30 2012-05-30 Automatic running recovery method considering real measured air speed for wind turbine generator Expired - Fee Related CN102820675B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210171794.9A CN102820675B (en) 2012-05-30 2012-05-30 Automatic running recovery method considering real measured air speed for wind turbine generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210171794.9A CN102820675B (en) 2012-05-30 2012-05-30 Automatic running recovery method considering real measured air speed for wind turbine generator

Publications (2)

Publication Number Publication Date
CN102820675A true CN102820675A (en) 2012-12-12
CN102820675B CN102820675B (en) 2014-09-10

Family

ID=47304603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210171794.9A Expired - Fee Related CN102820675B (en) 2012-05-30 2012-05-30 Automatic running recovery method considering real measured air speed for wind turbine generator

Country Status (1)

Country Link
CN (1) CN102820675B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104659818A (en) * 2013-11-21 2015-05-27 国家电网公司 Optimal allocation method for positive and negative spinning reserve capacity in system comprising wind farm
CN116523349A (en) * 2023-05-19 2023-08-01 北京协合运维风电技术有限公司 Wind power station reliability analysis method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005765A (en) * 2010-11-18 2011-04-06 西北电网有限公司 Grid-connected operation reactive power controlling and regulating method suitable for large wind farm
WO2012000517A2 (en) * 2010-06-30 2012-01-05 Vestas Wind Systems A/S Operating a wind power plant including energy storage during grid faults

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012000517A2 (en) * 2010-06-30 2012-01-05 Vestas Wind Systems A/S Operating a wind power plant including energy storage during grid faults
CN102005765A (en) * 2010-11-18 2011-04-06 西北电网有限公司 Grid-connected operation reactive power controlling and regulating method suitable for large wind farm

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李智等: "地区电网风电场功率超短期预测方法", 《绿色电力自动化》, vol. 34, no. 7, 10 April 2010 (2010-04-10), pages 90 - 94 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104659818A (en) * 2013-11-21 2015-05-27 国家电网公司 Optimal allocation method for positive and negative spinning reserve capacity in system comprising wind farm
CN104659818B (en) * 2013-11-21 2017-10-24 国家电网公司 A kind of optimum allocation method of positive and negative spinning reserve capacity in containing wind power system
CN116523349A (en) * 2023-05-19 2023-08-01 北京协合运维风电技术有限公司 Wind power station reliability analysis method and system
CN116523349B (en) * 2023-05-19 2024-01-23 北京协合运维风电技术有限公司 Wind power station reliability analysis method and system

Also Published As

Publication number Publication date
CN102820675B (en) 2014-09-10

Similar Documents

Publication Publication Date Title
Hossain et al. Future research directions for the wind turbine generator system
CN104052159B (en) A kind of energy management controller for wind-light storage micro-grid system
CN103595138B (en) A kind of smart micro-grid system
CN104281977B (en) A kind of mixed type micro-capacitance sensor application platform and its control method
CN102427244B (en) Large-scale photovoltaic wind power information accessing system
CN104184171B (en) A kind of wind energy turbine set layer active power controller system and method
CN102496948B (en) Central-control-system-based energy storage type wind power plant
CN103310306B (en) Wind electricity storage field integrated information management system for monitoring and monitoring management method
CN102354992A (en) Reactive-power control method of wind power field
WO2017118175A1 (en) Emergency control method applicable to wind-photovoltaic power station
CN107294131A (en) A kind of new energy power station voltage control system and method based on inverter generator operation as synchronous condenser
CN106130004A (en) A kind of also site new forms of energy considering stability characteristic (quality) receive the appraisal procedure of ability
CN202472396U (en) Off-grid small wind power station monitoring system
CN103793563A (en) Wind power plant equivalent simulation module, AC/DC locomotive and power supply system of AC/DC locomotive
CN207339296U (en) A kind of distributed photovoltaic power generation energy storage management control system
CN102820675B (en) Automatic running recovery method considering real measured air speed for wind turbine generator
CN105515014A (en) Wind farm integrated reactive power control system based on protection action information and control method thereof
CN103904684A (en) Micro-grid control system and a new energy recycling system
CN106385055A (en) Safety checking method for power distribution network containing distributed power supply
CN105098840A (en) Coordinated control method for power of wind power plant and system employing coordinated control method
CN104200027A (en) Wind power plant equivalent modeling method and device with low voltage ride through characteristic considered
Hatziargyriou et al. Energy management in the Greek islands
CN204361779U (en) A kind of wind energy turbine set fault recovery system
CN205961018U (en) Wind -solar complementary street lamp and little two -way interactive power supply system of electric wire netting of new forms of energy
CN104682398A (en) Load reduction method for realizing power supply reliability of independent micronet power supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANGSU CHUANGHANG ELECTRIC CO., LTD.

Free format text: FORMER OWNER: SHAO JUNSONG

Effective date: 20131111

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210037 NANJING, JIANGSU PROVINCE TO: 211151 NANJING, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20131111

Address after: Jiangning District of Nanjing City, Jiangsu province 211151 Hengxi Street Community Wu Tao Wang Road No. 2-2

Applicant after: JIANGSU CHUANGHANG ELECTRICAL CO., LTD.

Address before: 210037 Gulou District, Jiangsu, Nanjing Hui Lin oasis phase 1, room three, room 904

Applicant before: Shao Junsong

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20190530

CF01 Termination of patent right due to non-payment of annual fee