CN102785059B - Process for manufacturing bolster of spinning machine - Google Patents

Process for manufacturing bolster of spinning machine Download PDF

Info

Publication number
CN102785059B
CN102785059B CN201210227972.5A CN201210227972A CN102785059B CN 102785059 B CN102785059 B CN 102785059B CN 201210227972 A CN201210227972 A CN 201210227972A CN 102785059 B CN102785059 B CN 102785059B
Authority
CN
China
Prior art keywords
pipe
welding
plug body
plug
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210227972.5A
Other languages
Chinese (zh)
Other versions
CN102785059A (en
Inventor
徐挺尚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cixi Hongdi Textile Machinery Co ltd
Original Assignee
Cixi Hongdi Textile Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cixi Hongdi Textile Machinery Co ltd filed Critical Cixi Hongdi Textile Machinery Co ltd
Priority to CN201210227972.5A priority Critical patent/CN102785059B/en
Publication of CN102785059A publication Critical patent/CN102785059A/en
Application granted granted Critical
Publication of CN102785059B publication Critical patent/CN102785059B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The invention discloses a process for manufacturing a bolster of a spinning machine. The process comprises the following steps: a pipe, a flange and a plug are prepared, wherein the plug comprises a plug body and a welding ring on the back of the plug body, and a welding neck is between the welding ring and the plug body; after the welding neck and the welding ring extend into the pipe from the tail part of the pipe, the rear end face of the plug body leans on the tail end face of the pipe, the welding neck, the welding ring, the plug body and the pipe enclose to form a containing chamber, the joint of the pipe and the plug body is subjected to friction welding, the internal deformation bulge generated by the friction welding of the pipe and the plug body is filled in the containing chamber, and the external deformation bulge generated by the friction welding of the pipe and the plug body is removed; the head end faces of the flange and the pipe are joined and then subjected to friction welding, and the internal and external deformation bulges generated by the friction welding of the flange and the pipe are removed. By the method, the flange and the pipe, and the plug and the pipe are subjected to friction welding, so that little cutting is needed, and furthermore, the processing is convenient, and raw materials are saved.

Description

A kind of manufacturing process of frame bolster
(1) technical field
The present invention relates to a kind of manufacturing process of frame bolster.
(2) background technology
Frame bolster generally comprises pipe, is located at the end socket of pipe afterbody and is located at the flange of tube head.In the prior art, frame bolster generally adopts bar, and bar adopts deep hole rig processing place central tube, then is machined by bar and form pipe and flange, shapingly extremely bothers, and can waste large content of starting materials in Drilling operation and Vehicle Processing.
(3) summary of the invention
In order to overcome the above-mentioned deficiency of the manufacturing process of existing frame bolster, the invention provides a kind of manufacturing process of processing frame bolster that is easy, that economize in raw materials.
The technical scheme that the present invention solves its technical problem is: a kind of manufacturing process of frame bolster, comprises the following steps:
A. a pipe, a flange and a plug is prepared, described flange has the centre bore suitable with described pipe, described plug comprises plug body and is located at the welding ring at the described plug body back side, for welding neck between described welding ring and described plug body, the external diameter of described welding ring is less than the external diameter of described plug body, and the diameter of described welding neck is less than the external diameter of described welding ring;
After described welding neck and described welding ring stretch into described pipe from the afterbody of described pipe, the rear end face of described plug body leans on mutually with the tail end face of described pipe, described welding neck, welding ring, plug body and pipe surround a container cavity, the intersection friction welding of pipe and plug body, the deflection internal projection that pipe and plug friction welding produce is filled in container cavity, like this then be positioned at the deflection internal projection of pipe depths without the need to reprocessing, avoid the trouble in pipe depths cutting surplus, deflection outer lug pipe and plug friction welding produced is removed,
Friction welding after the head end closing of described flange and described pipe, again flange is welded produced deflection internal projection with pipe friction, deflection outer lug removes, because flange is positioned at the head of pipe, therefore flange welds the more shallow position that produced deflection internal projection is positioned at tube head with pipe friction, and cutting operation does not have difficulties.
Further, described flange and described plug all adopt Vehicle Processing.
Beneficial effect of the present invention is: flange welds with pipe friction, plug welds with pipe friction, substantially without cutting, easy to process, save material.
(4) accompanying drawing explanation
Fig. 1 is the structural representation of frame bolster.
Fig. 2 is the structural representation of plug.
Fig. 3 is that plug inserts the schematic diagram after in pipe.
Fig. 4 is the schematic diagram after plug welds with pipe friction.
(5) detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, a kind of manufacturing process of frame bolster, comprises the following steps:
Prepare pipe 1, flange 2 and a plug 3, described flange 2 has the centre bore suitable with described pipe 1, described plug 3 comprises plug body 4 and is located at the welding ring 5 at described plug body 4 back side, for welding neck 6 between described welding ring 5 and described plug body 4, the external diameter of described welding ring 5 is less than the external diameter of described plug body 4, and the diameter of described welding neck 6 is less than the external diameter of described welding ring 5.
After described welding neck 6 and described welding ring 5 stretch into described pipe 1 from the afterbody of described pipe 1, the rear end face of described plug body 4 leans on mutually with the tail end face of described pipe 1, described welding neck 6, welding ring 5, plug body 4 and pipe 1 surround a container cavity 7, the intersection friction welding of pipe 1 and plug body 4, the deflection internal projection 8 that pipe and plug friction welding produce is filled in container cavity 7, like this then be positioned at the deflection internal projection of pipe depths without the need to reprocessing, avoid the trouble in pipe depths cutting surplus, deflection outer lug pipe and plug friction welding produced is removed and (is generally first cut, polish again).
Friction welding after described flange 2 and the head end closing of described pipe 1, again flange is welded produced deflection internal projection with pipe friction, deflection outer lug removes and (generally first cut, polish again), because flange 2 is positioned at the head of pipe 1, therefore the deflection internal projection that flange 2 and pipe 1 friction welding produce is positioned at the more shallow position of tube head, and cutting operation does not have difficulties.

Claims (2)

1. a manufacturing process for frame bolster, is characterized in that comprising the following steps:
Prepare a pipe, a flange and a plug, described flange has the centre bore suitable with described pipe, described plug comprises plug body and is located at the welding ring at the described plug body back side, for welding neck between described welding ring and described plug body, the external diameter of described welding ring is less than the external diameter of described plug body, and the diameter of described welding neck is less than the external diameter of described welding ring;
After described welding neck and described welding ring stretch into described pipe from the afterbody of described pipe, the rear end face of described plug body leans on mutually with the tail end face of described pipe, described welding neck, welding ring, plug body and pipe surround a container cavity, the intersection friction welding of pipe and plug body, the deflection internal projection that pipe and plug friction welding produce is filled in container cavity, and deflection outer lug pipe and plug friction welding produced is removed;
Friction welding after the head end closing of described flange and described pipe, then flange is welded produced deflection internal projection with pipe friction, deflection outer lug removes.
2. the manufacturing process of frame bolster as claimed in claim 1, is characterized in that: described flange and described plug all adopt Vehicle Processing.
CN201210227972.5A 2012-06-26 2012-06-26 Process for manufacturing bolster of spinning machine Expired - Fee Related CN102785059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210227972.5A CN102785059B (en) 2012-06-26 2012-06-26 Process for manufacturing bolster of spinning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210227972.5A CN102785059B (en) 2012-06-26 2012-06-26 Process for manufacturing bolster of spinning machine

Publications (2)

Publication Number Publication Date
CN102785059A CN102785059A (en) 2012-11-21
CN102785059B true CN102785059B (en) 2015-07-15

Family

ID=47150750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210227972.5A Expired - Fee Related CN102785059B (en) 2012-06-26 2012-06-26 Process for manufacturing bolster of spinning machine

Country Status (1)

Country Link
CN (1) CN102785059B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104959727B (en) * 2015-07-29 2017-09-12 江苏科技大学 A kind of thin-wall aluminum alloy pipe end composite seal device and welding method
CN111015110B (en) * 2019-12-23 2021-01-08 西部金属材料股份有限公司 Preparation method of metal pipe fitting difficult to deform
CN113770569B (en) * 2021-08-11 2023-02-17 安徽大昌科技股份有限公司 Machining process for rear torsion beam of automobile

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB234045A (en) * 1924-05-16 1925-07-23 Honegger & Cie Improvements in or relating to spindles for textile machinery
DE4406309A1 (en) * 1994-02-26 1995-08-31 Stahlecker Fritz Simplified spinning spindle bearing assembly with prodn. cost savings
US5996326A (en) * 1997-06-20 1999-12-07 Novibra Gmbh Spindle for a spinning or a twisting machine
CN2438729Y (en) * 2000-08-28 2001-07-11 赵孝东 Changable bolster for spinning frame
CN1737484A (en) * 2004-08-19 2006-02-22 林项武 Heat pipe vacuum sealing method and apparatus thereof
CN101139761A (en) * 2007-09-29 2008-03-12 山西四海通机械制造有限公司 Method for manufacturing steel bolster
CN201116322Y (en) * 2007-09-29 2008-09-17 山西四海通机械制造有限公司 Combined type steel bolster
CN201473660U (en) * 2009-08-26 2010-05-19 徐圣明 Spindle foot used for spindle of two-for-one twister
CN201648617U (en) * 2010-01-28 2010-11-24 钱南安 Spindle bolster connector

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB234045A (en) * 1924-05-16 1925-07-23 Honegger & Cie Improvements in or relating to spindles for textile machinery
DE4406309A1 (en) * 1994-02-26 1995-08-31 Stahlecker Fritz Simplified spinning spindle bearing assembly with prodn. cost savings
US5996326A (en) * 1997-06-20 1999-12-07 Novibra Gmbh Spindle for a spinning or a twisting machine
CN2438729Y (en) * 2000-08-28 2001-07-11 赵孝东 Changable bolster for spinning frame
CN1737484A (en) * 2004-08-19 2006-02-22 林项武 Heat pipe vacuum sealing method and apparatus thereof
CN101139761A (en) * 2007-09-29 2008-03-12 山西四海通机械制造有限公司 Method for manufacturing steel bolster
CN201116322Y (en) * 2007-09-29 2008-09-17 山西四海通机械制造有限公司 Combined type steel bolster
CN201473660U (en) * 2009-08-26 2010-05-19 徐圣明 Spindle foot used for spindle of two-for-one twister
CN201648617U (en) * 2010-01-28 2010-11-24 钱南安 Spindle bolster connector

Also Published As

Publication number Publication date
CN102785059A (en) 2012-11-21

Similar Documents

Publication Publication Date Title
CN102785059B (en) Process for manufacturing bolster of spinning machine
CN104607874A (en) Machining process of ultra-long cylindrical thin-wall part
CN101456056A (en) Autocar spindle fork vertical type forging technique method
CN201565678U (en) Gear shaving clamp
CN204276909U (en) A kind of super large tungsten crucible production assembling die
CN201394923Y (en) Closed type pressure machine eccentric sleeve
CN202144115U (en) Forming die for making large-volume soft infusion bag
CN201883945U (en) Thin-walled diamond drill bit
CN104607588A (en) Novel long-shaft flange forge piece forging-forming method
CN201511545U (en) Vertical flat-die straw briquetting machine template
CN203438452U (en) Split type forming mold for needle tube rubber plug
CN204353347U (en) Reducing sizing die
CN202934255U (en) Rod piece joint and connecting structure of rod piece joint and rod piece
CN204926818U (en) Removable irradiation supervise sample box
CN203948932U (en) Gas holder
CN204867353U (en) Integral cup that melts of die casting machine
CN204269469U (en) Large diameter nozzle internal-expansion type Tool for Hydraulic
CN202023919U (en) Pipe hydraulic-forming sealing structure
CN204102964U (en) Sealing ring of zinc-manganese-iron shell battery
CN201259949Y (en) Plug insertion pin
CN203818348U (en) Central taking-out device for graphite cylinders
CN203817261U (en) Fluted disc forging forming die
CN203391583U (en) Inner tube for bicycle
CN202655394U (en) Internal expanding shaping structure
CN201297382Y (en) Oil return pipe device of piston cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20160626