CN102786949B - Dry quenching exhaust gas generation and combustion heating device - Google Patents

Dry quenching exhaust gas generation and combustion heating device Download PDF

Info

Publication number
CN102786949B
CN102786949B CN201210279429.XA CN201210279429A CN102786949B CN 102786949 B CN102786949 B CN 102786949B CN 201210279429 A CN201210279429 A CN 201210279429A CN 102786949 B CN102786949 B CN 102786949B
Authority
CN
China
Prior art keywords
quirk
internal
gas
quenching
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210279429.XA
Other languages
Chinese (zh)
Other versions
CN102786949A (en
Inventor
王新民
白原平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Ruide New Material Technology Co ltd
Original Assignee
Shanxi Xinli Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Xinli Energy Technology Co Ltd filed Critical Shanxi Xinli Energy Technology Co Ltd
Priority to CN201210279429.XA priority Critical patent/CN102786949B/en
Publication of CN102786949A publication Critical patent/CN102786949A/en
Application granted granted Critical
Publication of CN102786949B publication Critical patent/CN102786949B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Supply (AREA)

Abstract

The invention discloses a dry quenching exhaust gas generation and combustion heating device which comprises a dry quenching device and a quenching exhaust gas heater; the dry quenching device is arranged in a coal pyrolyzing furnace chamber and is positioned under a coking chamber, a coke modification device, an internal combustion heating device and a flame path arch, and the dry quenching device comprises a high-temperature quenching chamber, a low-temperature quenching chamber, a quenching bridge arch and a quenching exhaust gas fan; and the quenching exhaust gas heater is arranged in the ring wall at the inner ring of the coking chamber and is positioned above the flame path arch, and comprises an inner flame path, an air replenishing pipe, a primary air replenishing pipe, a second air replenishing pipe, an air replenishing annular path, a central ring wall, an inner flame path partition wall and a central channel. According to the invention, the burnt exhaust gas is firstly utilized to generate high-temperature combustible exhaust gas through dry quenching, and then the high-temperature combustible exhaust gas is combusted to generate temperature and heat required by coal pyrolysis, so that an extra heating device is not needed, the gas generated by dry quenching can be further utilized, and the coking cost is reduced.

Description

A kind of dry coke quenching waste gas produces and burning heater
Technical field
The present invention relates to a kind of flammable high-temp waste gas and burning heater of producing, particularly a kind of dry coke quenching waste gas produces and burning heater.
Background technology
Coal heat decomposition stove (pit kiln) in the market mostly adopts intermittent type coking, enter stove coal proportioning, dewater, enter coal, preheating, charing, burnt upgrading, dry each processing step such as to put out relatively independent, can not produce continuously, production efficiency is low; In addition, the raw gas producing in pyrolysis of coal process is containing a lot of useful compositions, as H 2s, HCH etc. sour gas, NH 3the organism such as alkaline gas, tar class, benzene class, naphthalene class, washing oil class, do not have the complete complete technique that raw gas derivation, reclaiming clean are used.
This impel the inventor to explore to create a set of complete Continuous coking and to raw gas derive, the in addition complete technique of recycle of reclaiming clean.
Summary of the invention
The invention provides a kind of dry coke quenching waste gas produces and burning heater, this device first utilizes the waste gas after burning to carry out dry putting out and produces high temperature combustible exhaust gas, recycling high temperature combustible exhaust gas burns, provide temperature and institute's heat requirement to pyrolysis of coal, do not need to increase extra heating unit, can further utilize the dry gas that puts out generation again, reduce coking cost.
Realizing the technical scheme that above-mentioned purpose takes is:
A kind of dry coke quenching waste gas produces and burning heater, comprises dry device, the quenching waste gas heater of putting out, the described dry device that puts out arranges pyrolysis of coal furnace chamber meta in coking chamber, burnt modifying apparatus, interior burning heater and quirk bow below, comprises high temperature coke quencher, low temperature coke quencher, quenching bridge bow, quenching exhaust gas fan, described high temperature coke quencher is arranged on the below of quirk bow, and the top of high temperature coke quencher communicates with the high temperature combustible exhaust gas passage of quirk bow, described quenching bridge bow is arranged between high temperature coke quencher and low temperature coke quencher, comprise bridge bow, wind assembling set, the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., the dry pipe that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., more than at least one bridge bow is partitioned at an angle spoke shape with high temperature coke quencher and low temperature coke quencher axle center and arranges in the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., bridge bow middle part forms wind assembling set, wind assembling set be one straight through up big and down small inversed taper platform shape chamber, the top of wind assembling set is provided with semisphere blast cap, and the lower openings of wind assembling set is towards low temperature coke quencher, the dry pipe that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is arranged in bridge bow, and wind assembling set is led in the dry pipe one end that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., and the other end leads to the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., and the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is connected by blast pipe and quenching exhaust gas fan, the bottom opening place of described low temperature coke quencher is provided with the valve that discharges of the coke, described quenching waste gas heater, be arranged in the interior ringwall ring of coking chamber and be positioned at the top that quirk bends, comprise that internal-quirk, air mend pipe, blowdown pipe, secondary air compensating pipe, tonifying Qi circuit, center ringwall, internal-quirk partition wall, centre channel, described internal-quirk mainly by ringwall in coking chamber be positioned at coking chamber ringwall Nei center ringwall internal-quirk partition wall together with at least and be divided at least one group of above main internal-quirk, secondary internal-quirk arranged side by side, shutoff dividing plate, lower shutoff dividing plate are set in described secondary internal-quirk, secondary internal-quirk is divided into upper, middle and lower segment, be the secondary internal-quirk of epimere, the secondary internal-quirk in stage casing, the secondary internal-quirk of hypomere, on quirk partition wall between the described secondary internal-quirk of epimere and main internal-quirk, be provided with waste gas and gang up hole, hot waste gas exhaust channel is offered at the secondary internal-quirk of epimere and main internal-quirk top, on the quirk partition wall between the described secondary internal-quirk of hypomere and main internal-quirk, quirk is set and gangs up hole, described center ring circummure becomes centre channel, in centre channel, with the concordant place of upper shutoff dividing plate, one channel partition is set, centre channel is separated into, lower two portions, be that formation buffer zone is divided on top, formation high temperature combustible exhaust gas admission passage is divided in bottom, the waste gas that ringwall top, center is provided with perforation buffer zone and main internal-quirk and the secondary internal-quirk of epimere enters hole, the combustible exhaust gas that ringwall bottom, center is provided with perforation high temperature combustible exhaust gas admission passage and main internal-quirk and the secondary internal-quirk of hypomere enters hole, described tonifying Qi circuit is arranged on body of heater exterior wall, described air is mended pipe and tonifying Qi circuit UNICOM, a described blowdown pipe, secondary air compensating pipe and tonifying Qi circuit UNICOM, below bending from the bar of quirk bow, leading through extending upwardly to, quirk partition wall inside between secondary internal-quirk, the outlet of a blowdown pipe is positioned at below lower shutoff dividing plate, lead to respectively the secondary internal-quirk of main internal-quirk and hypomere, main internal-quirk is led in the secondary air compensating outlet of secondary air compensating pipe, the top of described dry high temperature coke quencher of putting out device communicates with the high temperature combustible exhaust gas admission passage of quenching waste gas heater with the high temperature combustible exhaust gas passage bending by quirk.
Preferably, the secondary internal-quirk in described stage casing forms the independent gas combustion chamber of relative closure, the secondary internal-quirk in upper stage casing connects into relevant one group with the secondary internal-quirk in next stage casing of next-door neighbour by chamber passage, chamber passage below upper shutoff dividing plate and from a secondary internal-quirk in stage casing and being close in a main internal-quirk between next stage casing pair internal-quirk pass.
Preferably, described quirk is ganged up hole near lower shutoff dividing plate below.
Preferably, described hot waste gas exhaust channel communicates with the exhaust air chamber of upper of furnace body.
Preferably, described secondary air compensating outlet upper shutoff dividing plate concordant or a little higher than with upper shutoff dividing plate.
Preferential, also comprise industry control center, industry control center and industry control center and quenching exhaust gas fan, the valve that discharges of the coke, the electrical connection of quenching thermometer, realization to quenching exhaust gas fan with discharge of the coke the automatic control of valve and by quenching thermometer to dry monitoring of putting out temperature.
Feature of the present invention is first to utilize the waste gas after burning to carry out the dry generation high temperature combustible exhaust gas that puts out, and recycling high temperature combustible exhaust gas burns, and provides temperature and institute's heat requirement to pyrolysis of coal, does not need to increase extra heating unit.
Brief description of the drawings
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
Fig. 1 is F-F place enlarged view in Figure 15;
Fig. 2 is x-x place sectional view in Fig. 1;
Fig. 3 is gas reverser schematic diagram involved in the present invention;
Fig. 4 is gas reverser upper lower burrs schematic diagram involved in the present invention;
Fig. 5 is c-c place schematic cross-section in Figure 14;
Fig. 5-1st, gas reverser involved in the present invention and combustion heater pipe network connection diagram;
Fig. 6 is z-z place schematic cross-section in Figure 11;
Fig. 7 is w-w place schematic cross-section in Figure 11;
Fig. 8 is y-y place schematic cross-section in Figure 11;
Fig. 9 is the burnt modifying apparatus schematic diagram (u-u place sectional view in Figure 11) of coal heat decomposition stove involved in the present invention;
Figure 10 is the quirk bow schematic diagram (t-t place sectional view in Figure 11) of coal heat decomposition stove involved in the present invention;
Figure 11 is pyrolysis of coal carbonizing apparatus schematic diagram of the present invention;
Figure 12 is the dry coke quenching auxiliary schematic diagram (H-H enlarged view in Figure 15) of coal heat decomposition stove involved in the present invention;
The quenching bridge bow schematic diagram of the dry coke quenching auxiliary of Figure 13 coal heat decomposition stove of the present invention;
Figure 14 is the electrical connection schematic diagram at the industry control center of coal heat decomposition stove involved in the present invention;
Figure 15 is coal heat decomposition stove general illustration involved in the present invention.
Embodiment
A kind of dry coke quenching waste gas of the present invention produces and the specific embodiment of burning heater is mainly introduced in detail in Section four of following Part V and first, second, third and fourth joint of Part IV.
First part enters stove coal proportioning and preparation
As select 5 kinds of different coals, they are respectively that bottle coal, rich coal, coking coal, 1/3rd coking coal, lean coal first mix the fragmentation of then sieving, until reaching 5mm, crushed particles is formed into below stove coal, certainly coal heat decomposition stove of the present invention to other proportioning and granular size to enter stove coal applicable equally, do not form to coal heat decomposition stove of the present invention required enter the restriction of stove coal dust.
The second part enters stove coal dewatering
Enter dewatering of stove coal by entering stove coal dewatering device to what enter this coal heat decomposition stove in advance, play energy-saving and cost-reducing effect.
Part III enters stove coal and enters coal, preheating, adjusting, cooling
After dehydration enter stove coal through conveying after temperature generally can be down to normal temperature, temperature may be lower, so need to carry out preheating, adjusting, cooling before entering coking chamber to entering stove coal.
First segment enters stove coal and enters coal and enter device for coal and be used for entering stove coal after input dehydration
Second section enters the top that stove coal preheating primary heater unit is arranged at into the below of device for coal and is positioned at coal heat decomposition stove.What primary heater unit reduced temperature after carrying with preheating enters stove coal.
Section three, the stove coal that enters after preheating regulates and is arranged on upper of furnace body into stove coal surge bunker and is positioned at primary heater unit bottom, enters stove coal surge bunker and is used for regulating in the coking chamber of coal heat decomposition stove and adds the amount of injecting stove coal.
Part IV enters stove pyrolysis of coal (charing heating, burnt upgrading, dry coke quenching)
First segment enters stove pyrolysis of coal charing heating
As shown in figure 15, pyrolysis of coal carbonizing apparatus 6 is arranged on body of heater 91 middle parts, mainly comprises that coking chamber 61, outer gas-operated thermal bath facility 64, interior burning heater 67, quirk bow 65 form, as shown in Figure 2: coking chamber 61 is by fire-resistant thermally conductive material, outer ring wall 612, 611 form an annulus, being centered around coking chamber exterior wall 611, to encircle periphery be outer gas-operated thermal bath facility 64, wherein outer gas-operated thermal bath facility 64 is mainly some groups of identical the first combustion heaters 62 of (9 groups of this examples) structure, the second combustion heater 60 and gas reversing system 66 form, in addition, as shown in figure 15: because coking chamber 61 is highly higher, wherein outer gas-operated thermal bath facility 64 is mainly divided into, in, lower Three-section type heating, every section has 9 groups of identical first combustion heaters 62 of structure, the second combustion heater 60 forms.
As shown in Figure 6: in coking chamber, in ringwall 612 rings, be interior burning heater 67, interior burning heater 67 is mainly by some groups of the 3rd combustion heater 68, the 4th combustion heater 69 and the quenching waste gas heaters 63 that (3 groups of this examples) structure is identical.
As shown in Figure 1, the first described combustion heater 62 mainly comprises that the first combustion chamber 621, the first coal gas enter arm 622 and the first regenerative heat exchanger 624.
As shown in Figure 2, body of heater 91 exterior walls that be made up of refractory materials the first combustion chamber 621 and fire-resistant thermally conductive material are made coking chamber outer ring wall 611 and outer quirk partition wall 625 and surround the gas-fired quirk of a relative closure, as shown in Figure 1, the first coal gas enters arm 622 and leads in the first combustion chamber 621 through body of heater 91 exterior walls.
As shown in Fig. 1,12: the first regenerative heat exchanger 624 comprises that the first accumulation of heat chamber 626, the first heat storage 623, the first air enter arm 627 and the first combustion exhaust exhaust outlet 628; The first accumulation of heat chamber 626 is arranged in body of heater 91 exterior walls, the first heat storage 623 arranges in the first accumulation of heat chamber 626,621 bottoms, the first combustion chamber are led in the first 626 one end, accumulation of heat chamber, and the other end is connected to respectively the first air and enters arm 627 and the first combustion exhaust exhaust outlet 628.
As shown in Figure 2: enter and between arm 627 and the first accumulation of heat chamber 626, be provided with the first one-way air valve 629, the first one-way air valves 629 and allow air to enter pipe 627 and the first accumulation of heat chamber 626 flows into the first combustion chamber 621 from the first air at the first air; Between the first combustion exhaust exhaust outlet 628 and the first accumulation of heat chamber 626, be provided with the first unidirectional waste gas valve 620, the first unidirectional waste gas valve 620 allows the gas-fired waste gas first accumulation of heat chamber 626 of flowing through from the first combustion chamber 621, finally discharge (certainly from the first combustion exhaust exhaust outlet 628, adopt gas reversing system 66 as described below, when air supervisor 667 is in charge of 6671 connections with the first air, air supervisor 667 and the second air are in charge of 6673 in cut-out; Meanwhile, combustion exhaust supervisor 669 is in charge of 6691 with the first combustion exhaust and also cuts off mutually, and corresponding combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693 in being connected, can play the effect that replaces the first one-way air valve 629 and the first unidirectional waste gas valve 620).
In like manner, as shown in Figure 2: identical the second combustion heater 60 of structure mainly comprises that the second combustion chamber 601, the second coal gas enter arm 602 and the second regenerative heat exchanger 604, body of heater 91 exterior walls that be made up of refractory materials the second combustion chamber 601 and fire-resistant thermally conductive material are made coking chamber outer ring wall 611 and outer quirk partition wall 625 and surround the gas-fired quirk of a relative closure, and the second coal gas enters arm 602 and leads in the first combustion chamber 601 through body of heater 91 exterior walls.
As shown in Figure 2: the second regenerative heat exchanger 604 comprises the second accumulation of heat chamber 606, the second heat storage 603, the second air enters arm 607 and the second combustion exhaust exhaust outlet 608, the second accumulation of heat chamber 606 is arranged in body of heater 91 exterior walls, the second heat storage 603 arranges in the second accumulation of heat chamber 606, 601 bottoms, the second combustion chamber are led in the second 606 one end, accumulation of heat chamber, the other end is connected to respectively the second air and enters arm 607 and the second combustion exhaust exhaust outlet 608, enter between arm 607 and the second accumulation of heat chamber 606 and be provided with the second one-way air valve 609 at the second air, the second one-way air valve 609 allow air from the second air enter pipe 607 and second accumulation of heat chamber 606 flow into the second combustion chamber 601, between the second combustion exhaust exhaust outlet 608 and the second accumulation of heat chamber 606, be provided with the second unidirectional waste gas valve 600, the second unidirectional waste gas valve 600 allows the gas-fired waste gas second accumulation of heat chamber 606 of flowing through from the second combustion chamber 601, finally discharge (certainly from the second combustion exhaust exhaust outlet 608, adopt gas reversing system 66 as described below, when air supervisor 667 and the first air are in charge of 6671 cut-outs, air supervisor 667 and the second air are in charge of 6673 in connecting, meanwhile, combustion exhaust supervisor 669 and the first combustion exhaust are in charge of 6691 and are also connected, and corresponding combustion exhaust supervisor 669 is in charge of 6693 also cut-outs mutually with the second combustion exhaust, can play the effect that replaces the second one-way air valve and the second unidirectional waste gas valve).
As shown in Figure 1 and Figure 2, between the second combustion chamber 601 of the first combustion chamber 621 and next-door neighbour, the top of outer quirk partition wall 625 is provided with combustion chamber through hole 6251, combustion chamber through hole 6251 is connected the first combustion chamber 621 to form associated one group with the second combustion chamber 601 of next-door neighbour, in this example, outer gas-operated thermal bath facility 64 is provided with quirk partition wall 625 partition walls outside 18 roads altogether, forms 9 groups of associated burning groups; In addition, as shown in figure 15; Because coking chamber 61 is highly higher, wherein outer gas-operated thermal bath facility 64 is mainly divided into the heating of upper, middle and lower segment formula, and every section has 9 groups of identical the first combustion heaters 62 of structure, second combustion heaters 60 to form.
In sum, combustion heater and regenerative heat exchange method are;
1, in the time that the coal gas in the first combustion chamber 621 burns, purified gas after raw gas reclaiming clean enters arm 622 by the first coal gas and enters in the first combustion chamber 621, the first one-way air valve 629 is opened, allow air from the first air enter pipe 627 and first accumulation of heat chamber 626 flow into the first combustion chamber 621; The first described unidirectional waste gas valve 620 is closed, the hot waste gas producing leads to 6251 holes by combustion chamber and enters behind the second combustion chamber 601, hot waste gas is during through the second heat storage 603 in the second accumulation of heat chamber 606, the second heat storage 603 carries out absorbing and cooling temperature to hot waste gas, and hot waste gas becomes the relatively low low temperature waste gas of temperature and discharges from the second combustion exhaust exhaust outlet 608;
2, when take turns in the second combustion chamber 601 gas-fired time, purified gas after raw gas reclaiming clean enters arm 602 by the second coal gas and enters in the second combustion chamber 601, the second one-way air valve 609 is opened, air enters arm 607 from the second air and enters into the second combustion chamber 601 processes through the second accumulation of heat chamber 606, and the heat heating that air is discharged by the second heat storage 603 becomes the gas-fired in combustion-supporting the second combustion chamber 601 of warm air; Meanwhile, the second described unidirectional waste gas valve 600 is closed, hot waste gas after gas-fired in the second combustion chamber 601 enters behind the first combustion chamber 621 by combustion chamber through hole 6251, hot waste gas is during through the first heat storage 623 in the first accumulation of heat chamber 626, the first heat storage 623 carries out absorbing and cooling temperature to hot waste gas, and hot waste gas becomes the relatively low low temperature waste gas of temperature and discharges from the first combustion exhaust exhaust outlet 628;
3, in like manner, the 1st step and the 2nd step alternate cycles are carried out.
As shown in Figure 1: on body of heater 91 exterior walls, be also provided with chamber temperature monitoring holes 6201 and combustion chamber spy hole 6202, combustion chamber spy hole 6202 is convenient to technician's gas-fired situation of observing each combustion chamber directly perceived, in chamber temperature monitoring holes 6201, be provided with chamber temperature table 6203 for the temperature monitoring to combustion chamber, so that the assessment to pyrolysis of coal process.
As shown in figure 14: chamber temperature table 6203 is connected with industry control center 90, automatically gathered the temperature data of chamber temperature table 6203 by industry control center 90.
As Fig. 3, Fig. 4, shown in Fig. 5-1, gas reversing system 66 comprises dish 661, lower wall 662, rotation reversing motor 663, air blower 664, gas fan 665, exhaust gas fan 666, lower wall 662 is connected to respectively an air supervisor 667 and the first air is in charge of 6671, the second air is in charge of 6673, coal gas supervisor 668 and the first gas manifold 6681, the second gas manifold 6683, combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693, the first combustion exhaust is in charge of 6691, wherein, the second combustion exhaust be in charge of 6693 and first combustion exhaust be in charge of 6691 and first air be in charge of 6671 and second air be in charge of 6673 and the setting of first gas manifold 6681 and the second gas manifold 6683 just exchange (Fig. 4, shown in Fig. 5-1).
As Fig. 3, 15, shown in Fig. 5-1: above coil 661 and be fitted in lower wall 662 tops, upper dish 661 respectively correspondence is provided with air pipe connecting 6672, coal gas pipe connecting 6682, combustion exhaust pipe connecting 6692, thereby rotation reversing motor 663 drive upper dish 661 reciprocating rotation on lower wall 662 realize air supervisor 667 constantly with the first air be in charge of 6671 and second air be in charge of 6673 and connect and cut off conversion, coal gas supervisor 668 constantly connects and cuts off conversion with the first gas manifold 6681 and the second gas manifold 6683, combustion exhaust supervisor 669 constantly with the second combustion exhaust be in charge of 6693 and first combustion exhaust be in charge of 6691 connect and cut off conversion (with the first air be in charge of 6671 and second air be in charge of 6673 and the switching of first gas manifold 6681 and the second gas manifold 6683 just contrary).
As shown in Fig. 1, Fig. 5-1, be also provided with two groups of bustle pipes in the periphery of body of heater 91, comprise the first air bustle pipe 6674, the first coal gas bustle pipe 6684, the first combustion exhaust bustle pipes 6694; The second air bustle pipe 6675, the second coal gas bustle pipe 6685, the second combustion exhaust bustle pipes 6695.
As shown in Fig. 5-1: the first air bustle pipe 6674 by the first air be in charge of 6671 and first air enter arm 627 and link up, by the first air be in charge of 6671, the first air bustle pipe 6674, the first air enter arm 627, the first accumulation of heat chamber 626 and the first combustion chamber 621 and form same path; Meanwhile, the first coal gas bustle pipe 6684 enters arm 622 by the first gas manifold 6681 and the first coal gas and links up, by the first gas manifold 6681, the first coal gas bustle pipe 6684, the first coal gas enters arm 622 and the first combustion chamber 621 forms same path; Simultaneously now, the first combustion exhaust bustle pipe 6694 be by the first combustion exhaust be in charge of 6681 and first combustion exhaust exhaust outlet 628 link up, by the first combustion exhaust be in charge of 6681, the first combustion exhaust exhaust outlet 628, the first accumulation of heat chamber 626 form same path with combustion chamber 621;
In like manner, the second air bustle pipe 6675 by the second air be in charge of 6673 and second air enter arm 607 and link up, by the second air be in charge of 6673, the second air bustle pipe 6675, the second air enter arm 607, the second accumulation of heat chamber 606 and the second combustion chamber 601 and form same path; Meanwhile, the second coal gas bustle pipe 6685 enters arm 602 by the second gas manifold 6683 and the second coal gas and links up, by the second gas manifold 6683, the second coal gas bustle pipe 6685 will, the second coal gas enters arm 602 and the second combustion chamber 601 forms same path; Meanwhile, the second combustion exhaust bustle pipe 6695 by the second burning gas be in charge of 6693 and second combustion exhaust exhaust outlet 608 link up, by the second combustion exhaust be in charge of 6693, the second combustion exhaust exhaust outlet 608, the second accumulation of heat chamber 606 and the second combustion chamber 601 form same path.
In addition; as shown in figure 14; this example also comprises that gas reversing system controller 906 is for controlling rotation reversing motor 663, air blower 664, gas fan 665, exhaust gas fan 666; reversing system electric controller 906 is connected with upper industry control center 90 again; certainly from electric control theory; in this example, rotate reversing motor 663, air blower 664, gas fan 665, exhaust gas fan 666 and controlled by industry control center 90, so the restriction that gas reversing system controller 906 does not form this routine protection domain is set herein.
As shown in Fig. 1, Fig. 5-1 and Fig. 2~Fig. 5, the heating means of outer gas-operated thermal bath facility 64 are:
(1) the rotation reversing motor 663 of gas reversing system 66 drives upper dish 661 to rotate on lower wall 662, and air supervisor 667 and the first air are in charge of 6671 connections, and air supervisor 667 and the second air are in charge of 6673 in dissengaged positions; Meanwhile, coal gas supervisor 668 and the first gas manifold 6681 are also connected, coal gas supervisor 668 and the second gas manifold 6683 dissengaged positions; Meanwhile, combustion exhaust supervisor 669 is in charge of 6691 with the first combustion exhaust and also cuts off mutually, and corresponding combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693 in the state of being connected;
(2) air blower 664 by air blast air supervisor 667, air successively through air pipe connecting 6672, the first air be in charge of 6671, the first air bustle pipe 6674, the first air enter arm 627 and enter into the first accumulation of heat chamber 626, enter in the first combustion chamber 621 after utilizing heat that the first heat storage 623 discharges to heat air, simultaneously, gas fan 665 obtains raw gas purified gas and blasts coal gas supervisor 668 after reclaiming clean, coal gas passes through coal gas pipe connecting 6682 successively, the first gas manifold 6681, the first coal gas bustle pipe 6684, the first coal gas enters arm 622 and enters in the first combustion chamber 621 and burn, meanwhile, because combustion exhaust supervisor 669 is in charge of 6691 in phase dissengaged positions with the first combustion exhaust, and corresponding combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693 in the state of being connected, so the waste gas in the first combustion chamber 621 after gas-fired can only enter into the second combustion chamber 601 by the combustion chamber through hole 6251 on outer quirk partition wall 625 tops, again after the second heat storage 603 in the second accumulation of heat chamber 606 carries out absorbing and cooling temperature from the second combustion exhaust exhaust outlet 608, the second combustion exhaust bustle pipe 6695, the second combustion exhaust is in charge of 6693, combustion exhaust supervisor 669 discharges by exhaust gas fan 666,
(3) through burning after a while, the rotation reversing motor 663 of gas reversing system 66 drives upper dish 661 to rotate backward on lower wall 662, air supervisor 667 and the first air are in charge of 6671 cut-outs, air supervisor 667 and the second air are in charge of 6673 in on-state, simultaneously, coal gas supervisor 668 also cuts off mutually with the first gas manifold 6681, coal gas supervisor 668 and the second gas manifold 6683 on-states, meanwhile, combustion exhaust supervisor 669 and the first combustion exhaust are in charge of 6691 and are also connected, and corresponding combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693 also phase dissengaged positions,
(4) air blower 664 by air blast air supervisor 667, air successively through air pipe connecting 6672, the second air be in charge of 6673, the second air bustle pipe 6675, the second air enter arm 607 and enter into the second accumulation of heat chamber 606, after the heat that utilizes the second heat storage 603 in the second accumulation of heat chamber 606 to discharge heats air, enter in the second combustion chamber 601, simultaneously, gas fan 665 obtains raw gas purified gas and blasts coal gas supervisor 668 after reclaiming clean, coal gas passes through coal gas pipe connecting 6682 successively, the second gas manifold 6683, the second coal gas bustle pipe 6685, the second coal gas enters arm 602 and enters in the second combustion chamber 601 and burn, meanwhile, because combustion exhaust supervisor 669 and the first combustion exhaust are in charge of 6691 and are connected, and corresponding combustion exhaust supervisor 669 and the second combustion exhaust are in charge of 6693 in phase dissengaged positions, so the waste gas in the second combustion chamber 601 after gas-fired can only enter in the first combustion chamber 621 by the combustion chamber through hole 6251 on outer quirk partition wall 625 tops, again through the first accumulation of heat chamber 626, in the first heat storage 603 absorbing and cooling temperatures after, finally from the first combustion exhaust exhaust outlet 628, the first combustion exhaust bustle pipe 6694, the first combustion exhaust is in charge of 6691, combustion exhaust supervisor 669 discharges by exhaust gas fan 666.
So, outer gas-operated thermal bath facility 64 combustion principle are to enter the second combustion chamber 601 when the waste gas generating after gas-fired in the first combustion chamber 621 from combustion chamber through hole 6251, after the second heat storage 603 in the second combustion chamber 601 and the second accumulation of heat chamber 606 is to its exhaust-heat absorption cooling, discharge.
Otherwise, when the waste gas generating after gas-fired in the second combustion chamber 601 enters the first combustion chamber 621 from combustion chamber through hole 6251, after the first heat storage 603 in the first combustion chamber 621 and the first accumulation of heat chamber 606 is to its exhaust-heat absorption cooling, discharge.
In sum, this gas two by gas reversing system enters the mode of operation of the regenerative heat exchange of a mode of operation outing and regenerative heat exchanger, realize two groups of combustion heater alternate combustion, be that gas reversing system is sent into air, purified gas burning to the combustion chamber of the first combustion heater, the hot waste gas after sucking-off burning from the combustion chamber of the second combustion heater simultaneously, the second heat storage absorbing and cooling temperature of hot waste gas in the second regenerative heat exchanger of the second combustion heater becomes the relatively low low temperature waste gas of temperature and discharges; In like manner, gas reversing system is sent into air, purified gas burning to the combustion chamber of the second combustion heater, the hot waste gas after sucking-off burning from the combustion chamber of the first combustion heater simultaneously, the first heat storage absorbing and cooling temperature of hot waste gas in the first regenerative heat exchanger of the first combustion heater becomes the relatively low low temperature waste gas of temperature and discharges; This method of mutually utilizing waste gas residual heat after gas-fired to add warm air, both played the waste gas residual heat after gas-fired had been made full use of, improve the efficiency of combustion of the coal gas in combustion chamber, can carry out cooling to a certain degree to the waste gas after gas-fired again, need not consume the external energy, play energy-saving and cost-reducing object, save coking cost.
As shown in Fig. 6, Figure 15, interior burning heater 67 is mainly by some groups of identical combustion heater 68,69 and the quenching waste gas heaters 63 of (3 groups of this examples) structure.
As shown in Figure 11, Fig. 8, quenching waste gas heater 63 comprises that internal-quirk 631, air mend pipe 632, blowdown pipe 6321, secondary air compensating pipe 6322, tonifying Qi circuit 633, center ringwall 634, internal-quirk partition wall 635, centre channel 638, and internal-quirk 631 is arranged on quirk bow 65.
As shown in Figure 8, internal-quirk 631 mainly by ringwall in coking chamber 612 be positioned at coking chamber ringwall 612Nei center ringwall 634 internal-quirk partition wall 635 together with at least and be divided at least one group of above main internal-quirk 636, secondary internal-quirk 637 arranged side by side, as shown in Figure 8,636 and 6 secondary internal-quirks 637 of 6 main internal-quirks of this example, form side by side and amount to 6 groups of internal-quirks 631.
As shown in figure 11, in secondary internal-quirk 637, shutoff dividing plate 6371 is set, lower shutoff dividing plate 6372, is divided into upper, middle and lower segment by secondary internal-quirk 637, i.e. the secondary internal-quirk 6375 of epimere, the secondary internal-quirk 6374 in stage casing, the secondary internal-quirk 6373 of hypomere; On quirk partition wall 635 between the secondary internal-quirk 6375 of epimere and main internal-quirk 636, be provided with waste gas and gang up hole 6303, hot waste gas exhaust channel 6306 is offered at the secondary internal-quirk 6375 of epimere and main internal-quirk 636 tops, and hot waste gas exhaust channel 6306 communicates with the exhaust air chamber 391 on body of heater 91 tops.
As shown in Figure 11, Fig. 8, on quirk partition wall 635 between the secondary internal-quirk 6373 of hypomere and main internal-quirk 636, quirk is set and gangs up hole 6304, quirk is ganged up hole 6304 near lower shutoff dividing plate 6372 belows, as shown in Figure 8,6 quirks are ganged up hole 6304 connects secondary 6 hypomeres internal-quirks 6373 respectively with main internal-quirk 636 together with.
As shown in figure 11, center ringwall 634 surrounds centre channel 638, in centre channel 638, with the concordant place of upper shutoff dividing plate 6371, one channel partition 6382 is set, centre channel 638 is separated into upper and lower two portions, be that formation high temperature combustible exhaust gas admission passage 6383 is divided in bottom, formation buffer zone 6381 is divided on top.
As shown in Fig. 9, Figure 11, ringwall 634 bottoms in center are provided with perforation high temperature combustible exhaust gas admission passage 6383 and enter hole 639 with the combustible exhaust gas of main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere, and ringwall 634 tops in center are provided with perforation buffer zone 6381 and enter hole 6301 with the waste gas of main internal-quirk 636 and epimere pair internal-quirk 6375.
As shown in Figure 11, Figure 10, Fig. 9: tonifying Qi circuit 633 is arranged on body of heater 91, air is mended pipe 632 and is led to tonifying Qi circuit 633, blowdown pipe 6321, secondary air compensating pipe 6322 and tonifying Qi circuit 633 UNICOMs, below the bar bow 651 of quirk bow 65 through the inside that extends upwardly to the quirk partition wall 635 major and minor internal-quirk 636,637.
As shown in Figure 11, Fig. 2: blowdown pipe 6321 be arranged on major and minor internal-quirk 636,637 between the inside of quirk partition wall 635, the outlet 6323 of a blowdown pipe 6321 is positioned at lower shutoff dividing plate below 6372, leads to respectively the secondary internal-quirk 6373 of main internal-quirk 636 and hypomere; As shown in figure 11, secondary air compensating pipe 6322 is also arranged on the inside of the quirk partition wall 635 of major and minor internal-quirk 636,637, and the secondary air compensating of secondary air compensating pipe 6322 outlet 6324 is positioned at upper shutoff dividing plate 6371 concordant or a little higher than with upper shutoff dividing plate 6371, lead to main internal-quirk 636.
As shown in Figure 11, Fig. 7, the secondary internal-quirk 6374 in stage casing forms the independent gas combustion chamber of relative closure, the secondary internal-quirk 6374 in a upper stage casing connects into relevant one group to the secondary internal-quirk 6374 in next stage casing of next-door neighbour by chamber passage 6305, chamber passage 6305 below upper shutoff dividing plate 6371 and from pass in a main internal-quirk 636 between next stage casing pair internal-quirk 6374 of the secondary internal-quirk 6374 in stage casing and next-door neighbour, as shown in Figure 7,6 secondary internal-quirks 6374 in stage casing connect into 3 groups by 3 chamber passages 6305.
As Figure 11, Fig. 6, shown in Fig. 7, the secondary internal-quirk 6374 in two stage casings in secondary internal-quirk 637 (is gone up, lower shutoff dividing plate 6371, between 6372) one group of association the 3rd combustion heater 68 that structure is identical is set, the 4th combustion heater 69, the first burning heater 62 of its structure and combustion principle and above introduction, the second burning heater 60 is almost identical, also comprise that the 3rd combustion heater 68 comprises the 3rd combustion chamber 681, the 3rd coal gas enters arm 682, the 3rd accumulation of heat chamber 686, the 3rd heat storage 683, the 3rd air enters arm 687 and the 3rd combustion exhaust exhaust outlet 688.
As shown in Figure 11, Fig. 6, need to illustrate different is the secondary internal-quirk 6374 in the 3rd 681Shi stage casing, combustion chamber of the 3rd burning heater 68, by relatively airtight gas-fired quirk between upper and lower shutoff dividing plate 6371,6372.
As Figure 11, Figure 10, shown in Fig. 9: the 3rd coal gas enters arm 682 and leads to the 3rd combustion chamber 681 (being stage casing pair internal-quirk 6374) through upwards extending past quirk partition wall 635 inside below from article bow 651 of quirk bow 65, the 3rd accumulation of heat chamber 686 is arranged on article body of heater that bends 651 belows 91, the 3rd heat storage 683 is placed in the 3rd accumulation of heat chamber 686, the 3rd 686 one end, accumulation of heat chamber is passed below article bow 651 of quirk bow 65 by extending passage 6861, upwards extend past quirk partition wall 635 inside and lead to 681 bottoms, the 3rd combustion chamber, the 3rd accumulation of heat chamber 686 the other ends are connected to respectively the 3rd air and enter arm 687 and the 3rd combustion exhaust exhaust outlet 688.
In like manner, the 4th combustion heater 69 structures are complete identical with the 3rd combustion heater 68, repeat no more here, and wherein the 4th combustion chamber 691 is connected and formed associated one group (shown in Fig. 7) by chamber passage 6305 with the 3rd combustion chamber 681.
Wherein, as shown in Fig. 5-1, the 3rd coal gas of the 3rd combustion chamber 681 of the 3rd burning heater 68 enter arm 682, the 3rd air enter arm 687 and the 3rd combustion exhaust exhaust outlet 688 respectively by the first coal gas bustle pipe 6684, the first air bustle pipe 6674, the first combustion exhaust bustle pipes 6694 and the first gas manifold 6681, the first air be in charge of 6671, the first combustion exhaust is in charge of 6691 and communicates.
As shown in Fig. 5-1, the 4th coal gas of the 4th combustion chamber 691 of the 4th burning heater 69 enter arm 692, the 3rd air enter arm 697 and the 3rd combustion exhaust exhaust outlet 698 respectively by the second coal gas bustle pipe 6685, the second air bustle pipe 6675, the second combustion exhaust bustle pipe 6695 and the second gas manifold 6683, the second air be in charge of 6673, the second combustion exhaust is in charge of 6693 and communicates.
In sum, the 3rd burning heater 68, the 4th combustion heater 69, combustion principle and above the first burning heater 62, the second burning heater 60 are almost identical, repeat no more here.
Interior burning heater 67 Method And Principles of this example are that the secondary internal-quirk 6375 of epimere and the secondary internal-quirk 6373 of hypomere and main internal-quirk 636 are that the high temperature combustible exhaust gas that utilizes dry coke quenching to produce carries out tonifying Qi combustion heating, and the secondary internal-quirk 6374 in stage casing is the purified gas combustion heatings that utilize in addition after raw gas reclaiming clean.
Interior burning heater 67 methods of this example are: (1), enter from the high temperature combustible exhaust gas admission passage 6383 of centre channel 638 bottoms when high temperature combustible exhaust gas, entering hole 639 through combustible exhaust gas enters in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere, the high temperature combustible exhaust gas temperature just having entered is higher generally all at 1000 DEG C~1100 DEG C, but along with waste gas rises and externally does work and dispel the heat in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere, temperature can reduce;
(2), at this moment give the air that fills in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere by a blowdown pipe 6321, thereby make high temperature combustible exhaust gas obtain airborne oxygen burning, the amount of the combustible gas in high-temperature combustible gas body is certain after all, and the heat and the temperature that provide coking chamber 61 pyrolysis of coal required are provided;
(3) so, when passing through quirk through the waste gas after tonifying Qi burning, the high temperature combustible exhaust gas of the secondary internal-quirk 6373 of hypomere gangs up hole 6304 around in main internal-quirk 636, mix in main quirk 636 and rise with the waste gas after the high-temperature combustible gas body in main internal-quirk 636 and burning, along with the waste gas after mixed high-temperature combustible gas body and burning can be to providing heat and externally acting to the pyrolysis of coal in coking chamber 61 by ringwall in coking chamber 612 in uphill process, temperature can reduce gradually;
(4) so need to again enter short covering gas by secondary air compensating pipe 6322 in the middle and upper part of main internal-quirk 636, make the waste gas further burning again after mixed high-temperature combustible gas body and burning, this provides required heat and temperature not only to coking chamber 61 pyrolysis of coal, and can make again high-temperature combustible gas body fully burn, improve high-temperature combustible gas work by combustion efficiency;
(5), in addition, owing to having buffer zone 6381 in the middle of main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, ringwall 634 tops in center are provided with perforation buffer zone 6381 and enter hole 6301 with the waste gas of main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, on the quirk partition wall 635 between main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, be provided with waste gas and gang up hole 6303, between the secondary internal-quirk 6375 of each main internal-quirk 636 and epimere, completely mutually connect, waste gas after the burning of tonifying Qi for the second time can be mixed completely mutually, between the secondary internal-quirk 6375 of the main internal-quirk 636 in place and epimere, reaching samming all presses, balanced heat and temperature is provided can to the pyrolysis of coal on whole coking chamber 61 tops,
(6), enter the exhaust air chamber 391 on body of heater 91 tops by the hot waste gas exhaust channel 6306 at main internal-quirk 636 and the secondary internal-quirk of epimere 6375 tops finally by the waste gas after the burning of mistake secondary air compensating;
(7), meanwhile, in order to make up the quantity not sufficient of the combustible gas in high-temperature combustible gas body, be not enough to provide the required heat of coking chamber 61 pyrolysis of coal and the defect of temperature, and can making full use of the raw gas producing in pyrolysis of coal process, give the 3rd combustion heater 68, the 3rd combustion chamber 681 of the 4th combustion heater 69 and the 4th combustion chamber 691 provide the purified gas burning of raw gas after reclaiming clean, in the secondary internal-quirk 637 in stage casing, add heat, enough heat and temperature are provided not only to coking chamber 61 pyrolysis of coal, improve again the utilization ratio of raw gas simultaneously, reduce and discharge in atmosphere, avoid atmospheric pollution, protect environment.
The burnt upgrading of second section
Because coal carries out the coke forming after pyrolysis in coking chamber, there is the inequality of being heated, the situation that coke briquette grain size is irregular, preferably provide certain temperature and time to coke, make fully to contact between coke, mutually carry out heat transmission, this just needs burnt modifying apparatus 610.
As shown in Figure 12, Figure 11, Fig. 9, Figure 15, burnt modifying apparatus 610, be arranged in body of heater and be positioned on quirk bow 65, burnt modifying apparatus 610 comprises that burnt upgrading chamber 6100, main internal-quirk 636 bottoms, the secondary internal-quirk 6373 of hypomere are formed at the bottom of coking chamber 6, center ringwall 634 surrounds the bottom of the high temperature combustible exhaust gas admission passage 6383 of centre channel 638, and ringwall 634 bottoms in center are provided with perforation high temperature combustible exhaust gas admission passage 6383 and enter hole 639 with the combustible exhaust gas of main internal-quirk 636, the secondary internal-quirk 6373 of hypomere.
In addition, as shown in Figure 1: body of heater 91 exterior walls are provided with burnt upgrading temperature monitoring hole 6101, burnt upgrading temperature monitoring hole is provided with a burnt upgrading thermometer 6012 in 6101 holes, as shown in figure 14, industry control center 90 is electrically connected with burnt upgrading thermometer 6012, and the burnt upgrading temperature signal of the upgrading thermometer 6012 of automatically focusing is monitored.
The method that this burnt modifying apparatus carries out upgrading is: outside is incubated by the body of heater exterior wall of heat insulating refractory material, inside enters hole 639 by high temperature combustible exhaust gas from combustible exhaust gas and enters main internal-quirk 636 bottoms, in the secondary internal-quirk 6373 of hypomere, utilize the waste heat of high temperature combustible exhaust gas itself that insulation institute's heat requirement and temperature are provided, the high temperature combustible exhaust gas temperature particularly just having entered is just applicable to burnt upgrading between 1000 DEG C~1100 DEG C, make coke retain certain hour in burnt upgrading chamber, fully contact between coke briquette grain, carry out each other heat transmission, reach evenly object of coke button size.
Section three, quirk bow
As Figure 11, shown in Figure 10, because the quirk partition wall 635 of ringwall 612 and interior burning heater 67 in coking chamber, center ringwall 634 is all arranged in furnace chamber, need quirk bow 65 to provide support for it, the laying of various pipelines is provided to again interior burning heater 67 simultaneously, as Figure 11, shown in Figure 10, quirk bow 65 is arranged on coking chamber 61, interior burning heater 67, in the furnace chamber of burnt modifying apparatus 610 belows, mainly comprise the bar bow 651 of some, Huo Gong center ringwall 652, ringwall 652 middle parts in Huo Gong center form high temperature combustible exhaust gas passage 653, bar bends 651 one end and is fixed on Huo Gong center ringwall 652, the other end is fixed on body of heater 91, bar bow 651 is the radial layout of scattering in interval at a certain angle around ringwall 652 centers, Huo Gong center, fire bow 651 in this example is 12 bows, the master of quantity and interior burning heater 67, secondary internal-quirk 636, 637 sums are consistent.
As Figure 11, shown in Figure 10, article one, in the body of wall of fire bow 651, the 3rd coal gas is set and enters the extension passage 6861 in arm 682 and the 3rd accumulation of heat chamber 686, the blowdown pipe 6321 arranging in the body of wall of tight another adjacent fire bow 651, secondary air compensating pipe 6322, provide convenience to the pipeline laying of interior burning heater 67, article 6, in the body of wall of fire bow 651, be set up in parallel respectively 6 article of the 3rd coal gas and enter the extension passage 6861 in arm 682 and the 3rd accumulation of heat chamber 686, 6 blowdown pipes 6321 that are set up in parallel respectively in the body of wall of another 6 fire bows 651, secondary air compensating pipe 6322, make the various conduit arrangements of interior burning heater 67 orderly, be unlikely to interfere.
Section four, dry coke quenching
Coke temperature after upgrading is higher, generally all at 1000 DEG C~1100 DEG C, need to carry out cooling could convenience to high temperature coke and carries and store, and need to have the dry device 7 that puts out.
As shown in Figure 12 and Figure 13, the dry device 7 that puts out is arranged on quirk and bends 65 belows, comprises high temperature coke quencher 71, low temperature coke quencher 72, quenching bridge bow 73, quenching exhaust gas fan 75; High temperature coke quencher 71 is arranged on the below of quirk bow 65, and the top of high temperature coke quencher 71 communicates with high temperature combustible exhaust gas passage 653; Quenching bridge bow 73 is arranged between high temperature coke quencher 71 and low temperature coke quencher 72, and quenching bridge bow 73 comprises bridge bow 731, wind assembling set 74, the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., the dry pipe 77 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc.; 6 Tiao Qiaogongyi high temperature coke quencher 71 and the 72Zhou of low temperature coke quencher center are partitioned at an angle spoke shape and arrange in the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., bridge bends 731 middle parts and forms wind assembling set 74, wind assembling set 74 be one straight through up big and down small inversed taper platform shape chamber, the top of wind assembling set 74 is provided with semisphere blast cap 78, and the lower openings 79 of wind assembling set 74 is towards low temperature coke quencher 72; The dry pipe 77 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is arranged in bridge bow 731, and wind assembling set 74 is led in dry pipe 77 one end that relieve dizziness, high fever, infantile convulsions, epilepsy, etc., and the other end leads to the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., and the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is connected by blast pipe 761 and quenching exhaust gas fan 75; Bottom opening 721 places of low temperature coke quencher 72 are provided with the valve 70 that discharges of the coke.
As shown in figure 12, be provided with the quenching temperature monitoring hole 711 of leading to high temperature coke quencher 71 on the exterior wall 91 of body of heater, quenching temperature monitoring hole is provided with quenching thermometer 712 in hole.
As shown in figure 14, quenching thermometer 712, quenching exhaust gas fan 75 and the valve 70 that discharges of the coke are electrically connected with industry control center 90, industry control center 90 is controlled automatically to quenching exhaust gas fan 75 and the valve 70 that discharges of the coke, and by quenching thermometer 712, quenching temperature is monitored.Quenching thermometer 712, quenching exhaust gas fan 75 and the valve 70 that discharges of the coke are electrically connected with industry control center 90 by the dry Setup Controller 907 that puts out, and certainly from electric control theory, in this example, the dry Setup Controller 907 that puts out does not form the restriction to this routine protection domain.
The dry method of utilizing low-temperature burning waste gas to carry out dry coke quenching of putting out device 7 of this example is:.
(1) waste gas after gas-fired in the 3rd combustion heater 68 of the first burning heater 62, the first burning heater 60 and the interior burning heater 67 of outer gas-operated thermal bath facility 64, the 4th combustion heater 69 is introduced to quenching exhaust gas fan 75, because the waste gas after gas-fired naturally becomes the relatively low low temperature waste gas of temperature respectively after heat storage heat absorption;
(2) utilize quenching exhaust gas fan 75 that low temperature waste gas is passed through to blast pipe 761 successively, the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., the dry pipe 77 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. blasts in wind assembling set Room 74, low temperature waste gas converges in wind assembling set Room 74, because wind assembling set 74 adopts unique structure, the blast cap 78 at top is semisphere, middle part chamber is inversed taper platform shape structure, so low temperature waste gas can be from lower openings 79 blowout and going out, be blown in low temperature coke quencher 72, upwards seal in again high temperature coke quencher 71, high temperature coke quencher 71 is neutralized to the coke falling to low temperature coke quencher 72 from high temperature coke quencher 71 lowers the temperature, this example adopts air-cooled form STRENGTH ON COKE to lower the temperature, therefore be referred to as dry putting out,
(3) in addition, this example is dry to be put out device 7 and also can produce a certain amount of high-temperature combustible gas body dry in putting out process, because, in one, low temperature waste gas, contain the high temperature coke that a small amount of moisture content runs into after burnt upgrading chemical reaction can occur, produce some inflammable gass; Also there is the not clean-burning inflammable gas of part in low temperature waste gas itself two; Three, also residual a part of inflammable gas of the high temperature coke after burnt upgrading itself, these inflammable gass upwards enter the high temperature combustible exhaust gas passage 653 at ringwall 652 middle parts, Huo Gong center, thereby source of the gas are provided to the major and minor quirk 636,637 of the interior burning heater 67 of coal heat decomposition stove.
The low temperature waste gas of lifting in this example refers to the waste gas that the purified gas after the raw gas reclaiming clean producing in pyrolysis of coal process produces after the combustion heater burning in outer gas-operated thermal bath facility and the interior burning heater of coal heat decomposition stove, this waste gas becomes cryogenic gas after the heat storage absorbing and cooling temperature in accumulation of heat chamber, trunk puts out device and is also advantageous in that and utilizes the incombustibility of combustion exhaust own to replace existing use inert nitrogen to carry out dry putting out, equipment is simple, with low cost, remarkable in economical benefits.Compared with traditional wet quenching, more can there is not a large amount of water-gas because large water gaging runs into high temperature coke and to airborne release, atmospheric pollution is little in this example, water saving, can make full use of the raw gas producing in pyrolysis of coal process again simultaneously.
Section five, continuous coking apapratus
Comprehensively above-mentioned, a large advantage of this coal heat decomposition stove is energy Continuous coking, replaces traditional coking at intermittence or native nest coking, compares traditional coal-coking process, has incomparable advantage.
The comprehensive cyclic utilization of Part V, pyrolysis of coal gas
Chapter 1, the reclaiming clean utilization of raw gas (derivation, condensation, change are produced)
First segment raw gas is derived
Raw gas, containing a lot of useful compositions, need to be derived to utilize raw gas
The condensation of second section raw gas
Raw gas temperature is higher, need to carry out cooling to high temperature raw gas.
Section three, the reclaiming clean of raw gas
Raw gas after ammoniacal liquor sprays can store for burning.
Chapter 2, the recycle after raw gas reclaiming clean (burning, dryly put out, burnt upgrading, again burn, enter the preheating of stove coal, enter stove coal dewatering, tonifying Qi air heating)
First segment raw gas purifies the purified gas burning after reclaiming
Raw gas provides thermal source through purifying recovery afterfire to pyrolysis of coal.
Dry the putting out of waste gas after the burning of second section purified gas
Specifically see the introduction of above dry coke quenching chapters and sections, repeat no more here.
Section three, the burnt upgrading of high temperature combustible exhaust gas after dry putting out
High temperature combustible exhaust gas temperature after dry putting out can reach 1000 DEG C~1100 DEG C, and burnt upgrading just in time need to be incubated upgrading at this temperature section,
Section four, the tonifying Qi burning again of the high temperature combustible exhaust gas after dry putting out.
High temperature combustible exhaust gas is externally acting in STRENGTH ON COKE upgrading process, temperature can reduce, can drop to 900 DEG C~1000 DEG C, and pyrolysis of coal charing is temperature required higher in coking chamber, on average all at 1400 DEG C~1500 DEG C, carry out combustion heating so fill into air for the first time to high temperature combustible exhaust gas, because coking chamber height is higher, and combustiblecomponents exists a certain amount of in high temperature combustible exhaust gas, so need to increase and have the 3rd combustion heater at interior burning heater middle part, the 4th combustion heater is to supplement the required heat of pyrolysis of coal, finally fill into for the second time again air on interior burning heater top and carry out again abundant combustion heating by high temperature combustible exhaust gas, both reached to pyrolysis of coal and provided outside thermal source acting, can allow again high temperature combustible exhaust gas fully burn, reduce the pollution to atmospheric environment.
The content of comprehensive this section (Section four of Part V chapter 2) and above the 4th first, second, third and fourth joint show that a kind of dry coke quenching waste gas produces and burning heater, comprises the dry quenching waste gas heater 63 that puts out device 7, inner heating device 67; The described dry concrete structure that puts out device 7 is shown in the above the 4th Section four introduction, and the concrete structure of described quenching waste gas heater 63 is shown in above the 4th first segment introduction, repeats no more here.Here only describe for the structural relation between them, the described dry device 7 that puts out is arranged on quirk and bends 65 belows, the top of dry high temperature coke quencher 71 of putting out device 7 and the high temperature combustible exhaust gas passage 653 and high temperature combustible exhaust gas admission passage that bend by quirk.
This routine a kind of dry coke quenching waste gas produces and combustion heating performing step is:
(1) waste gas, after purified gas burning is introduced quenching exhaust gas fan 75, because the waste gas after gas-fired naturally becomes the relatively low low temperature waste gas of temperature respectively after heat storage heat absorption;
(2), utilize quenching exhaust gas fan 75 that low temperature waste gas is passed through successively in the blast pipe 761 of coke quenching device 7, the dry circuit 76 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., the dry pipe 77 that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. blasts in wind assembling set Room 74, low temperature waste gas converges in wind assembling set Room 74, because wind assembling set 74 adopts unique structure, the blast cap 78 at top is semisphere, middle part chamber is inversed taper platform shape structure, so low temperature waste gas can be from lower openings 79 blowout and going out, be blown in low temperature coke quencher 72, upwards seal in again high temperature coke quencher 71, high temperature coke quencher 71 is neutralized to the coke falling to low temperature coke quencher 72 from high temperature coke quencher 71 lowers the temperature, this example adopts air-cooled form STRENGTH ON COKE to lower the temperature, therefore be referred to as dry putting out,
(3), simultaneously, low temperature waste gas produces a certain amount of high temperature combustible exhaust gas dry in putting out process, high temperature combustible exhaust gas comprises 3 kinds, contains the high temperature coke that a small amount of moisture content runs into after burnt upgrading chemical reaction can occur in one, low temperature waste gas, produces some inflammable gass; Also there is the not clean-burning inflammable gas of part in low temperature waste gas itself two; Three, also residual a part of inflammable gas of the high temperature coke after burnt upgrading itself;
(4), high temperature combustible exhaust gas enters into the high temperature combustible exhaust gas admission passage 6383 of centre channel 638 bottoms from the top of high temperature coke quencher 71, entering hole 639 through combustible exhaust gas enters in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere, the high temperature combustible exhaust gas temperature just having entered is higher generally all at 1000 DEG C~1100 DEG C, but along with waste gas rises and externally does work and dispel the heat in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere, temperature can reduce;
(5), at this moment give the air that fills in main internal-quirk 636 and the secondary internal-quirk 6373 of hypomere by a blowdown pipe 6321, thereby make high temperature combustible exhaust gas obtain airborne oxygen burning, the amount of the combustible gas in high-temperature combustible gas body is certain after all, and the heat and the temperature that provide coking chamber 61 pyrolysis of coal required are provided;
(6) so, when passing through quirk through the waste gas after tonifying Qi burning, the high temperature combustible exhaust gas of the secondary internal-quirk 6373 of hypomere gangs up hole 6304 around in main internal-quirk 636, mix in main quirk 636 and rise with the waste gas after the high-temperature combustible gas body in main internal-quirk 636 and burning, along with the waste gas after mixed high-temperature combustible gas body and burning can be to providing heat and externally acting to the pyrolysis of coal in coking chamber 61 by ringwall in coking chamber 612 in uphill process, temperature can reduce gradually;
(7) so need to again enter short covering gas by secondary air compensating pipe 6322 in the middle and upper part of main internal-quirk 636, make the waste gas further burning again after mixed high-temperature combustible gas body and burning, this provides required heat and temperature not only to coking chamber 61 pyrolysis of coal, and can make again high-temperature combustible gas body fully burn, improve high-temperature combustible gas work by combustion efficiency;
(8), in addition, owing to having buffer zone 6381 in the middle of main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, ringwall 634 tops in center are provided with perforation buffer zone 6381 and enter hole 6301 with the waste gas of main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, on the quirk partition wall 635 between main internal-quirk 636 and the secondary internal-quirk 6375 of epimere, be provided with waste gas and gang up hole 6303, between the secondary internal-quirk 6375 of each main internal-quirk 636 and epimere, completely mutually connect, waste gas after the burning of tonifying Qi for the second time can be mixed completely mutually, between the secondary internal-quirk 6375 of the main internal-quirk 636 in place and epimere, reaching samming all presses, balanced heat and temperature is provided can to the pyrolysis of coal on whole coking chamber 61 tops,
(9), enter the exhaust air chamber 391 on body of heater 91 tops by the hot waste gas exhaust channel 6306 at main internal-quirk 636 and the secondary internal-quirk of epimere 6375 tops finally by the waste gas after the burning of mistake secondary air compensating.

Claims (4)

1. dry coke quenching waste gas produces and a burning heater, it is characterized in that: comprise dry device, the quenching waste gas heater of putting out, the described dry device that puts out, be arranged in pyrolysis of coal furnace chamber and be positioned at coking chamber, burnt modifying apparatus, interior burning heater and quirk bow below, quirk bow is arranged on coking chamber, interior burning heater, in the furnace chamber of burnt modifying apparatus below, mainly comprise the bar bow of some, Huo Gong center ringwall, ringwall middle part, Huo Gong center forms high temperature combustible exhaust gas passage, bar bow one end is fixed on the ringwall of Huo Gong center, the other end is fixed on body of heater, bar bow is the radial layout of scattering in interval at a certain angle around ringwall center, Huo Gong center, the dry device that puts out comprises high temperature coke quencher, low temperature coke quencher, quenching bridge bow, quenching exhaust gas fan, described high temperature coke quencher is arranged on the below of quirk bow, and the top of high temperature coke quencher communicates with high temperature combustible exhaust gas passage, described quenching bridge bow is arranged between high temperature coke quencher and low temperature coke quencher, comprise bridge bow, wind assembling set, the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., the dry pipe that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., more than at least one bridge bow is partitioned at an angle spoke shape with high temperature coke quencher and low temperature coke quencher axle center and arranges in the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., bridge bow middle part forms wind assembling set, wind assembling set is an inversed taper platform shape chamber that diameter is up big and down small, the top of wind assembling set is provided with semisphere blast cap, and the lower openings of wind assembling set is towards low temperature coke quencher, the dry pipe that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is arranged in bridge bow, and wind assembling set is led in the dry pipe one end that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., and the other end leads to the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc., and the dry circuit that relieves dizziness, high fever, infantile convulsions, epilepsy, etc. is connected by blast pipe and quenching exhaust gas fan, the bottom opening place of described low temperature coke quencher is provided with the valve that discharges of the coke, described quenching waste gas heater, be arranged in the interior ringwall ring of coking chamber and be positioned at the top that quirk bends, comprise that internal-quirk, air mend pipe, blowdown pipe, secondary air compensating pipe, tonifying Qi circuit, center ringwall, internal-quirk partition wall, centre channel, described internal-quirk mainly by ringwall in coking chamber be positioned at coking chamber ringwall Nei center ringwall internal-quirk partition wall together with at least and be divided at least one group of above main internal-quirk, secondary internal-quirk arranged side by side, shutoff dividing plate, lower shutoff dividing plate are set in described secondary internal-quirk, secondary internal-quirk is divided into upper, middle and lower segment, be the secondary internal-quirk of epimere, the secondary internal-quirk in stage casing, the secondary internal-quirk of hypomere, on internal-quirk partition wall between the described secondary internal-quirk of epimere and main internal-quirk, be provided with waste gas and gang up hole, hot waste gas exhaust channel is offered at the secondary internal-quirk of epimere and main internal-quirk top, on internal-quirk partition wall between the described secondary internal-quirk of hypomere and main internal-quirk, quirk is set and gangs up hole, described quirk is ganged up hole near lower shutoff dividing plate below, described center ring circummure becomes centre channel, in centre channel, with the concordant place of upper shutoff dividing plate, one channel partition is set, centre channel is separated into, lower two portions, be that formation buffer zone is divided on top, formation high temperature combustible exhaust gas admission passage is divided in bottom, the waste gas that ringwall top, center is provided with perforation buffer zone and main internal-quirk and the secondary internal-quirk of epimere enters hole, the combustible exhaust gas that ringwall bottom, center is provided with perforation high temperature combustible exhaust gas admission passage and main internal-quirk and the secondary internal-quirk of hypomere enters hole, described tonifying Qi circuit is arranged on body of heater exterior wall, described air is mended pipe and tonifying Qi circuit UNICOM, a described blowdown pipe, secondary air compensating pipe and tonifying Qi circuit UNICOM, below bending from the bar of quirk bow, leading through extending upwardly to, internal-quirk partition wall inside between secondary internal-quirk, the outlet of a blowdown pipe is positioned at below lower shutoff dividing plate, lead to respectively the secondary internal-quirk of main internal-quirk and hypomere, main internal-quirk is led in the secondary air compensating outlet of secondary air compensating pipe, described secondary air compensating outlet upper shutoff dividing plate concordant or a little higher than with upper shutoff dividing plate, the top of described dry high temperature coke quencher of putting out device communicates with the high temperature combustible exhaust gas admission passage of quenching waste gas heater with the high temperature combustible exhaust gas passage bending by quirk.
2. a kind of dry coke quenching waste gas according to claim 1 produces and burning heater, it is characterized in that: the secondary internal-quirk in described stage casing forms the independent gas combustion chamber of relative closure, the secondary internal-quirk in upper stage casing connects into relevant one group with the secondary internal-quirk in next stage casing of next-door neighbour by chamber passage, chamber passage below upper shutoff dividing plate and from a secondary internal-quirk in stage casing and being close in a main internal-quirk between next stage casing pair internal-quirk pass.
3. a kind of dry coke quenching waste gas according to claim 1 produces and burning heater, it is characterized in that: described hot waste gas exhaust channel communicates with the exhaust air chamber of upper of furnace body.
4. a kind of dry coke quenching waste gas according to claim 1 produces and burning heater, it is characterized in that: also comprise industry control center, industry control center and quenching exhaust gas fan, the valve that discharges of the coke, the electrical connection of quenching thermometer, realize to quenching exhaust gas fan and discharge of the coke the automatic control of valve and by quenching thermometer to dry monitoring of putting out temperature.
CN201210279429.XA 2012-08-06 2012-08-06 Dry quenching exhaust gas generation and combustion heating device Active CN102786949B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210279429.XA CN102786949B (en) 2012-08-06 2012-08-06 Dry quenching exhaust gas generation and combustion heating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210279429.XA CN102786949B (en) 2012-08-06 2012-08-06 Dry quenching exhaust gas generation and combustion heating device

Publications (2)

Publication Number Publication Date
CN102786949A CN102786949A (en) 2012-11-21
CN102786949B true CN102786949B (en) 2014-08-06

Family

ID=47152542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210279429.XA Active CN102786949B (en) 2012-08-06 2012-08-06 Dry quenching exhaust gas generation and combustion heating device

Country Status (1)

Country Link
CN (1) CN102786949B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102786947B (en) * 2012-08-06 2014-08-06 山西鑫立能源科技有限公司 Internal combustion heating device of coal pyrolyzing furnace

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB470275A (en) * 1936-02-14 1937-08-12 Didier Werke Ag Fa Improvements in the production of gas from carbonaceous fuels
CN2038907U (en) * 1988-07-26 1989-06-07 李柏寿 Combined device for coking and metal ball
CN2283065Y (en) * 1995-11-21 1998-06-03 康成 Vertical continuous coke oven
CN202898321U (en) * 2012-08-06 2013-04-24 山西鑫立能源科技有限公司 Dry quenching exhaust gas generation and combustion heating device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB470275A (en) * 1936-02-14 1937-08-12 Didier Werke Ag Fa Improvements in the production of gas from carbonaceous fuels
CN2038907U (en) * 1988-07-26 1989-06-07 李柏寿 Combined device for coking and metal ball
CN2283065Y (en) * 1995-11-21 1998-06-03 康成 Vertical continuous coke oven
CN202898321U (en) * 2012-08-06 2013-04-24 山西鑫立能源科技有限公司 Dry quenching exhaust gas generation and combustion heating device

Also Published As

Publication number Publication date
CN102786949A (en) 2012-11-21

Similar Documents

Publication Publication Date Title
CN102786940B (en) Coal-pyrolyzing and carbonizing device of coal pyrolyzing furnace
CN102786947B (en) Internal combustion heating device of coal pyrolyzing furnace
CN102766473B (en) Heat storage and exchange device for gas heater of coal pyrolyzing furnace
CN102786944B (en) External gas heating device of coal pyrolyzing furnace
CN102796535B (en) Gas commutation device for coal pyrolysis furnace combustion heater
CN102786960B (en) Dry quenching device for coal pyrolyzing furnace
CN102786942B (en) Gas reversing method for coal pyrolyzing furnace gas heater
CN102786949B (en) Dry quenching exhaust gas generation and combustion heating device
CN102786975B (en) Dry quenched waste gas generating and coke modifying device
CN102786950B (en) Dry quenching exhaust gas generation and combustion heating method
CN102786954B (en) Flame path arch for coal pyrolyzing furnace
CN202898321U (en) Dry quenching exhaust gas generation and combustion heating device
CN103087728B (en) Continuous coking device of coal pyrolysis furnace
CN102786946B (en) Fuel gas heater for heating device of coal pyrolyzing furnace
CN202898322U (en) Device for producing combustible high-temperature waste gas by dry quenching of burned gas
CN202881188U (en) Dry quenched waste gas generation and coke modification device
CN202881173U (en) Coal pyrolysis and carbonization device of coal pyrolysis furnace
CN202898335U (en) Coke modifying device of coal pyrolyzing furnace
CN202881179U (en) Inner combustion heating device of coal pyrolysis furnace
CN202898324U (en) Flame path arch of coal pyrolyzing furnace
CN202898320U (en) Continues coking device of coal pyrolyzing furnace
CN202898326U (en) Dry quenching device of coal pyrolyzing furnace
CN202792087U (en) Heat storage heat exchanger
CN202881176U (en) Gas heater of heating device of coal pyrolysis furnace
CN202881177U (en) Gas reversing device for gas heaters of coal pyrolysis furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Zhao Haisheng

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Zhao Haisheng

Document name: Notification of procedure qualification

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220927

Address after: Room 201, 2nd Floor, Building 5, No. 77, Tanghuai Road, Tanghuai Park, Taiyuan, Taiyuan City, Shanxi Province, 030032

Patentee after: Shanxi Ruide New Material Technology Co.,Ltd.

Address before: Room 1023, Block C, No. 2 Keji Street, High-tech Zone, Taiyuan, Shanxi Province, 030006

Patentee before: SHANXI XINLI ENERGY TECHNOLOGY Co.,Ltd.