CN102795463A - 换流变压器站内移运工法 - Google Patents

换流变压器站内移运工法 Download PDF

Info

Publication number
CN102795463A
CN102795463A CN2011101380818A CN201110138081A CN102795463A CN 102795463 A CN102795463 A CN 102795463A CN 2011101380818 A CN2011101380818 A CN 2011101380818A CN 201110138081 A CN201110138081 A CN 201110138081A CN 102795463 A CN102795463 A CN 102795463A
Authority
CN
China
Prior art keywords
converter transformer
movement
real
traction
power transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101380818A
Other languages
English (en)
Inventor
张峙
吕兆福
宗戈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Province Power Transmission & Transformation Co
State Grid Corp of China SGCC
Original Assignee
Heilongjiang Province Power Transmission & Transformation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Province Power Transmission & Transformation Co filed Critical Heilongjiang Province Power Transmission & Transformation Co
Priority to CN2011101380818A priority Critical patent/CN102795463A/zh
Publication of CN102795463A publication Critical patent/CN102795463A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

一种换流变压器站内移运施工方法,其特征在于:换流变压器移运过程中采用数字拉力测量装置,通过对曲线的实时观测,及时发现卡阻、牵引过载,避免对换流变产生冲撞。移运过程中采用振动频谱仪测量装置,通过实时的测量数据反应牵引过程中换流变的所受冲撞情况,更深入的分析移运小车的动稳定性和牵引系统的设计合理性。将两台振动频谱仪分别安装在换流变压器的器身和阀侧套管的接线板处,通过数据线将其与计算机用数据网线连接,实现移运过程实时监控。本方法可广泛用于重量大、就位难度大的换流变压器站内移运施工。

Description

换流变压器站内移运工法
技术领域:
本发明型涉及换流变压器的站内移运施工方法,特别是针对我国首次建设的±660kV直流输电示范工程换流变压器的安装就位。
背景技术:
换流变压器是直流输电系统中的重要设备,处在交流电网侧与换流阀之间的核心位置,其可靠性对整个直流输电系统的安全稳定运行起着非常关键作用。目前我国规范仅对变压器运输过程要求不应有严重冲击,且允许冲击值由制造厂及合同确定,对于变压器安装完成后的站内移运过程中的冲击加速度尚无明确要求。但移运过程中所受冲击加速度对其今后的安全运行、使用寿命以及设备质量事故分析有着重要的作用。随着直流输电工程传输功率的增大和电压等级的不断提高,换流变压器的重量、阀侧套管长度也随之增加,根据上述特点制定成熟可靠的施工方法以确保换流变压器站内移运顺利进行已成为急需。
发明内容:
克服现有技术存在的不足,换流变压器移运过程中采用数字拉力测量装置,通过对实时采样曲线进行实时观测并记录,及时发现卡阻、牵引过载,避免对换流变压器产生冲撞。移运过程中采用振动频谱仪测量装置,通过实时的测量并记录数据反应牵引过程中换流变的所受冲撞情况,更深入的分析移运小车的动稳定性和牵引系统的设计合理性。将两台振动频谱仪分别安装在换流变压器的器身和阀侧套管的接线板处,通过数据线将其与计算机用数据网线连接,实现移运过程实时监控。
具体实施方式
下面结合附图对本发明的最佳实施方案进行详细描述:
换流变压器站内移运工法是:
1.通过理论计算拉力传感器的额定值,并确定其采样频率.将其串入换流变压器牵引系统的两个牵引点位置,通过数据线传输到后台,通过装置转换,在已安装好软件的计算机上输出曲线,移运过程中采用数字拉力测量装置,通过曲线的实时观测,同时将装置设定额定拉力输出开关量,当拉力超出整定值时,开关量控制牵引设备停机.及时发现卡阻、牵引过载,避免对换流变产生冲撞。
拉力仪具备如下功能:
Figure BSA00000504493500021
采用集成电路设计,性能稳定可靠,功能齐全,抗干扰能力强;
Figure BSA00000504493500022
检测精度为±1.0%F·S;
Figure BSA00000504493500023
滞后及重复性误差≤±1.0%F·S
Figure BSA00000504493500024
允许过负载能力20%F·S
Figure BSA00000504493500025
拉力传感器和显示仪表通过数据线相连接,监视人员可以远离受力部位,增强检测安全性;
Figure BSA00000504493500026
具有标准计算机接口输出检测功能;
Figure BSA00000504493500027
装置采样频率为1HZ,并实时输出采样数值和曲线;
Figure BSA00000504493500028
能够计算两个采样的差值并实时输出曲线;
Figure BSA00000504493500029
报警值可根据实际需要任意设定,具有开关量输出;
Figure BSA000005044935000210
使用环境应满足:环境温度5~40℃,相对湿度≯85%的环境
2.移运过程中采用振动频谱仪测量装置,通过实时的测量数据反应牵引过程中换流变的所受冲撞情况,更深入的分析小车的动稳定性和牵引系统的设计合理性,并能够对设备移运振动数据记录。
设备具有如下功能:
采集的数据带有时间和日期坐标,可通过用户自行设定的时间间隔来测量记录三轴(x、y、z)加速度的峰值;
Figure BSA00000504493500032
由电池供电,可独立工作,可以连续以500Hz的速率采样加速度计的数据;
Figure BSA00000504493500033
加速度量程为±5g,分辨率为±0.2g,精确度为0.01g;
Figure BSA00000504493500034
记录数据容量为40000/轴以上;传输速率25000bps以上;
具备输出USB计算机端口,其软件在计算机上可实时监控并计算和记录最大值、最小值、平均值、三轴矢量和以及概要统计报告。并能将实时采集的数据绘制成带有时间和日期坐标的连续曲线;
Figure BSA00000504493500036
工作环境温度5~+60℃,0~95%RH非冷凝
为了能够将数据反应全面,将两台振动频谱仪分别安装在换流变压器的器身和阀侧套管的接线板处,通过数据线将其与计算机用数据网线连接好。
采用低速匀速卷扬机牵引装置,确定其速度为2米/分钟,通过2-2滑轮组反映到换流变压器的移运速度为0.5米/分钟。
附图说明
图1为换流变压器移运示意图。图中:1-换流变压器本体、2-套管、3-数字振动频谱仪、4-数字拉力记录仪、5-移运小车。
图2为拉力装置采集数据绘制曲线
图3为振动频谱装置采集数据绘制曲线
技术比较情况
Figure BSA00000504493500041
换流变压器移运的注意事项
a.牵引前工作负责人及安全监察人员进行一次全面检查,查看地锚点固定应牢固、2-2滑轮组钢丝绳绕向正确、换流变前进方向无障碍。
b.在牵引时,除总指挥全面负责统一指挥外,试验仪器监控系统、各地锚点、换流变运转小车均设专人监视,监视、试验人员各尽其责,发现异常情况立即向指挥人员汇报。
c.牵引时换流变应保持平稳匀速前进,减少受冲击或振动,。
d.牵引至换流变基础位置时,逐步检查换流变导轨,如发现有阻碍现象立即停止牵引,排除障碍。
e.换流变移至终点位置处,在两道钢轨的阀厅墙壁侧放置道木,防止换流变过牵引撞击阀厅墙壁。

Claims (1)

1.一种换流变压器站内移运施工方法,其特征在于:换流变压器移运过程中采用数字拉力测量装置,通过对曲线的实时观测,及时发现卡阻、牵引过载,避免对换流变产生冲撞。移运过程中采用振动频谱仪测量装置,通过实时的测量数据反应牵引过程中换流变的所受冲撞情况,更深入的分析移运小车的动稳定性和牵引系统的设计合理性。将两台振动频谱仪分别安装在换流变压器的器身和阀侧套管的接线板处,通过数据线将其与计算机用数据网线连接,实现移运过程实时监控。
CN2011101380818A 2011-05-26 2011-05-26 换流变压器站内移运工法 Pending CN102795463A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101380818A CN102795463A (zh) 2011-05-26 2011-05-26 换流变压器站内移运工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101380818A CN102795463A (zh) 2011-05-26 2011-05-26 换流变压器站内移运工法

Publications (1)

Publication Number Publication Date
CN102795463A true CN102795463A (zh) 2012-11-28

Family

ID=47194813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101380818A Pending CN102795463A (zh) 2011-05-26 2011-05-26 换流变压器站内移运工法

Country Status (1)

Country Link
CN (1) CN102795463A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106706120A (zh) * 2016-12-20 2017-05-24 国家电网公司 一种变压器振动测试系统及方法
CN108051070A (zh) * 2017-11-29 2018-05-18 中国电力科学研究院有限公司 一种全装主变压器移动过程中的振动检测系统和方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87215101U (zh) * 1987-11-25 1988-10-05 刘光武 带测力传感器的车钩
CN2851193Y (zh) * 2005-11-16 2006-12-27 苏为业 一种大倾角胶带机游动坠车防撞保护装置
CN2918314Y (zh) * 2006-04-14 2007-07-04 沈阳重工电器制造有限公司 输送带拉绳开关
EP1816092A1 (en) * 2006-02-07 2007-08-08 Vanderlande Industries Nederland B.V. Conveyor system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87215101U (zh) * 1987-11-25 1988-10-05 刘光武 带测力传感器的车钩
CN2851193Y (zh) * 2005-11-16 2006-12-27 苏为业 一种大倾角胶带机游动坠车防撞保护装置
EP1816092A1 (en) * 2006-02-07 2007-08-08 Vanderlande Industries Nederland B.V. Conveyor system
CN2918314Y (zh) * 2006-04-14 2007-07-04 沈阳重工电器制造有限公司 输送带拉绳开关

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张国兵,张文亮: "特高压变压器运输冲击加速度控制与安全裕度评估", 《高压电技术》 *
李扬: "800KV云广特高压换流变压器现场安装关键技术", 《电力建设》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106706120A (zh) * 2016-12-20 2017-05-24 国家电网公司 一种变压器振动测试系统及方法
CN108051070A (zh) * 2017-11-29 2018-05-18 中国电力科学研究院有限公司 一种全装主变压器移动过程中的振动检测系统和方法

Similar Documents

Publication Publication Date Title
CN202400737U (zh) 起重机械在线安全监控记录仪
EP3505724A1 (en) Method for monitoring vibration and strain of key parts of tunnel boring machine
CN108362966B (zh) 一种油浸变压器高精度噪声在线监测方法和系统
CN201852711U (zh) 一种起升机构能效和性能测试系统
CN102826437A (zh) 扶梯运行记录监控装置
CN201228202Y (zh) 起重机安全运行监控记录装置
CN107655513A (zh) 一种铁路接触网动态监测装置
CN203212149U (zh) 电梯轿厢振动在线监测报警器
CN102795463A (zh) 换流变压器站内移运工法
CN102285591B (zh) 一种起重机制动下滑量检测仪
CN104326360B (zh) 门座式起重机全息检测方法
CN112924061A (zh) 一种天然气管道非均匀沉降应力无线实时监测系统及方法
CN117382465A (zh) 一种移动充电车的充电异常诊断评估系统
CN201942437U (zh) 塔机小车位置检测装置及塔机力矩检测装置
CN114061507A (zh) 一种基于无人机的架空输电线路线下障碍物测距方法
CN205898200U (zh) 基于Zigbee模块的桥梁综合监测系统
CN103498790B (zh) 基于光纤光栅传感的机泵群状态监测方法及装置
CN202257165U (zh) 一种移动式堆料设备行走测控装置
CN104444812A (zh) 新型起重机监控系统
CN201867357U (zh) 一种面向管道运输的管道内腐蚀监测装置
CN101566512A (zh) 一种砌筑井壁时在线实时检测模板悬吊绳拉力的设备
CN105675011A (zh) 一种用于电力管道轨迹测量仪的自动牵引装置及方法
CN106768274B (zh) 一种发电机定子绕组端部振动监测系统及监测方法
CN114166397A (zh) 一种线缆一体式张力监测装置及监测方法
CN210487896U (zh) 一种高压电缆短路故障精确定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121108

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121108

Address after: 150000 Heilongjiang city of Harbin province Lijiang Qunli Qunli road and Sixth Avenue intersection in Heilongjiang province songbiandian engineering company

Applicant after: Heilongjiang Province Power Transmission & Transformation Company

Applicant after: State Grid Corporation of China

Address before: 150000 Heilongjiang city of Harbin province Lijiang Qunli Qunli road and Sixth Avenue intersection in Heilongjiang province songbiandian engineering company

Applicant before: Heilongjiang Province Power Transmission & Transformation Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121128