CN102817370A - 正负压联合注浆方法 - Google Patents

正负压联合注浆方法 Download PDF

Info

Publication number
CN102817370A
CN102817370A CN2012102859557A CN201210285955A CN102817370A CN 102817370 A CN102817370 A CN 102817370A CN 2012102859557 A CN2012102859557 A CN 2012102859557A CN 201210285955 A CN201210285955 A CN 201210285955A CN 102817370 A CN102817370 A CN 102817370A
Authority
CN
China
Prior art keywords
pipe
grouting
tube
negative pressure
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102859557A
Other languages
English (en)
Inventor
周国庆
陆伦
赵晓东
沈慰安
赵光思
杨金宏
梁恒昌
王鹏越
王建州
周金生
王涛
毋磊
吴超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2012102859557A priority Critical patent/CN102817370A/zh
Publication of CN102817370A publication Critical patent/CN102817370A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

一种正负压联合注浆方法,属于地下工程建设中止水帷幕形成以及裂隙岩体注浆堵水方法。该方法采用三根注浆花管,二根负压注浆管,一根正压注浆管,二根负压注浆管与1标准大气压真空泵相连,一根正压注浆管与储浆罐相连。在正负压形成的压力梯度作用下,浆液将沿着正压管A和负压管B和负压管C形成的裂隙通道内以较小的阻力和较高的速度流动,当浆液扩散至负压管B和负压管C中心位置时,按顺时针移动A管和B管到C管相邻区域,重复上述过程直至形成圆形闭合止水帷幕。该方法可避免传统单管压力注浆方法中的浆液堵塞现象,容易形成止水帷幕,同时节省浆液量,具有显著的技术优势和经济价值。特别适合透水性能较好的砂层、粉土层以及裂隙岩体。

Description

正负压联合注浆方法
技术领域
本发明涉及一种用于地下工程建设中止水帷幕形成以及裂隙岩体注浆堵水方法,特别是一种正负压联合注浆方法。
背景技术
地下工程建设中临时支护结构和永久支护结构都面临地下水的侵扰,支护结构长期在地下承压水作用下,其防渗性能逐渐劣化。而注浆能有效改善地层条件,在实现注浆堵水同时提高地基承载能力。传统注浆方法一般采用“正压力注浆”,止水帷幕形成需要相邻注浆管之间浆液扩散交圈。而相邻注浆管浆液交圈同时无法控制浆液在垂直工作面方向扩散量,从而增加了注浆成本。
正压注浆是浆液流动和岩土介质内部微观结构调整变化相互耦合的过程。外部荷载直接作用在土体骨架或颗粒上,土体颗粒是“被动”重组排列,颗粒重新排列过程中微细颗粒破碎充填其中,容易出现堵塞现象,从而降低浆液流动的速度,增加注浆压力。
发明内容
本发明的目的在于提供一种操作简单,能够满足松散地层或裂隙岩体注浆堵水的正负压联合注浆方法。
本发明的目的是这样实现的:该方法为:首先将三根注浆花管布置于预止水区域,三根注浆花管中有二根为负压注浆管,一根为正压注浆管,其中二根负压注浆管为B管和C管,B管和C管与真空泵相连,一根正压注浆管为A管,A管与储浆罐相连,对储浆罐中施加正压,同时给B管和C管施加1标准大气压的负压,在A管和B管之间以及A管和C管之间形成贯通的裂隙通道,该裂隙通道始于A管分别止于B管和C管,浆液在压力梯度作用下沿着AB和AC椭圆通道扩散;待浆液顺利达到B管和C管中心处,停止注浆,取出A管和B管,按顺时针方向移动B管和A管于管C相邻区域,重复上述注浆过程,直至形成封闭式圆形止水帷幕。
有益效果,由于采用了上述方案,正负压联合注浆方法,在有效控制浆液用量前提下能够实现理想的止水帷幕,不仅具有良好的加固效果,而且经济效益显著,特别适合透水性能较好的砂层、粉土层以及裂隙岩体注浆。
在正负压联合注浆过程中,岩土介质中既存正压条件下“被动”重新排列和微细颗粒破碎充填过程,又存在负压条件下介质孔隙中的气体被抽出,土体颗粒发生“主动”重新排列的过程。正负压联合注浆管方法结合了单一负压注浆方法和单一正压压浆方法压的优点, 使得浆液在裂隙孔隙通道内流动更为顺畅,极大的缩短了形成闭合帷幕的时间,提高了注浆效率,同时有效的节省了浆液量,具有显著的技术优势和经济价值。
优点:该方法可避免传统单管压力注浆方法中的浆液堵塞现象,容易形成止水帷幕,同时节省浆液量,具有显著的技术优势和经济价值。特别适合透水性能较好的砂层、粉土层以及裂隙岩体。
附图说明
图1是传统的单管压力注浆浆液扩散示意。
图2是本发明正负压联合注浆浆液扩散示意。
具体实施方式
实施例1:该方法为:首先将三根注浆花管布置于预止水区域,三根注浆花管中有二根为负压注浆管,一根为正压注浆管,其中二根负压注浆管为B管和C管,B管和C管与真空泵相连,一根正压注浆管为A管,A管与储浆罐相连,对储浆罐中施加正压后,同时给B管和C管施加1标准大气压的负压,在A管和B管之间以及A管和C管之间形成贯通的裂隙通道,该裂隙通道始于A管分别止于B管和C管,浆液在压力梯度作用下沿着AB和AC椭圆通道扩散;待浆液顺利达到B管和C管中心处,停止注浆,取出A管和B管,按顺时针方向移动B管和A管于管B相邻区域,重复上述注浆过程,直至形成封闭式圆形止水帷幕。

Claims (1)

1. 一种正负压联合注浆方法,其特征在于:该方法为:首先将三根注浆花管布置于预止水区域,三根注浆花管中有二根为负压注浆管,一根为正压注浆管,其中二根负压注浆管为B管和C管,B管和C管与真空泵相连,一根正压注浆管为A管,A管与储浆罐相连,对储浆罐中施加正压,同时给B管和C管施加1标准大气压的负压,在A管和B管之间以及A管和C管之间形成贯通的裂隙通道,该裂隙通道始于A管分别止于B管和C管,浆液在压力梯度作用下沿着AB和AC椭圆通道扩散;待浆液顺利达到B管和C管中心处,停止注浆,取出A管和B管,按顺时针方向移动B管和A管于管C相邻区域,重复上述注浆过程,直至形成封闭式圆形止水帷幕。
CN2012102859557A 2012-08-13 2012-08-13 正负压联合注浆方法 Pending CN102817370A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102859557A CN102817370A (zh) 2012-08-13 2012-08-13 正负压联合注浆方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102859557A CN102817370A (zh) 2012-08-13 2012-08-13 正负压联合注浆方法

Publications (1)

Publication Number Publication Date
CN102817370A true CN102817370A (zh) 2012-12-12

Family

ID=47301784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102859557A Pending CN102817370A (zh) 2012-08-13 2012-08-13 正负压联合注浆方法

Country Status (1)

Country Link
CN (1) CN102817370A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895525A (zh) * 2015-06-17 2015-09-09 中国地质大学(北京) 一种气驱式注浆方法
CN105133629A (zh) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 一种垃圾填埋场地下水控制系统中止水帷幕的确定方法
CN106970181A (zh) * 2017-04-07 2017-07-21 河海大学 一种壁后注浆浆液在地层中的排水固结试验装置及方法
CN109137948A (zh) * 2018-08-27 2019-01-04 北京住总集团有限责任公司 一种桩间后注浆咬合止水方法及设备
CN110258501A (zh) * 2019-07-13 2019-09-20 北京中岩大地科技股份有限公司 一种真空负压注浆方法和装置
CN112855072A (zh) * 2021-02-04 2021-05-28 河南理工大学 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法
CN113026787A (zh) * 2021-03-24 2021-06-25 山东电力工程咨询院有限公司 一种用于咬合式排桩施工冷缝的导流注浆结构及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5249888A (en) * 1991-12-20 1993-10-05 Hughes Aircraft Company Enhanced gradient soil and groundwater remediation method
US5449251A (en) * 1993-05-04 1995-09-12 The Regents Of The University Of California Dynamic underground stripping: steam and electric heating for in situ decontamination of soils and groundwater
JPH093869A (ja) * 1995-06-21 1997-01-07 Hazama Gumi Ltd 表面グラウト工法及び表面グラウト装置
US5986159A (en) * 1997-09-16 1999-11-16 The Regents Of The University Of California Chemical tailoring of steam to remediate underground mixed waste contaminents
CN1287202A (zh) * 1999-09-03 2001-03-14 柳州欧维姆建筑机械有限公司 真空灌浆法及其密封锚索
WO2007129693A1 (ja) * 2006-05-09 2007-11-15 Asahi Techno Corp. 地盤の改良工法
JP2007309055A (ja) * 2006-05-22 2007-11-29 Kurose Aiko 軟弱地盤強化方法
JP2012112103A (ja) * 2010-11-20 2012-06-14 Maruyama Kogyo Kk 軟弱地盤の改良工法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5249888A (en) * 1991-12-20 1993-10-05 Hughes Aircraft Company Enhanced gradient soil and groundwater remediation method
US5449251A (en) * 1993-05-04 1995-09-12 The Regents Of The University Of California Dynamic underground stripping: steam and electric heating for in situ decontamination of soils and groundwater
JPH093869A (ja) * 1995-06-21 1997-01-07 Hazama Gumi Ltd 表面グラウト工法及び表面グラウト装置
US5986159A (en) * 1997-09-16 1999-11-16 The Regents Of The University Of California Chemical tailoring of steam to remediate underground mixed waste contaminents
CN1287202A (zh) * 1999-09-03 2001-03-14 柳州欧维姆建筑机械有限公司 真空灌浆法及其密封锚索
WO2007129693A1 (ja) * 2006-05-09 2007-11-15 Asahi Techno Corp. 地盤の改良工法
JP2007309055A (ja) * 2006-05-22 2007-11-29 Kurose Aiko 軟弱地盤強化方法
JP2012112103A (ja) * 2010-11-20 2012-06-14 Maruyama Kogyo Kk 軟弱地盤の改良工法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895525A (zh) * 2015-06-17 2015-09-09 中国地质大学(北京) 一种气驱式注浆方法
CN105133629A (zh) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 一种垃圾填埋场地下水控制系统中止水帷幕的确定方法
CN106970181A (zh) * 2017-04-07 2017-07-21 河海大学 一种壁后注浆浆液在地层中的排水固结试验装置及方法
CN109137948A (zh) * 2018-08-27 2019-01-04 北京住总集团有限责任公司 一种桩间后注浆咬合止水方法及设备
CN109137948B (zh) * 2018-08-27 2020-12-11 北京住总集团有限责任公司 一种桩间后注浆咬合止水方法及设备
CN110258501A (zh) * 2019-07-13 2019-09-20 北京中岩大地科技股份有限公司 一种真空负压注浆方法和装置
CN112855072A (zh) * 2021-02-04 2021-05-28 河南理工大学 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法
CN112855072B (zh) * 2021-02-04 2022-10-28 河南理工大学 利用浆液及微生物矿化多级封堵围岩裂隙水的装置及方法
CN113026787A (zh) * 2021-03-24 2021-06-25 山东电力工程咨询院有限公司 一种用于咬合式排桩施工冷缝的导流注浆结构及方法

Similar Documents

Publication Publication Date Title
CN102817370A (zh) 正负压联合注浆方法
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN103397900B (zh) 一种多孔协同压抽一体化瓦斯抽采方法
CN107939333B (zh) 多级承压式渗透型封孔方法及装置
CN203768926U (zh) 一种地下室深井封堵装置
CN204849738U (zh) 能够穿透砂层的静压管桩及其施工装置
CN102808584A (zh) 套管完井多段压裂水平井多点出水的机械堵水管柱及方法
CN202578782U (zh) 一种用于富水粉细砂层的降水管
CN103362542A (zh) 顺层瓦斯抽采钻孔分段封孔方法
CN105821884A (zh) 一种用于漂卵砾石地层的灌浆装置及灌浆方法
CN109763479A (zh) 一种增压式真空柔性管井降排水系统及其施工方法
CN103334714A (zh) 一种用于快速封孔的囊袋装置
CN201400890Y (zh) 复合止水帷幕结构
CN105274994B (zh) 在深厚饱水砂层中防倒吸防沉淀的注浆工艺及注浆装置
CN201672159U (zh) 一种管道穿越防水地面的结构
CN210315385U (zh) 一种小口径深井三管气驱排渗装置
CN204212168U (zh) 一种利用溶洞联合筑坝的大坝挡水结构
CN110805045B (zh) 一种深基坑渗漏主动防御施工方法
CN103132517B (zh) 带膨胀换热器的地源热能锚杆及施工方法
CN102350150B (zh) 含沼气地层气体抽放用过滤管
CN207538058U (zh) 一种软岩基础防渗墙槽底结构
CN204877415U (zh) 一种水平井分段压裂管柱
CN203145020U (zh) 咬合桩定向注浆结构
CN106988330A (zh) 软土地基分层降水施工结构以及施工方法
CN210370606U (zh) 一种用于水力压裂的复合形状支撑剂体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121212