CN102819861B - 电力系统三维设备场景建模方法 - Google Patents

电力系统三维设备场景建模方法 Download PDF

Info

Publication number
CN102819861B
CN102819861B CN201210260744.8A CN201210260744A CN102819861B CN 102819861 B CN102819861 B CN 102819861B CN 201210260744 A CN201210260744 A CN 201210260744A CN 102819861 B CN102819861 B CN 102819861B
Authority
CN
China
Prior art keywords
dimensional device
dimensional
device component
modeling
component model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210260744.8A
Other languages
English (en)
Other versions
CN102819861A (zh
Inventor
王勇
陆国俊
张显聪
黄炎光
熊俊
覃煜
易满成
林昌年
吴海宏
辛平野
伍衡
宁宇
方健
陈俊
曹柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201210260744.8A priority Critical patent/CN102819861B/zh
Publication of CN102819861A publication Critical patent/CN102819861A/zh
Application granted granted Critical
Publication of CN102819861B publication Critical patent/CN102819861B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供一种电力系统三维设备场景建模方法,包括:采用虚拟现实技术建立三维场景中各分类的三维设备组件模型;通过客户端将所述三维设备组件模型上传至服务器端的三维组件库中;通过客户端访问服务器端,从三维组件库中获取三维场景建模所需的三维设备组件模型;利用三维设备组件模型搭建三维设备场景模型;将搭建的三维设备场景模型导入电力系统仿真系统中,并根据其进行仿真培训、可视化展示或虚拟试验。本发明的技术,将建模过程拆为组件建模阶段和场景装配阶段分别进行,降低了场景建模的难度,提高了场景建模效率,模型的可复用性高,特别有利于团队协同建模,设备组件在虚拟场景中位置准确率高,后期维护的工作量小、过程简单和难度低。

Description

电力系统三维设备场景建模方法
技术领域
本发明涉及电力设备仿真建模技术,特别是涉及一种电力系统三维设备场景建模方法。
背景技术
基于虚拟现实技术的三维图形技术可以大大提高用户视图显示的逼真程度,能够更加准确、逼真地反映现场设备及环境的状态,进一步改善交互式视觉效果,具有很好的真实感、临场感。目前三维虚拟现实技术已经广泛的应用于电力系统的仿真培训、可视化展示、虚拟试验等应用中,大大提升了用户的视觉效果和人机交互体验。
为了实现虚拟现实技术在电力系统中的各类应用,三维设备场景的建模是必不可少的工作,目前的三维设备场景的建模多采用基于商用三维建模软件对整个设备场景进行建模,然后通过相关的导出插件导出为适用于各类三维图形引擎的三维场景的图形文件。
采用上述的三维场景建模方式,导致电力系统三维场景建模是一项较为繁重的工作,该项工作对建模人员要求较高,不仅要求建模人员熟练掌握三维建模软件的使用,而且还要求建模人员对电力设备场景有较好的了解。三维设备场景经常由于现场设备运行调整而需要进行二次维护和编辑,建模效率低,而且,在后期局部场景修改中,需要在建模工具中对整个场景进行修改并重新导出,维护的工作量大、过程复杂和难度高。
发明内容
基于此,有必要针对上述现有技术的三维场景建模方式效率低,维护的工作量大、过程复杂和难度高的问题,提供一种电力系统三维设备场景建模方法。
一种电力系统三维设备场景建模方法,包括如下步骤:
组件建模阶段:
采用虚拟现实技术建立三维场景中各分类的三维设备组件模型,其中,所述三维设备组件包括一个设备主体和若干部件;
通过客户端将所述三维设备组件模型上传至服务器端的三维设备组件库中;
场景装配阶段:
通过客户端访问所述服务器端,从所述三维设备组件库中获取三维场景建模所需的三维设备组件模型;
利用所述三维设备组件模型搭建三维设备场景模型;
模型应用阶段:
将所述搭建的三维设备场景模型导入电力系统仿真系统中,并根据所述三维设备场景模型进行仿真培训、可视化展示或虚拟试验。
上述电力系统三维设备场景建模方法,将建模过程拆为组件建模阶段和场景装配阶段分别进行,降低了场景建模的难度,提高了场景建模效率,模型的可复用性高,特别有利于团队协同建模,设备组件在虚拟场景中位置准确率高,后期维护的工作量小、过程简单和难度低。
附图说明
图1为一个实施例的电力系统三维设备场景建模方法流程图。
具体实施方式
下面结合附图对本发明的电力系统三维设备场景建模方法的具体实施方式作详细描述。
图1示出了一个实施例的电力系统三维设备场景建模方法,包括如下步骤:
组件建模阶段:
步骤S101,采用虚拟现实技术建立三维场景中各分类的三维设备组件模型,其中,所述三维设备组件包括一个设备主体和若干部件;
在本步骤中,主要是由三维设备组件建模人员,利用商用建模软件来对电力系统中的各类设备组件进行建模,
需要说明的是,三维设备组件是构建三维场景的基本单位,一个三维设备组件包括一个设备主体和若干部件,例如,一个隔离开关设备组件包含一个设备的主框架和刀闸运动臂、绝缘瓷瓶等部件。
在一个实施例中,建模包括如下:
a、采用商用三维建模软件3dsmax SDK中的二次开发环境,建立三维设备组件的插件;具体地,三维模型建模人员根据现场拍摄的设备的各个角度的照片,启动商业建模软件对设备进行建模,在建模的过程中,需要将设备主体模型和部件模型分别聚合成为独立的几何体。
b、将所述插件无缝集成到3dsmax中的集成运行环境中进行建模;例如,利用集成于商用建模软件中的设备组件生产器进行建模;
c、将在所述3dsmax中建立的三维设备组件模型转换并导出为电力系统的三维设备组件模型;例如,将三维设备组件导出为多个磁盘文件形式的三维模型文件和组件的配置文件。
步骤S102,通过客户端将所述三维设备组件模型上传至服务器端的三维设备组件库中;
在本步骤中,三维模型建模人员调用三维设备组件库中的客户端程序,将导出的三维模型文件及其组件配置文件上传到服务器端的三维设备组件库中,在上传前,填写三维设备组件模型的各项电气参数信息。
对于三维设备组件库,采用关系数据库的形式进行管理,各个分类的三维设备组件模型通过分配的表格进行数据存储,其中,所述表格的字段包括设备电压等级、设备型号、设备子型号、建模者名称、建模日期等信息和模型实体。在本实施例中,三维设备组件库提供了对三维设备组件模型的存储、编辑和检索功能,通过服务器端提供存储和检索服务功能;客户端则提供了访问功能,建模人员可以通过客户端提交建好的三维设备组件模型,再采用高效的数据压缩算法将每个三维设备组件模型的相关文件和配置文件压缩到一个存储数据包中。
场景装配阶段:
步骤S103,通过客户端访问所述服务器端,从所述三维设备组件库中获取三维场景建模所需的三维设备组件模型;
在本步骤中,三维模型建模人员对所述三维设备组件库中的表格进行检索,确定三维场景建模所需的三维设备组件模型;具体地,可以对上述设备电压等级、设备型号、设备子型号、建模者名称、建模日期等信息进行检索,以搜索到相关的三维设备组件模型;然后将所检索到的三维设备组件模型下载至客户端本地进行存储,供装配使用。
在一个实施例中,三维场景装配人员启动场景装配器,对照场景的实际照片,了解场景的布局和设备构成后,通过设备组件库的客户端输入设备的电气参数检索出三维设备组件模型,并下载到本地。
步骤S104,利用所述三维设备组件模型搭建三维设备场景模型;
在本步骤中,主要是三维场景装配人员通过鼠标和键盘,选择三维设备组件模型添加到场景中去,并通过选中三维设备组件模型,对三维设备组件模型的位置、方位、比例等空间参数进行调整,使得三维设备组件模型位于正确的位置。
在一个实施例中,搭建三维设备场景模型过程具体包括如下:
通过虚拟装配的搭建方式,将所述三维设备组件模型放置在场景的预设位置;根据用户输入指令,对所述三维设备组件模型进行相应的三维拾取、移动处理;将所述三维设备组件模型与装配背景进行碰撞检测;对所述三维设备组件模型进行约束导航定位,释放所述三维设备组件模型。
通过上述方式,实现了搭建三维设备场景模型,搭建的过程只需要通过界面进行简单的虚拟装配操作,操作简单,降低了建模的复杂度。
模型应用阶段:
步骤S105,将所述搭建的三维设备场景模型导入电力系统仿真系统中,并根据所述三维设备场景模型进行仿真培训、可视化展示或虚拟试验;
具体地,利用本发明的技术获得的三维设备场景模型来进行仿真应用,如进行仿真培训、可视化展示、虚拟试验等,在这些应用当中,可以减少前期建模的工作量,降低建模成本,同时在后维护中,也可以减轻维护的工作量,降低维护工作的难度和复杂度。
综上所述,相对于现有技术,本发明的电力系统三维设备场景建模方法,具有以下明显优点:
(1)降低了场景建模的整体难度,提高了场景建模的工作效率,三维模型建模人员可以专注与建立三维设备模型,无需了解电气设备场景,而且基于设备组件库,使得电力系统专业人员可以发挥专业特长,无需学习复杂的建模软件的操作即可高效的装配出三维设备场景模型。
(2)设备组件库的使用,大大提高了三维设备组件模型的复用性,而且,基于网络数据库的架构设计有利于多人团队协同工作。
(3)基于虚拟装配策略的虚拟场景组装技术,提高了三维设备组件模型在虚拟场景中位置的正确率。
以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。

Claims (2)

1.一种电力系统三维设备场景建模方法,其特征在于,包括如下步骤:
组件建模阶段:
采用虚拟现实技术建立三维场景中各分类的三维设备组件模型,其中,所述三维设备组件包括一个设备主体和若干部件;
通过客户端将所述三维设备组件模型上传至服务器端的三维设备组件库中,其中,所述三维设备组件库的管理形式为关系数据库,各个分类的三维设备组件模型通过分配的表格进行数据存储,其中,所述表格的字段包括设备电压等级、设备型号、建模者名称、建模日期和模型实体;
场景装配阶段:
通过客户端访问所述服务器端,从所述三维设备组件库中获取三维场景建模所需的三维设备组件模型,具体包括:根据设备电压等级、设备型号、建模者名称、建模日期对所述三维设备组件库中的表格进行检索,搜索相关的三维设备组件模型,确定三维场景建模所需的三维设备组件模型;将所述三维设备组件模型下载至客户端本地进行存储;
利用所述三维设备组件模型搭建三维设备场景模型;具体包括:通过虚拟装配的搭建方式,将所述三维设备组件模型放置在场景的预设位置;根据用户输入指令,对所述三维设备组件模型进行相应的三维拾取、移动处理;将所述三维设备组件模型与装配背景进行碰撞检测;对所述三维设备组件模型进行约束导航定位,释放所述三维设备组件模型;
模型应用阶段:
将所述搭建的三维设备场景模型导入电力系统仿真系统中,并根据所述三维设备场景模型进行仿真培训、可视化展示或虚拟试验。
2.根据权利要求1所述的电力系统三维设备场景建模方法,其特征在于,所述采用虚拟现实技术建立三维场景中的各类三维设备组件模型步骤包括:
采用商用三维建模软件3dsmax SDK中的二次开发环境,建立三维设备组件的插件;
将所述插件无缝集成到3dsmax中的集成运行环境中进行建模;
将在所述3dsmax中建立的三维设备组件模型转换并导出为电力系统的三维设备组件模型。
CN201210260744.8A 2012-07-25 2012-07-25 电力系统三维设备场景建模方法 Active CN102819861B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210260744.8A CN102819861B (zh) 2012-07-25 2012-07-25 电力系统三维设备场景建模方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210260744.8A CN102819861B (zh) 2012-07-25 2012-07-25 电力系统三维设备场景建模方法

Publications (2)

Publication Number Publication Date
CN102819861A CN102819861A (zh) 2012-12-12
CN102819861B true CN102819861B (zh) 2015-08-05

Family

ID=47303963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210260744.8A Active CN102819861B (zh) 2012-07-25 2012-07-25 电力系统三维设备场景建模方法

Country Status (1)

Country Link
CN (1) CN102819861B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11967434B2 (en) 2017-03-10 2024-04-23 Altair Engineering, Inc. Systems and methods for multi-dimensional fluid modeling of an organism or organ

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093663B (zh) * 2013-02-24 2014-09-24 天生桥二级水力发电有限公司 水电站三维精确建模及可视化仿真培训系统及其实施方法
CN104063527A (zh) * 2013-03-22 2014-09-24 上海电气集团股份有限公司 一种基于数字化技术的汽车工厂常用配件模型库系统
CN103268719B (zh) * 2013-06-04 2015-05-20 国家电网公司 220kvgl314六氟化硫断路器三维模型系统
CN103268387A (zh) * 2013-06-04 2013-08-28 国家电网公司 Lb6-110w2电流互感器三维模型系统
CN103268386A (zh) * 2013-06-04 2013-08-28 国家电网公司 110kVGL312六氟化硫断路器三维模型系统
CN103399873B (zh) * 2013-07-10 2017-09-29 中国大唐集团科学技术研究院有限公司 虚拟现实系统的数据库动态加载管理方法及装置
CN103455677B (zh) * 2013-09-04 2017-06-09 广东电网公司电力调度控制中心 环境仿真方法和系统
CN103578134A (zh) * 2013-11-11 2014-02-12 国网山东省电力公司 一种基于虚拟现实技术的压板投退状态仿真方法
CN103885788B (zh) * 2014-04-14 2015-02-18 焦点科技股份有限公司 一种基于模型组件化动态web 3d虚拟现实场景的搭建方法及系统
CN104123423A (zh) * 2014-08-05 2014-10-29 中铁电气化局集团有限公司 牵引供电系统bs框架下数字模型底层优化方法
CN105653750A (zh) * 2014-12-03 2016-06-08 航天科工仿真技术有限责任公司 人机界面三维设计系统中组件布局的实现方法
CN105205263B (zh) * 2015-09-23 2018-09-28 国网上海市电力公司 一种电力设备三维模型快速搭建设备及其应用
CN106202406A (zh) * 2016-07-11 2016-12-07 浪潮(北京)电子信息产业有限公司 一种3d可视化机房资产信息管理方法及系统
CN106408630A (zh) * 2016-11-18 2017-02-15 江苏省水利勘测设计研究院有限公司 一种基于vr互动技术的泵站优化运行参数模拟方法
CN106951067A (zh) * 2017-02-13 2017-07-14 歌尔科技有限公司 一种虚拟现实场景的生成方法及设备
US10803211B2 (en) * 2017-03-10 2020-10-13 General Electric Company Multiple fluid model tool for interdisciplinary fluid modeling
US10977397B2 (en) 2017-03-10 2021-04-13 Altair Engineering, Inc. Optimization of prototype and machine design within a 3D fluid modeling environment
CN107193375B (zh) * 2017-05-17 2020-11-06 李福荣 一种基于虚拟现实的电力安全生产场景交互系统
CN107330970A (zh) * 2017-06-15 2017-11-07 新奥泛能网络科技股份有限公司 一种三维模型处理方法,服务器及计算机可读取存储介质
CN107301507A (zh) * 2017-06-19 2017-10-27 福州大学 一种电力系统精准三维培训演练方法
CN107704483B (zh) * 2017-07-05 2019-02-12 国网山东省电力公司 一种三维模型的加载方法
CN107464486A (zh) * 2017-09-21 2017-12-12 内蒙古农业大学 一种电力系统仿真实验方法及装置
CN108573529A (zh) * 2018-03-20 2018-09-25 国网江苏省电力有限公司电力科学研究院 一种变电站虚拟现实场景的构建方法和系统
CN109146091A (zh) * 2018-07-30 2019-01-04 成都飞机工业(集团)有限责任公司 一种基于设备地图的设备信息可视化的实现方法
CN109584666A (zh) * 2018-12-04 2019-04-05 广州番禺职业技术学院 一种工厂一次供电系统模拟方法
CN112750193A (zh) * 2019-10-31 2021-05-04 北京博超时代软件有限公司 输电设备三维模型建模方法、装置、设备及存储介质
CN111553079B (zh) * 2020-04-29 2023-06-09 武汉船舶职业技术学院 一种基于虚拟现实技术的三维电网培训仿真方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101315642A (zh) * 2008-04-25 2008-12-03 东南大学 风力发电系统的虚拟现实仿真方法
CN102254251A (zh) * 2011-07-18 2011-11-23 广东省电力设计研究院 电网三维设计成果数据管理系统及数字化管理方法
CN102508989A (zh) * 2011-09-27 2012-06-20 福建省电力有限公司 一种基于虚拟现实的电网全景动态展示系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE60238926D1 (de) * 2001-08-31 2011-02-24 Dassault Systemes Solidworks Gleichzeitige benutzung von 2d- und 3d-modellierungsdaten

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101315642A (zh) * 2008-04-25 2008-12-03 东南大学 风力发电系统的虚拟现实仿真方法
CN102254251A (zh) * 2011-07-18 2011-11-23 广东省电力设计研究院 电网三维设计成果数据管理系统及数字化管理方法
CN102508989A (zh) * 2011-09-27 2012-06-20 福建省电力有限公司 一种基于虚拟现实的电网全景动态展示系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
全景式电力监控系统的建模与控制技术;卢宇等;《微 计 算 机 应 用》;20090430;第30卷(第4期);全文 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11967434B2 (en) 2017-03-10 2024-04-23 Altair Engineering, Inc. Systems and methods for multi-dimensional fluid modeling of an organism or organ

Also Published As

Publication number Publication date
CN102819861A (zh) 2012-12-12

Similar Documents

Publication Publication Date Title
CN102819861B (zh) 电力系统三维设备场景建模方法
CN103885788B (zh) 一种基于模型组件化动态web 3d虚拟现实场景的搭建方法及系统
CN102800065B (zh) 基于二维码识别跟踪的增强现实设备及方法
CN103440357B (zh) 虚拟现实漫游场景生成方法及系统
CN102509330B (zh) 基于电力gis的变电站虚拟三维系统的应用方法
CN103400415B (zh) 平面空间结构三维数字模型自动生成及在线互动的实现方法
CN107610238B (zh) 一种电力设备ar动态模型系统及其工作方法
CN107153744B (zh) 地下三维管线决策系统
CN103093007A (zh) 输电铁塔三维虚拟装配方法
CN108920817B (zh) 基于多要素信息模型的信号联锁系统控制仿真模拟方法
CN110134642A (zh) 管理设计数据的方法、系统以及计算机可读介质
CN104866613A (zh) 一种电网设备设施三维组件化模型数据库的建立方法
CN104392037A (zh) 一种城市场景参数化建模系统
CN102063534B (zh) 高炉大修工程进度三维模拟装置及方法
CN109272800A (zh) 一种基于Unity3D的电厂仿真培训方法
CN105741340B (zh) 一种用于网页展示的输电线路三维场景仿真方法和系统
CN107436785B (zh) 基于信息系统的Revit软件信息交互系统及交互方法
CN104850700A (zh) 一种协作式可视化仿真平台
CN104967534A (zh) 一种电网中心及配电所线缆资源统一管理与规划方法
CN103093493A (zh) 既有电网设备的高精度三维对象建模方法
CN104167017A (zh) 一种对变电站三维模型实现数据压缩的方法及系统
Nebiker Support for visualisation and animation in a scalable 3D GIS environment: motivation, concepts and implementation
CN106067184A (zh) 一种三维模型处理方法及装置
CN107301269B (zh) 基于bim技术进行配电装置数据交互的方法
CN104392035A (zh) 一种基于Web的城市三维建模方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200915

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.