CN102820629A - Method for changing drainage wire parallel groove clamp under electrification - Google Patents

Method for changing drainage wire parallel groove clamp under electrification Download PDF

Info

Publication number
CN102820629A
CN102820629A CN2012103414457A CN201210341445A CN102820629A CN 102820629 A CN102820629 A CN 102820629A CN 2012103414457 A CN2012103414457 A CN 2012103414457A CN 201210341445 A CN201210341445 A CN 201210341445A CN 102820629 A CN102820629 A CN 102820629A
Authority
CN
China
Prior art keywords
parallel groove
groove clamp
bolt
insulating bar
pressing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103414457A
Other languages
Chinese (zh)
Other versions
CN102820629B (en
Inventor
翁建彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI JIAN POWER SUPPLY Co Ltd
State Grid Corp of China SGCC
Original Assignee
JIANGXI JIAN POWER SUPPLY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI JIAN POWER SUPPLY Co Ltd filed Critical JIANGXI JIAN POWER SUPPLY Co Ltd
Priority to CN201210341445.7A priority Critical patent/CN102820629B/en
Publication of CN102820629A publication Critical patent/CN102820629A/en
Application granted granted Critical
Publication of CN102820629B publication Critical patent/CN102820629B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention relates to a method for changing a drainage wire parallel groove clamp under electrification. The method comprises the following steps of: (1), checking a burning situation of a bolt, detaching bolts for fastening a parallel groove clamp and a press plate by utilizing a bolt detaching and fastening tool if the torsion of the bolts is reduced caused by burnt bolts, so as to automatically separate the fastened parallel groove clamp from the press plate; and (2) fixing the position of the parallel groove clamp by utilizing a parallel groove clamp mounting tool, placing the press plate on the parallel groove clamp by utilizing a press plate mounting tool, and finally fastening the parallel groove clamp and the press plate by utilizing the bolt detaching and fastening tool. According to the method for changing the drainage wire parallel groove clamp under electrification disclosed by the invention, the number of required operators is reduced from 12 to 6, the labor intensity is remarkably reduced, the operation is convenient, and the operators and an electric field keep safe distance so that the safety of operations under electrification is improved.

Description

The method of charged for replacement drainage thread parallel groove clamp
Technical field
The present invention relates to a kind of method of charged for replacement drainage thread parallel groove clamp.
Background technology
Live line working belongs to special work post, is high intelligence, high professional qualification, high investment, high risk work, is the operation that guarantees that power network safety operation does not have a power failure.Along with developing rapidly of electrical network, the increase of circuit is more and more, and charged elimination line defct task is heavy day by day.In order to guarantee the transmission line operational reliability, live line working is absolutely necessary; Because many circuit long operational times, ageing equipment, load weigh; Line conductor connecting portion appearance temperature raises; The phenomenon that lead is blown (particularly meeting period in kurtosis summer); This phenomenon especially occurs in the drainage thread parallel groove clamp place of junction, to the problems referred to above, eliminates the shaft tower drainage thread at present and the ditch line adopts usually: fastening when serious (need change whole drainage thread) and charged fastening two kinds of forms have a power failure: though one, have a power failure this kind of method ability good treatment defective fastening; Need planned power failure but have a power failure, promptly compel to stop with examining with unplanned stoppage in transit like need.Influence the transmission line power supply reliability same trade to mark.Add that handling similar defective circuit need have a power failure about four hours, the circuit availability coefficient obviously descends, the also corresponding increase of recondition expense; Two, adopt charged fastening method, though the circuit reliability operation has reached index, line load rising parallel groove clamp temperature raises equally.At any time can drainage thread be blown (causing one type of fault of circuit), this type of defective obviously can not well solve, and labour intensity is big, and is dangerous high.
Summary of the invention
The object of the present invention is to provide a kind of method of charged for replacement drainage thread parallel groove clamp, it has simple to operate, the advantage of safe ready.
The present invention realizes like this; A kind of method of charged for replacement drainage thread parallel groove clamp; It is characterized in that said method comprising the steps of: 1) inspection bolt burn situation; If the bolt burn causes bolt torsion to descend, then use disassembling bolts and fastened tools to remove the bolt of fastening parallel groove clamp and pressing plate, fastening parallel groove clamp separates with pressing plate automatically; 2) use the fixedly position of parallel groove clamp of parallel groove clamp erecting tools, be placed into pressing plate on the parallel groove clamp with the pressing plate erecting tools then, at last with the bolt of disassembling bolts and fastening parallel groove clamp of fastened tools and pressing plate; Described disassembling bolts and fastened tools comprise rotary handle, insulating bar, magnet and sleeve, and the upper end of insulating bar is connected with rotary handle, and the lower end of insulating bar is fixedly connected with sleeve, and the sleeve internal fixation is connected with magnet; Described parallel groove clamp erecting tools comprises pallet device, holder bar, metallic channel and insulating bar, and the pallet device is connected the lower end of insulating bar through helicitic texture, and the side of pallet device is provided with the holder bar, and the middle part of pallet device is provided with metallic channel; Described pressing plate erecting tools comprises insulating bar and grapple, and two grapple symmetries are fixedly connected on the lower end of insulating bar.
Technique effect of the present invention is: the method for charged for replacement drainage thread parallel groove clamp of the present invention makes operating personnel reduce to 6 people by 12 former people and can accomplish; Labour intensity obviously reduces; Easy to operate, and, make charged job security improve because staff and electric field keep a safe distance.
Description of drawings
Fig. 1 is the structural representation of disassembling bolts of the present invention and fastened tools.
Fig. 2 is the structural representation of parallel groove clamp erecting tools of the present invention.
Fig. 3 is the structural representation of pressing plate erecting tools of the present invention.
Rotary handle 2, insulating bar 3, magnet 4, sleeve 5, pallet device 6, holder bar 7, metallic channel 8, grapple in the drawings, 1.
Embodiment
The present invention realizes like this; A kind of method of charged for replacement drainage thread parallel groove clamp; It is characterized in that said method comprising the steps of: 1) inspection bolt burn situation; If the bolt burn causes bolt torsion to descend, then use disassembling bolts and fastened tools to remove the bolt of fastening parallel groove clamp and pressing plate, fastening parallel groove clamp separates with pressing plate automatically; 2) use the fixedly position of parallel groove clamp of parallel groove clamp erecting tools, be placed into pressing plate on the parallel groove clamp with the pressing plate erecting tools then, at last with the bolt of disassembling bolts and fastening parallel groove clamp of fastened tools and pressing plate;
Described disassembling bolts and fastened tools structure such as accompanying drawing 1, it comprises rotary handle 1, insulating bar 2, magnet 3 and sleeve 4, and the upper end of insulating bar 2 is connected with rotary handle 1, and the lower end of insulating bar 2 is fixedly connected with sleeve 4, and sleeve 4 internal fixation are connected with magnet 3;
Described parallel groove clamp erecting tools structure such as accompanying drawing 2; It comprises pallet device 5, holder bar 6, metallic channel 7 and insulating bar 2; Pallet device 5 is connected the lower end of insulating bar 2 through helicitic texture, and the side of pallet device 5 is provided with holder bar 6, and the middle part of pallet device 5 is provided with metallic channel 7;
Described pressing plate erecting tools structure such as accompanying drawing 3, it comprises that insulating bar 2 and 8, two grapple 8 symmetries of grapple are fixedly connected on the lower end of insulating bar 2.
In implementation process, the operating process of changing the drainage thread parallel groove clamp is:
1, at first the operator uses disassembling bolts and fastened tools; The user catches an end of insulating bar 2; Entangle the nut on the drainage thread parallel groove clamp with sleeve 4, rotate rotary handle 1, under the effect of magnet 3 and rotary torsion; Dismounting is the screw threads for fastening structure of drainage thread parallel groove clamp down, and this moment, parallel groove clamp and pressing plate came off under the effect of gravity naturally;
2, use the parallel groove clamp erecting tools then; The user catches insulating bar 2; Hold parallel groove clamp with pallet device 5, the holder bar 6 on the pallet device 5 blocks parallel groove clamp with metallic channel 7, moves insulating bar 2 and is placed into the parallel groove clamp on the pallet device 5 position that needs installation; Another operating personnel use the pressing plate erecting tools, use grapple 8 to catch a pressing plate earlier, utilize insulating bar 2 to move to pressing plate on the parallel groove clamp then;
3, use disassembling bolts and fastened tools at last, adsorb nuts and bolt with the magnet 3 that is positioned at sleeve 4, and be placed on the appropriate location of parallel groove clamp, rotate rotary handle 1 then, accomplish the fastening of helicitic texture.

Claims (4)

1. the method for a charged for replacement drainage thread parallel groove clamp; It is characterized in that said method comprising the steps of: 1) inspection bolt burn situation; If the bolt burn causes bolt torsion to descend; Then use disassembling bolts and fastened tools to remove the bolt of fastening parallel groove clamp and pressing plate, fastening parallel groove clamp separates with pressing plate automatically; 2) use the fixedly position of parallel groove clamp of parallel groove clamp erecting tools, be placed into pressing plate on the parallel groove clamp with the pressing plate erecting tools then, at last with the bolt of disassembling bolts and fastening parallel groove clamp of fastened tools and pressing plate.
2. the method for a kind of charged for replacement drainage thread parallel groove clamp as claimed in claim 1; It is characterized in that described disassembling bolts and fastened tools comprise rotary handle, insulating bar, magnet and sleeve; The upper end of insulating bar is connected with rotary handle; The lower end of insulating bar is fixedly connected with sleeve, and the sleeve internal fixation is connected with magnet.
3. the method for a kind of charged for replacement drainage thread parallel groove clamp as claimed in claim 1; It is characterized in that described parallel groove clamp erecting tools comprises pallet device, holder bar, metallic channel and insulating bar; The pallet device is connected the lower end of insulating bar through helicitic texture; The side of pallet device is provided with the holder bar, and the middle part of pallet device is provided with metallic channel.
4. the method for a kind of charged for replacement drainage thread parallel groove clamp as claimed in claim 1 is characterized in that described pressing plate erecting tools comprises insulating bar and grapple, and two grapple symmetries are fixedly connected on the lower end of insulating bar.
CN201210341445.7A 2012-09-17 2012-09-17 The method of charged for replacement drainage thread parallel groove clamp Expired - Fee Related CN102820629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210341445.7A CN102820629B (en) 2012-09-17 2012-09-17 The method of charged for replacement drainage thread parallel groove clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210341445.7A CN102820629B (en) 2012-09-17 2012-09-17 The method of charged for replacement drainage thread parallel groove clamp

Publications (2)

Publication Number Publication Date
CN102820629A true CN102820629A (en) 2012-12-12
CN102820629B CN102820629B (en) 2016-08-03

Family

ID=47304562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210341445.7A Expired - Fee Related CN102820629B (en) 2012-09-17 2012-09-17 The method of charged for replacement drainage thread parallel groove clamp

Country Status (1)

Country Link
CN (1) CN102820629B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103368104A (en) * 2013-07-26 2013-10-23 江苏省电力公司常州供电公司 Insulating operating rod of ground potential operation non-bearing-strength consecutive wire clamp
CN104538813A (en) * 2014-12-18 2015-04-22 国家电网公司 Operating rod of multifunctional grounding device special for meter installation and power connection
CN104836180A (en) * 2015-05-16 2015-08-12 国家电网公司 Transmission line cotter pin mounting device
CN108365560A (en) * 2018-03-29 2018-08-03 国网福建省电力有限公司泉州供电公司 A kind of overhead transmission line jumper wire and the semi-automatic replacement tool of hook wire clamp
CN110601076A (en) * 2019-10-22 2019-12-20 国网安徽省电力有限公司蚌埠供电公司 Three-phase drainage wire fixing device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2543225Y (en) * 2002-06-04 2003-04-02 嘉善银电商贸有限公司 High-voltage live lapping wire clamp holder
JP2004080955A (en) * 2002-08-21 2004-03-11 Iwabuchi Corp Electric pole clamping device for equipment attaching bracket
CN102136692A (en) * 2010-12-09 2011-07-27 福建省电力有限公司福州电业局 Tool for replacing JB type parallel groove clamp on live line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2543225Y (en) * 2002-06-04 2003-04-02 嘉善银电商贸有限公司 High-voltage live lapping wire clamp holder
JP2004080955A (en) * 2002-08-21 2004-03-11 Iwabuchi Corp Electric pole clamping device for equipment attaching bracket
CN102136692A (en) * 2010-12-09 2011-07-27 福建省电力有限公司福州电业局 Tool for replacing JB type parallel groove clamp on live line

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103368104A (en) * 2013-07-26 2013-10-23 江苏省电力公司常州供电公司 Insulating operating rod of ground potential operation non-bearing-strength consecutive wire clamp
CN103368104B (en) * 2013-07-26 2016-08-10 江苏省电力公司常州供电公司 The insulating bar of earth potential working non-bearing connecting clip
CN104538813A (en) * 2014-12-18 2015-04-22 国家电网公司 Operating rod of multifunctional grounding device special for meter installation and power connection
CN104836180A (en) * 2015-05-16 2015-08-12 国家电网公司 Transmission line cotter pin mounting device
CN108365560A (en) * 2018-03-29 2018-08-03 国网福建省电力有限公司泉州供电公司 A kind of overhead transmission line jumper wire and the semi-automatic replacement tool of hook wire clamp
CN110601076A (en) * 2019-10-22 2019-12-20 国网安徽省电力有限公司蚌埠供电公司 Three-phase drainage wire fixing device

Also Published As

Publication number Publication date
CN102820629B (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN102820629A (en) Method for changing drainage wire parallel groove clamp under electrification
CN203774471U (en) A special fixture for a low voltage switchgear cabinet busbar
CN202094540U (en) Hardware fitting with electrical installation combination tool
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN204103316U (en) For the charged insulation eagle's beak pliers action bars disconnected of isolated circuit breaker
CN110165603B (en) Device for installing T-shaped wire clamp of high-voltage wire in live-line operation
WO2020233727A1 (en) Device for dismounting and installing high-voltage line t-connector in hot-line operation
CN203674624U (en) Sleeve-type combination tool for live-line jumper clamp fastening
CN203109858U (en) Bevel gear intermediate shaft insulating spanner
CN101814707B (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN103441445A (en) 760kN disc-shaped insulator clamp
CN203367880U (en) 760kN disk-shaped insulator holder
CN110112675B (en) Device for disassembling high-voltage wire T-shaped wire clamp in live-line operation
CN204947466U (en) Portable live line working line lifter
CN202495694U (en) Charged fastening device for substation equipment clip bolts
CN105186368B (en) The automatics of the powered montage fire of overhead distribution
CN203800487U (en) Multifunctional live-line operation rod
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN203228206U (en) Transformer maintenance combined tool
CN202259718U (en) Movable-type grounding pile
CN105470839A (en) Support used for isolation switch overhauling
CN203631778U (en) Electric power cable terminal with adjustable contact surface
CN104617518A (en) Special clamp for linear angle tower and application method of special clamp
CN201927726U (en) Sequentially-mounted ground wire
CN104677616B (en) Stop limiting and monitoring device for large-sized flywheel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130328

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130328

Address after: 251 No. 343011 Ji'an province Jiangxi City Qingyuan District Qingyuan Road

Applicant after: Jiangxi Jian Power Supply Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 251 No. 343011 Ji'an province Jiangxi City Qingyuan District Qingyuan Road

Applicant before: Jiangxi Jian Power Supply Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20170917