CN102795147B - Mining area fortune filling car - Google Patents

Mining area fortune filling car Download PDF

Info

Publication number
CN102795147B
CN102795147B CN201210307091.4A CN201210307091A CN102795147B CN 102795147 B CN102795147 B CN 102795147B CN 201210307091 A CN201210307091 A CN 201210307091A CN 102795147 B CN102795147 B CN 102795147B
Authority
CN
China
Prior art keywords
valve
pipeline
mining area
joint
bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210307091.4A
Other languages
Chinese (zh)
Other versions
CN102795147A (en
Inventor
杨乐
刘洪磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINXING HEAVY INDUSTRY GROUP Co Ltd
Original Assignee
XINXING HEAVY INDUSTRY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINXING HEAVY INDUSTRY GROUP Co Ltd filed Critical XINXING HEAVY INDUSTRY GROUP Co Ltd
Priority to CN201210307091.4A priority Critical patent/CN102795147B/en
Publication of CN102795147A publication Critical patent/CN102795147A/en
Application granted granted Critical
Publication of CN102795147B publication Critical patent/CN102795147B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Check Valves (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

A kind of mining area fortune filling car, comprises chassis system (11), tank system (12), panel block (13) and pump oil pipe line system (14).Pipeline and the joint of 3 kinds of different bores is provided with in described pump oil pipe line system, conveniently can connect DN80, DN50 and DN25 filling conduit and joint and nozzle supporting with it, can oil filling be carried out to respectively or simultaneously distinct device and vehicle in mining area.This mining area fortune filling car can not meet various equipment and engineering truck in mining area completely mainly for general fortune filling car and design the requirement of bore during oil filling, its chassis power is large, load-carrying capacity is strong, is applicable to the highway in mining area, hill path, the rugged various road conditions such as road of jolting.When ensureing low cost, what ensured mining area all devices and vehicle uses oily demand, reduces potential safety hazard.

Description

Mining area fortune filling car
Technical field
The present invention relates to a kind of mining area fortune filling car, particularly a kind of mining area fortune filling car possessing different bore filling conduit.
Background technology
The fortune filling car that mining area uses, main transport and the storage being used as spin-off such as gasoline, diesel oil, crude oil, lubricating oil and the coal tar wet goods oil product of oil.Fortune filling car is the equal of the petrol service station of a movement, can carry out fuel feeding to required vehicle whenever and wherever possible.The fortune filling car that current mining area uses comprises the fortune filling car of large, medium and small type, and conventional fortune filling car is only equipped with the pipeline of single bore, and a kind of fluid of bore flow namely only can be provided to export.There is following shortcoming when using in mining area in the fortune filling car of such configuration: first, what small-sized fortune filling car configured is small-bore pipeline, the fortune filling car flow configuring small-bore pipeline is less, if give the medium-and-large-sized equipment in mining area and vehicle filling oil plant, the quantity of the fortune filling car needed is many, refueling time is longer, affects the work efficiency of equipment and vehicle.The second, configure the dilly of the fortune filling car of small-bore pipeline, because its chassis power is little, vehicle body is low, and load-carrying capacity is more weak, can not adapt to the road conditions in mining area and environment completely, cannot go deep into mining area operation, use and have inconvenience more.3rd, what big-and-middle-sized fortune filling car configured usually is heavy caliber pipeline, the big-and-middle-sized fortune filling car flow of configuration heavy caliber pipeline is large, but because bore is single, the heavy caliber pipeline configured cannot give dilly and the equipment filling oil plant of the small-bore pipeline of configuration in mining area.Finally, if be equipped with many dissimilar fortune filling cars in mining area operation, add cost, and due to mining area environment severe, being equipped with multiple vehicle can increase potential safety hazard.
Summary of the invention
In order to overcome above-mentioned shortcoming of the prior art, the object of this invention is to provide a kind of fortune filling car being equipped with many bores filling conduit, this fortune filling car can utilize the filling conduit of the multiple caliber of outfit to the oil filling of all devices in mining area and vehicle, when ensureing low cost, what ensured mining area all devices and vehicle uses oily demand, reduces potential safety hazard.
The present invention is achieved in that
A kind of mining area fortune filling car, this mining area fortune filling car comprises: chassis system 11, tank system 12, panel block 13 and pump oil pipe line system 14; Described chassis system comprises transmission system, running device, steering system and brake system four part, for supporting, installs automotive engine and each parts, assembly; Described tank system 12 comprises tank body, and described tank body is used for containing oil material; Described panel block 13 is configured in the left side of vehicle, comprises maneuvering system, and this maneuvering system is for operating chassis system, tank system and pump oil pipe line system; Described pump oil pipe line system configuration is in panel block, pipeline and the joint of at least 3 kinds of different bores is provided with in pump oil pipe line system, the connection of each pipeline and joint all uses the quick coupling of negative and positive end, by described pipeline and joint, pump oil pipe line system can carry out oil filling to respectively or simultaneously distinct device and vehicle in mining area.
In the fortune filling car of described mining area, described pump oil pipe line system comprises geared oil pump, the power that this geared oil pump is carried as oil plant, is pumped by oil plant from tank body.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN50 bore, the pipeline of this DN50 bore and joint arrangement have the nozzle of DN50 bore, and the pipeline of described DN50 bore and the nozzle of joint and DN50 bore are used for the oil filling of big-and-middle-sized equipment and engineering truck to mining area.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN80 bore, and the pipeline of described DN80 bore and joint are used for the conveying of oil plant.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN25 bore, the pipeline of this DN25 bore and joint arrangement have the nozzle of DN25 bore, and the pipeline of described DN25 bore and the nozzle of joint and DN25 bore are used for the oil filling to mining area midget plant and engineering truck.
In the fortune filling car of described mining area, described pump oil pipe line system 14 comprises geared oil pump 24, check valve 22, rough filter 23, micronic filter 26, flow counter the 25, the 1 tee ball valve the 1, the 24 tee ball valve 2, first straight-through valve 3, second straight-through valve 4, first flange oedoeagus 5, second flange oedoeagus 6, three-flange oedoeagus 7, the 4th flange oedoeagus 8; Wherein
The entrance of geared oil pump 24 is communicated with rough filter 23, and the entrance of rough filter 23 is communicated with the one or four tee ball valve 1 first port;
The outlet of geared oil pump 24 is communicated with the second port of the two or four tee ball valve 2 with the entrance of check valve 22;
The outlet of check valve 22 is communicated with second port of tank body 21 with the one or four tee ball valve 1, and the 3rd port of the one or four tee ball valve 1 is communicated with the first flange oedoeagus 5;
3rd port of the two or four tee ball valve 2 is communicated with the second flange oedoeagus 6, and the first port of the two or four tee ball valve 2 is communicated with the entrance of micronic filter 26;
The outlet of micronic filter 26 is communicated with the entrance of flow counter 25, and the outlet of flow counter is communicated with the first end of the second straight-through valve 4 with the first end of the first straight-through valve 3;
Second end of the first straight-through valve 3 is communicated with three-flange oedoeagus 7, and the second end of the second straight-through valve 4 is communicated with the 4th flange oedoeagus 8.
In the fortune filling car of described mining area, described one or four tee ball valve 1 and the two or four tee ball valve 2 are DN80 tetra-tee ball valves; First straight-through valve 3 is DN80 straight-through valves, and the second straight-through valve 4 is DN25 straight-through valves; First flange oedoeagus 5, second flange oedoeagus 6 and three-flange oedoeagus 7 are DN80 flange oedoeagus; 4th flange oedoeagus 8 is DN25 flange oedoeagus.
The present invention compared with prior art has following characteristics and beneficial effect:
1, fortune filling car in mining area of the present invention is equipped with pipeline and the joint of at least 3 kinds of different sizes, can a car multiplex, the oil filling problem of the various equipment in mining area and vehicle can be solved, and decrease the amount of purchase of mining area vehicle, reduce cost.
2, mining area of the present invention each pipeline of fortune filling car connects all use negative and positive end quick coupling, swift to operate, convenient.
3, the chassis power of mining area of the present invention fortune filling car is large, and load-carrying capacity is strong, adapts to various road conditions and the rugged environment in mining area.
Accompanying drawing explanation
When reading detailed description and the detailed description of the invention of following appended with drawings, these and other feature, aspect and advantage of the present invention will be better understood, wherein:
Fig. 1 is the front elevation of the overall appearance structure of the mining area fortune filling car of the embodiment of the present invention;
Fig. 2 is the mining area fortune filling car oil pumping system schematic diagram of the embodiment of the present invention
The switching manipulation notice signal chart of the various valves of oil pumping system when Fig. 3 is the mining area fortune filling car oiling of the embodiment of the present invention.
Detailed description of the invention
The present invention relates to a kind of mining area fortune filling car, as shown in Figure 1, this fortune filling car mainly comprises: chassis system 11, tank system 12, panel block 13 and pump oil pipe line system 14, described chassis system 11 comprises transmission system, running device, steering system and brake system four part, for supporting, automotive engine and each parts thereof are installed, assembly, described tank system 12 comprises tank body, described tank body is used for containing oil material, described panel block 13 is configured in the left side of vehicle heading, comprise maneuvering system, this maneuvering system is for operating chassis system, tank system and pump oil pipe line system, described pump oil pipe line system 14 is configured in panel block.Pipeline and the joint of at least 3 kinds of different bores is designed with in the pump oil pipe line system of described mining area fortune filling car, the connection of each pipeline and joint all uses the quick coupling of negative and positive end, by described pipeline and joint, the pump oil pipe line system of this mining area fortune filling car can carry out oil filling to respectively or simultaneously distinct device and vehicle in mining area.
In the fortune filling car of described mining area, described pump oil pipe line system comprises geared oil pump, the power that this geared oil pump is carried as oil plant, is pumped by oil plant from tank body.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN50 bore, the pipeline of this DN50 bore and joint arrangement have the nozzle of DN50 bore, and the pipeline of described DN50 bore and the nozzle of joint and DN50 bore are used for the oil filling of, medium size installations large-scale to mining area and engineering truck.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN80 bore, and the pipeline of described DN80 bore and joint are used for the conveying of oil plant.
In the fortune filling car of described mining area, the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN25 bore, the pipeline of this DN25 bore and joint arrangement have the nozzle of DN25 bore, and the pipeline of described DN25 bore and the nozzle of joint and DN25 bore are used for the oil filling to mining area midget plant and engineering truck.
Referring again to Fig. 2, described pump oil pipe line system 14 comprises geared oil pump 24, check valve 22, rough filter 23, micronic filter 26, flow counter the 25, the 1 tee ball valve the 1, the 24 tee ball valve 2, first straight-through valve 3, second straight-through valve 4, first flange oedoeagus 5, second flange oedoeagus 6, three-flange oedoeagus 7, the 4th flange oedoeagus 8; Wherein
The entrance of geared oil pump 24 is communicated with rough filter 23, and the entrance of rough filter 23 is communicated with the first port of the one or four tee ball valve 1;
The outlet of geared oil pump 24 is communicated with the second port of the two or four tee ball valve 2 with the entrance of check valve 22;
The outlet of check valve 22 is communicated with second port of tank body 21 with the one or four tee ball valve 1, and the 3rd port of the one or four tee ball valve 1 is communicated with the first flange oedoeagus 5;
3rd port of the two or four tee ball valve 2 is communicated with the second flange oedoeagus 6, and the first port of the two or four tee ball valve 2 is communicated with the entrance of micronic filter 26;
The outlet of micronic filter 26 is communicated with the entrance of flow counter 25, and the outlet of flow counter is communicated with the first end of the second straight-through valve 4 with the first end of the first straight-through valve 3;
Second end of the first straight-through valve 3 is communicated with three-flange oedoeagus 7, and the second end of the second straight-through valve 4 is communicated with the 4th flange oedoeagus 8.
One or four tee ball valve 1 and the two or four tee ball valve 2 are DN80 tetra-tee ball valves; First straight-through valve 3 is DN80 straight-through valves, and the second straight-through valve 4 is DN25 straight-through valves; First flange oedoeagus 5, second flange oedoeagus 6 and three-flange oedoeagus 7 are DN80 flange oedoeagus; 4th flange oedoeagus 8 is DN25 flange oedoeagus.
With reference to figure 3, when mining area fortune filling car refuels, the switching manipulation notice signal chart of the various valves of oil pumping system shows the concrete mode of operation of described mining area fortune filling car, and it can be divided into following several:
(1), oil pump emptying pattern one (quantitative model)
Now, for the one or four tee ball valve 1,
Second port open of the one or four tee ball valve 1 be communicated with tank body 21,
First port open of the one or four tee ball valve 1 be communicated with the entrance of rough filter 23,
3rd port shutdown of the one or four tee ball valve 1 be connected with the first flange oedoeagus 5;
For the two or four tee ball valve 2,
With the second port open of the two or four tee ball valve 2 of the outlet of geared oil pump 24;
First port open of the two or four tee ball valve 2 be communicated with the entrance of micronic filter 26;
3rd port shutdown of the two or four tee ball valve 2 be communicated with the second flange oedoeagus 6;
In addition, the two ends of the first straight-through valve 3 are all opened, and the two ends of the second straight-through valve 4 are all closed.
Thus, the fluid of tank body is discharged by the one or four tee ball valve the 1, the 24 tee ball valve 2, flow counter 25 and the first straight-through valve 3, and the quantity of the fluid of discharge is measured by flow counter 25.
(2), oil pump emptying pattern two (not quantitative model)
Now, the opening and closing situation of each port of the one or four tee ball valve 1 is identical with above-mentioned quantitative model.The two ends of the first straight-through valve 3 and the two ends of the second straight-through valve 4 are all closed.
For the two or four tee ball valve 2,
With the second port open of the two or four tee ball valve 2 of the outlet of geared oil pump 24;
First port shutdown of the two or four tee ball valve 2 be communicated with the entrance of micronic filter 26;
3rd port open of the two or four tee ball valve 2 be communicated with the second flange oedoeagus 6;
Thus, the fluid of tank body is discharged by the one or four tee ball valve the 1, the 24 tee ball valve 2, the obstructed overcurrent gauge 25 of fluid of discharge.
(3), oil discharging by gravity flow's pattern
Now, for the one or four tee ball valve 1,
Second port open of the one or four tee ball valve 1 be communicated with tank body 21,
The one or four tee ball valve 1 first port shutdown be communicated with the entrance of rough filter 23,
3rd port open of the one or four tee ball valve 1 be connected with the first flange oedoeagus 5;
Thus, the fluid of tank body is directly discharged from the one or four tee ball valve 1.And for the two or four tee ball valve 2, with the second port shutdown of the two or four tee ball valve 2 of the outlet of geared oil pump 24; First port open of the two or four tee ball valve 2 be communicated with the entrance of micronic filter 26; 3rd port open of the two or four tee ball valve 2 be communicated with the second flange oedoeagus 6; Like this can by also emptying for fluid remaining in pipeline.Meanwhile, the two ends of the first straight-through valve 3 and the two ends of the second straight-through valve 4 are all closed.
(4), DN50 nozzle oiling pattern
Now, the opening and closing situation of each port of the one or four tee ball valve the 1, the 24 tee ball valve 2, first straight-through valve 3, second straight-through valve 4 is identical with above-mentioned quantitative model.
Wherein, pass through at the second end of the first straight-through valve 3 fuel filler pipe that DN80 female end becomes DN50 oedoeagus reducing head connection DN50, under the pattern of metering, DN50 nozzle can be realized and refuel thus.The quantity of the fluid of discharging is measured by flow counter 25.
(5), DN25 nozzle oiling pattern
Now, the opening and closing situation of each port of the one or four tee ball valve the 1, the 24 tee ball valve 2 is identical with above-mentioned quantitative model; In addition, the two ends of the first straight-through valve 3 are all closed, the two ends of the second straight-through valve 4 all open.Connect the fuel filler pipe of DN25 at the second end of the second straight-through valve 4, under the pattern of metering, DN25 nozzle can be realized and refuel thus.The quantity of the fluid of discharging is measured by flow counter 25.
Although in conjunction with the embodiments above-mentioned and accompanying drawing is described the specific embodiment of the present invention; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (5)

1. a mining area fortune filling car, comprises chassis system (11), tank system (12), panel block (13) and pump oil pipe line system (14); Described chassis system (11) comprises transmission system, running device, steering system and brake system four part, for supporting, installs automotive engine and each parts, assembly; Described tank system (12) comprises tank body (21), described tank body (21) for containing oil material; Described panel block (13) is configured in the left side of vehicle, comprises maneuvering system, and maneuvering system is for operating chassis system (11), tank system (12) and pump oil pipe line system (14); Described pump oil pipe line system (14) is configured in panel block, it is characterized in that: the pipeline and the joint that are provided with at least 3 kinds of different bores in described pump oil pipe line system (14), the connection of each pipeline and joint all uses the quick coupling of negative and positive end, described pump oil pipe line system carries out oil filling to respectively or simultaneously distinct device and vehicle in mining area by described pipeline and joint
Described pump oil pipe line system (14) comprises geared oil pump (24), check valve (22), rough filter (23), micronic filter (26), flow counter (25), the one or four tee ball valve (1), the two or four tee ball valve (2), the first straight-through valve (3), the second straight-through valve (4), the first flange oedoeagus (5), the second flange oedoeagus (6), three-flange oedoeagus (7), the 4th flange oedoeagus (8);
The entrance of geared oil pump (24) is communicated with rough filter (23), and the entrance of rough filter (23) is communicated with the one or four tee ball valve (1) first port;
The outlet of geared oil pump (24) is communicated with the second port of the two or four tee ball valve (2) with the entrance of check valve (22);
The outlet of check valve (22) is communicated with the second port of the one or four tee ball valve (1) with tank body (21), and the 3rd port of the one or four tee ball valve (1) is communicated with the first flange oedoeagus (5);
3rd port of the two or four tee ball valve (2) is communicated with the second flange oedoeagus (6), and the first port of the two or four tee ball valve (2) is communicated with the entrance of micronic filter (26);
The outlet of micronic filter (26) is communicated with the entrance of flow counter (25), and the outlet of flow counter (25) is communicated with the first end of the second straight-through valve (4) with the first end of the first straight-through valve (3);
Second end of the first straight-through valve (3) is communicated with three-flange oedoeagus (7), and the second end of the second straight-through valve (4) is communicated with the 4th flange oedoeagus (8);
Wherein, the fluid of tank body is discharged by the one or four tee ball valve (1), the two or four tee ball valve (2), flow counter (25) and the first straight-through valve (3).
2. mining area according to claim 1 fortune filling car, it is characterized in that: the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN50 bore, the pipeline of this DN50 bore and joint arrangement have the nozzle of DN50 bore, and the pipeline of described DN50 bore and the nozzle of joint and DN50 bore are used for the oil filling to mining area main equipment and engineering truck.
3. mining area according to claim 1 fortune filling car, is characterized in that: the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN80 bore, and the pipeline of described DN80 bore and joint are used for the conveying of oil plant.
4. mining area according to claim 1 fortune filling car, it is characterized in that: the pipeline of described at least 3 kinds of different bores and joint wherein a kind of is pipeline and the joint of DN25 bore, the pipeline of described DN25 bore and joint arrangement have the nozzle of DN25 bore, and the pipeline of described DN25 bore and the nozzle of joint and DN25 bore are used for the oil filling to mining area midget plant and engineering truck.
5. mining area according to claim 1 fortune filling car, is characterized in that:
Described one or four tee ball valve (1) and the two or four tee ball valve (2) are DN80 tetra-tee ball valves;
First straight-through valve (3) is DN80 straight-through valve, and the second straight-through valve (4) is DN25 straight-through valve;
First flange oedoeagus (5), the second flange oedoeagus (6) and three-flange oedoeagus (7) are DN80 flange oedoeagus;
4th flange oedoeagus (8) is DN25 flange oedoeagus.
CN201210307091.4A 2012-08-26 2012-08-26 Mining area fortune filling car Expired - Fee Related CN102795147B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210307091.4A CN102795147B (en) 2012-08-26 2012-08-26 Mining area fortune filling car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210307091.4A CN102795147B (en) 2012-08-26 2012-08-26 Mining area fortune filling car

Publications (2)

Publication Number Publication Date
CN102795147A CN102795147A (en) 2012-11-28
CN102795147B true CN102795147B (en) 2016-01-20

Family

ID=47194530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210307091.4A Expired - Fee Related CN102795147B (en) 2012-08-26 2012-08-26 Mining area fortune filling car

Country Status (1)

Country Link
CN (1) CN102795147B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552496A (en) * 2013-11-01 2014-02-05 北京三兴汽车有限公司 Small-sized oil distribution vehicle
CN104528625B (en) * 2014-11-22 2017-10-13 太原理工大学 A kind of mobile lubricating oil oil injection cart

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102216556A (en) * 2007-10-24 2011-10-12 M-I有限公司 Boat installation frame for transportation tanks
CN202038219U (en) * 2011-04-20 2011-11-16 北京三兴汽车有限公司 Light fuel oil tanker
CN202088964U (en) * 2011-04-20 2011-12-28 北京三兴汽车有限公司 Oil truck having an oil tank with volume of 5000 liters
CN202728059U (en) * 2012-08-26 2013-02-13 新兴重工集团有限公司 Transporting and fueling vehicle for mining area

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3581223B2 (en) * 1996-09-20 2004-10-27 昭和飛行機工業株式会社 Tank lorry
US8376244B2 (en) * 2009-05-27 2013-02-19 Caterpillar Inc. Mobile fluid distribution system and method
CN201999725U (en) * 2011-04-21 2011-10-05 北京三兴汽车有限公司 Small size multifunctional tank type oil transporting and filling vehicle
CN202046240U (en) * 2011-05-19 2011-11-23 张家港中集圣达因低温装备有限公司 Tank semi-trailer used for transporting low-temperature liquid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102216556A (en) * 2007-10-24 2011-10-12 M-I有限公司 Boat installation frame for transportation tanks
CN202038219U (en) * 2011-04-20 2011-11-16 北京三兴汽车有限公司 Light fuel oil tanker
CN202088964U (en) * 2011-04-20 2011-12-28 北京三兴汽车有限公司 Oil truck having an oil tank with volume of 5000 liters
CN202728059U (en) * 2012-08-26 2013-02-13 新兴重工集团有限公司 Transporting and fueling vehicle for mining area

Also Published As

Publication number Publication date
CN102795147A (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN203174538U (en) Small-size multifunctional high-pressure cleaning vehicle
CN203094209U (en) Cargo loading vehicle trailer for road transporting tool and road transporting tool combination
CN102815335B (en) Steering and braking integrated control system and mineral dumper
CN101850740B (en) Dual-power refueller
CN204267196U (en) Heavy truck and two oil tank fuel system thereof
CN102795147B (en) Mining area fortune filling car
CN203653225U (en) Oil tank truck bottom fuel loading system
CN202728059U (en) Transporting and fueling vehicle for mining area
CN201999725U (en) Small size multifunctional tank type oil transporting and filling vehicle
CN201040701Y (en) Fork lift hydraulic driving device
US10442676B1 (en) Mobile auxiliary distribution station
CN202011742U (en) Double-bin refueller pipeline system with independent self-absorption function
CN206969002U (en) A kind of unpowered multiplex roles refueling device
CN202038219U (en) Light fuel oil tanker
CN206107243U (en) A link up water system for track maintenance logistics support car
CN202038456U (en) Fuel delivery and filling vehicle for airplanes
CN201980167U (en) External vehicle-mounted air supply
CN204055527U (en) A kind of filling car
CN211081808U (en) Special chemical dosing vehicle for oil and gas fields
CN101181896A (en) Electric hydraulic brake device of aircraft tractor
CN201694822U (en) Dual-power refueling vehicle
CN201453893U (en) Novel fire-fighting water tender
CN202557383U (en) Aviation kerosene transfer vehicle
CN214693302U (en) Can realize measurement tank service truck pipe-line system who refuels
CN202687938U (en) Novel double-fuel refueling truck

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20210826

CF01 Termination of patent right due to non-payment of annual fee