CN102808423B - Method for eliminating settlement crack at joint of ground and building outer wall - Google Patents
Method for eliminating settlement crack at joint of ground and building outer wall Download PDFInfo
- Publication number
- CN102808423B CN102808423B CN201210305898.4A CN201210305898A CN102808423B CN 102808423 B CN102808423 B CN 102808423B CN 201210305898 A CN201210305898 A CN 201210305898A CN 102808423 B CN102808423 B CN 102808423B
- Authority
- CN
- China
- Prior art keywords
- skin
- ground
- horizontal bearing
- wall
- flat board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 239000011150 reinforced concrete Substances 0.000 claims description 9
- 239000004567 concrete Substances 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 4
- 239000002344 surface layer Substances 0.000 abstract 3
- 238000004062 sedimentation Methods 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 5
- 239000010438 granite Substances 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000005336 cracking Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 208000010392 Bone Fractures Diseases 0.000 description 1
- 206010017076 Fracture Diseases 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
- Foundations (AREA)
Abstract
The invention relates to a building outer wall technology, in particular to a method for eliminating a settlement crack at the joint of the ground and a building outer wall. According to the method for eliminating the settlement crack at the joint of the ground and the building outer wall, a horizontal bearing flat plate is arranged on the lower part of the joint of the building outer wall and a ground outer surface layer and fixedly connected with the building outer wall in the vertical direction; the ground outer surface layer is arranged on the horizontal bearing flat plate; and through the horizontal bearing flat plate, the ground outer surface layer and the building outer wall are relatively fixed in the vertical direction. By the method for eliminating the settlement crack at the joint of the ground and the building outer wall, the width of the settlement crack can be reduced to be one sixth of the original width.
Description
Technical field:
The present invention relates to a kind of skin technology, further relate to a kind of method of eliminating ground and skin junction settlement crack.
Background technology:
In building operations and landscape engineering, often running into the problem of the outer ground pavement of building and skin intersection cracking, trace it to its cause, is mainly because ground pavement is asynchronous with skin sedimentation caused.Ordinary circumstance is, skin settling rate is slower, and ground pavement sedimentation is very fast, and the two occurs crack, and is still difficult to solve the nonsynchronous problem of sedimentation after repeating to mat formation.Therefore, be badly in need of a kind of new technique, solve the asynchronous problem of Cracking causing of sedimentation.
Summary of the invention:
The object of this invention is to provide a kind of method of eliminating ground and skin junction settlement crack.The present invention realizes by following technique:
Eliminate the method for ground and skin junction settlement crack, outside the building a horizontal bearing flat board is placed in wall and extexine intersection bottom, ground, and described horizontal bearing flat board, is fixedly connected with in the vertical direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction.
The dull and stereotyped preferably reinforced concrete structure of described horizontal bearing.The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in the vertical direction with external wall.Described reinforced concrete structure is thickness 10-20 centimetre in the vertical direction, and along being 80-100 centimetre perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 5-10 centimetre; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
By implementing the technique of elimination of the present invention ground and skin junction settlement crack, the crack that sedimentation can be caused is reduced to 1/6 of primary fracture width.
Brief description of the drawings:
Fig. 1 is the embodiment of the present invention 1 structural representation.In figure, 1 represents skin; 2 represent ground extexine; 3 represent horizontal bearing flat board.
Detailed description of the invention:
Embodiment 1:
In conjunction with Fig. 1, implementation process of the present invention is described.
Eliminate the method for ground and skin junction settlement crack, outside the building a horizontal bearing flat board that steel concrete is built is placed in wall and extexine intersection bottom, ground, described horizontal bearing flat board, is fixedly connected with in vertical level direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction.
The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in vertical level direction with external wall.Described reinforced concrete structure 20 centimetres of thickness in the vertical direction, along being 100 centimetres perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 10 centimetres; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
Measured data.We are taking two groups of Practical Projects as experimental subjects.
First group: using length as 10m external wall and 1*10m granite mat formation as experimental subjects, according to the method for the invention construction, after horizontal bearing flat plate steel reinforced concrete is built, through normal maintenance in 7 days, start at top laying granite face.
Second group: using length as 10m external wall and 1*10m granite mat formation as experimental subjects, according to conventional construction, in concrete cushion, do not implant reinforcing bar, through normal maintenance in 7 days, start bed course top lay granite face.
The surface construction of two groups of experiments starts simultaneously, finishes simultaneously, maintenance simultaneously.Surface construction is complete is April 10, and in external wall and the junction of mating formation, two groups of experimental subjects all arrange a settlement observation point.Now, the distance of two groups of observation points and seam is 0.Note: settlement observation point at external wall and the seam crossing of mating formation, arranges a fixing mark.
June 10, through observation, first group of observation point and seam were apart from being 0.4mm; Second group of observation point and seam distance are 1mm.
August 10, through observation, first group of observation point and seam were apart from being 1mm; Second group of observation point and seam distance are 5mm.
October 10, through observation, first group of observation point and seam were apart from being 1.2mm; Second group of observation point and seam distance are 8mm.
December 10, through observation, first group of observation point and seam were apart from being 1.5mm; Second group of observation point and seam distance are 9mm.Now sedimentation no longer occurs.
Table 1: experimental data contrast table
Observation time | First group of crack width | Second group of crack width |
2011.4.10 | 0 | 0 |
2011.6.10 | 0.4mm | 1mm |
2011.8.10 | 1mm | 5mm |
2011.10.10 | 1.2mm | 8mm |
2011.12.10 | 1.5mm | 9mm |
Through above-mentioned experiment, first group of settlement crack amplitude is 1.5mm, and second group of settlement crack amplitude is 9mm.Implement construction technology of the present invention, can make this type of settlement issues be controlled effectively.
Claims (1)
1. the method for eliminating ground and skin junction settlement crack, is characterized in that, outside the building a horizontal bearing flat board is placed in wall and extexine intersection bottom, ground, and described horizontal bearing flat board, is fixedly connected with in the vertical direction with external wall; Ground extexine is arranged on horizontal bearing flat board; By horizontal bearing flat board, realize ground extexine relative fixing with skin position in vertical direction;
Described horizontal bearing flat board is reinforced concrete structure; The method of attachment of described reinforced concrete structure and skin is: the reinforcing bar distribution mode in steel concrete is that grid distributes, one group is perpendicular to skin, another is organized as being parallel to skin, wherein a group perpendicular to skin vertically inserts exterior wall, after building, realize horizontal bearing flat board, be fixedly connected with in the vertical direction with external wall;
Described reinforced concrete structure is thickness 10-20 centimetre in the vertical direction, and along being 80-100 centimetre perpendicular to skin direction width, the reinforcing bar degree of depth of inserting skin is 5-10 centimetre; Reinforcing bar model is Φ 10 200, and concrete model is C20 or C25.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210305898.4A CN102808423B (en) | 2012-08-23 | 2012-08-23 | Method for eliminating settlement crack at joint of ground and building outer wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210305898.4A CN102808423B (en) | 2012-08-23 | 2012-08-23 | Method for eliminating settlement crack at joint of ground and building outer wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102808423A CN102808423A (en) | 2012-12-05 |
CN102808423B true CN102808423B (en) | 2014-07-23 |
Family
ID=47232279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210305898.4A Expired - Fee Related CN102808423B (en) | 2012-08-23 | 2012-08-23 | Method for eliminating settlement crack at joint of ground and building outer wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102808423B (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0010883B1 (en) * | 1978-10-19 | 1982-01-27 | Schlegel (Uk) Limited | Improved crack inducing and sealing strip |
CN2154881Y (en) * | 1992-10-24 | 1994-02-02 | 王玉德 | Light spacing board and its connecting structure |
DE4422648C2 (en) * | 1994-06-28 | 1998-09-03 | Rene P Schmid | Sollriß joint rail |
CN101131000A (en) * | 2006-08-23 | 2008-02-27 | 天津市森宇建筑技术法律咨询有限公司 | Construction method for controlling differential settlement of buildings |
CN101608503B (en) * | 2009-03-26 | 2011-10-05 | 云南奥斯通芬兰新型建材有限公司 | Method for preventing and controlling cracks of hollow wallboard for building |
-
2012
- 2012-08-23 CN CN201210305898.4A patent/CN102808423B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102808423A (en) | 2012-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208293405U (en) | A kind of abutment of linking deck type suspension bridge and the sidewalk that bankets | |
CN105178202A (en) | Method for reinforcing concrete pier through combination of corrugated steel pipes and fiber reinforced powder concrete | |
CN103711328B (en) | The bracing means of a kind of beams of concrete and construction method thereof | |
CN203346750U (en) | Long-short pile raft structure roadbed of deep spongy soil region | |
CN104532714A (en) | Roadbed structure for treating deep soft soil karst foundation | |
CN204703012U (en) | Dual adjustable formula track foundation | |
CN202787312U (en) | Building outer wall structure for eliminating settlement cracks on junction of ground and building outer wall | |
CN102808423B (en) | Method for eliminating settlement crack at joint of ground and building outer wall | |
CN204801846U (en) | Civil engineering pipe fitting rack | |
CN204266216U (en) | Bamboo beam anchoring and supporting structure of side slope | |
CN203498850U (en) | Raft foundation reinforcement support of super high-rising building | |
CN205804315U (en) | A kind of soft soil foundation structure of anti-Earth cave | |
CN202298649U (en) | Buttress structure with longitudinal beams | |
CN205171382U (en) | Hyperboloid case beam side combination structure support device | |
CN202899141U (en) | Foundation pit supporting structure suitable for basin type excavation method | |
CN203960759U (en) | A kind of off-load formula rigidity culvert structure | |
CN202577344U (en) | L-shaped retaining wall structure | |
CN202451974U (en) | Anti-floating structure of buried pipeline | |
CN208121792U (en) | A kind of brick mold structure of stable structure | |
CN207933907U (en) | Longitudinal shallow embedding box culvert and road connected structure | |
CN205662945U (en) | Precast concrete piping lane | |
CN204510258U (en) | A kind of reinforced bar net layered rolling retaining wall structure | |
CN105464127A (en) | Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall | |
CN203977814U (en) | The plugging structure at hole, a kind of lift door frame bottom | |
CN204040057U (en) | A kind of adjustable bucket wheel machine foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140723 |
|
CF01 | Termination of patent right due to non-payment of annual fee |