CN102777191A - Strengthening girder trolley - Google Patents

Strengthening girder trolley Download PDF

Info

Publication number
CN102777191A
CN102777191A CN2012102873357A CN201210287335A CN102777191A CN 102777191 A CN102777191 A CN 102777191A CN 2012102873357 A CN2012102873357 A CN 2012102873357A CN 201210287335 A CN201210287335 A CN 201210287335A CN 102777191 A CN102777191 A CN 102777191A
Authority
CN
China
Prior art keywords
brace summer
support body
leading screw
truss chassis
reinforcing truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102873357A
Other languages
Chinese (zh)
Other versions
CN102777191B (en
Inventor
唐勇
刘文解
任刚
马成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201210287335.7A priority Critical patent/CN102777191B/en
Publication of CN102777191A publication Critical patent/CN102777191A/en
Application granted granted Critical
Publication of CN102777191B publication Critical patent/CN102777191B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The invention relates to the field of tunnel construction, and specifically relates to a strengthening girder trolley. The strengthening girder trolley comprises a frame body and multiple pairs of support beams, wherein the frame body is provided with a plurality of guiding devices used for guiding the glide directions of the supporting beams, and the support beams are arranged in the guiding devices; each pair of support beams are horizontally and coaxially arranged, axis of the multiple pairs of support beams are parallel, and each support beam is connected with a pushing mechanism used for pushing the support beams to a direction far from the frame body along the length direction; and the bottom of the frame body is provided with a railway wheel matched with a railway. Compared with the prior art, the strengthening girder trolley provided by the invention can simultaneously abuts against a middle partition wall and the hole wall of a middle pilot hole through extending the supporting beams so as to support and strengthen the middle partition wall temporarily, and the strengthening girder trolley can be separated from the middle partition wall by only withdrawing thrust force the construction is completed; and the strengthening girder trolley is moved to the next position to be sequentially strengthened, the complete set system can be reused for multiple times, the waste is caused, and the cost is saved.

Description

Reinforce the truss chassis
Technical field
The present invention relates to the constructing tunnel field, be specifically related to a kind of reinforcing truss chassis.
Background technology
When carrying out Double Multi-Arch Tunnel Construction, pilot tunnel is opened and is carried out supporting in generally digging earlier, builds mid-board afterwards.Excavate the pilot tunnel of a side after constructing again and carry out supporting; Construct again after this side is also constructed and the finished hole of falling of opposite side.When this form of construction work is carried out the construction of falling the hole of a side again, cause bias voltage owing to the pressure distribution of mid-board both sides is uneven, this bias voltage can damage mid-board.In order to prevent that mid-board from damaging, when construction, need reinforce mid-board temporarily.By the time will reinforce dismounting again after the whole piece constructing tunnel finishes temporarily.
The general mode that adopts fixed steel truss bracing reinforcement of existing interim reinforcement measure.Fix through directly on mid-board, squeezing into steelframe, like this when removing in order not destroy the structure of mid-board, can only steelframe be cut off, and the part that steelframe is stayed in the mid-board can't reuse, and has caused waste, has increased cost.
Summary of the invention
The invention provides a kind of reinforcing truss chassis, can be repeatedly used.
In order to achieve the above object, technical scheme of the present invention is achieved in that reinforces the truss chassis, comprises support body and many to brace summer; Said support body is provided with a plurality of guiding devices that are used to guide said brace summer glide direction; Said brace summer all is located in the said guiding device; Every pair of said brace summer is the coaxial setting of level; Many axis to said brace summer are parallel to each other, and every said brace summer all is connected with and is used for pushing mechanism that said brace summer is promoted to the direction away from said support body along its length direction; The bottom of said support body is provided with and is used for the rail wheel that cooperates with track.
Further, in the aforesaid reinforcing truss chassis, said pushing mechanism is arranged between every pair of said brace summer; Comprise screw shell and leading screw; Said leading screw and said screw shell pass through threaded engagement; One end of said leading screw props up said brace summer.
Further, in the aforesaid reinforcing truss chassis, two said screw shells in the said pushing mechanism of two covers that every pair of said brace summer connected are wholely set; Two said leading screws stretch into the said screw shell that is wholely set by two ends respectively.
Further, in the aforesaid reinforcing truss chassis, the side that said brace summer closes on said leading screw is provided with blind hole; One end of said leading screw stretches into said blind hole and props up the bottom of said blind hole, and then props up said brace summer.
Further, in the aforesaid reinforcing truss chassis, said guiding device is gathering sill or pilot hole.
Further, in the aforesaid reinforcing truss chassis, said support body comprises two two frameworks that are arranged side by side; Two said frameworks are spliced by many crossbeams and many vertical beams; Connect through tie-beam between two said frameworks; The length direction of said tie-beam is consistent with the length direction of said brace summer.
Further, in the aforesaid reinforcing truss chassis, said tie-beam and said guiding device are wholely set.
Further, in the aforesaid reinforcing truss chassis, also be provided with oblique reinforcement between said two frameworks.
Further, in the aforesaid reinforcing truss chassis, said support body is provided with and is used to drive the motor that said rail wheel rotates.
Compared with prior art; Reinforcing truss chassis provided by the present invention is owing to be provided with brace summer and pushing mechanism; Can simultaneously offset with the hole wall of mid-board and middle pilot tunnel mid-board is carried out interim bracing reinforcement through stretching out brace summer, the back that finishes of waiting to construct only need remove pushing mechanism and is applied to thrust on the brace summer and just can makes and reinforce the truss chassis and realize separating with mid-board.Move to the position that the next one need reinforce temporarily through rail wheel along track afterwards and proceed to reinforce, a complete set of system can be repeatedly used, and can not cause waste, has practiced thrift cost.
Description of drawings
In order to be illustrated more clearly in the specific embodiment of the invention or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in the specific embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below is embodiments more of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is an overall structure sketch map of reinforcing the truss chassis described in the specific embodiment of the invention;
Fig. 2 is the plan structure sketch map of brace summer, guiding device and pushing mechanism described in the specific embodiment of the invention.
Reference numeral: 1-motor, 2-brace summer, 3-framework, 4-crossbeam, 5-vertical beam, 6-tie-beam, 7-gathering sill, 8-screw shell, 9-leading screw, 10-blind hole, the oblique reinforcement of 11-, 12-rail wheel.
The specific embodiment
For making the object of the invention, technical scheme and advantage clearer; To carry out clear, complete description to technical scheme of the present invention below; Based on the specific embodiment among the present invention; Those of ordinary skills are resulting all other embodiments under the prerequisite of not making creative work, the scope that all belongs to the present invention and protected.
Reinforce the truss chassis, comprise support body and many brace summer; Said support body is provided with a plurality of guiding devices that are used to guide said brace summer glide direction; Said brace summer all is located in the said guiding device; Every pair of said brace summer is the coaxial setting of level; Many axis to said brace summer are parallel to each other, and every said brace summer all is connected with and is used for pushing mechanism that said brace summer is promoted to the direction away from said support body along its length direction; The bottom of said support body is provided with and is used for the rail wheel that cooperates with track.
Can simultaneously offset with the hole wall of mid-board and middle pilot tunnel mid-board is carried out interim bracing reinforcement through stretching out brace summer like this, the back that finishes of waiting to construct only need remove pushing mechanism and is applied to thrust on the brace summer and just can makes and reinforce the truss chassis and realize separating with mid-board.Move to the position that the next one need reinforce temporarily through rail wheel along track afterwards and proceed to reinforce, a complete set of system can be repeatedly used, and can not cause waste, has practiced thrift cost.
In each embodiment of the present invention, as preferred version, said pushing mechanism is arranged between every pair of said brace summer; Comprise screw shell and leading screw; Said leading screw and said screw shell pass through threaded engagement; One end of said leading screw props up said brace summer.
The screw shell thrust that can provide stable, powerful that matches with leading screw promotes brace summer, makes it tightly prop up the hole wall in mid-board or Zhong Dao hole, and the combination of the two is tightr.In addition, this fit structure when operating, only need make produce relative rotation between screw shell and the leading screw just can, very easy to use.
During practical implementation, two said screw shells in the said pushing mechanism of two covers that every pair of said brace summer connected are wholely set; Two said leading screws stretch into the said screw shell that is wholely set by two ends respectively.
Every pair of suffered force localization of brace summer is distributed on the screw shell, reaches stress balance, the double thread sleeve carries out high strength structure and reinforces it is fixed on the support body again, can simplify production technology, practices thrift cost of manufacture.
In each embodiment of the present invention, as preferred version, the side that said brace summer closes on said leading screw is provided with blind hole; One end of said leading screw stretches into said blind hole and props up the bottom of said blind hole, and then props up said brace summer.
Leading screw need bear great active force in the practice of construction process, under this active force, is easy to make leading screw crooked even fracture if the deviation of directivity of the axis of leading screw and active force is excessive; And, an end of leading screw being limited in the blind hole through above-mentioned setting, the other end is limited in the screw shell.When construction, blind pore wall and thread bush barrel can produce restriction to moving radially of leading screw, and the active force of offsetting non axial direction guarantees leading screw all the time along its axially-movable, reduces its bending and the probability that fractures.
In each embodiment of the present invention, as preferred version, said guiding device is gathering sill or pilot hole.
These two kinds of structures all can play good guide effect, and structure is also fairly simple.
In each embodiment of the present invention, as preferred version, said support body comprises two two frameworks that are arranged side by side; Two said frameworks are spliced by many crossbeams and many vertical beams; Connect through tie-beam between two said frameworks; The length direction of said tie-beam is consistent with the length direction of said brace summer.
During practical implementation, said tie-beam and said guiding device are wholely set.
This structure can be simplified overall structure, effectively reduces cost of manufacture.
In each embodiment of the present invention,, also be provided with oblique reinforcement between said two frameworks as preferred version.
Can make connect between two frameworks more firm like this, for stronger defensive ability/resistance ability being arranged from oblique active force.
In each embodiment of the present invention, as preferred version, said support body is provided with and is used to drive the motor that said rail wheel rotates.
Can make like this and reinforce the truss chassis and move voluntarily, need not that other is vehicle towed, use convenient.
The present invention provide specific embodiment to describe below for better explaining.
Specific embodiment
As depicted in figs. 1 and 2, reinforce the truss chassis, comprise support body and many to brace summer 2; Support body comprises two two frameworks 3 that are arranged side by side; Two frameworks 3 are spliced by many crossbeams 4 and many vertical beams 5; Be connected with oblique reinforcement 11 through tie-beam 6 between two frameworks 3; Tie-beam 6 is provided with the gathering sill 7 that is used for guide support beam 2 glide directions; Brace summer 2 all is located in the gathering sill 7; And the length direction of tie-beam 6 is consistent with the length direction of brace summer 2.Every pair of brace summer 2 is the coaxial setting of level; Many axis to brace summer 2 are parallel to each other.
Every brace summer 2 all is connected with and is used for pushing mechanism that brace summer 2 is promoted to the direction away from support body along its length direction.Pushing mechanism is arranged between every pair of said brace summer 2; Comprise screw shell 8 and leading screw 9; Leading screw 9 passes through threaded engagement with screw shell 8; One end of leading screw 9 props up brace summer 2.Two screw shells 8 in the two cover pushing mechanisms that the every pair of brace summer 2 is connected are wholely set; Two rhizoid thick sticks 9 stretch into the screw shell 8 that is wholely set by two ends respectively.The side that brace summer 2 closes on leading screw 9 is provided with blind hole 10; One end of leading screw 9 stretches into blind hole 10 and props up the bottom of blind hole 10, and then props up brace summer 2.
The bottom of support body is provided with and is used for the rail wheel 12 that cooperates with track.Support body is provided with and is used to drive the motor 1 that rail wheel 12 rotates.
What should explain at last is: above embodiment and specific embodiment be only in order to explaining technical scheme of the present invention, but not to its restriction; Although the present invention has been carried out detailed explanation with reference to aforementioned embodiments and specific embodiment; Those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned embodiments is put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make essence disengaging each embodiment of the present invention of relevant art scheme and the spirit and the scope of specific embodiment technical scheme.

Claims (9)

1. reinforce the truss chassis, it is characterized in that: comprise support body and many brace summer; Said support body is provided with a plurality of guiding devices that are used to guide said brace summer glide direction; Said brace summer all is located in the said guiding device; Every pair of said brace summer is the coaxial setting of level; Many axis to said brace summer are parallel to each other, and every said brace summer all is connected with and is used for pushing mechanism that said brace summer is promoted to the direction away from said support body along its length direction; The bottom of said support body is provided with and is used for the rail wheel that cooperates with track.
2. reinforcing truss chassis as claimed in claim 1 is characterized in that: said pushing mechanism is arranged between every pair of said brace summer; Comprise screw shell and leading screw; Said leading screw and said screw shell pass through threaded engagement; One end of said leading screw props up said brace summer.
3. reinforcing truss chassis as claimed in claim 2 is characterized in that: two said screw shells in the said pushing mechanism of two covers that every pair of said brace summer connected are wholely set; Two said leading screws stretch into the said screw shell that is wholely set by two ends respectively.
4. reinforcing truss chassis as claimed in claim 2 is characterized in that: the side that said brace summer closes on said leading screw is provided with blind hole; One end of said leading screw stretches into said blind hole and props up the bottom of said blind hole, and then props up said brace summer.
5. reinforcing truss chassis as claimed in claim 1 is characterized in that: said guiding device is gathering sill or pilot hole.
6. reinforcing truss chassis as claimed in claim 1 is characterized in that: said support body comprises two two frameworks that are arranged side by side; Two said frameworks are spliced by many crossbeams and many vertical beams; Connect through tie-beam between two said frameworks; The length direction of said tie-beam is consistent with the length direction of said brace summer.
7. reinforcing truss chassis as claimed in claim 6 is characterized in that: said tie-beam and said guiding device are wholely set.
8. reinforcing truss chassis as claimed in claim 6 is characterized in that: also be provided with oblique reinforcement between said two frameworks.
9. like any described reinforcing truss chassis in the claim 1 to 8, it is characterized in that: said support body is provided with and is used to drive the motor that said rail wheel rotates.
CN201210287335.7A 2012-08-10 2012-08-10 Bracnig frame chassis Expired - Fee Related CN102777191B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210287335.7A CN102777191B (en) 2012-08-10 2012-08-10 Bracnig frame chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210287335.7A CN102777191B (en) 2012-08-10 2012-08-10 Bracnig frame chassis

Publications (2)

Publication Number Publication Date
CN102777191A true CN102777191A (en) 2012-11-14
CN102777191B CN102777191B (en) 2015-08-19

Family

ID=47122280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210287335.7A Expired - Fee Related CN102777191B (en) 2012-08-10 2012-08-10 Bracnig frame chassis

Country Status (1)

Country Link
CN (1) CN102777191B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828644A (en) * 2017-03-06 2017-06-13 南京航空航天大学 A kind of patch type piezoelectric drives four-wheel planetary detecting robot and its method of work

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283497A (en) * 2005-04-04 2006-10-19 Shimizu Corp Vertical wall assembling device and vertical wall construction method
KR20100128521A (en) * 2009-05-28 2010-12-08 박재현 Construction method of 2-arch tunnel
CN202202872U (en) * 2011-05-26 2012-04-25 中铁七局集团第四工程有限公司 Railway tunnel lining jacking frame
CN202280463U (en) * 2011-10-19 2012-06-20 中铁四局集团第一工程有限公司 Universal lining trolley for tunnel construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283497A (en) * 2005-04-04 2006-10-19 Shimizu Corp Vertical wall assembling device and vertical wall construction method
KR20100128521A (en) * 2009-05-28 2010-12-08 박재현 Construction method of 2-arch tunnel
CN202202872U (en) * 2011-05-26 2012-04-25 中铁七局集团第四工程有限公司 Railway tunnel lining jacking frame
CN202280463U (en) * 2011-10-19 2012-06-20 中铁四局集团第一工程有限公司 Universal lining trolley for tunnel construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
许占良: "高速公路双连拱隧道施工技术", 《中国高新技术企业》, 20 March 2010 (2010-03-20) *
路文典等: "简易桁架式台车在大断面导流洞衬砌中的应用", 《水利科技》, no. 2, 31 December 2006 (2006-12-31), pages 18 - 20 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828644A (en) * 2017-03-06 2017-06-13 南京航空航天大学 A kind of patch type piezoelectric drives four-wheel planetary detecting robot and its method of work

Also Published As

Publication number Publication date
CN102777191B (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN105298503B (en) Small space shield machine separate launching construction method
CN109026110A (en) A kind of advanced hydraulic support of foldable walking
CN105587113A (en) Movable construction platform adapting to different slope surfaces
CN207829911U (en) A kind of seperated trolley device of tunnel lining trolley
CN107119578A (en) The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage
CN104405416A (en) Whole-section, large-headroom and rapid lining trolley
CN203685224U (en) Bicycle type formwork for tunnel ditch
CN102619535B (en) Folding tunnel widening trolley
CN105840224A (en) Self-propelled fore support following heading machine
CN104074145A (en) Closure-section refit construction method for hanging basket
CN102777191A (en) Strengthening girder trolley
CN103397598A (en) Supporting device for girder erection at tunnel portal and in tunnel and application thereof
CN102787850A (en) Inverted arch formwork for tunnel inverted arch construction
CN215520935U (en) Coal mine tunnel supporting device
CN202520328U (en) Folding type widened trolley for tunnel
CN208151861U (en) The traversing supporting leg of Bridge Erector
CN206477855U (en) A kind of counter-force for pushing away stepping for TBM Quick airs provides device
CN202672033U (en) Novel bridge maintenance car
CN209227568U (en) A kind of high slope rockmass bracing means
CN207469111U (en) A kind of construction Hanging Basket walking structure
CN206888517U (en) A kind of cast-in-place support component for building
CN206329347U (en) A kind of lining trolley for metro station construction
CN202970789U (en) Extensible low-voltage cable storage device
CN101775990B (en) Three-dimensional space curved surface steel mould trolley
CN205135634U (en) Steel bow member protects and struts system for open type TBM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20160810