Supporting device of stone corbel for construction Download PDFInfo
- Publication number
- CN102776967B CN102776967B CN201210115536.9A CN201210115536A CN102776967B CN 102776967 B CN102776967 B CN 102776967B CN 201210115536 A CN201210115536 A CN 201210115536A CN 102776967 B CN102776967 B CN 102776967B
- Authority
- CN
- China
- Prior art keywords
- supporter
- wall
- insulation material
- cutter portion
- angle bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/21—Fastening means specially adapted for covering or lining elements
- E04F13/22—Anchors, support angles or consoles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0857—Supporting consoles, e.g. adjustable only in a direction parallel to the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/21—Fastening means specially adapted for covering or lining elements
- E04F13/26—Edge engaging fastening means, e.g. clamps, clips or border profiles
- E04F13/28—Edge engaging fastening means, e.g. clamps, clips or border profiles adjustable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Finishing Walls (AREA)
- Building Environments (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
A support device of a bearing angle for an architectural stone includes: a supporter having a screw hole formed at the center thereof and being movable along a spiral thread of an anchor bolt fixed to a wall body; and a cutting blade part being formed on the supporter and penetrating into an insulator by a rotational force generated by movement of the supporter so as to be supported in contact with the wall body.
Description
Technical field
The present invention relates to a kind of supporting device of stone corbel for construction, especially forms screw in the central authorities of supporter
Hole, makes the crab-bolt screw thread movement that supporter is fixed along on body of wall, and forms cutter portion in supporter, cutter portion by with
The rotatory force of the mobile generation of screw hole, penetrates insulation material and injects contact body of wall and play a supporting role.Due to by supporting
The cutter portion of body, injects while insulation material is cut into into round-shaped and contacts body of wall and produce supporting role, therefore can
More firmly fix the angle bracket for engaging, it is to avoid the crooked phenomenon of angle bracket, and then obtain firm support
Outside power, the insulation material cut by the cutter portion of supporter does not fall out outside, but inside supporter, so as to maximum
Limit ground is reduced when install on the wall angle bracket to damaging caused by insulation material, makes insulation material play guarantor to greatest extent
The supporting device of stone corbel for construction of temp effect.
Background technology
Fig. 1 and Fig. 2 are known angle bracket diagrams.
Described known angle bracket is, when such as marble stone material 8 is fixed on the surface of body of wall 7 of building, first by vertical
Then vertical long holes 2 are inserted crab-bolt 5 fixed on body of wall 7 by the surface of insulation material 6 pasted on plate contact body of wall 7, then use spiral shell
Female 4 fix, and horizontal plate 3 then places stone material 8.
Described known technology is after the surface mount insulation material 6 of body of wall 7, to expose on the surface of insulation material 6
The vertical long holes 2 of angle bracket are inserted in crab-bolt 5 and makes perpendicular plate contact insulation material 6, the crab-bolt on insertion vertical long holes 2
Nut 4 is installed on 5 and angle bracket is fixed.
But during nut 4 is installed in the crab-bolt 5, because the elastic force of insulation material 6 causes consolidating for angle bracket
Determine the phenomenons such as unstable state is solid, crooked.
The angle bracket is on the skew fixed, then stone material 8 fixed on horizontal plate 3 also cannot be neat.
It is also unstable after patch stone material and the angle bracket stationary state is built on the sand, therefore it is unexpected to be easily caused stone material 8
Come off etc. dangerous.
To solve the problem, it is the angle bracket directly contact wall that the method that the construction site having at present adopts is
Body 7, by the position of insulation material 6 that angle bracket is contacted square shape is cut into, and through hole is produced, by the perpendicular plate of angle bracket
1 inserts this through hole directly contact body of wall 7 and is fixed.
But the angle bracket reaches tens even hundreds of in an architectural stickup quantity, the through hole that need to be cut
Quantity also reaches tens even hundreds of and causes ineffective problem.
And as described above, tens even hundreds of through holes are cut out, its heat insulation effect also can correspondingly decline, need again
Do an Insulation and cause intricate operation, inconvenient problem.
The content of the invention
To solve the problem, it is an object of the present invention to using the cutter portion of supporter, insulation material be cut into into circle
Inject while shape shape and contact body of wall and supported, and be also not in the phenomenon such as crooked when engaging with angle bracket,
Can stably fix and make support force more consolidate outside, prevent from dropping to outside by the insulation material that cutter portion cuts,
But when pasting angle bracket on body of wall positioned at supporter inside, can to greatest extent reduce what insulation material was caused
Damage, make insulation material play maximum heat insulation effect.
To solve the problem, the technical solution used in the present invention is to form screw hole in the central authorities of supporter, makes support
Body is moved along the crab-bolt screw thread that body of wall is fixed;Cutter portion is formed in supporter, cutter portion is made by with the movement of screw hole
The rotatory force of generation, penetrates insulation material and injects and contact body of wall and play a supporting role.
As described above, the beneficial effects of the present invention is:Using the cutter portion of supporter, insulation material is cut circular
Inject while shape and contact body of wall and play a supporting role, the phenomenon such as thus avoid the angle bracket that engages with this crooked,
Can stably fix and support force is more consolidated;The insulation material of the cutter portion cutting of supported body does not fall out outer
Portion, but can reduce to greatest extent to caused by insulation material when body of wall pastes angle bracket positioned at supporter inside
Damage, make insulation material play maximum heat insulation effect.
Description of the drawings
Fig. 1 is the part cutting oblique view of known angle bracket structure.
Fig. 2 is known angle bracket bonding state explanation schematic diagram.
Fig. 3 is the structure oblique view of support meanss of the present invention.
Fig. 4 and Fig. 5 are the cohesive process explanation schematic diagrams of support meanss of the present invention.
Fig. 6 is the adjusting position explanation schematic diagram of the angle bracket under support device of the present invention.
Fig. 7 is that view after stone material is placed on angle bracket under support device of the present invention.
Main Reference Numerals explanation
101- supporter 102- cutteves portion
103- recess 104- screw holes
105- flanges.
Specific embodiment
Below in conjunction with the accompanying drawings, present configuration is described in detail.
The structure of support meanss of the present invention possesses:Supporter 101, and central authorities' formation screw hole 104 is solid along on body of wall 14
The screw thread movement of fixed crab-bolt 12, the angle bracket 11 for making supported stone 16 is firmly secured to body of wall 14, and in body of wall 14
When pasting angle bracket 11, the damage that causes to insulation material 15 is reduced to greatest extent and heat insulation effect is improved;
Cutter portion 102, forms on supporter 101, and the rotatory force for being rotated and being produced by the supporter 101 is penetrated
Insulation material 15 injects and contacts body of wall 14 and play a supporting role.
Additionally, to avoid reducing heat insulation effect from air inlet between the cutter portion 102 and insulation material 15, propping up
The outer peripheral face of support body 101 also forms flange 105.
And in order that supporter 101 is threadedly coupled by instrument 17 with crab-bolt 12, in the screw hole 104 of supporter 101
Outer circumferential surface section is also equipped with the recess 103 of insertion instrument 17.
The effect that the present invention has is illustrated below.
Fig. 3 is the part cutting oblique view of support device structure of the present invention, and the supporter 101 of the present invention is first and body of wall 14
The crab-bolt 12 exposed on the surface of insulation material 15 of upper stickup is engaged by screw.
Then make the vertical long holes formed on the perpendicular plate of angle bracket 11 kink nut 13 after engaging with crab-bolt 12 and
Complete engagement.
That is, Fig. 4 and Fig. 5 is the explanation schematic diagram of the engaging process to support meanss of the present invention, by present invention support
The screw hole 104 that the central authorities of body 101 are formed is engaged with the crab-bolt 12 exposed on the insulation material of body of wall 14 by screw.
After the crab-bolt 12 is engaged with screw hole 104 by screw, supporter 101 is along screw thread movement rotation simultaneously
Insulation material 15 is cut into by the cutter portion 102 formed on supporter 101 round-shaped.
And the cutter portion 102 may proceed to be rotating and penetrate insulation material 15 and touch body of wall 14, supporter 101 then because
The body of wall 7 is no longer able to turn and stops.
Therewith, the insulation material 15 of cutting will not be dropped to outside by supporter 101 of the invention, but insert internal sky
Between.
Cut insulation material 6 then fills up the inside of supporter 101 and avoids heat insulation effect from declining.
For the supporter 101, staff can be rotated with handss so as to be engaged with crab-bolt 12, but its quantity is too many,
Operational burden can be increased.
Therefore the present invention defines recess 103 in the outer circumferential surface section of the screw hole 104 of supporter 101, to insert electricity
Power driven tools 17 etc..
That is, it is possible to electric tool insertion the female portion 103 be rotated automatically and makes the device of supporter 101 work
More it is quickly accomplished.
After the assembly work of supporter 101 is completed, expose in the screw hole 104 of the supporter 101 from firm support
Existing angle bracket 11 is engaged in crab-bolt 12, exactly sandwiches the vertical long holes formed on the perpendicular plate of the angle bracket 11
Crab-bolt 12, then nut 13 is installed is fixed.
The angle bracket 11, therefore can first adjusting position as shown in fig. 6, can move up and down in vertical long holes
Fix again afterwards.
After angle bracket 11 is fixed on the supporter 101, as shown in fig. 7, putting on angle bracket 11
Put and fixed after stone material 16.
On the other hand, flange 104 is also formed with the outer peripheral face of supporter of the present invention 101, to prevent because cutter portion 102 cuts
And air is flowed into from the thin seam produced between the boundary face of cutter portion 102 and insulation material 15, reduce heat insulation effect.
Claims (1)
1. a kind of supporting device of stone corbel for construction, it is characterised in that include:
Supporter(101), central authorities form screw hole(104)And along body of wall(14)The crab-bolt of upper fixation(12)Screw thread move
It is dynamic, make supported stone(16)Angle bracket(11)It is firmly secured to body of wall(14), while in body of wall(14)It is upper to paste angular
Bracket(11)When,
Cutter portion(102), in supporter(101)It is upper to be formed and using with the supporter(101)Rotation produce rotation
Power, makes the cutter portion penetrate insulation material(15)And inject and contact body of wall(14), so as to play a supporting role, make thermal insulating material
Inside supporter, supporter is reduced to greatest extent to insulation material material position(15)The damage that causes and improve heat insulation effect;
And
It is also equipped with to supporter(101)The flange that outer peripheral face is formed(105), so as to prevent from the cutter portion(102)And insulation
Material(15)Between flow into air and reduce heat insulation effect;
In supporter(101)Screw hole(104)Outer circumferential surface section is also equipped with insertion instrument(17)Recess(103), with facility
Use instrument(17), by the supporter(101)And crab-bolt(12)Engaged by screw.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110040682A KR101077844B1 (en) | 2011-04-29 | 2011-04-29 | Stone corbel for support device |
KR10-2011-0040682 | 2011-04-29 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102776967A CN102776967A (en) | 2012-11-14 |
CN102776967B true CN102776967B (en) | 2017-04-19 |
Family
ID=45396908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210115536.9A Expired - Fee Related CN102776967B (en) | 2011-04-29 | 2012-04-19 | Supporting device of stone corbel for construction |
Country Status (5)
Country | Link |
---|---|
US (1) | US20120272609A1 (en) |
JP (1) | JP5972646B2 (en) |
KR (1) | KR101077844B1 (en) |
CN (1) | CN102776967B (en) |
WO (1) | WO2012148113A2 (en) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2745797A1 (en) * | 2011-07-08 | 2013-01-08 | Mark Van Dalen | Multi-piece anchor system for use with masonry over stud back-up walls |
KR101318299B1 (en) | 2012-05-21 | 2013-10-18 | 조아산업개발 주식회사 | Stone corbel for support device |
KR101402669B1 (en) | 2013-10-14 | 2014-06-09 | 송미선 | Install system of support unit for stone plate corbel |
KR101540963B1 (en) * | 2014-04-11 | 2015-07-31 | 송미선 | Install system of support member for stone plate corbel and Support member install method thereof |
KR101492594B1 (en) | 2014-05-02 | 2015-02-23 | (주)신일앙카 | Support Anchorage Of Finishing Member, Contructing Device And Method Thereof |
KR101533938B1 (en) * | 2014-11-10 | 2015-07-03 | 기세진 | A bracket support with punching tube for insulating material |
CN104499606B (en) * | 2014-12-19 | 2017-02-22 | 中国建筑第七工程局有限公司 | Adjustable bolt combination structure |
KR101616543B1 (en) | 2015-09-11 | 2016-04-28 | (주)신일앙카 | Support Anchorage Of Finishing Member, Contructing Device And Method Thereof |
CN105386552A (en) * | 2015-12-17 | 2016-03-09 | 母养清 | Stone installing device |
CN105672539B (en) * | 2016-01-07 | 2018-05-04 | 陈晓通 | A kind of stone material back of the body bolt suspension member and its application method |
USD788950S1 (en) * | 2016-03-16 | 2017-06-06 | Werner Co. | Roof anchor |
KR200486333Y1 (en) | 2016-08-17 | 2018-05-04 | 이나연 | Fixing Apparatus of Exterior Materials of Building |
KR101747774B1 (en) * | 2016-10-04 | 2017-06-15 | (주)다함석재 | installation device for supporting exterior material |
KR20190136838A (en) | 2018-05-31 | 2019-12-10 | 김순길 | Support angles for building finishing panels |
KR102324054B1 (en) | 2019-04-18 | 2021-11-11 | (주)대한볼트 | Supporting device for support angles to support the building stone panel |
KR102214739B1 (en) | 2019-05-21 | 2021-02-10 | 이성대 | Anchor Support with Drill and Construction Method thereof |
KR102324056B1 (en) | 2019-08-14 | 2021-11-11 | (주)대한볼트 | Supporting device for support angles to support the building stone panel |
KR102285343B1 (en) | 2019-10-10 | 2021-08-04 | 김형윤 | Insulated Anchor Support with Drill and Anchor Bolt Structure using It |
KR102345205B1 (en) | 2019-10-18 | 2021-12-30 | 김형윤 | Insulated Anchor Support with Drill Attatched by Magnets and Anchor Bolt Structure using It |
CN113756540B (en) * | 2021-08-28 | 2023-01-17 | 武汉特艺达建筑装饰设计工程有限公司 | Glass fiber reinforced cement decorative component and manufacturing method thereof |
CN114960967B (en) * | 2022-05-26 | 2023-08-11 | 中建八局总承包建设有限公司 | Resin screw rod connecting device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5118235A (en) * | 1991-02-11 | 1992-06-02 | Illinois Tool Works Inc. | Washer with integral flap and fastening assembly combining fastener with such washer |
KR200339487Y1 (en) * | 2003-11-05 | 2004-01-24 | 황유섭 | Angle supporting object for building stone pannel construction |
CN101265746A (en) * | 2007-03-15 | 2008-09-17 | 日吉华株式会社 | Substrate fixture and external wall constructing structure |
CN201416249Y (en) * | 2009-04-10 | 2010-03-03 | 深圳市亨泰利家俱有限公司 | Panel fixing device |
KR100987700B1 (en) * | 2010-03-17 | 2010-10-13 | 광스틸 주식회사 | A fixing bracket for heat insulator and clading of building |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3244839A1 (en) * | 1982-12-03 | 1984-06-07 | Achim Ing.(grad.) 8000 München Hirsemann | Insulation material retainer |
JPS61225447A (en) * | 1985-03-29 | 1986-10-07 | 株式会社 栗本鉄工所 | Heat insulating composite panel |
US5063722A (en) * | 1989-03-31 | 1991-11-12 | Hohmann Enterprises, Inc. | Gripstay channel veneer anchor assembly |
US5607272A (en) * | 1995-01-06 | 1997-03-04 | Illinois Tool Works Inc. | Attachment plate for insulation panels |
DE19619318A1 (en) * | 1996-05-14 | 1997-11-20 | Hilti Ag | Insulation fastener |
US6406243B1 (en) * | 2001-03-21 | 2002-06-18 | Illinois Tool Works Inc. | Washer with dome profile |
JP4376125B2 (en) | 2004-05-13 | 2009-12-02 | 株式会社山下工業研究所 | Socket for anchor bolt setter |
KR20090019233A (en) * | 2007-08-20 | 2009-02-25 | 주식회사 네오폴리텍 | Spacer for heat insulator |
JP4545179B2 (en) * | 2007-09-11 | 2010-09-15 | 株式会社ツヅキ | Exterior insulation method for building and reinforcing metal fittings for bolts |
KR100990440B1 (en) * | 2008-02-19 | 2010-10-29 | 박경찬 | Anchor bolt for fixation of stone |
KR20100026925A (en) * | 2008-09-01 | 2010-03-10 | 주식회사 에프엠테크 | Stone plate fixing apparatus of the building |
KR20100031805A (en) * | 2008-09-16 | 2010-03-25 | 김재옥 | Stone corbel |
US8544228B2 (en) * | 2009-10-27 | 2013-10-01 | Joseph Bronner | Winged anchor and spiked spacer for veneer wall tie connection system and method |
-
2011
- 2011-04-29 KR KR1020110040682A patent/KR101077844B1/en active IP Right Grant
-
2012
- 2012-04-05 JP JP2012086078A patent/JP5972646B2/en not_active Expired - Fee Related
- 2012-04-06 US US13/441,716 patent/US20120272609A1/en not_active Abandoned
- 2012-04-17 WO PCT/KR2012/002899 patent/WO2012148113A2/en active Application Filing
- 2012-04-19 CN CN201210115536.9A patent/CN102776967B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5118235A (en) * | 1991-02-11 | 1992-06-02 | Illinois Tool Works Inc. | Washer with integral flap and fastening assembly combining fastener with such washer |
KR200339487Y1 (en) * | 2003-11-05 | 2004-01-24 | 황유섭 | Angle supporting object for building stone pannel construction |
CN101265746A (en) * | 2007-03-15 | 2008-09-17 | 日吉华株式会社 | Substrate fixture and external wall constructing structure |
CN201416249Y (en) * | 2009-04-10 | 2010-03-03 | 深圳市亨泰利家俱有限公司 | Panel fixing device |
KR100987700B1 (en) * | 2010-03-17 | 2010-10-13 | 광스틸 주식회사 | A fixing bracket for heat insulator and clading of building |
Also Published As
Publication number | Publication date |
---|---|
JP2012233395A (en) | 2012-11-29 |
CN102776967A (en) | 2012-11-14 |
WO2012148113A2 (en) | 2012-11-01 |
WO2012148113A3 (en) | 2013-03-28 |
JP5972646B2 (en) | 2016-08-17 |
KR101077844B1 (en) | 2011-11-07 |
US20120272609A1 (en) | 2012-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102776967B (en) | Supporting device of stone corbel for construction | |
KR101299632B1 (en) | Stone corbel for support device | |
KR101299633B1 (en) | Stone corbel for support device | |
CN103669431B (en) | A kind of colliery minery electric power pylon inclination adjusting device | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN203960919U (en) | Colliery minery electric power pylon correction lift-up device | |
CN207027411U (en) | A kind of support frame for building electric pick of adjustable angle | |
CN204645079U (en) | A kind of large-scale compressor penetration type foundation bolt component | |
CN103711436A (en) | Foundation pit excavating device for photovoltaic power station | |
CN205043994U (en) | Single crystal silicon rod anchor clamps structure | |
CN203685039U (en) | Foundation-pit excavating device for photovoltaic power station | |
CN216042637U (en) | Embedded part for electric embedded pipe | |
CN215672093U (en) | House building construction foundation pile drilling equipment | |
CN203680567U (en) | Silicon ingot supporting assembly with drainage device | |
CN201989258U (en) | Silicon rod positioning clamp | |
CN106054942A (en) | Solar photovoltaic power generation control device | |
CN204361970U (en) | A kind of solar photovoltaic assembly mounting bracket | |
CN202109159U (en) | Anchor bolt for mounting a solar energy battery assembly | |
CN202323949U (en) | Grounded screen underpinning lifting instrument | |
CN205975590U (en) | Building pile | |
CN205857237U (en) | A kind of rock anchor base structure being applicable to mountain region photovoltaic module | |
CN205776373U (en) | Inspection well cover opening device | |
CN102922335A (en) | Tool mounting rack | |
CN203592469U (en) | Pendulum tool system and cutting and supporting device thereof | |
CN205734796U (en) | A kind of chair wheel mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20210419 |
|
CF01 | Termination of patent right due to non-payment of annual fee |