CN102780178A - Obstacle bridging construction method for power line wiring and wiring pulleys - Google Patents

Obstacle bridging construction method for power line wiring and wiring pulleys Download PDF

Info

Publication number
CN102780178A
CN102780178A CN2012102532333A CN201210253233A CN102780178A CN 102780178 A CN102780178 A CN 102780178A CN 2012102532333 A CN2012102532333 A CN 2012102532333A CN 201210253233 A CN201210253233 A CN 201210253233A CN 102780178 A CN102780178 A CN 102780178A
Authority
CN
China
Prior art keywords
pulley
framework
coaster
construction method
power circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102532333A
Other languages
Chinese (zh)
Inventor
韩明华
李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIASHAN POWER SUPPLY BUREAU
Original Assignee
JIASHAN POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIASHAN POWER SUPPLY BUREAU filed Critical JIASHAN POWER SUPPLY BUREAU
Priority to CN2012102532333A priority Critical patent/CN102780178A/en
Publication of CN102780178A publication Critical patent/CN102780178A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses an obstacle bridging construction method for power line wiring and wiring pulleys. The method is convenient and quick to construct, small in labor number and high in universality. The method sequentially includes: laying three pulling ropes and a front dragline, enabling the tree pulling ropes to respectively penetrate through at least one pulley block at one ends of towers, pulling the pulling rope in a main pulley to enable a middle guide line to go through from one tower to another tower under the suspension of the other two pulling ropes and auxiliary pulleys, pulling the pulling rope in the two auxiliary pulleys to enable two side guide lines to go through from one tower to another tower under the suspension of the auxiliary pulleys, and recovering the pulley block to finish wiring works of enabling the guide lines to pass through the obstacles. The whole wiring process is performed on the two towers, each guide line is suspended through the pulling ropes without contacting with the ground and free of control by people standing below, so that damages to ground crops and blockage to traffic lines below the guide lines are avoided.

Description

Power circuit stringing leaping over obstacles construction method and wires-erecting pulley
Technical field
The present invention relates in the electric power system a kind of method and the stringing of stringing and use coaster, more specifically to a kind of power circuit stringing leaping over obstacles construction method and wires-erecting pulley.
Background technology
In the overhead transmission line process of deployment of power circuit, often need the across obstacle stringing sometimes, like other circuit, highway, railway, bridge, river, tall and big plant woods, cropland etc. (general designation is crossed over thing); Restrictions such as often receiving object being spanned height, width, geographical position is set up in this leap; The leap operation is complicated, and workload and difficulty are big, and interruption duration is long; Big to the influence on ground, as to need road or navigation channel envelope road causes damages, problem such as dispute takes place to claim damages the vegetation on ground.Have a strong impact on the progress and the efficient of stringing, and whole stringing hand labor intensity is big.Though have at present 200810234611.7 overhead transmission lines to cross over the patent of stringing method and wires-erecting pulley, this method can only be set up by the single line single line, and when stringing, need the people on ground with steel wire rope 4 pulling wires-erecting pulley 1; Height with control wires-erecting pulley 1 upper conductor 8; The somebody must hold on ground and move and be connected the stay cord 6 on the coaster 1 simultaneously, reaches the purpose that moves forward and backward coaster 1, and preferably the somebody holds and moves and is connected the location drag-line 5 on the coaster 1; Each movable block 1 needs 3 people (at least 2 people) after this manner; If the construction of line of crossing over is long, intermediate demand 5-6 platform movable block 1 even longer just needs more people.Though such stringing method lead can unsettledly set up, many people also must stand under the lead rely on various ropes with about the control coaster 1, seesaw etc.This can only solve lead 8 and not land, and for lead be for 8 times highway, railway, lake, water surface navigation channel must seal, could the stringing construction after iceound.Therefore this method still receives the restriction of many environment and geographic factor, and numerous workmans' manipulation and cooperation need be arranged on ground, and the stringing cost is very high, and efficient is also low.
Summary of the invention
The purpose of this invention is to provide a kind of easy construction, quick, the recruitment number is few, the power circuit stringing leaping over obstacles construction method and the wires-erecting pulley of highly versatile.
In order to solve the problems of the technologies described above, this power circuit stringing leaping over obstacles construction method is successively:
(1) between two shaft towers of need route wires, put three pull ropes and a fore stay earlier, and be fixed between two A and the B shaft tower, the tail end of every pull rope connects middle lead and two limit leads that three needs are laid respectively;
(2) three pull ropes pass at least one tackle pulley respectively at an end of shaft tower; Each tackle pulley has a main coaster and two branch coasters, and two branch coasters wherein are connected with main coaster through connection cord, and fore stay is connected with first tackle pulley; Be connected in series through static line between the tackle pulley before and after each; In the end be fixed with backstay on a tackle pulley,, adjust centre and the overhead positions of each tackle pulley between two shaft towers through the traction of fore stay and backstay;
(3) pull rope in the tractive master coaster; With connecting middle lead behind this pull rope at all the other two pull ropes and divide under the suspention of coaster aloft from a shaft tower to another shaft tower; Should be strained and fixed on two shaft towers by middle lead then, lead is mentioned in all tackle pulley quilts;
(4) pull rope in two branch coasters of tractive, with two limit leads under the suspention of minute coaster aloft from a shaft tower to another shaft tower, accomplish three leads and set up vacantly between two shaft towers;
(5) tractive fore stay or backstay make each tackle pulley to an end of shaft tower, and what shed tackle pulley and middle lead and limit lead is connected the stringing work of completion lead leaping over obstacles.
The length of said static line is 30-40 rice.
Main coaster described in the above-mentioned power circuit stringing leaping over obstacles construction method be a fourfold block it include 4 pulleys that become each two arrangement of two rows; Each pulley is connected with the large pulley framework through bearing pin; Side at the large pulley framework is shaped on big overhead door through big hinge; The other end of big overhead door is connected with the large pulley framework through bearing pin; The lateral surface of big overhead door and with the large pulley framework of big overhead door relative position on be fixed with the connecting rod of opening respectively, form the looping pit that supplies connection cord to connect, on guide roller frame, be provided with the connecting hole that supplies static line to connect.
In looping pit, be with connecting ring, connection cord is connected with connecting rod through connecting ring again.
Described connecting hole is that be welded with fixed lever in the lower end of large pulley framework formed.
Branch coaster described in the above-mentioned power circuit stringing leaping over obstacles construction method is a three-fold block; It includes the truckle framework and on the truckle framework, sells and be fixed with three pulleys that are triangularly arranged; Side at the truckle framework is shaped on little overhead door through small hinge; The other end of little overhead door is connected with the truckle framework through pin, on the truckle framework, is shaped on the connecting ring that supplies fixed connection string.
Described pulley is processed with nylon material.
Power circuit stringing leaping over obstacles construction method and wires-erecting pulley according to such scheme enforcement; All on two shaft towers, carry out in whole stringing process; Each lead is not contacted with ground by pull rope, middle lead and the unsettled picking-up of special-purpose coaster in the process of traction; Do not need the people yet and control below, can not cause the injury of surface crops under the lead and the obstruction of traffic route.Whole stringing process operation is simple, and safety can not cause damage to surrounding environment, does not also receive the restriction of geographical conditions.The wires-erecting pulley structure and the manufacturing process that are designed are simple, use reliably, and convenient, especially main coaster adopts fourfold block, and whole tackle pulley is moved steadily.The loss that this scheme can be brought for laying, repairing shortening time and the minimizing construction of power circuit.
Description of drawings
Fig. 1 is that three pull ropes and a fore stay are fixed on the sketch map on the shaft tower;
Fig. 2 is main coaster reversal of the natural order of things, holds main coaster by two fens coasters, the sketch map of lead in tractive;
Fig. 3 is the partial enlarged drawing of a-quadrant among Fig. 2;
Fig. 4 is that main coaster is just hanging on the middle lead that cloth is good, and coaster was held by main coaster in two minutes, at the sketch map of tractive both sides lead;
Fig. 5 is the partial enlarged drawing in B zone among Fig. 4;
Fig. 6 is the front view of main coaster;
Fig. 7 is the left view of main coaster;
Fig. 8 is the state diagram when big overhead door is opened on the main coaster;
Fig. 9 is the front view of branch coaster;
Figure 10 is the left view of branch coaster;
Figure 11 is the state diagram when little overhead door is opened on the branch coaster.
Among the figure: 1, shaft tower; 2, pull rope; 3, fore stay; 4, middle lead; 5, limit lead; 6, tackle pulley; 7, main coaster; 8, divide coaster; 9, connection cord; 10, static line; 11, backstay; 12, pulley; 13, bearing pin; 14, large pulley framework; 15, big hinge; 16, big overhead door; 17, connecting rod; 18, looping pit; 19, connecting ring; 20, connecting hole; 21, fixed lever; 22, truckle framework; 23, pin; 24, small hinge; 25, little overhead door; 26, connecting ring.
Embodiment
Through embodiment the present invention is done further description below.
Power circuit stringing leaping over obstacles construction method is successively:
(1) earlier between two shaft towers 1 of need route wires, put three pull ropes 2 and a fore stay 3, and be fixed between two shaft towers 1, it is as shown in Figure 1 that the tail end of every pull rope 2 connects middle lead 4 and two limit leads 5 of three needs layings respectively.
(2) three pull ropes 2 pass tandem two tackle pulley 6 respectively at an end of shaft tower 1; Each tackle pulley 6 has a main coaster 7 and two branch coasters 8; Two branch coasters 8 wherein are connected with main coaster 7 through connection cord 9; Fore stay 3 is connected with first tackle pulley 6, and through static line 10 serial connections, the length of static line is 30-40 rice between two tackle pulley 6.In the end be fixed with backstay 11 on a tackle pulley 6.Through the traction of fore stay 3 and backstay 11, adjust centre and the overhead positions of each tackle pulley 6 between two shaft towers 1, main coaster 7 is in reversal of the natural order of things state such as Fig. 2, shown in Figure 3.
(3) pull rope 3 in the tractive master coaster 7, with connecting middle lead 4 behind this pull rope 3 at all the other two pull ropes 3 and divide under the suspention of coaster 8, aloft from a shaft tower 1 to another shaft tower 1.Should be strained and fixed on two shaft towers 1 by middle lead 4 then, lead 4 is mentioned in all tackle pulley 6 quilts, and main coaster 7 is in just hangs state such as Fig. 4, shown in Figure 5;
(4) pull rope 2 in two branch coasters 8 of tractive, with two limit leads 5 under the suspention of minute coaster 8 aloft from a shaft tower 1 to another shaft tower 1, accomplish three leads and set up vacantly between two shaft towers 1;
(5) tractive fore stay 3 or backstay 11 make the end of each tackle pulley 6 to shaft tower 1, and what shed tackle pulley 6 and middle lead 4 and limit lead 5 is connected the stringing work of completion lead leaping over obstacles.
Adopted 2 groups of tackle pulley 6 in the above-described embodiments between two shaft towers 1,, can adopt the tackle pulley 6 of 3 groups or more groups to be connected in series if the close together between two shaft towers 1 can adopt the distance between 1 group of tackle pulley, 6, two shaft towers 1 far away.
Main coaster 7 described in the above-mentioned power circuit stringing leaping over obstacles construction method as Fig. 6, shown in Figure 7 be a fourfold block it include 4 pulleys 12 that become each two arrangement of two rows; Each pulley 12 is connected with large pulley framework 14 through bearing pin 13; Side at large pulley framework 14 is shaped on big overhead door 16 through big hinge 15; The other end of big overhead door 16 is connected with large pulley framework 14 through bearing pin 13, the lateral surface of big overhead door 16 and with the large pulley framework 14 of overhead door 16 relative positions greatly on be fixed with the connecting rod 17 of opening, formation looping pit 18 respectively; In looping pit 18, be with connecting ring 19, this connecting ring 19 is used for and being connected of connection cord 9.On large pulley framework 14, be provided with the connecting hole 20 that supplies static line 10 to connect.This connecting hole 20 is that be welded with fixed lever 21 in the lower end of large pulley framework 14 formed.In in main coaster 7, placing during lead 4, it is as shown in Figure 8 to open big overhead door 16.
Branch coaster 8 described in the above-mentioned power circuit stringing leaping over obstacles construction method is a three-fold block such as Fig. 9, shown in Figure 10; It includes truckle framework 22; On truckle framework 22, sell 23 and be fixed with three pulleys 12 that are triangularly arranged; Side at truckle framework 22 is shaped on little overhead door 25 through small hinge 24, and the other end of little overhead door 15 is connected with truckle framework 22 through pin 23, on truckle framework 22, is shaped on the connecting ring 26 that supplies fixed connection string 9.When in minute coaster 8, placing limit lead 5, it is shown in figure 11 to open little overhead door 25.
Above-mentioned pulley 12 is all processed with nylon material.

Claims (7)

1. power circuit stringing leaping over obstacles construction method, its characteristic is successively:
(1) between two shaft towers of need route wires, put three pull ropes and a fore stay earlier, and be fixed between two A and the B shaft tower, the tail end of every pull rope connects middle lead and two limit leads that three needs are laid respectively;
(2) three pull ropes pass at least one tackle pulley respectively at an end of shaft tower; Each tackle pulley has a main coaster and two branch coasters, and two branch coasters wherein are connected with main coaster through connection cord, and fore stay is connected with first tackle pulley; Be connected in series through static line between the tackle pulley before and after each; In the end be fixed with backstay on a tackle pulley,, adjust centre and the overhead positions of each tackle pulley between two shaft towers through the traction of fore stay and backstay;
(3) pull rope in the tractive master coaster; With connecting middle lead behind this pull rope at all the other two pull ropes and divide under the suspention of coaster aloft from a shaft tower to another shaft tower; Should be strained and fixed on two shaft towers by middle lead then, lead is mentioned in all tackle pulley quilts;
(4) pull rope in two branch coasters of tractive, with two limit leads under the suspention of minute coaster aloft from a shaft tower to another shaft tower, accomplish three leads and set up vacantly between two shaft towers;
(5) tractive fore stay or backstay make each tackle pulley to an end of shaft tower, and what shed tackle pulley and middle lead and limit lead is connected the stringing work of completion lead leaping over obstacles.
2. power circuit stringing leaping over obstacles construction method according to claim 1, the length that it is characterized in that said static line is 30-40 rice.
3. power circuit stringing leaping over obstacles construction method according to claim 1; It is characterized in that described main coaster be a fourfold block it include 4 pulleys that become each two arrangement of two rows; Each pulley is connected with the large pulley framework through bearing pin; Side at the large pulley framework is shaped on big overhead door through big hinge, and the other end of big overhead door is connected with the large pulley framework through bearing pin, the lateral surface of big overhead door and and be fixed with the connecting rod of opening greatly on the large pulley framework of overhead door relative position respectively; Form the looping pit that supplies connection cord to connect, on guide roller frame, be provided with the connecting hole that supplies static line to connect.
4. power circuit stringing leaping over obstacles construction method according to claim 3 is characterized in that in looping pit, being with connecting ring, and connection cord is connected with connecting rod through connecting ring again.
5. power circuit stringing leaping over obstacles construction method according to claim 3 is characterized in that described connecting hole is that be welded with fixed lever in the lower end of large pulley framework formed.
6. power circuit stringing leaping over obstacles construction method according to claim 1; It is characterized in that described minute coaster is a three-fold block; It includes the truckle framework and on the truckle framework, sells and be fixed with three pulleys that are triangularly arranged; Side at the truckle framework is shaped on little overhead door through small hinge, and the other end of little overhead door is connected with the truckle framework through pin, on the truckle framework, is shaped on the connecting ring that supplies fixed connection string.
7. according to claim 3 and 6 described power circuit stringing leaping over obstacles construction methods, it is characterized in that described pulley processes with nylon material.
CN2012102532333A 2012-07-19 2012-07-19 Obstacle bridging construction method for power line wiring and wiring pulleys Pending CN102780178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102532333A CN102780178A (en) 2012-07-19 2012-07-19 Obstacle bridging construction method for power line wiring and wiring pulleys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102532333A CN102780178A (en) 2012-07-19 2012-07-19 Obstacle bridging construction method for power line wiring and wiring pulleys

Publications (1)

Publication Number Publication Date
CN102780178A true CN102780178A (en) 2012-11-14

Family

ID=47124991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102532333A Pending CN102780178A (en) 2012-07-19 2012-07-19 Obstacle bridging construction method for power line wiring and wiring pulleys

Country Status (1)

Country Link
CN (1) CN102780178A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103138205A (en) * 2013-03-14 2013-06-05 江苏省电力公司淮安供电公司 Tension-free cable-laying crossing device
CN103441451A (en) * 2013-08-26 2013-12-11 国网河南省电力公司周口供电公司 Overhead line cross wiring device
CN104600623A (en) * 2015-01-16 2015-05-06 国家电网公司 High-altitude crossover releasing device for lifting type heavy power cable
CN105162034A (en) * 2015-09-10 2015-12-16 国家电网公司 Lead removing and changing device for overhead transmission line
CN105186378A (en) * 2015-10-19 2015-12-23 江苏省电力公司南京供电公司 Power transmission line channel crossing protection mechanism
CN107834434A (en) * 2017-09-27 2018-03-23 安徽送变电工程公司 Crossing method for the construction of transmission line of electricity tension stringing
CN107947029A (en) * 2018-01-03 2018-04-20 宁波华翔东方电力机具有限公司 A kind of distribution line crosses over shelves thread-changing coaster and its thread-changing method
CN109797658A (en) * 2019-02-25 2019-05-24 中国石油天然气集团公司 A kind of device for the aerotow of Long span pipeline suspension bridge and transport
CN111917058A (en) * 2020-09-15 2020-11-10 周彦彤 Manned 5G big data safety type overhead power maintenance moving frame and method
CN112217145A (en) * 2020-10-09 2021-01-12 中国化学工程第六建设有限公司 Stringing construction and installation process of carbon fiber composite core lead
CN113353854A (en) * 2021-05-31 2021-09-07 南京华易泰电子科技有限公司 Loading position adjustable system of automatic material conveying system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1288276A (en) * 2000-08-02 2001-03-21 国家电力公司电力建设研究所 Method and equipment of stride across construction utilizing overhead cableway
CN201225976Y (en) * 2008-12-09 2009-04-22 中国人民解放军国防科学技术大学 Connection device for measuring dynamics performance of piezoelectric ceramics slice
JP4277281B2 (en) * 2004-05-20 2009-06-10 川北電気工業株式会社 Hanging wire type transfer method by net formation
CN101969184A (en) * 2010-09-16 2011-02-09 河南省电力公司新乡供电公司 Pay-off tackle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1288276A (en) * 2000-08-02 2001-03-21 国家电力公司电力建设研究所 Method and equipment of stride across construction utilizing overhead cableway
JP4277281B2 (en) * 2004-05-20 2009-06-10 川北電気工業株式会社 Hanging wire type transfer method by net formation
CN201225976Y (en) * 2008-12-09 2009-04-22 中国人民解放军国防科学技术大学 Connection device for measuring dynamics performance of piezoelectric ceramics slice
CN101969184A (en) * 2010-09-16 2011-02-09 河南省电力公司新乡供电公司 Pay-off tackle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方杰,吴志刚: "《"一牵一"同步张力展放多分裂导线施工技术》", 《电力建设《"一牵一"同步张力展放多分裂导线施工技术》》, vol. 28, no. 10, 31 October 2007 (2007-10-31) *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103138205A (en) * 2013-03-14 2013-06-05 江苏省电力公司淮安供电公司 Tension-free cable-laying crossing device
CN105390990A (en) * 2013-08-26 2016-03-09 郑州思辩科技有限公司 Spanning wire laying device
CN103441451A (en) * 2013-08-26 2013-12-11 国网河南省电力公司周口供电公司 Overhead line cross wiring device
CN105390990B (en) * 2013-08-26 2017-12-15 江苏智光创业投资有限公司 One kind crosses over wire laying device
CN103441451B (en) * 2013-08-26 2016-01-20 国家电网公司 A kind of overhead transmission line crosses over wire laying device
CN104600623A (en) * 2015-01-16 2015-05-06 国家电网公司 High-altitude crossover releasing device for lifting type heavy power cable
CN105162034A (en) * 2015-09-10 2015-12-16 国家电网公司 Lead removing and changing device for overhead transmission line
CN105186378A (en) * 2015-10-19 2015-12-23 江苏省电力公司南京供电公司 Power transmission line channel crossing protection mechanism
CN107834434A (en) * 2017-09-27 2018-03-23 安徽送变电工程公司 Crossing method for the construction of transmission line of electricity tension stringing
CN107947029A (en) * 2018-01-03 2018-04-20 宁波华翔东方电力机具有限公司 A kind of distribution line crosses over shelves thread-changing coaster and its thread-changing method
CN109797658A (en) * 2019-02-25 2019-05-24 中国石油天然气集团公司 A kind of device for the aerotow of Long span pipeline suspension bridge and transport
CN109797658B (en) * 2019-02-25 2023-12-15 中国石油天然气集团有限公司 Device for air traction and transportation of large-span suspension cable pipeline bridge
CN111917058A (en) * 2020-09-15 2020-11-10 周彦彤 Manned 5G big data safety type overhead power maintenance moving frame and method
CN112217145A (en) * 2020-10-09 2021-01-12 中国化学工程第六建设有限公司 Stringing construction and installation process of carbon fiber composite core lead
CN113353854A (en) * 2021-05-31 2021-09-07 南京华易泰电子科技有限公司 Loading position adjustable system of automatic material conveying system

Similar Documents

Publication Publication Date Title
CN102780178A (en) Obstacle bridging construction method for power line wiring and wiring pulleys
ES2617541T3 (en) Apparatus and method for working on conductors
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN102290742B (en) Tension stringing construction technology
US8622744B2 (en) Mobile Training trailer for electric transmission lines
CN105780658B (en) A kind of Spatial Cable face structural cables system is laterally to pulling method
CN108736377B (en) Live crossing system for paying-off construction crossing power line and application method thereof
CN102570372A (en) Electrified lead deicer
CN105271526A (en) Biology floating island capable of automatically rising and falling
CN200941537Y (en) Hot-line crossing rack of insulated cable bridge
CN104577875A (en) Construction method of block crossover frame cable of power circuit
CN208818207U (en) A kind of lightning protection hydrometric cableway current surveying device
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN111355187B (en) Method for replacing ground wire by crossing high-speed rail by using old lead net sealing
CN206401811U (en) A kind of leap net of crossing live-line Poling Construction
CN117767166A (en) Electric power crossing net hanging layout device and net hanging method
CN203722136U (en) Insulation rope net apparatus for railway crossing tension stringing construction
KR20060025426A (en) Installation method of overhead ground wire in live line
CN101697403B (en) Construction method for spreading lead wire and earth wire in transmission line
CN101966823A (en) Carrier cable crossing frame and erecting method thereof
CN204927953U (en) Demolish bird's nest specialized tool
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN104682268A (en) Method for constructing compact double-loop overhead line by adoption of flying powered parachute
CN204536629U (en) A kind of aerial optical cable crossing frame assembly
CN202009190U (en) Flared port line-protection tool for line spanning of spread conducting wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121114