CN102808423B CN201210305898.4A CN201210305898A CN102808423B CN 102808423 B CN102808423 B CN 102808423B CN 201210305898 A CN201210305898 A CN 201210305898A CN 102808423 B CN102808423 B CN 102808423B
Authority
CN
China
Prior art keywords
skin
ground
horizontal bearing
wall
flat board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210305898.4A
Other languages
Chinese (zh)
Other versions
CN102808423A (en
Inventor
郭献民
陈静
陈东
郭娟
刘洋
余鑫鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JINMEI GARDEN ENGINEERING CO LTD
Original Assignee
TIANJIN JINMEI GARDEN ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JINMEI GARDEN ENGINEERING CO LTD filed Critical TIANJIN JINMEI GARDEN ENGINEERING CO LTD
Priority to CN201210305898.4A priority Critical patent/CN102808423B/en
Publication of CN102808423A publication Critical patent/CN102808423A/en
Application granted granted Critical
Publication of CN102808423B publication Critical patent/CN102808423B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a building outer wall technology, in particular to a method for eliminating a settlement crack at the joint of the ground and a building outer wall. According to the method for eliminating the settlement crack at the joint of the ground and the building outer wall, a horizontal bearing flat plate is arranged on the lower part of the joint of the building outer wall and a ground outer surface layer and fixedly connected with the building outer wall in the vertical direction; the ground outer surface layer is arranged on the horizontal bearing flat plate; and through the horizontal bearing flat plate, the ground outer surface layer and the building outer wall are relatively fixed in the vertical direction. By the method for eliminating the settlement crack at the joint of the ground and the building outer wall, the width of the settlement crack can be reduced to be one sixth of the original width.

Description

Eliminate the method for ground and skin junction settlement crack
Technical field:
The present invention relates to a kind of skin technology, further relate to a kind of method of eliminating ground and skin junction settlement crack.
Background technology:
In building operations and landscape engineering, often running into the problem of the outer ground pavement of building and skin intersection cracking, trace it to its cause, is mainly because ground pavement is asynchronous with skin sedimentation caused.Ordinary circumstance is, skin settling rate is slower, and ground pavement sedimentation is very fast, and the two occurs crack, and is still difficult to solve the nonsynchronous problem of sedimentation after repeating to mat formation.Therefore, be badly in need of a kind of new technique, solve the asynchronous problem of Cracking causing of sedimentation.
Summary of the invention:
The object of this invention is to provide a kind of method of eliminating ground and skin junction settlement crack.The present invention realizes by following technique:
Eliminate the method for ground and skin junction settlement crack, outside the building a horizontal bearing flat board is placed in wall and extexine intersection bottom, ground, and described horizontal bearing flat board, is fixedly connected with in the vertical direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction.
The dull and stereotyped preferably reinforced concrete structure of described horizontal bearing.The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in the vertical direction with external wall.Described reinforced concrete structure is thickness 10-20 centimetre in the vertical direction, and along being 80-100 centimetre perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 5-10 centimetre; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
By implementing the technique of elimination of the present invention ground and skin junction settlement crack, the crack that sedimentation can be caused is reduced to 1/6 of primary fracture width.
Brief description of the drawings:
Fig. 1 is the embodiment of the present invention 1 structural representation.In figure, 1 represents skin; 2 represent ground extexine; 3 represent horizontal bearing flat board.
Detailed description of the invention:
Embodiment 1:
In conjunction with Fig. 1, implementation process of the present invention is described.
Eliminate the method for ground and skin junction settlement crack, outside the building a horizontal bearing flat board that steel concrete is built is placed in wall and extexine intersection bottom, ground, described horizontal bearing flat board, is fixedly connected with in vertical level direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction.
The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in vertical level direction with external wall.Described reinforced concrete structure 20 centimetres of thickness in the vertical direction, along being 100 centimetres perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 10 centimetres; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
Measured data.We are taking two groups of Practical Projects as experimental subjects.
First group: using length as 10m external wall and 1*10m granite mat formation as experimental subjects, according to the method for the invention construction, after horizontal bearing flat plate steel reinforced concrete is built, through normal maintenance in 7 days, start at top laying granite face.
Second group: using length as 10m external wall and 1*10m granite mat formation as experimental subjects, according to conventional construction, in concrete cushion, do not implant reinforcing bar, through normal maintenance in 7 days, start bed course top lay granite face.
The surface construction of two groups of experiments starts simultaneously, finishes simultaneously, maintenance simultaneously.Surface construction is complete is April 10, and in external wall and the junction of mating formation, two groups of experimental subjects all arrange a settlement observation point.Now, the distance of two groups of observation points and seam is 0.Note: settlement observation point at external wall and the seam crossing of mating formation, arranges a fixing mark.
June 10, through observation, first group of observation point and seam were apart from being 0.4mm; Second group of observation point and seam distance are 1mm.
August 10, through observation, first group of observation point and seam were apart from being 1mm; Second group of observation point and seam distance are 5mm.
October 10, through observation, first group of observation point and seam were apart from being 1.2mm; Second group of observation point and seam distance are 8mm.
December 10, through observation, first group of observation point and seam were apart from being 1.5mm; Second group of observation point and seam distance are 9mm.Now sedimentation no longer occurs.
Table 1: experimental data contrast table
Observation time First group of crack width Second group of crack width
2011.4.10 0 0
2011.6.10 0.4mm 1mm
2011.8.10 1mm 5mm
2011.10.10 1.2mm 8mm
2011.12.10 1.5mm 9mm
Through above-mentioned experiment, first group of settlement crack amplitude is 1.5mm, and second group of settlement crack amplitude is 9mm.Implement construction technology of the present invention, can make this type of settlement issues be controlled effectively.

Claims (1)

1. the method for eliminating ground and skin junction settlement crack, is characterized in that, outside the building a horizontal bearing flat board is placed in wall and extexine intersection bottom, ground, and described horizontal bearing flat board, is fixedly connected with in the vertical direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction;
Described horizontal bearing flat board is reinforced concrete structure; The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in the vertical direction with external wall;
Described reinforced concrete structure is thickness 10-20 centimetre in the vertical direction, and along being 80-100 centimetre perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 5-10 centimetre; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
CN201210305898.4A 2012-08-23 2012-08-23 Method for eliminating settlement crack at joint of ground and building outer wall Expired - Fee Related CN102808423B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210305898.4A CN102808423B (en) 2012-08-23 2012-08-23 Method for eliminating settlement crack at joint of ground and building outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210305898.4A CN102808423B (en) 2012-08-23 2012-08-23 Method for eliminating settlement crack at joint of ground and building outer wall

Publications (2)

Publication Number Publication Date
CN102808423A CN102808423A (en) 2012-12-05
CN102808423B true CN102808423B (en) 2014-07-23

Family

ID=47232279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210305898.4A Expired - Fee Related CN102808423B (en) 2012-08-23 2012-08-23 Method for eliminating settlement crack at joint of ground and building outer wall

Country Status (1)

Country Link
CN (1) CN102808423B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0010883B1 (en) * 1978-10-19 1982-01-27 Schlegel (Uk) Limited Improved crack inducing and sealing strip
CN2154881Y (en) * 1992-10-24 1994-02-02 王玉德 Light spacing board and its connecting structure
DE4422648C2 (en) * 1994-06-28 1998-09-03 Rene P Schmid Sollriß joint rail
CN101131000A (en) * 2006-08-23 2008-02-27 天津市森宇建筑技术法律咨询有限公司 Construction method for controlling differential settlement of buildings
CN101608503B (en) * 2009-03-26 2011-10-05 云南奥斯通芬兰新型建材有限公司 Method for preventing and controlling cracks of hollow wallboard for building

Also Published As

Publication number Publication date
CN102808423A (en) 2012-12-05

Similar Documents

Publication Publication Date Title
CN208293405U (en) A kind of abutment of linking deck type suspension bridge and the sidewalk that bankets
CN105178202A (en) Method for reinforcing concrete pier through combination of corrugated steel pipes and fiber reinforced powder concrete
CN103711328B (en) The bracing means of a kind of beams of concrete and construction method thereof
CN203346750U (en) Long-short pile raft structure roadbed of deep spongy soil region
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN204703012U (en) Dual adjustable formula track foundation
CN202787312U (en) Building outer wall structure for eliminating settlement cracks on junction of ground and building outer wall
CN102808423B (en) Method for eliminating settlement crack at joint of ground and building outer wall
CN204801846U (en) Civil engineering pipe fitting rack
CN204266216U (en) Bamboo beam anchoring and supporting structure of side slope
CN203498850U (en) Raft foundation reinforcement support of super high-rising building
CN205804315U (en) A kind of soft soil foundation structure of anti-Earth cave
CN202298649U (en) Buttress structure with longitudinal beams
CN205171382U (en) Hyperboloid case beam side combination structure support device
CN202899141U (en) Foundation pit supporting structure suitable for basin type excavation method
CN203960759U (en) A kind of off-load formula rigidity culvert structure
CN202577344U (en) L-shaped retaining wall structure
CN202451974U (en) Anti-floating structure of buried pipeline
CN208121792U (en) A kind of brick mold structure of stable structure
CN207933907U (en) Longitudinal shallow embedding box culvert and road connected structure
CN205662945U (en) Precast concrete piping lane
CN204510258U (en) A kind of reinforced bar net layered rolling retaining wall structure
CN105464127A (en) Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall
CN203977814U (en) The plugging structure at hole, a kind of lift door frame bottom
CN204040057U (en) A kind of adjustable bucket wheel machine foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140723

CF01 Termination of patent right due to non-payment of annual fee