CN105464127A - Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall - Google Patents

Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall Download PDF

Info

Publication number
CN105464127A
CN105464127A CN201510067264.3A CN201510067264A CN105464127A CN 105464127 A CN105464127 A CN 105464127A CN 201510067264 A CN201510067264 A CN 201510067264A CN 105464127 A CN105464127 A CN 105464127A
Authority
CN
China
Prior art keywords
retaining wall
construction method
grid
layered rolling
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510067264.3A
Other languages
Chinese (zh)
Inventor
宋泽恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201510067264.3A priority Critical patent/CN105464127A/en
Publication of CN105464127A publication Critical patent/CN105464127A/en
Pending legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

The invention discloses a construction method for a fractional decomposition retaining wall and a reinforced net layered rolling structure for the retaining wall. The construction method for the fractional decomposition retaining wall comprises the steps that 1, the fractional decomposition retaining wall in the eight-meter height H position is parted, and an existing reinforced concrete cantilever structure is still adopted for the section where the height H of the retaining wall is smaller than eight meters; 2, the reinforced net layered rolling structure is adopted for the section where the height H of the retaining wall is larger than or equal to eight meters; 3, the construction method that the retaining wall is constructed at first, and then soil backfilling is conducted is adopted for the reinforced concrete cantilever structure; and 4, the construction method that a layer of building blocks are built, a layer of grille net is paved and a layer of backfilling soil is cushioned to be firmly rolled and elevated layer by layer is adopted for the reinforced net layered rolling structure. According to the construction method for the fractional decomposition retaining wall and the reinforced net layered rolling structure for the retaining wall, different wall structures are adopted according to different heights of the retaining wall, so that the requirement for bearing capacity of foundation soil is met, and potential safety hazards are eliminated; meanwhile, the construction investment of an operative surface is also reduced, and the construction period is shortened; the structure is reasonable, and stressing is definite.

Description

The construction method of decomposition retaining wall and reinforced bar net layered rolling retaining wall structure
Technical field
the present invention relates to a kind of construction method and reinforced bar net layered rolling retaining wall structure of decomposition retaining wall, what belong to decomposition operating surface constructs technical field.
Background technology
according to the technological process requirement of decomposition, need structure length L to be 300 meters, width W is 42 meters, and the gradient is the operating surface of 3%.Constructing of this operating surface first constructs retaining wall, formation of then banketing in retaining wall, and therefore this operating surface is a long and narrow inclined plane, and minimum operating surface is concordant with ground, and operating surface highest point H is above the ground level about 9 meters.Existing retaining wall all adopts steel concrete cantilever retaining wall.This structure has the following disadvantages, when basis hold power bearing capacity lower or for backfill time, higher steel concrete cantilever retaining wall bearing capacity of foundation soil can not meet the demands, and there is potential safety hazard.The steel concrete cantilever retaining wall construction period is longer in addition, invests larger.
Summary of the invention
the object of the invention is to, provide a kind of and can eliminate safe hidden trouble and the construction method of the decomposition retaining wall that the construction period is shorter, investment is less and reinforced bar net layered rolling retaining wall structure, to overcome the deficiencies in the prior art.
technical scheme of the present invention is achieved in that
the construction method of a kind of decomposition retaining wall of the present invention is, the method is 8 meters of punishment circles in decomposition retaining wall height H, and retaining wall height H is less than 8 meters one section and still adopts existing steel concrete cantilever construction; Retaining wall height H is equal to or greater than one section of employing reinforced bar net layered rolling structure of 8 meters; Steel concrete cantilever construction adopts and first constructs retaining wall, then the construction method of backfill; Reinforced bar net layered rolling structure adopts builds one deck building block, lays one deck grid, the construction method that pad one deck backfill compaction by rolling successively raises.
in preceding method, the construction sequence of described reinforced bar net layered rolling retaining wall is first in below ground construction reinforced bar concrete foundation, reinforced concrete foundation is built one deck building block, inside building block, lays one deck grid, grid pads one deck backfill compaction; Then repeat above-mentioned steps to build to design height always, last construct a steel concrete cap stone along most top layer block tops, and at building block external surface construction surface layer.
in preceding method, described grid width is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm, and the degree of compaction of layered rolling backfill is greater than 93%.
according to of the present invention a kind of reinforced bar net layered rolling retaining wall structure that said method builds be, this structure comprises the reinforced concrete foundation located below ground level, reinforced concrete foundation is provided with the reinforced bar net layered rolling retaining wall body of wall be made up of building block, body of wall top is provided with steel concrete cap stone, and exterior surface of wall is provided with surface layer; Be equipped with the grid that layering is arranged inside body of wall, between grid, be provided with the backfill of layering compaction by rolling.
in aforementioned structure, described grid width W 1 is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm.
owing to have employed technique scheme, the present invention compared with prior art, the present invention have employed different wall body structures according to the height difference of retaining wall, the present invention meets the requirement of bearing capacity of foundation soil by adopting reinforced bar net layered rolling structure at higher retaining wall, thus effectively eliminates potential safety hazard.The present invention had both met the requirement of bearing capacity of foundation soil, turn eliminated potential safety hazard, also saved the construction investment of operating surface simultaneously, shortened the construction period.Use through actual tests and prove, the present invention not only has the advantage that can effectively eliminate safe hidden trouble, but also has construction period short, less, rational in infrastructure, the stressed advantage such as clearly of investment.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention;
fig. 2 is the structural representation of steel concrete cantilever retaining wall;
fig. 3 is the structural representation of reinforced bar net layered rolling retaining wall of the present invention.
being labeled as in accompanying drawing: the backfill of 1-reinforced bar net layered rolling retaining wall, 2-steel concrete cantilever retaining wall, 3-backfill, 4-ground, 5-grid, 6-reinforced concrete foundation, 7-reinforced concrete segment, 8-layering compaction by rolling, 9-surface layer, 10-steel concrete cap stone, 11-boundary.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
the construction method of a kind of decomposition retaining wall of the present invention, as shown in Figure 1, the method is 8 meters of punishment circles 11 in decomposition retaining wall height H, and retaining wall height H is less than 8 meters one section and still adopts existing steel concrete cantilever construction; Retaining wall height H is equal to or greater than one section of employing reinforced bar net layered rolling structure of 8 meters; Steel concrete cantilever construction adopts and first constructs retaining wall, then the construction method of backfill; Reinforced bar net layered rolling structure adopts builds one deck building block, lays one deck grid, the construction method that pad one deck backfill compaction by rolling successively raises.The construction sequence of reinforced bar net layered rolling retaining wall is first in below ground construction reinforced bar concrete foundation, reinforced concrete foundation is built one deck building block, lays one deck grid inside building block, grid pads one deck backfill compaction; Then repeat above-mentioned steps to build to design height always, last construct a steel concrete cap stone along most top layer block tops, and at building block external surface construction surface layer.Grid width is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm, and the degree of compaction of layered rolling backfill is greater than 93%.
according to of the present invention a kind of reinforced bar net layered rolling retaining wall structure that said method builds, as shown in Figure 3, this structure comprises the reinforced concrete foundation 6 being positioned at ground less than 4, reinforced concrete foundation 6 is provided with reinforced bar net layered rolling retaining wall 1 body of wall be made up of building block 7, body of wall top is provided with steel concrete cap stone 10, and exterior surface of wall is provided with surface layer 9; Be equipped with the grid 5 that layering is arranged inside body of wall, between grid 5, be provided with the backfill 8 of layering compaction by rolling.Grid 5 width W 1 is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm.
Embodiment
as shown in Figure 1, when retaining wall is higher than 8 meters, and when bearing capacity of foundation soil is lower, decomposition DESIGN OF RETAINING WALLS is become reinforced bar net layered rolling retaining wall 1.To ensure the safety of structure, investment reduction and the reduction of erection time simultaneously.If when transforming existing decomposition retaining wall, boundary 11 can be set being highly about 8 meters of, remove the steel concrete cantilever retaining wall higher than 8 meters, again constructing by reinforced bar net layered rolling retaining wall 1.When constructing reinforced bar net layered rolling retaining wall 1, first do 1200 × 500mm reinforced concrete foundation 6; Spread the backfill 8 of one deck grid 5 and layering compaction by rolling again at interval of 350mm, then build 350 × 350 × 500mm reinforced concrete segment at reinforced concrete foundation 6 end face.Grid 5, backfill, building block 7 are alternately constructed until retaining wall top; Finally build 150mm thick C30 steel concrete surface layer 9 in reinforced bar net layered rolling retaining wall 1 side; Finally again do steel concrete cap stone 10 at surface layer top C25 concrete.

Claims (5)

1. a construction method for decomposition retaining wall, is characterized in that: the method is 8 meters of punishment circles in decomposition retaining wall height H, and retaining wall height H is less than 8 meters one section and still adopts existing steel concrete cantilever construction; Retaining wall height H is equal to or greater than one section of employing reinforced bar net layered rolling structure of 8 meters; Steel concrete cantilever construction adopts and first constructs retaining wall, then the construction method of backfill; Reinforced bar net layered rolling structure adopts builds one deck building block, lays one deck grid, the construction method that pad one deck backfill compaction by rolling successively raises.
2. the construction method of decomposition retaining wall according to claim 1, it is characterized in that: the construction sequence of described reinforced bar net layered rolling retaining wall is first in below ground construction reinforced bar concrete foundation, reinforced concrete foundation is built one deck building block, inside building block, lay one deck grid, grid pads one deck backfill compaction; Then repeat above-mentioned steps to build to design height always, last construct a steel concrete cap stone along most top layer block tops, and at building block external surface construction surface layer.
3. the construction method of decomposition retaining wall according to claim 2, is characterized in that: described grid width is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm, and the degree of compaction of layered rolling backfill is greater than 93%.
4. a reinforced bar net layered rolling retaining wall structure, it is characterized in that: comprise and be positioned at ground (4) reinforced concrete foundation below (6), reinforced concrete foundation (6) is provided with reinforced bar net layered rolling retaining wall (1) body of wall be made up of building block (7), body of wall top is provided with steel concrete cap stone (10), and exterior surface of wall is provided with surface layer (9); Be equipped with the grid (5) that layering is arranged inside body of wall, between grid (5), be provided with the backfill (8) of layering compaction by rolling.
5. reinforced bar net layered rolling retaining wall structure according to claim 4, is characterized in that: described grid (5) width W 1 is not less than 2 meters, and the spacing between every layer of grid is not less than 350mm.
CN201510067264.3A 2015-02-10 2015-02-10 Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall Pending CN105464127A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510067264.3A CN105464127A (en) 2015-02-10 2015-02-10 Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510067264.3A CN105464127A (en) 2015-02-10 2015-02-10 Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall

Publications (1)

Publication Number Publication Date
CN105464127A true CN105464127A (en) 2016-04-06

Family

ID=55602245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510067264.3A Pending CN105464127A (en) 2015-02-10 2015-02-10 Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall

Country Status (1)

Country Link
CN (1) CN105464127A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024665A (en) * 2018-09-11 2018-12-18 四川睿铁科技有限责任公司 A kind of building-brick type reinforced earth bulkhead and its construction method
CN115142465A (en) * 2022-06-18 2022-10-04 中国水利水电第十六工程局有限公司 Construction method of inclined gravity retaining wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070073434A (en) * 2006-01-05 2007-07-10 박성언 Environment green wall
CN201321618Y (en) * 2008-12-23 2009-10-07 中铁二院工程集团有限责任公司 Cantilever retaining wall reinforcing compound structure
CN204510258U (en) * 2015-02-10 2015-07-29 贵阳铝镁设计研究院有限公司 A kind of reinforced bar net layered rolling retaining wall structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070073434A (en) * 2006-01-05 2007-07-10 박성언 Environment green wall
CN201321618Y (en) * 2008-12-23 2009-10-07 中铁二院工程集团有限责任公司 Cantilever retaining wall reinforcing compound structure
CN204510258U (en) * 2015-02-10 2015-07-29 贵阳铝镁设计研究院有限公司 A kind of reinforced bar net layered rolling retaining wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴彬彬等: "加筋土路肩挡土墙施工工艺", 《西铁科技》 *
皮正波: "高边坡RMC挡土墙的研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑(月刊)》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024665A (en) * 2018-09-11 2018-12-18 四川睿铁科技有限责任公司 A kind of building-brick type reinforced earth bulkhead and its construction method
CN115142465A (en) * 2022-06-18 2022-10-04 中国水利水电第十六工程局有限公司 Construction method of inclined gravity retaining wall
CN115142465B (en) * 2022-06-18 2024-05-14 中国水利水电第十六工程局有限公司 Construction method of upward inclined gravity retaining wall

Similar Documents

Publication Publication Date Title
CN203923924U (en) No. 0 section bracket prepressing device
CN103161169B (en) Prestressed girder for foundation pit supporting
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN103966947B (en) A kind of anti-fall girder apparatus based on bridge beam body damping
CN103290851B (en) Prestressed steel support used for controlling internal and external differential displacement of foundation pit enclosure wall and construction method
CN104674843A (en) Cantilever type steel reinforced concrete pre-stressed composite structure for reinforcing retaining wall
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN105464127A (en) Construction method for fractional decomposition retaining wall and reinforced net layered rolling structure for retaining wall
CN103603502A (en) High altitude spherical net rack splicing method based on large gymnasium frame continuous beam
CN204510258U (en) A kind of reinforced bar net layered rolling retaining wall structure
CN103334778A (en) Construction technology of step temporary support and partial double side walls
CN103382702B (en) A kind of support of cast-in-situ box girder and building method thereof
CN203769826U (en) Lateral type tunnel fan erecting device
CN203361163U (en) Prestress steel support used for controlling differential displacement inside and outside foundation ditch enclosure wall
CN204080820U (en) A kind of concrete structure foundation ditch support replacement device
CN205012596U (en) Defense sector face is uniform settlement structure not
CN204475368U (en) A kind of cantilevered steel reinforced concrete prestressed combined structure for reinforcement of retaining wall
CN204225897U (en) A kind of support of tunnel structure
CN102587224A (en) Basic structure of ground structures and application method of the basic structure for building railway roadbed
CN203188125U (en) Side-sliding system of cable crane towers
CN203668926U (en) Foundation for tapered concrete piles
CN206768858U (en) Assembled external application construction elevator base steel plinth
CN203475490U (en) Root file based foundation reinforcement structure for debris flow gully crossing tunnel
CN204080617U (en) The bridge tower of many lattice room combining structure or bridge pier
CN104563121A (en) Retaining wall construction device based on multilayer template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160406

RJ01 Rejection of invention patent application after publication