CN102797477B - Method for preventing partition from biasing in tunnel - Google Patents
Method for preventing partition from biasing in tunnel Download PDFInfo
- Publication number
- CN102797477B CN102797477B CN201210287332.3A CN201210287332A CN102797477B CN 102797477 B CN102797477 B CN 102797477B CN 201210287332 A CN201210287332 A CN 201210287332A CN 102797477 B CN102797477 B CN 102797477B
- Authority
- CN
- China
- Prior art keywords
- iron
- horizontal
- tunnel
- construction section
- leading screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a method for preventing a partition from biasing in a tunnel. The method comprises the steps as follows: driving a movable reinforcing truss trolley to a preset position at current construction section through a driving motor; adjusting a transverse reversed H-shaped steel to prop against an initial support at one side of a guiding hole and an intermediate partition at the other side of the guiding hole in the current construction section in the tunnel; dismounting the transverse reversed H-shaped steel of the current construction section after finishing the construction; and carrying out the construction of the next construction section. According to the method, the circulating flow process has a large number of turns, so that the repeated utilization rate can be increased, and the quantity of used profile steels can be reduced; a reinforcing supporting point is conveniently mounted and dismounted, and the mounting time is short; the transverse reversed H-shaped steel is positioned through a level guiding channel steel, so high accuracy is achieved; and the tension of the transverse reversed H-shaped steel is adjusted through a lead screw, thereby the work of calculating the blanked materials can be effectively reduced.
Description
Technical field
The present invention relates to highway construction technical field, especially relate to a kind of anti-tunnel partition wall bias method.
Background technology
Double-arched tunnel, in work progress, needs to take reinforcement measure to its mid-board, to resist bias voltage body.
Existing reinforcement measure, one adopts in the concrete technical scheme of bias voltage side backfill slabstone, and this kind of technical scheme needs a large amount of sheet stone concretes, and construction cost is higher, and have a greatly reduced quality by the concrete value of slabstone crossed, cause raw-material waste.Meanwhile, this kind of Scheme of Strengthening, when removing, workload is very large, and construction period is longer, and difficulty is also higher.
Also have a kind of Scheme of Strengthening to be adopt fixed type steel truss support to reinforce, adopt this kind of reinforcing mode, although construction more for convenience, need to consume a large amount of steelframe, easily cause steel resources shortage, all transfer efficients are lower, affect construction period.
In sum, the technological means mid-board of double-arched tunnel being taked to reinforcement measure of prior art, all exists and needs a large amount of problem consuming constructional materials, namely cause larger waste to constructional materials.
Summary of the invention
The present invention proposes a kind of anti-tunnel partition wall bias method, solve problem constructional materials being caused to larger waste of the prior art.
In order to achieve the above object, technical scheme of the present invention is achieved in that
The invention provides a kind of anti-tunnel partition wall bias method, comprise step:
A, utilizes drive motors that portable bracnig frame chassis is driven to the predeterminated position of current construction section;
B, regulates the horizontal i iron of described portable bracnig frame chassis with the pilot tunnel side preliminary bracing making it and prop up current construction section in tunnel and opposite side mid-board;
C, after current construction section construction terminates, removes the described horizontal i iron of current construction section, enters the construction of next construction section.
Wherein, described steps A comprises step:
The walking track of described portable bracnig frame chassis is set, utilizes drive motors to drive the active walking assembly of described portable bracnig frame chassis and driven wheels, drive to the predeterminated position of current construction section.
Wherein, described step B comprises step:
Horizontally-guided channel-section steel and leading screw are set to regulate horizontal i iron, make described horizontal i iron prop up the preliminary bracing of pilot tunnel side and the opposite side mid-board of current construction section in tunnel.
Wherein, described horizontally-guided channel-section steel is set and leading screw comprises step to regulate horizontal i iron:
Described leading screw is fixed in described horizontally-guided channel-section steel;
The steel plate of described leading screw termination props up described horizontal i iron, promotes described horizontal i iron or promote described horizontal i iron to opposite side mid-board to preliminary bracing direction, pilot tunnel side.
Wherein, described step B also comprises step:
Oblique line i iron is fixed between the pilot tunnel side preliminary bracing of current construction section in described tunnel and opposite side mid-board.
Wherein, described walking track is 43 type light rails.
Visible, the present invention at least has following beneficial effect:
The anti-tunnel partition wall bias method of one of the present invention, by drive motors, portable bracnig frame chassis is driven to the predeterminated position of current construction section, and regulate horizontal i iron with the pilot tunnel side preliminary bracing making it and prop up current construction section in tunnel and opposite side mid-board, after current construction section construction terminates, remove the described horizontal i iron of current construction section, entering the construction of next construction section, like this without the need to using sheet stone concrete, thus saving sheet stone concrete resource; And each construction section construction terminate after, steel used can be removed and be utilized by next construction section, like this movement recycle steelframe, make the utilization rate of steel higher, thus significantly reduce the consumption to constructional materials.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart of a kind of anti-tunnel partition wall bias method of the present invention.
Detailed description of the invention
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
The invention provides a kind of anti-tunnel partition wall bias method, see Fig. 1, comprise step:
Step S110, utilizes drive motors that portable bracnig frame chassis is driven to the predeterminated position of current construction section.
The walking track of described portable bracnig frame chassis is set, utilizes drive motors to drive the active walking assembly of described portable bracnig frame chassis and driven wheels, drive to the predeterminated position of current construction section.
Described predeterminated position is the construction location that constructor specifies, and is specifically determined according to actual conditions by constructor.
The implementation method of the embodiment of the present invention is based on the portable bracnig frame chassis of one, and described portable bracnig frame chassis comprises horizontal i iron, oblique i iron, horizontally-guided channel-section steel, leading screw, drive motors, initiatively walking assembly, driven wheels and track.
Preferably, in embodiments of the present invention, described portable bracnig frame chassis length and initiatively two to serve as a contrast chassis length identical.
Preferably, in embodiments of the present invention, the walking track in the walking track of described portable bracnig frame chassis is 43 type light rails.
Step S111, regulates horizontal i iron with the pilot tunnel side preliminary bracing making it and prop up current construction section in tunnel and opposite side mid-board.
After utilizing drive motors that described portable bracnig frame chassis is driven to assigned address, horizontally-guided channel-section steel and leading screw are set, regulate horizontal i iron to prop up tunnel middle drift side preliminary bracing and opposite side mid-board by horizontally-guided channel-section steel and leading screw, reach the horizontal thrust that the main hole two of balance serves as a contrast the generation of concrete construction system transform.
Preferably, in embodiments of the present invention, described step arranges horizontally-guided channel-section steel and leading screw to regulate this step of horizontal i iron, mainly leading screw is laid and is fixed in horizontal channel-section steel, flexible to both sides by the flexible horizontal i iron be laterally placed in horizontally-guided channel-section steel that regulates of leading screw.
Specifically comprise step:
Described leading screw is fixed in described horizontally-guided channel-section steel.
The steel plate of described leading screw termination props up described horizontal i iron, promotes described horizontal i iron or promote described horizontal i iron to opposite side mid-board to preliminary bracing direction, pilot tunnel side.
Leading screw is laid to be fixed in horizontal channel-section steel, flexible to both sides by the flexible i iron be laterally placed in horizontal channel-section steel that regulates of leading screw.
Preferably, in embodiments of the present invention, described leading screw is secured by bolts in horizontally-guided channel-section steel, two joint horizontal i iron be the two ends being placed on leading screw respectively, one to tunnel middle drift side preliminary bracing, one to opposite side mid-board.
Leading screw is two-in-one, namely two leading screws link together, be fixed in transverse channel steels, one can push away horizontal i iron to the left side (i.e. the preliminary bracing of pilot tunnel side), and another can push away horizontal i iron to the right (i.e. opposite side mid-board).
Horizontal i iron connects for conflicting with leading screw, and there is the steel plate of block 3 cm thick leading screw termination, and steel plate props up horizontal i iron and just can realize promoting.
Utilize leading screw to regulate the retractility of horizontal i iron, prevent the scale error that fixed support is processed, avoid loaded down with trivial details Cutting calculation work.
Preferably, in embodiments of the present invention, also step is comprised:
Oblique line i iron is fixed between the pilot tunnel side preliminary bracing of current construction section in described tunnel and opposite side mid-board.
Step S112, after current construction section construction terminates, removes the described horizontal i iron of current construction section, enters the construction of next construction section.
Total design of the technical scheme of the embodiment of the present invention is that proposing one is applicable to Double Multi-Arch, for solve one-sided biasing problem when main hole and mid-board support system are changed, the circulating construction method of anti-tunnel partition wall bias voltage.Adopt drive motors running gear, supporting horizontal i iron, oblique i iron support system, can carry out streamlined operation.
Portable bracnig frame chassis forms streamlined operation, improves recycling rate of waterused, decreases the consumption of shaped steel.
In prior art, remove after backfill slabstone concrete construction and construction workload large, cause waste of material, in addition, backfill sheet stone concrete is adopted to solve biasing problem, when removing the concrete operation of interim backfill after reinforcing, easily bad quality problems are caused to the permanent supporting of in type main body.
Adopt fixed steelframe to solve biasing problem, comparatively large to the wastage of steel, installation period is longer, affects construction speed.
The anti-tunnel partition wall bias method of the one based on portable bracnig frame chassis that the embodiment of the present invention adopts, compared with prior art, portable bracnig frame chassis forms do mechanization operation, and the number of turnover is many, improve recycling rate of waterused, decrease the consumption of shaped steel.
Meanwhile, simple structure, installs and convenient disassembly, and reinforce strong point installation, convenient disassembly, the set-up time is short, and operating efficiency is high, effectively shortens the construction period.
Further, because the embodiment of the present invention adopts horizontal orientation channel-section steel, leading screw regulating system, horizontal i iron adopts horizontally-guided channel-section steel location, the degree of accuracy is high, so compared with prior art, improve the correctness of strong point location, make horizontal force system more reasonable.
Further, adopt leading screw to regulate the elasticity of horizontal i iron, make horizontal i iron be adjustable and retractable, such technical scheme compared with prior art, solves the scale error of fixed support processing, has deducted loaded down with trivial details Cutting calculation work.
One of ordinary skill in the art will appreciate that: all or part of step realizing said method embodiment can have been come by the hardware that programmed instruction is relevant, aforesaid program can be stored in a computer read/write memory medium, this program, when performing, performs the step comprising said method embodiment; And aforesaid storage medium comprises: ROM, RAM, magnetic disc or CD etc. various can be program code stored medium.
Last it is noted that above embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (3)
1. an anti-tunnel partition wall bias method, is characterized in that, comprise step:
A, utilizes drive motors that portable bracnig frame chassis is driven to the predeterminated position of current construction section;
B, regulates the horizontal i iron of described portable bracnig frame chassis with the pilot tunnel side preliminary bracing making it and prop up current construction section in tunnel and opposite side mid-board;
C, after current construction section construction terminates, removes the described horizontal i iron of current construction section, enters the construction of next construction section;
Described steps A comprises step:
The walking track of described portable bracnig frame chassis is set, utilizes drive motors to drive the active walking assembly of described portable bracnig frame chassis and driven wheels, drive to the predeterminated position of current construction section;
Described step B comprises step:
Horizontally-guided channel-section steel and leading screw are set to regulate horizontal i iron, make described horizontal i iron prop up the preliminary bracing of pilot tunnel side and the opposite side mid-board of current construction section in tunnel;
Described horizontally-guided channel-section steel is set and leading screw comprises step to regulate horizontal i iron:
Described leading screw is fixed in described horizontally-guided channel-section steel;
The steel plate of described leading screw termination props up described horizontal i iron, promotes described horizontal i iron or promote described horizontal i iron to opposite side mid-board to preliminary bracing direction, pilot tunnel side;
Described leading screw is laid and is fixed in horizontal channel-section steel, flexible to both sides by the flexible horizontal i iron be laterally placed in horizontally-guided channel-section steel that regulates of leading screw.
2. anti-tunnel partition wall bias method according to claim 1, it is characterized in that, described step B also comprises step:
Oblique line i iron is fixed between the pilot tunnel side preliminary bracing of current construction section in described tunnel and opposite side mid-board.
3. anti-tunnel partition wall bias method according to claim 1, is characterized in that, described walking track is 43 type light rails.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210287332.3A CN102797477B (en) | 2012-08-10 | 2012-08-10 | Method for preventing partition from biasing in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210287332.3A CN102797477B (en) | 2012-08-10 | 2012-08-10 | Method for preventing partition from biasing in tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102797477A CN102797477A (en) | 2012-11-28 |
CN102797477B true CN102797477B (en) | 2015-05-27 |
Family
ID=47196755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210287332.3A Expired - Fee Related CN102797477B (en) | 2012-08-10 | 2012-08-10 | Method for preventing partition from biasing in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102797477B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075162B (en) * | 2012-12-29 | 2015-04-22 | 上海市机械施工集团有限公司 | Tunnel portal earth retaining device as well as underground pedestrian passageway construction system and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519969A (en) * | 2009-03-26 | 2009-09-02 | 上海大学 | Double partition two-arch tunnel |
CN101864960A (en) * | 2010-05-17 | 2010-10-20 | 中铁二十局集团有限公司 | Carst region double-arch road tunnel construction method |
CN201627359U (en) * | 2010-04-14 | 2010-11-10 | 中国葛洲坝集团股份有限公司 | Large-section arch top concrete lining movable load-bearing bent |
CN201696056U (en) * | 2010-03-04 | 2011-01-05 | 湖南省交通规划勘察设计院 | Improved structure of twin-arch tunnel with composite middle partition wall |
CN202165091U (en) * | 2011-05-23 | 2012-03-14 | 深圳市市政设计研究院有限公司 | Lining template trolley for baffle wall in tunnel |
CN202250105U (en) * | 2011-09-30 | 2012-05-30 | 云南路桥股份有限公司 | Integral hydraulic steel formwork trolley |
CN102536261A (en) * | 2012-01-14 | 2012-07-04 | 湖南五新重型装备有限公司 | Retractable emergency car avoidance belt tunnel lining trolley |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4509844B2 (en) * | 2005-04-04 | 2010-07-21 | 清水建設株式会社 | Vertical wall assembly apparatus and vertical wall construction method |
-
2012
- 2012-08-10 CN CN201210287332.3A patent/CN102797477B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519969A (en) * | 2009-03-26 | 2009-09-02 | 上海大学 | Double partition two-arch tunnel |
CN201696056U (en) * | 2010-03-04 | 2011-01-05 | 湖南省交通规划勘察设计院 | Improved structure of twin-arch tunnel with composite middle partition wall |
CN201627359U (en) * | 2010-04-14 | 2010-11-10 | 中国葛洲坝集团股份有限公司 | Large-section arch top concrete lining movable load-bearing bent |
CN101864960A (en) * | 2010-05-17 | 2010-10-20 | 中铁二十局集团有限公司 | Carst region double-arch road tunnel construction method |
CN202165091U (en) * | 2011-05-23 | 2012-03-14 | 深圳市市政设计研究院有限公司 | Lining template trolley for baffle wall in tunnel |
CN202250105U (en) * | 2011-09-30 | 2012-05-30 | 云南路桥股份有限公司 | Integral hydraulic steel formwork trolley |
CN102536261A (en) * | 2012-01-14 | 2012-07-04 | 湖南五新重型装备有限公司 | Retractable emergency car avoidance belt tunnel lining trolley |
Non-Patent Citations (1)
Title |
---|
高速公路双连拱隧道施工技术;许占良;《中国高新技术企业》;20100320;正文第2页左栏第3段 * |
Also Published As
Publication number | Publication date |
---|---|
CN102797477A (en) | 2012-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102230383B (en) | All-hydraulic tunnel inverted arch trestle-type moving die frame | |
CN208534043U (en) | Formwork reinforcement tools | |
CN102797477B (en) | Method for preventing partition from biasing in tunnel | |
CN107630709B (en) | A kind of construction method of the mobile trolley of bored tunnel construction | |
CN101363224A (en) | Movable foundation pit support system and construction method | |
CN102322028A (en) | Semi-automatic arch culvert construction template | |
CN205188840U (en) | Horizontal top of bridge pushes away deviation correcting device | |
CN202132052U (en) | Fully-hydraulic tunnel inverted arch trestle-type mobile mold frame | |
CN216892416U (en) | Pouring device for construction of soft foundation cast-in-place box girder | |
CN202194078U (en) | Deck hanging basket main truss shifter | |
CN104074145B (en) | A kind of closure segment Hanging Basket repacking construction method | |
CN102787850A (en) | Inverted arch formwork for tunnel inverted arch construction | |
CN219114330U (en) | Integral sliding formwork | |
CN202250105U (en) | Integral hydraulic steel formwork trolley | |
CN204712262U (en) | A kind of self-propelled integrated hydraulic prefabricated case beam plate device | |
CN103603490B (en) | Floor slab concrete construction method applying floor slab trolley | |
CN202073570U (en) | Inverted arch movable formwork trolley with crossing running gears | |
CN208792786U (en) | A kind of building concrete spreading out device | |
CN201309817Y (en) | Hydraulic lifting mounting carrier vehicle | |
CN202707076U (en) | Double-line railway tunnel trolley | |
CN210317347U (en) | Tunnel grid bow member bed-jig | |
CN201810322U (en) | Needle beam type invert lining slide mould carrier | |
CN209703506U (en) | A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform | |
CN219490721U (en) | Mobile bridge inner cavity maintenance equipment | |
CN208267865U (en) | A kind of backform trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150527 Termination date: 20150810 |
|
EXPY | Termination of patent right or utility model |