CN102799442A - 火力发电厂实时数据系统能耗全流程图的开发方法 - Google Patents

火力发电厂实时数据系统能耗全流程图的开发方法 Download PDF

Info

Publication number
CN102799442A
CN102799442A CN2012103248758A CN201210324875A CN102799442A CN 102799442 A CN102799442 A CN 102799442A CN 2012103248758 A CN2012103248758 A CN 2012103248758A CN 201210324875 A CN201210324875 A CN 201210324875A CN 102799442 A CN102799442 A CN 102799442A
Authority
CN
China
Prior art keywords
energy consumption
power plant
fuel
time data
whole process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103248758A
Other languages
English (en)
Other versions
CN102799442B (zh
Inventor
黄鹏
李政
邢涛
赵学山
王承亮
蒋蓬勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Branch of Huadian Power International Corporation Limited
Technical service center of Hua electricity International Power incorporated company
Original Assignee
SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd filed Critical SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd
Priority to CN201210324875.8A priority Critical patent/CN102799442B/zh
Publication of CN102799442A publication Critical patent/CN102799442A/zh
Application granted granted Critical
Publication of CN102799442B publication Critical patent/CN102799442B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及信息管理系统领域,特别公开了一种火力发电厂实时数据系统能耗全流程图的开发方法。本发明以PI系统实时采集数据为实时评价数据来源,利用本申请展示及对比分析的数据可以嵌入到其它系统中,以实现与其他分析模块的无缝链接。本发明全面客观地对火力发电厂实时生产系统能耗全流程进行监控,评估各个局部生产单元的能耗,对各能耗损失项目进行分析,进一步提高能耗管理水平,满足区域发电公司智能好运营管控的需要,适于广泛推广应用。

Description

火力发电厂实时数据系统能耗全流程图的开发方法
(一)        技术领域
    本发明涉及信息管理系统领域,特别涉及一种火力发电厂实时数据系统能耗全流程图的开发方法。
(二)        背景技术
火力发电厂实时数据系统实现高效易用的远程实时监控是当今企业信息化、可视化趋势下的一项重要关键技术。目前国内火力发电企业对于相关内容的研究主要局限于以下几点:(1)基于DCS或PLC系统;(2)按照生产流程进行局部生产单元的流程图开发;(3)采用SVG技术进行远程界面开发;(4)主要采用静态图。
目前各火电发电集团基本采用PI系统进行实时数据的采集与开发。PI系统提供实时和历史的数据管理,直接应用于运行、维护和管理一体化,可直接采集,实时获取难度较高的各种运行过程中的实时数据(通常该类数据封闭在各自成体系的自动化系统或人工数据源中),并将其转化为公共的且对生产有效的信息。
为了全面客观地对火力发电厂实时生产系统能耗全流程进行监控,评估各个局部生产单元的能耗,对各能耗损失项目进行分析,进一步提高生产管理水平,建立一种新的火力发电厂实时数据系统能耗全流程图的开发方法非常必要。
(三)        发明内容
    本发明为了弥补现有技术的不足,提供了一种流程全面、数据准确、分析合理的火力发电厂实时数据系统能耗全流程图的开发方法。
本发明是通过如下技术方案实现的:
一种火力发电厂实时数据系统能耗全流程图的开发方法,包括如下步骤:
(1)以PI系统自身应用功能为开发基础,建立基本图元,扩充PI系统自身应用功能;
(2)建立火力发电厂局部生产单元能耗流程图,将火力发电厂按照内部能耗边界划分若干个局部生产单元;
(3)按照内部能耗边界对各个局部生产单元流程图进行整合;
(4)对整合后能耗全流程图和局部单元流程图中测点进行标示,实现数据在线展示;
(5)按照内部能耗边界,对不同等级的测点进行分级显示;
(6)整合后能耗全流程图与局部单元流程图进行连接,实现浮动及无级缩放功能;
(7)整合后能耗全流程图与局部单元流程图中与性能相关测点连接,实现实时报警、同类型机组、同类型测点对比分析。
本发明以PI系统自身应用功能为开发基础,建立火力发电厂能耗全流程图和局部单元流程图,实现数据在线展示、分级显示,流程图为动态显示,能清晰看出火力发电厂厂级及单元及实际生产流程、能耗组成和流向,利用本申请展示及对比分析的数据可以嵌入到其它系统中,以实现与其他分析模块的无缝链接。
本发明的更优方案为:
步骤(2)中,局部生产单位包括汽水、风烟、制粉、汽机本体、冷端、低加与凝结水、主给水、脱硫、供热及厂用电单元。
步骤(3)中,局部生产单元流程图中设备及测点具有清晰的系统归属接线、交互式流程和功能说明。
步骤(4)和(5)中,整合后能耗全流程图显示主要生产数据及测点级实时数据,局部单元流程图显示性能级及测点级实时数据,且上述所有数据均按照重要程度分为三级显示。
步骤(6)中,整合后能耗全流程图及局部单元流程图为动态显示,能清晰看出火力发电厂厂级及单元级实际生产流程、能耗组成和流向。
本发明全面客观地对火力发电厂实时生产系统能耗全流程进行监控,评估各个局部生产单元的能耗,对各能耗损失项目进行分析,进一步提高能耗管理水平,满足区域发电公司智能好运营管控的需要,适于广泛推广应用。
(四)        具体实施方式
实施例:包括如下步骤:
(1)以PI系统自身应用功能为开发基础,建立圆、椭圆、矩形、线、多边形等基本图元,扩充PI系统自身应用功能。
(2)建立火力发电厂局部生产单元能耗流程图,将火力发电厂按照内部能耗边界划分为汽水、风烟、制粉、汽机本体、冷端、低加与凝结水、主给水、脱硫、供热及厂用电等局部生产单元;
(3)按照内部能耗边界对各个局部生产单元流程图进行整合;
(4)对整合后能耗全流程图和局部单元流程图中测点进行标识,实现数据在线展示;
(5)按照内部能耗边界,对不同等级的测点进行分级显示;
(6)整合后能耗全流程图可与局部单元流程图进行链接、浮动及无级缩放功能;
(7)整合后能耗全流程图和局部单元流程图中与性能相关测点实现实时报警、同类型机组、同类型测点对比分析。
其中客户端需要实现复杂生产工艺流程的图形化直观表现,而且根据实时数据变化,能够在流程图画面中动态反映测点所对应的物理量的变化,同时实时监控流程图要求软件具备可灵活配置、可根据用户需求自定义的特点。
步骤(1)和(2)中,采用圆、椭圆、矩形、线、多边形等五种基本图元,实时监控流程图中所有复杂的图形均可通过这五种基本图元组合实现。基本图元通过一组属性来描述。给定某种基本图元的属性组一组确定的取值,即得到该种基本图元的一个实例。
基本图元的组合构成复合图元,复合图元是监控流程图绘制过程中可重用的基本单元,也称“元件”,进行建库保存,称为“元件库”。元件库的建立将提高图元的复用性,从而极大提高流程图组态的效率。

Claims (5)

1.一种火力发电厂实时数据系统能耗全流程图的开发方法,其特征为,包括如下步骤:
(1)以PI系统自身应用功能为开发基础,建立基本图元,扩充PI系统自身应用功能;
(2)建立火力发电厂局部生产单元能耗流程图,将火力发电厂按照内部能耗边界划分若干个局部生产单元;
(3)按照内部能耗边界对各个局部生产单元流程图进行整合;
(4)对整合后能耗全流程图和局部单元流程图中测点进行标示,实现数据在线展示;
(5)按照内部能耗边界,对不同等级的测点进行分级显示;
(6)整合后能耗全流程图与局部单元流程图进行连接,实现浮动及无级缩放功能;
(7)整合后能耗全流程图与局部单元流程图中与性能相关测点连接,实现实时报警、同类型机组、同类型测点对比分析。
2.根据权利要求1所述的火力发电厂实时数据系统能耗全流程图的开发方法,其特征在于:步骤(2)中,局部生产单位包括汽水、风烟、制粉、汽机本体、冷端、低加与凝结水、主给水、脱硫、供热及厂用电单元。
3.根据权利要求1所述的火力发电厂实时数据系统能耗全流程图的开发方法,其特征在于:步骤(3)中,局部生产单元流程图中设备及测点具有清晰的系统归属接线、交互式流程和功能说明。
4.根据权利要求1所述的火力发电厂实时数据系统能耗全流程图的开发方法,其特征在于:步骤(4)和(5)中,整合后能耗全流程图显示主要生产数据及测点级实时数据,局部单元流程图显示性能级及测点级实时数据,且上述所有数据均按照重要程度分为三级显示。
5.根据权利要求1所述的火力发电厂实时数据系统能耗全流程图的开发方法,其特征在于:步骤(6)中,整合后能耗全流程图及局部单元流程图为动态显示,能清晰看出火力发电厂厂级及单元级实际生产流程、能耗组成和流向。
CN201210324875.8A 2012-09-05 2012-09-05 火力发电厂实时数据系统能耗全流程图的开发方法 Expired - Fee Related CN102799442B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210324875.8A CN102799442B (zh) 2012-09-05 2012-09-05 火力发电厂实时数据系统能耗全流程图的开发方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210324875.8A CN102799442B (zh) 2012-09-05 2012-09-05 火力发电厂实时数据系统能耗全流程图的开发方法

Publications (2)

Publication Number Publication Date
CN102799442A true CN102799442A (zh) 2012-11-28
CN102799442B CN102799442B (zh) 2015-09-02

Family

ID=47198559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210324875.8A Expired - Fee Related CN102799442B (zh) 2012-09-05 2012-09-05 火力发电厂实时数据系统能耗全流程图的开发方法

Country Status (1)

Country Link
CN (1) CN102799442B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104020730A (zh) * 2014-04-11 2014-09-03 华电国际电力股份有限公司技术服务中心 一种环保监控平台
CN105912325A (zh) * 2016-04-05 2016-08-31 华自科技股份有限公司 基于组态软件的图元组件的复用方法、系统和组态软件
CN112583624A (zh) * 2019-09-30 2021-03-30 北京国双科技有限公司 能耗数据的处理方法和装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005004020A1 (en) * 2003-07-03 2005-01-13 Abb Research Ltd Method to measure and display energy use for an enterprise
WO2005015366A2 (en) * 2003-08-08 2005-02-17 Electric Power Group, Llc Real-time performance monitoring and management system
CN101918767A (zh) * 2007-10-04 2010-12-15 桑格威迪公司 用于提供能源系统的方法和装置
CN102207734A (zh) * 2010-03-31 2011-10-05 镇江雅迅软件有限责任公司 一种醋酸生产线能耗管控系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005004020A1 (en) * 2003-07-03 2005-01-13 Abb Research Ltd Method to measure and display energy use for an enterprise
WO2005015366A2 (en) * 2003-08-08 2005-02-17 Electric Power Group, Llc Real-time performance monitoring and management system
CN101918767A (zh) * 2007-10-04 2010-12-15 桑格威迪公司 用于提供能源系统的方法和装置
CN102207734A (zh) * 2010-03-31 2011-10-05 镇江雅迅软件有限责任公司 一种醋酸生产线能耗管控系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨宇亮: "基于MES的生产监控辅助决策系统的研究与应用", 《中国优秀硕士学位论文全文数据库(信息科技辑)》, 15 April 2010 (2010-04-15), pages 33 - 58 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104020730A (zh) * 2014-04-11 2014-09-03 华电国际电力股份有限公司技术服务中心 一种环保监控平台
CN104020730B (zh) * 2014-04-11 2016-01-20 华电国际电力股份有限公司技术服务中心 一种环保监控平台
CN105912325A (zh) * 2016-04-05 2016-08-31 华自科技股份有限公司 基于组态软件的图元组件的复用方法、系统和组态软件
CN112583624A (zh) * 2019-09-30 2021-03-30 北京国双科技有限公司 能耗数据的处理方法和装置
CN112583624B (zh) * 2019-09-30 2023-05-23 北京国双科技有限公司 能耗数据的处理方法和装置

Also Published As

Publication number Publication date
CN102799442B (zh) 2015-09-02

Similar Documents

Publication Publication Date Title
CN105187010B (zh) 一种光伏电站的智能化监控与运维系统
Sanchez-Hidalgo et al. A survey on visual data representation for smart grids control and monitoring
CN113077101A (zh) 面向能源互联网调配管理的数字化系统及方法
CN104460635B (zh) 一种基于智能水电厂的一体化信息平台系统
CN103177391A (zh) 一种基于三维实景的设施设备监控系统及系统集成方法
CN103618380A (zh) 基于光伏微电网的智能监控系统
CN106655516A (zh) 电源设备采集装置及远程故障诊断系统
CN103744386B (zh) 海上石油平台能源管控系统
Escobedo et al. Big data & analytics to support the renewable energy integration of smart grids
CN107404416A (zh) 一种用电信息采集系统的可视化监测方法
CN102799442B (zh) 火力发电厂实时数据系统能耗全流程图的开发方法
CN113762911A (zh) 一种基于分布式架构的综合能源服务平台的制作方法
CN204028668U (zh) 一种地热井远程数据监控系统
CN116045357A (zh) 一种基于地热的城市供热三维可视化监控系统及方法
Liyakat et al. IoT in the Electric Power Industry
Matani Internet of things and internet of drones in the renewable energy infrastructure towards energy optimization
US10637239B2 (en) Utility network monitoring device
Chenyan et al. Research of carbon emission reduction on the green building based on the Internet of Things
Felius et al. Smart components and systems
Shin et al. Reliability evaluation considering structures of a large scale wind farm
Vijayalakshmi et al. AI and IoT in Improving Resilience of Smart Energy Infrastructure
CN118034181B (zh) 一种用于供热的监控系统
AU2021107234A4 (en) Digital system and method for energy internet deployment management
Ma et al. An overview on smart distribution grid
Kushawaha et al. Enhancing Energy Efficiency: Advances in Smart Grid Optimization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: TECHNICAL SERVICE CENTER OF HUADIAN POWER INTERNAT

Effective date: 20150625

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Peng

Inventor after: Wang Wei

Inventor after: Li Zheng

Inventor after: Xing Tao

Inventor after: Zhao Xueshan

Inventor after: Wang Chengliang

Inventor after: Jiang Pengbo

Inventor after: Liu Xianchun

Inventor after: Liu Maoming

Inventor before: Huang Peng

Inventor before: Li Zheng

Inventor before: Xing Tao

Inventor before: Zhao Xueshan

Inventor before: Wang Chengliang

Inventor before: Jiang Pengbo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG PENG LI ZHENG XING TAO ZHAO XUESHAN WANG CHENGLIANG JIANG PENGBO TO: HUANG PENG WANG WEI LI ZHENG XING TAO ZHAO XUESHAN WANG CHENGLIANG JIANG PENGBO LIU XIANCHUN LIU MAOMING

TA01 Transfer of patent application right

Effective date of registration: 20150625

Address after: 250000, No. ten, No. 14800, Lixia District, Ji'nan City, Shandong Province

Applicant after: Shandong Branch of Huadian Power International Corporation Limited

Applicant after: Technical service center of Hua electricity International Power incorporated company

Address before: 250000, No. ten, No. 14800, Lixia District, Ji'nan City, Shandong Province

Applicant before: Shandong Branch of Huadian Power International Corporation Limited

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20160905

CF01 Termination of patent right due to non-payment of annual fee