CN102803615A - Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure - Google Patents

Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure Download PDF

Info

Publication number
CN102803615A
CN102803615A CN2010800265939A CN201080026593A CN102803615A CN 102803615 A CN102803615 A CN 102803615A CN 2010800265939 A CN2010800265939 A CN 2010800265939A CN 201080026593 A CN201080026593 A CN 201080026593A CN 102803615 A CN102803615 A CN 102803615A
Authority
CN
China
Prior art keywords
mentioned
type parts
steel pipe
pipe sheet
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010800265939A
Other languages
Chinese (zh)
Other versions
CN102803615B (en
Inventor
岩村荣世
村井健二
永岛聪志
青柳孝义
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Publication of CN102803615A publication Critical patent/CN102803615A/en
Application granted granted Critical
Publication of CN102803615B publication Critical patent/CN102803615B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel

Abstract

The invention provides a structure for connecting steel pipe sheet piles which is provided with: a pair of first L-shaped members which are joined, both facing inwards, to the side of a first steel pipe sheet pile; and a pair of second L-shaped members which are provided opposite the first L-shaped members and joined, both facing outwards, to the side of a second steel pipe sheet pile adjacent to the first steel pipe sheet pile. The pair of second L-shaped members is positioned inside of the pair of first L-shaped members, and concrete containing aggregate is placed in the space enclosed by the pair of first L-shaped members and the pair of second L-shaped members. The gap between the tip ends of the first L-shaped members and the second L-shaped members is smaller than the aggregate grain size, and the gap between the tip ends of the second L-shaped members and the first L-shaped members is at least twice the aggregate grain size.

Description

Steel pipe sheet pile joint construction and tectosome each other
Technical field
The present invention relates to be used for the joint construction of steel pipe sheet pile that steel pipe sheet pile is linked each other and the tectosome that has used the joint construction of this steel pipe sheet pile.
The application based on June 19th, 2009 spy in japanese publication be willing to 2009-146271 number and advocate priority, its content is applied at this.
Background technology
In the past, constructed steel pipe sheet pile ground etc. through linking a plurality of steel pipe sheet piles.Generally, engage, carry out the binding of steel pipe sheet pile through the chimeric each other P-P type that engage, so-called of band slit pipe set on the external surface that makes adjacent steel pipe sheet pile.
Usually, in the P-P type engages, clean in the space of chimeric pipe, and fill plaster in inside.Thus, make mutual binding reliable, guarantee shearing resistance.But during the P-P type in the past engaged, needs cleaned in the narrow space and fill plaster, the instability so its quality might become.In addition, in order to obtain higher shearing resistance, need the steel pipe of use inner surface belt projection etc.
In the joint construction of patent documentation 1 disclosed steel pipe sheet pile, on first steel pipe sheet pile, the pair of L structural section upcountry is provided with each other, and on second steel pipe sheet pile, the pair of L structural section outwards is provided with each other.And, through chimeric outside pair of L structural section in inside pair of L structural section, link first steel pipe sheet pile and second steel pipe sheet pile thus.And, between each L structural section, be provided with bar-shaped steel.
The prior art document
Patent documentation
Patent documentation 1: TOHKEMY 2005-282174 communique
Summary of the invention
The problem that invention will solve
But, less towards inside and outside L structural section interval each other respectively in the joint construction of the steel pipe sheet pile of patent documentation 1 record, so be difficult to carry out cleaning and the filling of plaster between it.In addition, because bar-like member need be set in addition, the problem that increases when therefore having the worker of steel pipe sheet pile.
The present invention carries out in view of this problem, and its purpose is to provide a kind of steel pipe sheet pile joint, has higher shearing resistance, and simple structure, to link operability good, can prevent the dirt of sealing.
Be used to solve the means of problem.
The present invention adopts following means in order to realize above-mentioned purpose.
(1) first mode of the present invention is a kind of steel pipe sheet pile joint construction each other, possesses: a pair of L type parts, each other towards interior side be bonded on the side of first steel pipe sheet pile; With a pair of the 2nd L type parts, be provided with opposed to each other with above-mentioned L type parts, and each other towards foreign side be bonded on the side of second steel pipe sheet pile adjacent with above-mentioned first steel pipe sheet pile.
Above-mentioned a pair of the 2nd L type parts are provided in the inside of above-mentioned a pair of L type parts; In the space that surrounds by above-mentioned a pair of L type parts and above-mentioned a pair of the 2nd L type parts; Cast contains the concrete of aggregate; Gap between the front end of above-mentioned L type parts and above-mentioned the 2nd L type parts is less than the size of the particle of above-mentioned aggregate, and the gap between the front end of above-mentioned the 2nd L type parts and the above-mentioned L type parts is more than 2 times of size of the particle of above-mentioned aggregate.
(2) in the steel pipe sheet pile joint construction each other of above-mentioned (1) record, also can at least a portion side of above-mentioned the 2nd L type parts, with predetermined distance a plurality of holes be set in the axial direction.
(3) in the steel pipe sheet pile joint construction each other of above-mentioned (2) record, the size in above-mentioned hole also can be more than 2 times of size of the particle of above-mentioned aggregate.
(4) in above-mentioned (1)~(3) in the steel pipe sheet pile joint construction each other of each record; Also can near at least a portion the leading section of above-mentioned L type parts, be provided with towards above-mentioned the 2nd L type component side seal member that extend, that can contact with above-mentioned the 2nd L type parts.
(5) in the steel pipe sheet pile joint construction each other of above-mentioned (4) record, above-mentioned seal member also can have width and become big tapered portion gradually towards the below from the upper end of above-mentioned L type parts.
(6) in the steel pipe sheet pile joint construction each other of above-mentioned (1)~(5) records, also can above-mentioned L type parts and/or above-mentioned the 2nd L type parts with above-mentioned concrete contact surface on form concavo-convex.
(7) second mode of the present invention is a kind of tectosome, and a plurality of steel pipe sheet piles edge roughly vertical direction is arranged in the water, and steel pipe sheet pile passes through connector engages each other.Use possesses the joint construction of a pair of L type parts and a pair of the 2nd L type parts; These a pair of L type parts do; Each other towards interior side be bonded on the side of first steel pipe sheet pile; These a pair of the 2nd L type parts do, be provided with opposed to each other with above-mentioned L type parts, each other towards foreign side be bonded on the side of second steel pipe sheet pile adjacent with above-mentioned first steel pipe sheet pile; Above-mentioned a pair of the 2nd L type parts embed above-mentioned a pair of L type parts; In the space that surrounds by above-mentioned a pair of L type parts and above-mentioned a pair of the 2nd L type parts; Cast contains the concrete of aggregate; Gap between the front end of above-mentioned L type parts and above-mentioned the 2nd L type parts is less than the size of the particle of above-mentioned aggregate, and the gap between the front end of above-mentioned the 2nd L type parts and the above-mentioned L type parts is than 2 times big of the size of the particle of above-mentioned aggregate; The portion that buries underground under the bottom at least at above-mentioned joint construction; On above-mentioned the 2nd L type parts side, with predetermined distance the hole is set in the axial direction; At least lean on upper portion than the bottom at above-mentioned joint construction; Near foreign side's leading section of above-mentioned L type parts, be provided with towards above-mentioned the 2nd L type component side seal member that extend, that can contact with above-mentioned the 2nd L type parts.
(8) above-mentioned (7) record tectosome in, also can above-mentioned L type parts and/or above-mentioned the 2nd L type parts with above-mentioned concrete contact surface on be formed with concavo-convex.
The effect of invention:
According to the formation of above-mentioned (1) record,, be provided with easily owing to be not as P-P engages, to make the slit structure of interlock each other.In addition, because the front end of L type parts and the gap between the 2nd L type parts be less than the size of the particle of aggregate, thus when having poured into a mould concrete, aggregate landfill gap, concrete can be from the gap flows out to joint construction is outside.In addition, because the front end and the gap between the L type parts of the 2nd L type parts are more than 2 times of size of the particle of aggregate, so, also can concrete be filled into joint construction inside reliably even use the concrete that contains aggregate.Therefore, can be easily and carry out concrete cast reliably.
Formation according to above-mentioned (2) record is provided with a plurality of holes through the part at the 2nd L type parts, and concrete flows through the hole thus, and it is inner therefore can concrete to be filled into L type parts joint construction each other reliably.In addition, because in the concrete entering hole, so the adhesive strength between concrete and the L type parts improves.
According to the formation of above-mentioned (3) record, because the size in hole is more than 2 times of size of the particle of aggregate, so fill concrete more reliably.
Formation according to above-mentioned (4) record; Because near the leading section of L type parts a part, towards the 2nd L type component side be provided with the seal member that can contact with the 2nd L type parts, so can prevent the situation that concrete spills from L type parts gap each other more reliably.
According to the formation of above-mentioned (5) record, the width through seal member is set becomes big tapered portion gradually from the upper end of L type parts towards the below, can insert the 2nd L type parts of adjacent steel pipe sheet pile thus easily.Therefore, carry out operation easily.
According to the formation of above-mentioned (6) record, because formation is concavo-convex on the concrete contact surface of L type parts and/or the 2nd L type parts, so and the increase of the adhesive strength between the concrete, can access more firm joint construction.
Formation according to above-mentioned (7) record can obtain the tectosome that application property is good, intensity is higher through simple structure.Especially; Owing to constitute joint construction through pair of L type parts, so application property is good, through be positioned at than the bottom by under the 2nd L type parts of part on the hole is set; Concrete fillibility can be improved thus, and the adhesive strength between concrete and the L type parts can be improved.Even under the situation that foreign side exposes, so long as down water-bed, then concrete also can not flow out, and does not have the problem of the dirt of water in the hole.
In addition owing to be provided with seal member in the part of leaning on than the bottom, therefore can suppress reliably concrete from the gap by the aggregate landfill but the outflow of also residual minim gap can be prevented the dirt of sealing.
According to the formation of above-mentioned (8) record, concavo-convex owing on the concrete surface of L type parts and/or the 2nd L type parts, being formed with, therefore increase with respect to concrete adhesive strength, can access tectosome with more firm joint construction.
According to the present invention, a kind of steel pipe sheet pile joint can be provided, have higher shearing resistance, simple structure, to link operability good, can prevent the dirt of sealing.
Description of drawings
Figure 1A is the elevation of the tectosome 1 of one embodiment of the present invention.
Figure 1B is the vertical view of the tectosome 1 of one embodiment of the present invention.
Fig. 2 A is that expression is with near the figure the joint 13 of 2 steel pipe sheet pile 3a, 3b binding.
Fig. 2 B is the A part enlarged drawing of Fig. 2 A.
Fig. 3 is the below enlarged drawing of the tectosome 1 of one embodiment of the present invention, is the figure in set hole 21, the water-bed bottom of expression 9.
Fig. 4 A is the sectional view that comprises the hole 21 of joint 13.
Fig. 4 B is the sectional view that comprises the hole 21 of joint 13, is the figure of the state that is provided with to the direction skew with the closure approximate vertical each other of 2 steel pipe sheet pile 3a of expression, 3b.
Fig. 5 A is the sectional view that comprises the hole 21 of joint 13, is that expression steel pipe sheet pile 3b is arranged on the figure near the locational state of steel pipe sheet pile 3a side.
Fig. 5 B is the sectional view of 21 positions, hole of joint 13, be expression steel pipe sheet pile 3b be arranged on steel pipe sheet pile 3a round about away from the figure of locational state.
Fig. 6 A is illustrated in the figure that is provided with the state of seal member 27a on the L type parts 15a.
Fig. 6 B is illustrated in the figure that is provided with the state of seal member 27b on the L type parts 15a.
Fig. 6 C is expression has connected the state of 2 steel pipe sheet pile 3a, 3b through the L type parts that are provided with seal member 27a figure.
Fig. 7 A is the front view of the tapered portion 29 on expression seal member 27a top.
Fig. 7 B is the P-P line sectional view of Fig. 7 A.
Fig. 7 C is the Q-Q line sectional view of Fig. 7 A.
The specific embodiment
Below, the tectosome of embodiment of the present invention is described.Figure 1A, Figure 1B represent the tectosome 1 of an embodiment of the invention.Figure 1A is the elevation of tectosome 1, and Figure 1B is the vertical view of tectosome 1.
Tectosome 1 mainly comprises and is arranged on a plurality of steel pipe sheet piles 3 of water-bed 5 and base plate 7 etc.Constitute the steel pipe sheet pile 3 of tectosome 1, for example that kind shown in Figure 1B disposes a plurality of circularly.Joint 13 through being arranged on steel pipe sheet pile 3 sides carries out steel pipe sheet pile 3 joint each other.Because joint 13 has watertightness, so can discharge by the water in the scope of a plurality of steel pipe sheet piles 3 encirclements.
Below the inside that surrounds by steel pipe sheet pile 3, base plate 7 is set.Base plate 7 for example is a concrete system.
In addition, the shape of the tectosome 1 that is formed by steel pipe sheet pile 3 is not limited to circle, also can be other shapes such as rectangle.In addition, in the explanation afterwards, the position than water-bed 5 dark positions of being arranged on of steel pipe sheet pile 3 is called water-bed bottom 9, leans on the positions of top to be called water-bed top 11 than water-bed 5.
Then, the structure of butt joint 13 is elaborated.Fig. 2 A, Fig. 2 B represent joint 13.Fig. 2 A is the figure between expression steel pipe sheet pile 3a, the 3b, and Fig. 2 B is the A part enlarged drawing of Fig. 2 A.In addition, in following explanation, adjacent steel pipe sheet pile 3a, the joint 13 between the 3b are described.In two sides of steel pipe sheet pile 3a, 3b, along steel pipe sheet pile 3a, 3b separately L type parts 15a, 15b axially be set.Side (right side among the figure) at steel pipe sheet pile 3a, 3b is provided with pair of L type parts 15a.Opposite side (left side among the figure) at steel pipe sheet pile 3a, 3b is provided with pair of L type parts 15b.That is, L type parts 15a, 15b are arranged on the roughly mutual opposition side of steel pipe sheet pile 3a, 3b.As L type parts 15a, 15b, also can use the shaped steel of cross section L word shape.
L type parts 15a is respectively the plate-shaped member that bends to L type shape, towards closure (right side among the figure) setting of adjacent steel pipe sheet pile.Pair of L type parts 15a has base portion 17a that mutual almost parallel ground is provided with and the generally perpendicularly crooked arm 19a towards the inboard each other at the leading section of base portion 17a.
Equally, L type parts 15b is respectively the plate-shaped member that is bent to L type shape, towards closure (left side among the figure) setting of adjacent steel pipe sheet pile.Pair of L type parts 15b has base portion 17b that mutual almost parallel ground is provided with and at the generally perpendicularly crooked toward the outer side each other arm 19b of the leading section of base portion 17b.On the part of the base portion 17b of L type parts 15b, hole 21 is set.In addition, L type parts 15a, 15b base portion 17a, 17b separately wait the assigned position that is bonded on steel pipe sheet pile 3a, 3b through welding.
The steel pipe sheet pile 3a that is engaged, 3b pair of L type parts 15a and pair of L type parts 15b separately is provided with opposed to each other.The base portion 17b of pair of L type parts 15b is configured between the arm 19b front end of pair of L type parts 15a, and the arm 19b of L type parts 15b is housed in the space that is surrounded by pair of L type parts 15a.In addition; When the connection of steel pipe sheet pile 3a, 3b; Be provided with first steel pipe sheet pile (for example steel pipe sheet pile 3a) afterwards, from the top of the steel pipe sheet pile that has been provided with, with L type parts each other the mode of interlock insert second steel pipe sheet pile (for example steel pipe sheet pile 3b) from the top and get final product.
Shown in Fig. 2 B, inserting L type parts 15b to L type parts 15a each other interlock state under, fill concrete 23 in the space that surrounds by L type parts 15a, 15b and steel pipe sheet pile 3a, 3b.Guarantee the watertightness of joint 13 and guarantee the intensity at junction surface through fill concrete 23.
In addition, in the joint construction of in the past steel pipe sheet pile, plaster etc. is used as packing material, does not use the concrete that contains aggregate in order to improve fillibility.With respect to this, in this embodiment, the inner concrete 23 that contains aggregate of filling.Its reason with after state.In addition, preferably on each L type parts 15a, 15b and contact surface concrete 23, be provided with in advance omit illustrated concavo-convex.Thus, can further guarantee the adhesive strength between L type parts 15a, 15b and the concrete 23, the shearing resistance at junction surface improves.For example, also can be provided with concavo-convex through chequer plate being used as L type parts.
Fig. 3 is the below enlarged drawing of tectosome 1, and expression is arranged on the steel pipe sheet pile 3 of water-bed bottom 9.As stated, steel pipe sheet pile 3 is arranged at water-bed 5.Therefore, the below of steel pipe sheet pile 3 (water-bed bottom 9) is embedded in water-bed 5.At the joint that is arranged in water-bed bottom 9 13, a plurality of holes 21 are set on the base portion 17b of L type parts 15b with separating predetermined distance.That is, hole 21 is set in place at least on the base portion 17b of the L of water-bed bottom 9 type parts 15b.
Then, the joint 13 to 21 positions, hole illustrates in greater detail.Fig. 4 A, Fig. 4 B are the sectional views that comprises the hole 21 of joint 13.Fig. 4 A is the figure of expression steel pipe sheet pile 3a, the 3b state that is set at straight position (promptly, L type parts 15a, 15b each other the state of setting) non-contiguously.Fig. 4 B be expression steel pipe sheet pile 3a, 3b each other with the direction of closure approximate vertical on the figure of the state that is provided with of skew ground (promptly, the end of L type parts 15a and L type parts 15b are provided with contiguously state).
As stated, fill the concrete 23 that contains aggregate 25 to the inside of joint 13.Aggregate 25 can use various rubbles etc.As aggregate 25, also can use artificial aggregates such as natural aggregates such as extra large sand and blast-furnace slag.At this, aggregate 25 for example is coarse aggregate (aggregate that uses the screen cloth of 5mm, is retained more than 85% according to weight), and the size of particle for example is preferably about 20mm.At this, the size of the particle of aggregate 25, the general maximum size of expression coarse aggregate.For example, according to the granulometry of the coarse aggregate of JIS A 1102, the size of the particle of aggregate 25 is 20mm, and expression utilizes the screen cloth of nominal dimension 20mm, and the weight percent of the particle through screen cloth is 90~100%.That is, the size of the particle of coarse aggregate comprises the particle about general 5~20mm.
In addition,, mix sometimes and contain coarse aggregate and fines, but the size of the particle of the aggregate 25 among the present invention according to concrete difference, be meant the aggregate that mainly contains in the concrete, by the size of the particle of above-mentioned JIS regulation.For example, containing under the situation that fineness modulus or solid cubic content rate are the coarse aggregate A more than 50%, even contain other finess and particulate, also be meant this coarse aggregate A particle by the represented size of JIS.
In Fig. 4 A, Fig. 4 B, only illustrate the part of aggregate 25.In addition, the state before expression concrete 23 solidifies in Fig. 4 A, Fig. 4 B, aggregate 25 can freely move in joint 13 inside.
At this; Shown in Fig. 4 A; At steel pipe sheet pile 3a, 3b each other as the crow flies under the situation of opposite disposed, the gap between the base portion 17b external surface of the arm 19a front end of L type parts 15a and L type parts 15b is defined as B, the length till from the base portion 17b external surface of L type parts 15b to arm 19b front end is defined as C; Distance definition till from the arm 19b front end of L type parts 15b to the base portion 17a inner surface of L type parts 15a is D, and the diameter in hole 21 is defined as E.
Equally, shown in Fig. 4 B, having produced under the situation of peak excursion on the direction (arrow I direction among the figure) with respect to the closure approximate vertical at steel pipe sheet pile 3a, 3b, will be B ', D ' with the corresponding distance definition of B, D of Fig. 4 A.And the size definition of the particle of the aggregate 25 that concrete 23 is contained is d.
At this moment, can not break away from, under the state of Fig. 4 B that has squinted in steel pipe sheet pile position each other, need make C bigger the biglyyest than B ' from L type parts 15a in order to make L type parts 15b.
In addition, in joint 13, move (promptly, fill) easily for concrete 23 is got in order to make aggregate 25, the mobile route that need make aggregate 25 with respect to the size of aggregate 25 for enough greatly.It is former because when mobile route be hour with respect to aggregate 25, the path can be by aggregate 25 sealings, the filling of obstruction concrete 23.
At this, as the mobile route of aggregate 25, the gap (arrow G direction the figure) till for example existing from the arm 19b front end of L type parts 15b to the base portion 17a inner surface of L type parts 15a.Under the state of Fig. 4 B that has squinted in steel pipe sheet pile position each other, it is minimum that this gap becomes the biglyyest, and aggregate 25 can move and get final product under this state.That is, D ' enough gets final product greatly than d, if for example D ' is more than 2 times of d, then aggregate 25 can not stop up in this position, and can not hinder flowing of concrete 23, is preferred therefore.
In addition, as the mobile route of aggregate 25, in addition also there is hole 21 (arrow F direction among the figure).Therefore, E enough gets final product greatly than d, if for example E is more than 2 times of d, then aggregate 25 can not stop up in this position, and can not hinder flowing of concrete 23, is preferred therefore.
At this, as stated, the gap maximum between the base portion 17b external surface of the arm 19a front end of L type parts 15a and L type parts 15b becomes B '.When this gap was big with respect to the big or small d of aggregate 25, aggregate 25 (concrete 23) can flow out to the outside from this gap.For example,, there is water, so concrete 23 flows out in water in the outside in this gap on water-bed top 11 (Figure 1A).Therefore, water becomes dirty.Therefore, need prevent that concrete 23 is from this clearance leakage.
At this, if the size d of aggregate 25 greater than B ', then aggregate 25 stops up these gaps (arrow H direction among the figure).Therefore, through aggregate 25 these gaps of sealing, suppress the outflow of concrete 23.That is, preferred B ' is less than d.In other words, preferred B is less than general 1/2 of d.
Then, do not become certain to the distance between steel pipe sheet pile 3a, the 3b and situation that squinted describes.Fig. 5 A, Fig. 5 B are the sectional views of 21 positions, hole of joint 13.Fig. 5 A is that expression steel pipe sheet pile 3b is arranged on the figure near the locational state of steel pipe sheet pile 3a side, Fig. 5 B be expression steel pipe sheet pile 3b be arranged on steel pipe sheet pile 3a round about away from the figure of locational state.
Shown in Fig. 5 A, when steel pipe sheet pile 3a, 3b squinted to approaching each other direction (arrow J direction among the figure), the front end of L type parts 15b contacted (perhaps the front end of L type parts 15a contacts with steel pipe sheet pile 3b) with steel pipe sheet pile 3a, each other can be further not approaching.In this case, when fill concrete 23 in the scope of being surrounded by base portion 17b and steel pipe sheet pile 3a, 3b, concrete 23 is filled into base portion 17b each other, and through hole 21 (arrow K direction among the figure).Therefore, also be filled concrete 23 between opposed L type parts 15a and the L type parts 15b.
At this moment, as stated, aggregate 25 is blocked in the gap between the base portion 17b external surface of front end and L type parts 15b of L type parts 15a (arm 19a).Therefore, suppressing concrete 23 flows out from this gap.
Then, shown in Fig. 5 B, steel pipe sheet pile 3a, 3b are described to the situation of the direction of leaving each other (arrow N direction among the figure) skew.In this case, as stated, arm 19b can not break away from from arm 19a, so keep steel pipe sheet pile 3a, 3b connection each other yet.
Because between the side of arm 19b and steel pipe sheet pile 3a, form bigger gap, so concrete 23 is filled in the space by L type parts 15a, 15b and steel pipe sheet pile 3a, 3b flanked reliably, aggregate 23 can not stop up.
On the other hand, base portion 17b exposes in the outside of arm 19a.Therefore, the outside of joint 13 is communicated with through hole 21 with inner.Therefore, the concrete 23 that contains aggregate 23 might pass through hole 21 to outside outflow (arrow M direction among the figure).
But,, therefore have sand in the outside of joint 13 because hole 21 only is arranged on water-bed bottom 9 (Figure 1A and Fig. 3).Therefore, suppress to have passed through the outflow of the concrete 23 in hole 21 by sand.In addition, even hypothesis flows out a little, owing to leaning on the bottom than water-bed 5 around the hole 21, so can directly not make water become dirt.Therefore, can be owing to the cast of concrete 23 contaminant water.
Then, the formation to the joint 13 on water-bed top 11 (Figure 1A) describes.As stated, on water-bed top 11, there is water in joint 13 outsides.Therefore, when concrete 23 grades when joint 13 flows out, water becomes dirty thus.Therefore, need prevent that concrete 23 is to joint 13 outside outflows.In this embodiment, as stated,, make the gap smaller between arm 19a front end and the base portion 17b, so, prevent that concrete 23 from flowing out from this gap through aggregate 25 landfill gaps with respect to the size of aggregate 25.But,, preferably on arm 19a, seal member is set in order to prevent the outflow of concrete 23 more reliably.
Fig. 6 A, Fig. 6 B, Fig. 6 C are illustrated in the figure that is provided with the state of seal member on the arm 19a.Shown in Fig. 6 A, on the external surface of arm 19a, the seal member 27a towards the preceding extreme direction extension of arm 19a is set.Seal member 27a be can elastic-plastic deformation material, for example can use the resin etc. of metal system and the rubber etc. of steel sheet etc.Seal member is arranged in the scope on water-bed top 11 (Figure 1A) from the top of steel pipe sheet pile 3 at least.It is former because in water-bed bottom 9 (Figure 1A), as stated, sand on every side plays the effect of seal member.
In addition, shown in Fig. 6 A, also seal member 27a can be set with prebending.In addition, shown in Fig. 6 B, also can seal member 27b be set as the crow flies with respect to arm 19a.The sort of mode no matter, seal member can both contact with the base portion 17b of the steel pipe sheet pile 3b side that engages object and be out of shape, and the gap between obstruction arm 19a and the base portion 17b.In following explanation, the example that has used seal member 27a is described.
Fig. 6 C is the figure of expression steel pipe sheet pile 3a, the connected state of 3b.Shown in Fig. 6 C, on the arm 19a of pair of L type parts 15a, the outstanding seal member 27a of direction ratio arm 19a to the inside is set each other.The front end of seal member 27a contacts with the base portion 17b external surface that conduct engages the steel pipe sheet pile 3b of object.Seal member 27a can elastic-plastic deformation, so also follow for the skew (skew that Fig. 4 B is such) of steel pipe sheet pile 3a, 3b, the gap between arm 19a and the base portion 17b is blocked.Therefore, even, also can prevent the concrete 23 (arrow O direction among the figure) that flows out a little reliably through the gap between aggregate 25 obstruction arm 19a and the base portion 17b.
Fig. 7 A representes to be provided with the L type parts 15a of the state of seal member 27a.Fig. 7 A is the front view of observing from the direction of engagement side of L type parts 15a, and Fig. 7 B is the P-P line sectional view of Fig. 7 A, and Fig. 7 C is the Q-Q line sectional view of Fig. 7 A.
Seal member 27a steel pipe sheet pile 3 axially on be provided with along L type parts 15a.Tapered portion 29 is set above seal member 27a.Tapered portion 29 forms, and it is big that the front end of a pair of seal member 27a interval each other becomes towards the top.That is, above seal member 27a, the tapered portion 29 that the width (cross-directional length) of formation seal member 27a diminishes towards the top gradually.
Shown in Fig. 7 B, near steel pipe sheet pile 3b upper end, the cross-directional length of seal member 27a is shorter.For example, be arranged on the seal member 27a on the external surface of arm 19a, outstanding near the upper end from the front end of arm 19a, and guarantee a pair of arm 19a interval each other.That is, in Fig. 7 B, illustrate the L type parts 15b that engages object with dotted line, but the base portion 17b of L type parts 15b does not contact and contacts with arm 19a with seal member 27a.Therefore, from above with L type parts 15b (steel pipe sheet pile 3b) when L type parts 15a (steel pipe sheet pile 3a) embeds, seal member 27a does not contact with L type parts 15b.Therefore, can the insertion property of L type parts 15b not exerted an influence, operability is good.
On the other hand, shown in Fig. 7 C, the below of the tapered portion 29 of seal member 27a (being positioned at the position of water surface below) is that seal member 27a gives prominence to the length amount that is enough to stop up the gap from arm 19a front end, and contacts with base portion 17b.Therefore, stop up the gap between arm 19a and the base portion 17b through seal member 27a.Therefore, concrete can not flow out from this gap.
In addition, in above embodiment, only hole 21 is set, and only seal member 27a is set, but be not limited thereto on water-bed top 11 in water-bed bottom 9.For example, also can seal member 27a be set to water-bed bottom 9 till, in addition also can be in 11 formation holes 21, water-bed top.Even in 11 formation holes 21, water-bed top, make up less than the size of aggregate 25 or with seal member 27a through the size that makes hole 21, also can prevent concrete leakage thus.
According to the joint method of the steel pipe sheet pile of this embodiment, can engage steel pipe sheet pile simply each other, and concrete fillibility is good, and can prevents reliably that concrete from flowing out in water.In addition, because the sectional area that is surrounded by L type parts 15a, 15b is bigger, therefore can access higher shearing resistance at the junction surface.
Especially, owing to carry out steel pipe sheet pile 3a, 3b joint each other through the joint 13 that has used L type parts 15a, 15b, therefore for example pair of L type parts 15b is inserted between the pair of L type parts 15a and gets final product, bonding operation property is good.In addition, in the concrete 23 as packing material, contain aggregate 25, the gap between the base portion 17b external surface of the arm 19a front end of L type parts 15a and L type parts 15b is less than the size of aggregate 25.Therefore, aggregate 25 is blocked in this gap, can suppress concrete 23 and further flow out.
In addition, the gap between the base portion 17a inner surface of the arm 19b front end of L type parts 15b and L type parts 15a is enough big with respect to the size of aggregate 25.Therefore, concrete 23 can be filled in the space between L type parts 15a, the 15b reliably.
In addition, if at least in water-bed bottom 9, on base portion 17b, form hole 21, then in the concrete 23 entering holes 21, can improve the adhesive strength between concrete 23 and the L type parts 15b.Therefore, can access higher shearing resistance at the junction surface.In addition, because the size in hole 21 be enough greatly with respect to the size of aggregate 25, so when the space fluid concrete 23 between L type parts 15a, 15b, concrete 23 passes through hole 21.Therefore, can more reliably concrete 23 be filled in the space.
In addition, be provided with under the situation of seal member 27a, can suppress concrete 23 more reliably and flow out from the gap between arm 19a front end and the base portion 17b external surface on water-bed top 11.Therefore, can prevent that concrete 23 from flowing out in water and the water that causes becomes dirty.
In addition, have on the top of seal member 27a under the situation of tapered portion 29, when inserting L type parts 15b to L type parts 15a, seal member 27a can not hinder insertion.Therefore, can insert L type parts 15b along tapered portion 29.
In addition, on the inner surface (with the contact surface of concrete 23) of L type parts 15a, 15b, be pre-formed under the concavo-convex situation, the adhesive strength between concrete 23 and L type parts 15a, the 15b improves.Therefore, the shearing resistance at junction surface improves.
More than in other words the joint construction that steel pipe sheet pile is engaged with each other of an embodiment of explanation is a kind of steel pipe sheet pile joint construction each other, comprising: first steel pipe sheet pile; Second steel pipe sheet pile adjacent with above-mentioned first steel pipe sheet pile; A pair of L type parts have first arm and first base portion, are bonded on the side of above-mentioned first steel pipe sheet pile with the opposed mode of above-mentioned the first arm portion; A pair of the 2nd L type parts have second arm and second base portion, are bonded on the side of above-mentioned second steel pipe sheet pile with the opposed mode of above-mentioned second base portion, are provided in the inside of above-mentioned a pair of L type parts; And the concrete section that contains aggregate, be poured in the space that surrounds by above-mentioned a pair of L type parts and above-mentioned a pair of the 2nd L type parts; Gap between above-mentioned first arm and above-mentioned second base portion is less than the size of the particle of above-mentioned aggregate, and the gap between above-mentioned second arm and above-mentioned first base portion is more than 2 times of size of the particle of above-mentioned aggregate.
Also can at least a portion side of above-mentioned the 2nd L type parts, with predetermined distance a plurality of holes be set in the axial direction.
In addition, the size in above-mentioned hole also can be more than 2 times of size of the particle of above-mentioned aggregate.
In addition, also can at least a portion of above-mentioned first arm, the seal member that extends and contact with above-mentioned the 2nd L type parts towards above-mentioned the 2nd L type component side be set.
In addition, above-mentioned seal member also can have width and becomes big tapered portion gradually towards the below from the upper end of above-mentioned L type parts.
In addition, also can above-mentioned L type parts and above-mentioned the 2nd L type parts have the contact surface that contacts with above-mentioned concrete section, at least one side's of above-mentioned L type parts and above-mentioned the 2nd L type parts above-mentioned contact surface, be formed with concavo-convex.
More than, with reference to accompanying drawing embodiment of the present invention is illustrated, but technical scope of the present invention is not limited to above-mentioned embodiment.So long as those skilled in the art can obtain various variation or modification certainly in the category of the technological thought that the scope of patent request is put down in writing, these also are considered to belong to the scope of technology of the present invention certainly.
The industry utilizability
According to the present invention, a kind of steel pipe sheet pile joint can be provided, have higher shearing resistance, simple structure, to link operability good, can prevent the dirt of sealing.Therefore, industrial utilizability is bigger.
The explanation of symbol:
1 tectosome
3,3a, 3b steel pipe sheet pile
5 bottoms
7 base plates
9 water-bed bottoms
11 water-bed tops
13 joints
15a, 15b L type parts
17a, 17b base portion
19a, 19b arm
21 holes
23 concrete
25 aggregates
27a, 27b seal member
29 tapered portion

Claims (8)

1. steel pipe sheet pile joint construction each other is characterized in that,
Possess:
A pair of L type parts, each other towards interior side be bonded on the side of first steel pipe sheet pile; With
A pair of the 2nd L type parts, be provided with opposed to each other with above-mentioned L type parts, and each other towards foreign side be bonded on the side of second steel pipe sheet pile adjacent with above-mentioned first steel pipe sheet pile,
Above-mentioned a pair of the 2nd L type parts are provided in the inside of above-mentioned a pair of L type parts,
In the space that is surrounded by above-mentioned a pair of L type parts and above-mentioned a pair of the 2nd L type parts, cast contains the concrete of aggregate,
Gap between the front end of above-mentioned L type parts and above-mentioned the 2nd L type parts is less than the size of the particle of above-mentioned aggregate,
Gap between the front end of above-mentioned the 2nd L type parts and the above-mentioned L type parts is more than 2 times of size of the particle of above-mentioned aggregate.
2. steel pipe sheet pile according to claim 1 joint construction each other is characterized in that,
On at least a portion side of above-mentioned the 2nd L type parts, with predetermined distance a plurality of holes are set in the axial direction.
3. steel pipe sheet pile according to claim 2 joint construction each other is characterized in that,
The size in above-mentioned hole is more than 2 times of size of the particle of above-mentioned aggregate.
4. according to each described steel pipe sheet pile joint construction each other in the claim 1~3, it is characterized in that,
On near at least a portion the leading section of above-mentioned L type parts, be provided with towards above-mentioned the 2nd L type component side, the seal member that can contact with above-mentioned the 2nd L type parts.
5. steel pipe sheet pile according to claim 4 joint construction each other is characterized in that,
Above-mentioned seal member has width and becomes big tapered portion gradually towards the below from the upper end of above-mentioned L type parts.
6. according to each described steel pipe sheet pile joint construction each other in the claim 1~3, it is characterized in that,
At least one side of above-mentioned L type parts and above-mentioned the 2nd L type parts with above-mentioned concrete contact surface on form concavo-convex.
7. tectosome, a plurality of steel pipe sheet piles are arranged in the water along vertical direction roughly, and steel pipe sheet pile through connector engages, is characterized in that each other,
Use possesses the joint construction of a pair of L type parts and a pair of the 2nd L type parts; These a pair of L type parts do; Each other towards interior side be bonded on the side of first steel pipe sheet pile; These a pair of the 2nd L type parts do, be provided with opposed to each other with above-mentioned L type parts, each other towards foreign side be bonded on the side of second steel pipe sheet pile adjacent with above-mentioned first steel pipe sheet pile
Above-mentioned a pair of the 2nd L type parts embed above-mentioned a pair of L type parts,
In the space that is surrounded by above-mentioned a pair of L type parts and above-mentioned a pair of the 2nd L type parts, cast contains the concrete of aggregate,
Gap between the front end of above-mentioned L type parts and above-mentioned the 2nd L type parts is less than the size of the particle of above-mentioned aggregate,
Gap between the front end of above-mentioned the 2nd L type parts and the above-mentioned L type parts is than 2 times big of the size of the particle of above-mentioned aggregate,
In the portion that buries underground under the bottom at least of above-mentioned joint construction, on above-mentioned the 2nd L type parts side, with predetermined distance the hole is set in the axial direction,
Above-mentioned joint construction lean on upper portion than the bottom at least, near foreign side's leading section of above-mentioned L type parts, be provided with towards above-mentioned the 2nd L type component side, the seal member that can contact with above-mentioned the 2nd L type parts.
8. tectosome according to claim 7 is characterized in that,
At least one side of above-mentioned L type parts and above-mentioned the 2nd L type parts with above-mentioned concrete contact surface on form concavo-convex.
CN201080026593.9A 2009-06-19 2010-06-15 Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure Expired - Fee Related CN102803615B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2009-146271 2009-06-19
JP2009146271A JP5231344B2 (en) 2009-06-19 2009-06-19 Connection structure and structure of steel pipe sheet piles
PCT/JP2010/003971 WO2010146836A1 (en) 2009-06-19 2010-06-15 Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure

Publications (2)

Publication Number Publication Date
CN102803615A true CN102803615A (en) 2012-11-28
CN102803615B CN102803615B (en) 2014-04-02

Family

ID=43356168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201080026593.9A Expired - Fee Related CN102803615B (en) 2009-06-19 2010-06-15 Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure

Country Status (5)

Country Link
JP (1) JP5231344B2 (en)
CN (1) CN102803615B (en)
AU (1) AU2010261247B2 (en)
TW (1) TW201116671A (en)
WO (1) WO2010146836A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775529A (en) * 2015-02-16 2015-07-15 中交一航局第一工程有限公司 Waterstop structure of assembling type component and construction method of waterstop structure

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227382A (en) * 2020-10-19 2021-01-15 中建一局集团建设发展有限公司 Double-row pile structure with water stopping function and construction method thereof
CN113216228A (en) * 2021-01-13 2021-08-06 中交第三航务工程局有限公司 Construction process of combined pile cofferdam
CN113700013A (en) * 2021-08-20 2021-11-26 中建五局土木工程有限公司 High-pressure jet grouting and clay core wall combined earth-rock cofferdam seepage-proofing construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508363A (en) * 2002-12-18 2004-06-30 株式会社德达渡 Steel-tube-sheet pile sunk-well foundation and steel-tube-sheet pile used thereof
JP2004360440A (en) * 2003-05-14 2004-12-24 Taisei Rotec Corp Water cut-off method for water cut-off wall joint part
JP2005282174A (en) * 2004-03-30 2005-10-13 Nippon Steel Corp Steel pipe sheet pile joint, joint structure of steel pipe sheet pile, and steel pipe sheet pile foundation
CN1837512A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57105331U (en) * 1980-12-16 1982-06-29
JP2001207442A (en) * 2000-01-31 2001-08-03 Taiheiyo Cement Corp Sheet pile
JP2004353337A (en) * 2003-05-29 2004-12-16 Jfe Steel Kk Joint member and joint structure for steel pipe sheet pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508363A (en) * 2002-12-18 2004-06-30 株式会社德达渡 Steel-tube-sheet pile sunk-well foundation and steel-tube-sheet pile used thereof
JP2004360440A (en) * 2003-05-14 2004-12-24 Taisei Rotec Corp Water cut-off method for water cut-off wall joint part
JP2005282174A (en) * 2004-03-30 2005-10-13 Nippon Steel Corp Steel pipe sheet pile joint, joint structure of steel pipe sheet pile, and steel pipe sheet pile foundation
CN1837512A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775529A (en) * 2015-02-16 2015-07-15 中交一航局第一工程有限公司 Waterstop structure of assembling type component and construction method of waterstop structure

Also Published As

Publication number Publication date
JP2011001767A (en) 2011-01-06
AU2010261247B2 (en) 2015-09-24
TW201116671A (en) 2011-05-16
CN102803615B (en) 2014-04-02
WO2010146836A1 (en) 2010-12-23
AU2010261247A1 (en) 2012-01-19
JP5231344B2 (en) 2013-07-10

Similar Documents

Publication Publication Date Title
CN102803615B (en) Structure for connecting steel pipe sheet piles, and steel pipe sheet pile structure
CN102470311B (en) Sealed filter element
CA2824051A1 (en) Sheet pile connecting elements for use in pipe pile retaining walls
CN201170088Y (en) Filtering components of V type accurate micro-seam self-cleaning sand control screen
US8875905B2 (en) Plug assembly
CN104838192B (en) Pipe joint
KR200404580Y1 (en) A one body drainage seat with protrusion
JPH07504950A (en) Underground barrier sealing system
CN107109805A (en) Sleeper module unit for railway rail system
CN2732833Y (en) Plastic inspection well
JP5917226B2 (en) Transmission type sabo dam
KR100731173B1 (en) Connect structure for water pipe
JP6238071B2 (en) Column and beam joint structure
CN214993000U (en) Connecting structure of assembled bent cap
JP4997424B2 (en) Reservoir wall structure
DE10252981B4 (en) Pipe spacer
JP3659249B2 (en) Steel sheet pile and sheet pile steel wall
CN203297826U (en) Scour-resistant ash pipe elbow structure
JP2010127377A (en) Pipe joint
CN209129122U (en) A kind of connection locking-type landfill percolate pipe wears dam structure
JP7437237B2 (en) Pile press-in method, joint scraper and press-in piles
JP2016211341A (en) Steel pipe sheet pile coupling structure
JP2007132510A (en) Pipe connecting structure and pipe connecting method
CN105648986B (en) The water sealing structure of the adjacent seam crossing between of aqueduct
CN205712176U (en) A kind of around line immersed tube steel plate for sealing water and immersed tube water sealing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NIPPON STEEL + SUMITOMO METAL CORPORATION

Free format text: FORMER OWNER: SHIN NIPPON STEEL LTD.

Effective date: 20130313

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130313

Address after: Tokyo, Japan

Applicant after: Nippon Steel Corporation

Address before: Tokyo, Japan

Applicant before: Nippon Steel Corporation

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Patentee after: Nippon Iron & Steel Corporation

Address before: Tokyo, Japan

Patentee before: Nippon Steel Corporation

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20210615